CN215843467U CN202121660487.8U CN202121660487U CN215843467U CN 215843467 U CN215843467 U CN 215843467U CN 202121660487 U CN202121660487 U CN 202121660487U CN 215843467 U CN215843467 U CN 215843467U
Authority
CN
China
Prior art keywords
fixedly connected
water tank
dust
card
cardboard
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121660487.8U
Other languages
Chinese (zh)
Inventor
李凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202121660487.8U priority Critical patent/CN215843467U/en
Application granted granted Critical
Publication of CN215843467U publication Critical patent/CN215843467U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Processing Of Solid Wastes (AREA)

Abstract

The utility model belongs to the technical field of building waste treatment, and particularly relates to a building waste crushing device for a building site, which comprises a crushing device and a conveying device arranged on the crushing device, wherein a dust falling assembly convenient for dust falling is also arranged on the conveying device; the dust settling assembly comprises a water tank, a water inlet pipe, a controller, a water pump, a water outlet pipe and a spray head, wherein the water inlet pipe is fixedly connected to the top end of the left side of the water tank, the controller is fixedly connected to the left side of the water tank, and the water pump is fixedly connected to the right side of the water tank through a connecting pipe; meanwhile, the filter can be replaced quickly through the card and the device, so that the filter can be replaced in time.

Description

Building rubbish reducing mechanism that building site used
Technical Field
The utility model belongs to the technical field of construction waste treatment, and particularly relates to a construction waste crushing device for a construction site.
Background
Building rubbish is mostly broken brick, cement and grit, the common treatment mode of these rubbish is mostly the direct fill-up processing, the space that so not only occupies is great, and unable reuse building rubbish, the waste of resource has been caused, can smash building rubbish through reducing mechanism at present, rubbish granule after smashing, no matter be landfill treatment or reuse, it is all comparatively convenient, to in building rubbish reducing mechanism, present most reducing mechanism, can't effectually carry out the dust fall to rubbish after smashing, the dust of often doing is everywhere, not only the polluted air environment, and can cause the harm to operating personnel's health.
SUMMERY OF THE UTILITY MODEL
To solve the problems set forth in the background art described above. The utility model provides a construction waste crushing device for a construction site, which has the characteristics of fully reducing dust, avoiding environmental pollution and protecting the health of operators.
In order to achieve the purpose, the utility model provides the following technical scheme: a construction waste crushing device for a construction site comprises a crushing device and a conveying device arranged on the crushing device, wherein a dust falling assembly convenient for dust falling is further arranged on the conveying device;
the dust fall subassembly is including water tank, inlet tube, controller, water pump, outlet pipe and shower nozzle, water tank left side top fixedly connected with the inlet tube, water tank left side fixedly connected with the controller, the water tank right side is through connecting pipe fixedly connected with the water pump, water pump other end fixedly connected with the outlet pipe, the outlet pipe with conveyor fixed connection, outlet pipe fixed surface is connected with the shower nozzle.
Preferably, in the construction waste mill for construction sites according to the present invention, the number of the nozzles is 4 in total, and the nozzles are disposed at equal intervals.
Preferably, the dust fall assembly further comprises a dust collection box, a fan, a dust collection pipe and an air outlet window, the bottom end of the conveying device is fixedly connected with the dust collection box, the inner side of the dust collection box is fixedly connected with the fan through a connecting rod, the bottom end of the dust collection box is fixedly connected with the dust collection pipe, the dust collection pipe is clamped and connected with the water tank, and the inner side of the top end of the water tank is fixedly connected with the air outlet window.
Preferably, the dust fall assembly further comprises a filter, and the bottom end of the inner side of the water tank is connected with the filter through a connecting piece clamp.
Preferably, the dust fall assembly further comprises a water level sensor, and the water level sensor is fixedly connected to the right end of the inner side of the water tank.
Preferably, the dust fall assembly further comprises a clamp and an assembly which are convenient for replacing a filter, the clamp and the assembly comprise clamp plates, clamp blocks, springs and pull ropes, the clamp plates are clamped and connected on the inner side of the top end of the water tank, the clamp blocks are clamped and connected on the inner sides of the left end and the right end of the clamp plates, the clamp blocks are clamped and connected with the water tank, the springs are fixedly connected on one sides of the clamp blocks close to the central positions of the clamp plates, the springs are fixedly connected with the clamp plates, the pull ropes are connected on the inner sides of the springs in a sliding mode, and the pull ropes are connected with the clamp plates in a sliding mode.
Preferably, the clip and the assembly further include a pull ring, and the other end of the pull rope is fixedly connected to the pull ring.
Compared with the prior art, the utility model has the beneficial effects that: the device can spray water to the crushed garbage particles through the dust falling device, so that dust can be effectively reduced, and dust can be adsorbed through the fan; meanwhile, the filter can be replaced quickly through the card and the device, so that the filter can be replaced in time.
Drawings
The accompanying drawings, which are included to provide a further understanding of the utility model and are incorporated in and constitute a part of this specification, illustrate embodiments of the utility model and together with the description serve to explain the principles of the utility model and not to limit the utility model. In the drawings:
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of the overall structure of the crushing apparatus according to the present invention;
FIG. 3 is a schematic view of the overall structure of the dustfall assembly of the present invention;
FIG. 4 is a schematic view of the overall structure of the water outlet pipe according to the present invention;
fig. 5 is an enlarged schematic view of fig. 3 at a.
In the figure:
1. a crushing device; 2. a conveying device;
3. a dust fall assembly; 301. a dust collection box; 302. a fan; 303. a dust collection pipe; 304. a water tank; 305. a water inlet pipe; 306. a controller; 307. an air outlet window; 308. a filter; 309. a water level sensor; 310. a water pump; 311. a water outlet pipe; 312. a spray head;
4. cards and components; 41. clamping a plate; 42. a clamping block; 43. a spring; 44. pulling a rope; 45. and (4) a pull ring.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
As shown in fig. 1:
a construction waste crushing device for a construction site comprises a crushing device 1 and a conveying device 2 installed on the crushing device 1.
In this embodiment: during the use, can carry out effectual smashing to building rubbish through breaker 1, rubbish after smashing can be transmitted away through conveyor 2, and the reuse of being convenient for or carry out the landfill processing, but can produce a large amount of dusts at this in-process, not only can the contaminated air still can cause the harm to workman's healthy, adds dust fall subassembly 3 on borrowing this basis.
Further, the method comprises the following steps:
as shown in fig. 1, 2, 3 and 4:
with the above in mind: this dust fall subassembly 3 is including water tank 304, inlet tube 305, controller 306, water pump 310, outlet pipe 311 and shower nozzle 312, water tank 304 left side top fixedly connected with inlet tube 305, water tank 304 left side fixedly connected with controller 306, connecting pipe fixedly connected with water pump 310 is passed through on the water tank 304 right side, water pump 310 other end fixedly connected with outlet pipe 311, outlet pipe 311 and conveyor 2 fixed connection, outlet pipe 311 fixed surface is connected with shower nozzle 312.
In this embodiment: can intake through inlet tube 305, start water pump 310 through controller 306 this moment, can make water through outlet pipe 311, at last from shower nozzle 312 blowout to can be very effectual to the dust of the production above conveyor 2, the water spray dust fall intakes, thereby can make the dust fall effect better.
Further, the method comprises the following steps of;
in an alternative embodiment, the number of the nozzles 312 is 4, and the nozzles 312 are equidistantly disposed.
In this embodiment: thus, the spraying of the spray head 312 is more uniform, and the dust can be rapidly reduced.
Further, the method comprises the following steps of;
in an optional embodiment, the dust fall assembly 3 further includes a dust collection box 301, a fan 302, a dust collection pipe 303 and an air outlet window 307, the bottom end of the conveying device 2 is fixedly connected with the dust collection box 301, the inner side of the dust collection box 301 is fixedly connected with the fan 302 through a connecting rod, the bottom end of the dust collection box 301 is fixedly connected with the dust collection pipe 303, the dust collection pipe 303 is clamped and connected with the water tank 304, and the inner side of the top end of the water tank 304 is fixedly connected with the air outlet window 307.
In this embodiment: like this can the effectual dust that adsorbs of fan 302 to can effectually make the dust through suction box 301, enter into dust absorption pipe 303, the dust can enter into aquatic like this, thereby can carry out effectual integration with water, thereby can fuse the dust through water, the air after water filters can be discharged through air-out window 307.
Further, the method comprises the following steps of;
in an alternative embodiment, the dust settling assembly 3 further comprises a filter 308, and the bottom end of the inner side of the water tank 304 is clamped and connected with the filter 308 through a connector.
In this embodiment: the water with the dust is filtered by the filter 308, the dust can be effectively intercepted on the filter 308, and the water after being filtered can pass through the water outlet pipe 311 and then be sprayed out through the spray head 312 under the action of the water pump 310, so that the water can be recycled.
It should be noted that: the filter 308 is filled with sponge for absorbing dust.
Further, the method comprises the following steps of;
in an optional embodiment, the dust fall assembly 3 further comprises a water level sensor 309, and the right end inside the water tank 304 is fixedly connected with the water level sensor 309.
In this embodiment: therefore, the water level in the water tank 304 can be detected in time through the water level sensor 309, and when the water level reaches the position of the water level sensor 309, the controller 306 can send an instruction to control the water inlet pipe 305 to stop water inlet.
As shown in fig. 3 and 5:
this building rubbish reducing mechanism that building site used is still including being convenient for carry out the card and the subassembly 4 that change to filter 308, card and subassembly 4 are including cardboard 41, fixture block 42, spring 43 and stay cord 44, the inboard card in water tank 304 top with be connected with cardboard 41, the inboard card in both ends is controlled and fixture block 42 is connected to cardboard 41, fixture block 42 blocks and is connected with water tank 304, fixture block 42 is close to one side fixedly connected with spring 43 of cardboard 41 central point department, spring 43 and cardboard 41 fixed connection, the inboard sliding connection of spring 43 has stay cord 44, stay cord 44 and cardboard 41 sliding connection.
In this embodiment: can make cardboard 41 and water tank 304 realize like this with, fixture block 42 enters into the draw-in groove in water tank 304 under the effect of spring 43 this moment to can realize effectual location, when filter 308 is taken off to needs, only need stimulate stay cord 44, just so can drive fixture block 42 and remove, thereby make fixture block 42 and water tank 304 break away from the contact, thereby be convenient for get and put.
Further, the method comprises the following steps of;
in an alternative embodiment, the card and assembly 4 further comprises a pull ring 45, and the pull ring 45 is fixedly connected to the other end of the pull cord 44.
In this embodiment: therefore, the pull ring 45 can be pulled to drive the pull ropes 44 on the left side and the right side to move simultaneously, so that the fixture block 42 can be effectively controlled to move conveniently.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that changes may be made in the embodiments and/or equivalents thereof without departing from the spirit and scope of the utility model. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (7)

1. The utility model provides a construction waste reducing mechanism that building site used, includes breaker (1) and installs conveyor (2) on breaker (1), its characterized in that: a dust falling assembly (3) convenient for dust falling is further mounted on the conveying device (2);
dust fall subassembly (3) is including water tank (304), inlet tube (305), controller (306), water pump (310), outlet pipe (311) and shower nozzle (312), water tank (304) left side top fixedly connected with inlet tube (305), water tank (304) left side fixedly connected with controller (306), connecting pipe fixedly connected with is passed through on water tank (304) right side water pump (310), water pump (310) other end fixedly connected with outlet pipe (311), outlet pipe (311) with conveyor (2) fixed connection, outlet pipe (311) fixed surface is connected with shower nozzle (312).
2. The construction waste pulverization apparatus for construction sites according to claim 1, characterized in that: the number of the spray heads (312) is 4, and the spray heads (312) are arranged at equal intervals.
3. The construction waste pulverization apparatus for construction sites according to claim 1, characterized in that: dust fall subassembly (3) are still including dust collection box (301), fan (302), dust absorption pipe (303) and air-out window (307), conveyor (2) bottom fixedly connected with dust collection box (301), dust collection box (301) inboard is through connecting rod fixedly connected with fan (302), dust collection box (301) bottom fixedly connected with dust absorption pipe (303), dust absorption pipe (303) with water tank (304) card and connection, the inboard fixedly connected with in water tank (304) top air-out window (307).
4. The construction waste pulverization apparatus for construction sites according to claim 1, characterized in that: the dust fall assembly (3) further comprises a filter (308), and the bottom end of the inner side of the water tank (304) is clamped and connected with the filter (308) through a connecting piece.
5. The construction waste pulverization apparatus for construction sites according to claim 1, characterized in that: the dust fall subassembly (3) still include level sensor (309), water tank (304) inboard right-hand member fixedly connected with level sensor (309).
6. The construction waste pulverization apparatus for construction sites according to claim 1, characterized in that: dust fall subassembly (3) are still including being convenient for carry out the card and subassembly (4) that change filter (308), card and subassembly (4) are including cardboard (41), fixture block (42), spring (43) and stay cord (44), water tank (304) top inboard card with be connected with cardboard (41), both ends inboard card about cardboard (41) with be connected with fixture block (42), fixture block (42) with water tank (304) card with be connected, fixture block (42) are close to one side fixedly connected with of cardboard (41) central point department spring (43), spring (43) with cardboard (41) fixed connection, spring (43) inboard sliding connection have stay cord (44), stay cord (44) with cardboard (41) sliding connection.
7. The construction waste pulverization apparatus for construction sites according to claim 6, characterized in that: the card and component (4) further comprises a pull ring (45), and the pull ring (45) is fixedly connected to the other end of the pull rope (44).
CN202121660487.8U 2021-07-21 2021-07-21 Building rubbish reducing mechanism that building site used Active CN215843467U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121660487.8U CN215843467U (en) 2021-07-21 2021-07-21 Building rubbish reducing mechanism that building site used

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121660487.8U CN215843467U (en) 2021-07-21 2021-07-21 Building rubbish reducing mechanism that building site used

Publications (1)

Publication Number Publication Date
CN215843467U true CN215843467U (en) 2022-02-18

Family

ID=80330887

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121660487.8U Active CN215843467U (en) 2021-07-21 2021-07-21 Building rubbish reducing mechanism that building site used

Country Status (1)

Country Link
CN (1) CN215843467U (en)

Similar Documents

Publication Publication Date Title
CN207951016U (en) A kind of food production workshop dust-extraction unit
CN106902602A (en) A kind of Self-excitation wet-type cleaning dust machine and dust collection method
CN105650755A (en) Improved type air purifying equipment
CN108499294A (en) A kind of dry filter device convenient for cleaning
CN215843467U (en) Building rubbish reducing mechanism that building site used
CN204853711U (en) Air purifier with from washing function
CN211612097U (en) Environment-friendly equipment for filtering waste gas
CN116761062A (en) Building construction safety monitoring system and monitoring method thereof
CN204017564U (en) New Mine air box type pulse bag dust removal unit
CN208193997U (en) Die casting exhaust-gas treatment Special-purpose purifier
CN207871808U (en) Protect the efficient preliminary clearning device of organic exhaust gas adsorption equipment
CN206343287U (en) A kind of plasma smoke and dust purifier
CN211026467U (en) Negative pressure dust absorption type coarse crusher
CN210495695U (en) Dust removal device for ore screening machine
CN106890528A (en) High-temperature dust removal equipment
CN207913391U (en) A kind of energy-saving dust-filtering tower of factory
CN206660847U (en) High-temperature dust removal equipment
CN104492217A (en) Dust collecting device
CN213885303U (en) Energy-concerving and environment-protective equipment of sewage cycle treatment convenient to clearance
CN204365089U (en) A kind of dust arrester
CN110743296A (en) Dust removal environmental protection equipment
CN213942555U (en) Dust collector is used in magnesite processing production
CN219366101U (en) Coal mine dust trapping device
CN208893862U (en) A kind of construction site dust-extraction unit
CN215506163U (en) Dust extraction is used in coating production and processing

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant