CN215837958U - Construction cost analysis device for building economic management - Google Patents

Construction cost analysis device for building economic management Download PDF

Info

Publication number
CN215837958U
CN215837958U CN202122065561.8U CN202122065561U CN215837958U CN 215837958 U CN215837958 U CN 215837958U CN 202122065561 U CN202122065561 U CN 202122065561U CN 215837958 U CN215837958 U CN 215837958U
Authority
CN
China
Prior art keywords
fixed
economic management
fixedly installed
construction cost
building economic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122065561.8U
Other languages
Chinese (zh)
Inventor
李月侠
陈星�
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202122065561.8U priority Critical patent/CN215837958U/en
Application granted granted Critical
Publication of CN215837958U publication Critical patent/CN215837958U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to the technical field of analysis devices and discloses a construction cost analysis device for building economic management, which comprises a bottom plate, wherein a sliding groove is formed in the top of the bottom plate, a sliding block is slidably mounted inside the sliding groove, a storage box is fixedly mounted on the surface of the sliding block, a handle is fixedly mounted on the surface of the storage box, a fixed block is fixedly mounted at the top of the bottom plate, and a protection box is fixedly mounted at the top of the fixed block. This cost analytical equipment for building economic management, the fluted disc that cup joints through rotating the knob drive rotary column surface rotates, fluted disc and rack toothing state, drive the lift post and carry out the adjustment of height, when adjusting to the height that wants, the motor function of lift post internally mounted drives down and places the board and carry out the rotation about going on and reach the adjustment of angle, the guard post of lift post top installation can protect the motor can not receive the damage of external force and dust, according to the effectual solution of above structure carry out the adjustment of height and angle to the device.

Description

Construction cost analysis device for building economic management
Technical Field
The utility model relates to the technical field of analysis devices, in particular to a construction cost analysis device for building economic management.
Background
The construction cost refers to the construction price of the building, which is defined from the perspective of a practitioner (investor) for the total sum of all expected or actually required costs for completing the construction of a building, and the construction cost refers to the construction cost of the building, which is the total fixed asset investment cost expected or actually paid for constructing a building.
In the prior art, the engineering cost analysis device for erecting the construction drawing has a single function, and when the construction drawing has different sizes, the drawings with different sizes are difficult to fix, so that trouble is brought to engineering cost evaluation of research personnel or users. After the drawing among the prior art finishes using, the save mode is improper, causes the damage of construction drawing easily, in addition can't accomplish the adjustment to equipment height and angle for adjust suitable viewing angle under this kind of abominable environment of construction ground, lead to the user to produce a series of troubles when the analysis data.
SUMMERY OF THE UTILITY MODEL
Aiming at the defects of the prior art, the utility model provides a construction cost analysis device for building economic management, which has the characteristic that drawings with various specifications and thicknesses can be fixed, and has the advantages that the angle and the height of equipment can be adjusted, so that construction drawings can be smoothly watched under a severe construction environment, and the problem that the construction drawings cannot be watched under the severe construction environment because the thickness of the drawings with various scales cannot be fixed and the height and the angle of the equipment cannot be adjusted in the conventional device is solved.
The utility model provides the following technical scheme: the utility model provides a cost analysis device for building economic management, includes the bottom plate, the spout has been seted up at the top of bottom plate, the inside slidable mounting of spout has the slider, the fixed surface of slider installs the receiver, the fixed surface of receiver installs the handle, the top fixed mounting of bottom plate has the fixed block, the top fixed mounting of fixed block has the protection box, the inside movable mounting of protection box has the lift post, one side fixed mounting of lift post has the rack, the top fixed mounting of fixed block has the dead lever.
Preferably, the inside movable mounting of dead lever has the lifter, the fixed surface of lifter installs the fixed plate, the fixed surface of fixed plate installs the circle piece, the inside movable mounting of circle piece has the rotary column, the fluted disc has been cup jointed on the surface of rotary column, the rotation button is installed to the one end of rotary column.
Preferably, a first circular groove is formed in the lifting column, and a motor is fixedly mounted in the first circular groove.
Preferably, one end of the motor is fixedly provided with a supporting disc, and the surface of the lifting column is fixedly provided with a protection column.
Preferably, the surface of the supporting disk is fixedly provided with a placing plate, the surface of the placing plate is fixedly provided with a supporting strip, the surface of the placing plate is provided with a second circular groove, and a first electromagnet is fixedly arranged inside the second circular groove.
Preferably, a spring is fixedly installed inside the second circular groove, a clamping block is movably installed at one end of the spring, and a second electromagnet is fixedly installed on the surface of the clamping block.
Compared with the prior art, the utility model has the following beneficial effects:
1. this cost analytical equipment for building economic management, the fluted disc that cup joints through rotating knob drive rotary column surface rotates, fluted disc and rack toothing state, drive the lift post and carry out the adjustment of height, when adjusting to the height of wanting, the motor function of lift post internally mounted drives down and places the board and carry out the rotation of left and right sides and reach the adjustment of angle, the protection post of lift capital portion installation can protect the motor can not receive the damage of external force and dust, according to above structure effectual solution carry out the adjustment of height and angle to the device, thereby people are when highly adjusting equipment more swift, and then improved people's work efficiency.
2. This cost analytical equipment for building economic management, place article on the holding strip after promoting the clamp splice under the effect that like poles repel each other and opposite poles attract through first electro-magnet and second battery iron, it makes magnetic force disappear to close the electro-magnet, fix article with the clamp splice resilience under the effect of spring, thereby can solve the drawing size thickness to multiple scale and carry out the centre gripping fixed, place the receiver with article through the pulling handle, the slider of receiver bottom installation steadily slides inside the spout, place article make article can accomplish the effect of protection under the construction environment in the receiver.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of the left side of FIG. 1 according to the present invention;
FIG. 3 is a schematic view of the structure of FIG. 1 at point A according to the present invention;
FIG. 4 is a schematic structural diagram of FIG. 1 at B according to the present invention.
In the figure: 1. a base plate; 2. a chute; 3. a storage box; 4. a handle; 5. a fixed block; 6. a protection box; 7. a lifting column; 8. a rack; 9. fixing the rod; 10. a lifting rod; 11. a fixing plate; 12. a knob is rotated; 13. turning the column; 14. a fluted disc; 15. a round block; 16. placing the plate; 17. supporting the strip; 18. a clamping block; 19. a motor; 20. a support disc; 21. a first circular groove; 22. a second circular groove; 23. a first electromagnet; 24. a spring; 25. a second electromagnet; 26. a slider; 27. and (4) protecting the column.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-4, a construction cost analysis device for building economic management comprises a bottom plate 1, a sliding chute 2 is disposed at the top of the bottom plate 1, a sliding block 26 is slidably mounted inside the sliding chute 2, a storage box 3 is fixedly mounted on the surface of the sliding block 26, a handle 4 is fixedly mounted on the surface of the storage box 3, the storage box 3 arranged on the surface of the sliding block 26 pulls the handle 4 to drive the storage box 3 to slide smoothly in the sliding groove 2 through the arrangement of the sliding groove 2, the fixed block 5 is fixedly arranged at the top of the bottom plate 1, the protection box 6 is fixedly arranged at the top of the fixed block 5, the lifting column 7 is movably arranged in the protection box 6, make the effect that lift post 7 had played fixed and protection when height-adjusting prevent that lifter 10 from receiving the influence of external force and damaging through setting up of protection box 6, one side fixed mounting of lift post 7 has rack 8, and the top fixed mounting of fixed block 5 has dead lever 9.
Wherein; the inside movable mounting of dead lever 9 has lifter 10, the fixed surface of lifter 10 installs fixed plate 11, the fixed surface of fixed plate 11 installs circle piece 15, the inside movable mounting of circle piece 15 has rotary column 13, fluted disc 14 has been cup jointed on the surface of rotary column 13, rotation button 12 is installed to the one end of rotary column 13, lifter 10 through dead lever 9 internally mounted drives the rotary column 13 of circle piece 15 internally mounted and makes the fluted disc 14 that the rotary column 13 surface cup jointed do the adjustment person of height and operate.
Wherein; first circular slot 21 has been seted up to the inside of lift post 7, and the inside fixed mounting of first circular slot 21 has motor 19, makes motor 19 possible to hide the operation through the setting of first circular slot 21, prevents to receive the damage of external force and dust.
Wherein; one end fixed mounting of motor 19 has supporting disk 20, and the fixed surface of lift post 7 installs protection post 27, makes through the setting of supporting disk 20 to place board 16 and can the steady operation, makes the damage of isolated external force of internals of protection post 27 through the setting of protection post 27.
Wherein; the fixed surface of supporting disk 20 installs places board 16, and the fixed surface who places board 16 installs and holds in the palm strip 17, through holding in the palm the effectual problem that drops of user when placing article of having solved that sets up of strip 17, places the surface of board 16 and has seted up second circular slot 22, and the inside fixed mounting of second circular slot 22 has first electro-magnet 23.
Wherein; inside fixed mounting of second circular slot 22 has spring 24, spring 24's one end movable mounting has clamp splice 18, the fixed surface of clamp splice 18 installs second electro-magnet 25, like poles repel each other through first electro-magnet 23 and second electro-magnet 25 and promote clamp splice 18 to remove under the effect that opposite poles attract, close the electro-magnet when the article is placed on holding in the palm strip 17, the effect at spring 24 drives clamp splice 18 and kick-backs and step up article, the effectual problem that leads to droing under the influence of external force of having solved article.
The working principle is that the rotating button 12 is rotated manually to drive the fluted disc 14 sleeved on the surface of the rotating column 13 to rotate, the fluted disc 14 and the rack 8 are meshed to drive the lifting column 7 to adjust the height, when the height is adjusted to a desired height, the motor 19 arranged in the lifting column 7 is operated to drive the placing plate 16 to rotate left and right to adjust the angle, the protecting column 27 arranged at the top of the lifting column 7 can protect the motor 19 from being damaged by external force and dust, the clamping blocks 18 are pushed under the action of the repelling and attracting of the same polarity of the first electromagnet 23 and the second electromagnet 25 to place objects on the supporting strips 17, the electromagnets are closed to eliminate magnetic force, the clamping blocks 18 rebound to fix the objects under the action of the springs 24, the clamping and fixing can be carried out on the sizes and thicknesses of drawings of various scales, the objects are placed in the storage box 3 in a severe environment of a construction site, the slider 26 attached to the bottom of the storage case 3 slides inside the chute 2, and the handle 4 is pulled to place the article in the storage case 3.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a cost analytical equipment for building economic management, a serial communication port, including bottom plate (1), spout (2) have been seted up at the top of bottom plate (1), the inside slidable mounting of spout (2) has slider (26), the fixed surface of slider (26) installs receiver (3), the fixed surface of receiver (3) installs handle (4), the top fixed mounting of bottom plate (1) has fixed block (5), the top fixed mounting of fixed block (5) has protection box (6), the inside movable mounting of protection box (6) has lift post (7), one side fixed mounting of lift post (7) has rack (8), the top fixed mounting of fixed block (5) has dead lever (9).
2. The construction cost analysis device for building economic management according to claim 1, characterized in that the inside movable mounting of dead lever (9) has lifter (10), the fixed surface of lifter (10) installs fixed plate (11), the fixed surface of fixed plate (11) installs round piece (15), the inside movable mounting of round piece (15) has rotary column (13), fluted disc (14) has been cup jointed on the surface of rotary column (13), the one end of rotary column (13) is installed and is rotated button (12).
3. A construction cost analysis apparatus for building economic management according to claim 1, wherein a first circular groove (21) is formed in the interior of the lifting column (7), and a motor (19) is fixedly installed in the interior of the first circular groove (21).
4. A construction cost analyzing apparatus for building economic management according to claim 3, wherein a support plate (20) is fixedly installed at one end of the motor (19), and a protection column (27) is fixedly installed on the surface of the elevating column (7).
5. The construction cost analysis device for building economic management according to claim 4, wherein a placing plate (16) is fixedly installed on the surface of the supporting plate (20), a supporting strip (17) is fixedly installed on the surface of the placing plate (16), a second circular groove (22) is formed in the surface of the placing plate (16), and a first electromagnet (23) is fixedly installed inside the second circular groove (22).
6. A construction cost analysis device for building economic management according to claim 5, wherein a spring (24) is fixedly installed inside the second circular groove (22), a clamping block (18) is movably installed at one end of the spring (24), and a second electromagnet (25) is fixedly installed on the surface of the clamping block (18).
CN202122065561.8U 2021-08-30 2021-08-30 Construction cost analysis device for building economic management Active CN215837958U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122065561.8U CN215837958U (en) 2021-08-30 2021-08-30 Construction cost analysis device for building economic management

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122065561.8U CN215837958U (en) 2021-08-30 2021-08-30 Construction cost analysis device for building economic management

Publications (1)

Publication Number Publication Date
CN215837958U true CN215837958U (en) 2022-02-18

Family

ID=80243948

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122065561.8U Active CN215837958U (en) 2021-08-30 2021-08-30 Construction cost analysis device for building economic management

Country Status (1)

Country Link
CN (1) CN215837958U (en)

Similar Documents

Publication Publication Date Title
CN215837958U (en) Construction cost analysis device for building economic management
CN215077245U (en) Office table with lifting screen
CN114898618A (en) Practical training teaching platform for Internet virtual experiment
CN113425096A (en) Information engineering supervision drawing strorage device
CN216454031U (en) Data storage device for engineering cost personnel
CN215456296U (en) Enterprise management consultation platform
CN215936805U (en) Engineering cost construction platform based on BIM technique
CN219438579U (en) Equipment cabinet convenient to store and fetch
CN213345108U (en) Display device of construction drawing
CN217846183U (en) House antidetonation detection device
CN220141155U (en) Improved storage cabinet
CN218427883U (en) Combined crystal support
CN221470467U (en) Sterilizing device with auxiliary taking and placing structure
CN219600773U (en) Portable monitoring report analysis board
CN220691627U (en) Protective recruitment exhibition stand
CN220814750U (en) Plastering device convenient to clean
CN215014255U (en) Portable higher mathematics drawing device
CN215827287U (en) Engineering consultation technical standard specification query system
CN215554240U (en) Single-rotor unmanned helicopter receiving platform
CN216896644U (en) Cloud control platform for multiple devices
CN219193061U (en) Portable water quality monitoring frame
CN212110377U (en) Portable temperature acquisition equipment
CN221327091U (en) Automatic card-issuing device for bracelet radio frequency card
CN215729066U (en) Two-photon microscope with lens protection assembly
CN215933145U (en) Human resource management personnel framework display rack

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant