CN215831882U - Prefabricated steel structure frame for boiler installation - Google Patents

Prefabricated steel structure frame for boiler installation Download PDF

Info

Publication number
CN215831882U
CN215831882U CN202122417957.4U CN202122417957U CN215831882U CN 215831882 U CN215831882 U CN 215831882U CN 202122417957 U CN202122417957 U CN 202122417957U CN 215831882 U CN215831882 U CN 215831882U
Authority
CN
China
Prior art keywords
column
boiler
fixedly connected
threaded
boiler installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122417957.4U
Other languages
Chinese (zh)
Inventor
郭建军
郭连军
王长久
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Jiahechang Industry And Trade Co ltd
Original Assignee
Qingdao Jiahechang Industry And Trade Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Jiahechang Industry And Trade Co ltd filed Critical Qingdao Jiahechang Industry And Trade Co ltd
Priority to CN202122417957.4U priority Critical patent/CN215831882U/en
Application granted granted Critical
Publication of CN215831882U publication Critical patent/CN215831882U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Ladders (AREA)

Abstract

The utility model relates to a prefabricated steel structure frame, in particular to a prefabricated steel structure frame for boiler installation, which comprises a boiler installation steel plate, wherein connecting columns are fixedly connected to both sides of the bottom surface of the boiler installation steel plate, second threaded grooves are formed in the lower end surfaces of the connecting columns, heightening columns are installed at the lower ends of the connecting columns, first threaded columns are fixedly connected to the upper ends of the heightening columns, first threaded grooves are formed in the lower end surfaces of the heightening columns, supporting legs are installed at the lower ends of the heightening columns, second threaded columns are fixedly connected to the upper ends of the supporting legs, and supporting blocks are fixedly connected to the lower ends of the supporting legs. The support height can be adjusted according to the actual site requirement, and the applicability is strong.

Description

Prefabricated steel structure frame for boiler installation
Technical Field
The utility model relates to a prefabricated steel structure frame, in particular to a prefabricated steel structure frame for boiler installation.
Background
The boiler is an energy conversion device, the energy input to the boiler comprises chemical energy and electric energy in fuel, and the boiler outputs steam, high-temperature water or an organic heat carrier with certain heat energy. The boiler is a water container heated on fire, a furnace is a place where fuel is combusted, and the boiler comprises a boiler and a furnace. The hot water or steam generated in the boiler can directly provide heat energy for industrial production and people life, and can also be converted into mechanical energy through a steam power device, or the mechanical energy is converted into electric energy through a generator. The boiler for supplying hot water is called a hot water boiler, is mainly used for life, and has a small amount of application in industrial production. The boiler for generating steam is called as a steam boiler, often called as a boiler for short, and is widely used for thermal power stations, ships, locomotives and industrial and mining enterprises. Need prefabricated steel structure frame to support the installation to the boiler in the existing boiler reinstallation, current structure has following shortcoming:
1. the existing structural frame firstly forms a complete frame structure before the boiler is installed, the volume of the complete frame structure is large, the transportation is inconvenient, the actual situation cannot be met, the height of the frame is adjusted, and the applicability is not strong
2. The existing structural frame is constructed as a whole, so that the supporting points cannot be adjusted according to the actual condition of the boiler, the support is unstable, and the practicability is low.
There is therefore a need for a prefabricated steel structural frame for boiler installation that ameliorates the above problems.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a prefabricated steel structure frame for boiler installation, which aims to solve the problems in the background technology.
In order to achieve the purpose, the utility model provides the following technical scheme:
a prefabricated steel structure frame for boiler installation comprises a boiler installation steel plate, connecting columns are fixedly connected to two sides of the bottom surface of the boiler installation steel plate, second thread grooves are formed in the lower end surfaces of the connecting columns, heightening columns are installed at the lower ends of the connecting columns, first thread columns are fixedly connected to the upper ends of the heightening columns, first thread grooves are formed in the lower end surfaces of the heightening columns, supporting legs are installed at the lower ends of the heightening columns, second thread columns are fixedly connected to the upper ends of the supporting legs, supporting blocks are fixedly connected to the lower ends of the supporting legs, limiting columns are fixedly connected to the upper surface of the boiler installation steel plate at equal intervals, first screw holes are formed in the two side surfaces of the limiting columns, supporting columns are fixedly installed on the upper surface of the boiler installation steel plate, arc-shaped supporting plates are fixedly connected to the upper ends of the supporting columns, limiting grooves are formed in the lower end surfaces of the supporting columns, and the groove walls on two sides of the limiting groove are provided with second screw holes.
According to the preferable scheme, two boiler mounting steel plates are arranged, connecting steel columns are fixedly connected between the two boiler mounting steel plates at equal intervals, ladder mounting plates are fixedly connected at the edge of the lower surface of one boiler mounting steel plate at equal intervals, and ladder mounting screw holes are formed in the ladder mounting plates.
As a preferable scheme of the utility model, the limiting groove formed on the surface of the lower end of the supporting column is connected with the limiting column on the upper surface of the boiler mounting steel plate in a clamping manner.
According to the preferable scheme of the utility model, the second screw holes formed in the groove walls on the two sides of the limiting groove are arranged corresponding to the first screw holes formed in the surfaces of the two sides of the limiting column, and a strong bolt is connected between the first screw holes and the second screw holes in a threaded manner.
In a preferred embodiment of the present invention, the first threaded column fixedly connected to the upper end of the height-increasing column is in threaded connection with the second threaded groove formed in the lower end surface of the connecting column.
Preferably, the second threaded column fixedly connected to the upper end of the support leg is in threaded connection with the first threaded groove formed in the lower end surface of the heightening column.
Compared with the prior art, the utility model has the beneficial effects that:
1. according to the utility model, through the supporting legs, the heightening columns and the connecting columns, the integral frame structure is carried to the position where a boiler needs to be installed, the heightening columns are connected with the connecting columns connected with the lower surface of a boiler installation steel plate, the first threaded columns at the upper ends of the heightening columns are in threaded connection with the second threaded grooves formed in the lower surface of the connecting columns, the supporting legs are connected with the heightening columns, the second threaded columns at the upper ends of the supporting legs are in threaded connection with the first threaded grooves formed in the lower end surfaces of the heightening columns, the boiler installation steel plate is further propped up, the propping height of the heightening columns for adjusting the boiler installation steel plate can be properly increased or reduced according to actual demands, the integral structure can be detached and conveniently transported before transportation, the supporting height can be adjusted according to actual site demands, and the applicability is strong.
2. According to the utility model, through the arrangement of the arc-shaped supporting plate and the limiting columns, the proper limiting columns are selected according to the specification and size of an actual boiler to install the arc-shaped supporting plate, the supporting columns fixedly connected with the lower surface of the arc-shaped supporting plate are fixedly installed on the proper limiting columns, the limiting grooves formed in the lower surfaces of the supporting columns are clamped on the surfaces of the limiting columns, the second screw holes in two sides of each limiting groove correspond to the first screw holes in two sides of each limiting column, then the strong bolts are fixed on the second screw holes and the first screw holes, the supporting columns are further fixed, the number of the arc-shaped supporting plates can be increased according to actual requirements, so that the boiler is supported more stably, the supporting points can be adjusted according to the actual conditions of the boiler, the stability of the boiler support is increased, and the practicability of the framework is improved.
Drawings
FIG. 1 is a perspective view of the present invention;
FIG. 2 is a schematic cross-sectional view of the present invention;
FIG. 3 is a schematic side sectional view of the present invention;
fig. 4 is a cross-sectional structure diagram of the present invention.
In the figure: 1. installing a steel plate in the boiler; 2. a limiting column; 3. a support pillar; 4. an arc-shaped support plate; 5. a first screw hole; 6. a strong bolt; 7. a ladder mounting plate; 8. mounting screw holes on the ladder; 9. supporting legs; 10. a support block; 11. connecting the steel columns; 12. heightening columns; 13. connecting columns; 14. a limiting groove; 15. a first threaded post; 16. a second threaded post; 17. a first thread groove; 18. a second thread groove; 19. and a second screw hole.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, rather than all embodiments, and all other embodiments obtained by a person of ordinary skill in the art without any creative work based on the embodiments of the present invention belong to the protection scope of the present invention.
To facilitate an understanding of the utility model, the utility model will now be described more fully with reference to the accompanying drawings. Several embodiments of the utility model are presented. This invention may, however, be embodied in many different forms and should not be construed as limited to the embodiments set forth herein. Rather, these embodiments are provided so that this disclosure will be thorough and complete.
It will be understood that when an element is referred to as being "secured to" another element, it can be directly on the other element or intervening elements may also be present. When an element is referred to as being "connected" to another element, it can be directly connected to the other element or intervening elements may also be present. The terms "vertical," "horizontal," "left," "right," and the like as used herein are for illustrative purposes only.
Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs. The terminology used in the description of the utility model herein is for the purpose of describing particular embodiments only and is not intended to be limiting of the utility model. As used herein, the term "and/or" includes any and all combinations of one or more of the associated listed items.
Referring to fig. 1-4, the present invention provides a technical solution:
example 1, please refer to fig. 1, 2, 3 and 4, a prefabricated steel structural frame for boiler installation, comprising a boiler installation steel plate 1, wherein two sides of the bottom surface of the boiler installation steel plate 1 are fixedly connected with connecting columns 13, the lower end surface of the connecting column 13 is provided with second thread grooves 18, the lower end of the connecting column 13 is provided with a heightening column 12, the upper end of the heightening column 12 is fixedly connected with a first thread column 15, the lower end surface of the heightening column 12 is provided with a first thread groove 17, the lower end of the heightening column 12 is provided with a supporting leg 9, the upper end of the supporting leg 9 is fixedly connected with a second thread column 16, the lower end of the supporting leg 9 is fixedly connected with a supporting block 10, the upper surface of the boiler installation steel plate 1 is fixedly connected with limiting columns 2 at equal intervals, two side surfaces of the limiting columns 2 are provided with first screw holes 5, the upper surface of the boiler installation steel plate 1 is fixedly provided with supporting columns 3, the upper ends of the supporting columns 3 are fixedly connected with arc-shaped supporting plates 4, the lower end surface of the supporting column 3 is provided with a limiting groove 14, and the groove walls on two sides of the limiting groove 14 are provided with second screw holes 19; the integral frame structure is transported to a position where a boiler needs to be installed, the heightening column 12 is connected with a connecting column 13 connected with the lower surface of a boiler installation steel plate 1, a first threaded column 15 at the upper end of the heightening column 12 is in threaded connection with a second threaded groove 18 formed in the lower surface of the connecting column 13, then the supporting leg 9 is connected with the heightening column 12, a second threaded column 16 at the upper end of the supporting leg 9 is in threaded connection with a first threaded groove 17 formed in the lower end surface of the heightening column 12, the boiler installation steel plate 1 is further propped up, the heightening column 12 can be properly increased or decreased according to actual requirements to adjust the propping height of the boiler installation steel plate 1, then a proper limiting column 2 is selected according to the specification size of the actual boiler to install the arc-shaped supporting plate 4, the supporting column 3 fixedly connected with the lower surface of the arc-shaped supporting plate 4 is fixedly installed on the proper limiting column 2, the limiting groove 14 formed in the lower surface of the supporting column 3 is clamped on the surface of the limiting column 2, the second screw holes 19 on the two sides of the limiting groove 14 correspond to the first screw holes 5 on the two sides of the limiting column 2, the powerful bolts 6 are fixed on the second screw holes 19 and the first screw holes 5, the supporting columns 3 are further fixed, the number of the arc-shaped supporting plates 4 can be increased according to actual requirements, and the boiler is more stable in supporting.
Embodiment 2, please refer to fig. 1, 2, 3 and 4, a prefabricated steel structural frame for boiler installation, comprising a boiler installation steel plate 1, wherein two sides of the bottom surface of the boiler installation steel plate 1 are fixedly connected with a connecting column 13, the lower end surface of the connecting column 13 is provided with a second thread groove 18, the lower end of the connecting column 13 is provided with a heightening column 12, the upper end of the heightening column 12 is fixedly connected with a first thread column 15, the lower end surface of the heightening column 12 is provided with a first thread groove 17, the lower end of the heightening column 12 is provided with a supporting leg 9, the upper end of the supporting leg 9 is fixedly connected with a second thread column 16, the lower end of the supporting leg 9 is fixedly connected with a supporting block 10, the upper surface of the boiler installation steel plate 1 is fixedly connected with a limiting column 2 at equal intervals, two side surfaces of the limiting column 2 are provided with first screw holes 5, the upper surface of the boiler installation steel plate 1 is fixedly provided with a supporting column 3, the upper end of the supporting column 3 is fixedly connected with an arc-shaped supporting plate 4, the lower end surface of the supporting column 3 is provided with a limiting groove 14, and the groove walls on two sides of the limiting groove 14 are provided with second screw holes 19; the two boiler mounting steel plates 1 are arranged, connecting steel columns 11 are fixedly connected between the two boiler mounting steel plates 1 at equal intervals, ladder mounting plates 7 are fixedly connected at the edge of the lower surface of one boiler mounting steel plate 1 at equal intervals, and ladder mounting screw holes 8 are formed in the ladder mounting plates 7; and selecting a proper ladder mounting plate 7 according to the specific opening position of the boiler to mount the ladder so as to facilitate the use and inspection of the follow-up boiler.
In embodiment 3, referring to fig. 1, 2, 3 and 4, the limiting groove 14 formed on the lower end surface of the supporting column 3 is engaged with the limiting column 2 on the upper surface of the boiler installation steel plate 1; second screw holes 19 formed in the wall of the limiting groove 14 on two sides are arranged corresponding to the first screw holes 5 formed in the surface of the limiting column 2 on two sides, and a strong bolt 6 is connected between the first screw holes 5 and the second screw holes 19 in a threaded manner; a first threaded column 15 fixedly connected with the upper end of the heightening column 12 is in threaded connection with a second threaded groove 18 formed in the lower end surface of the connecting column 13; a second threaded column 16 fixedly connected with the upper end of the supporting leg 9 is in threaded connection with a first threaded groove 17 formed in the lower end surface of the heightening column 12.
The working principle is as follows: when in use, the integral frame structure is carried to the position where a boiler needs to be installed, the heightening column 12 is connected with the connecting column 13 connected with the lower surface of the boiler installation steel plate 1, the first threaded column 15 at the upper end of the heightening column 12 is in threaded connection with the second threaded groove 18 formed in the lower surface of the connecting column 13, the supporting leg 9 is connected with the heightening column 12, the second threaded column 16 at the upper end of the supporting leg 9 is in threaded connection with the first threaded groove 17 formed in the lower end surface of the heightening column 12, the boiler installation steel plate 1 is further propped up, the heightening column 12 can be properly increased or decreased according to actual requirements to adjust the propping height of the boiler installation steel plate 1, the proper limiting column 2 is selected according to the specification size of the actual boiler to install the arc-shaped supporting plate 4, the supporting column 3 fixedly connected with the lower surface of the arc-shaped supporting plate 4 is fixedly installed on the proper limiting column 2, the limiting groove 14 formed in the lower surface of the supporting column 3 is clamped on the surface of the limiting column 2, correspond second screw 19 with the first screw 5 of 2 both sides of spacing post with the second screw 19 of spacing groove 14 both sides, fix powerful bolt 6 on second screw 19 and first screw 5 again, further fix support column 3, can increase the quantity of arc backup pad 4 according to actual demand, make the boiler support more stable, hoist the boiler again and install on arc backup pad 4, select suitable ladder mounting panel 7 to carry out the use and the inspection of the follow-up boiler of simple to operate with the ladder according to the concrete open position of boiler again.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a boiler installation is with prefabricated steel construction frame, includes boiler installation steel sheet (1), its characterized in that: the utility model discloses a boiler mounting steel plate, including boiler mounting steel plate (1), first threaded column (13) of equal fixedly connected with in bottom surface both sides, second thread groove (18) have been seted up to spliced pole (13) lower extreme surface, spliced pole (13) lower extreme is installed and is increased post (12), it is fixedly connected with first threaded column (15) to increase post (12) upper end, it has first thread groove (17) to increase post (12) lower extreme surface, it installs supporting leg (9) to increase post (12) lower extreme, supporting leg (9) upper end fixedly connected with second threaded column (16), supporting leg (9) lower extreme fixedly connected with supporting shoe (10), boiler mounting steel plate (1) upper surface equidistance fixedly connected with spacing post (2), first screw (5) have all been seted up on spacing post (2) both sides surface, boiler mounting steel plate (1) upper surface fixed mounting has support column (3), the support column is characterized in that an arc-shaped support plate (4) is fixedly connected to the upper end of the support column (3), a limit groove (14) is formed in the lower end surface of the support column (3), and second screw holes (19) are formed in groove walls on two sides of the limit groove (14).
2. The prefabricated steel structural frame for boiler installation of claim 1, wherein: boiler installation steel sheet (1) is provided with two, two equidistance fixedly connected with connects steel column (11), one between boiler installation steel sheet (1) equidistance fixedly connected with ladder mounting panel (7) in boiler installation steel sheet (1) lower surface edge, ladder installation screw (8) have been seted up on ladder mounting panel (7).
3. The prefabricated steel structural frame for boiler installation of claim 1, wherein: and the limiting groove (14) formed in the surface of the lower end of the supporting column (3) is clamped and connected with the limiting column (2) on the upper surface of the boiler mounting steel plate (1).
4. The prefabricated steel structural frame for boiler installation of claim 1, wherein: second screw holes (19) formed in the groove walls of the two sides of the limiting groove (14) are arranged corresponding to the positions of first screw holes (5) formed in the surfaces of the two sides of the limiting column (2), and a powerful bolt (6) is connected between the first screw holes (5) and the second screw holes (19) in a threaded mode.
5. The prefabricated steel structural frame for boiler installation of claim 1, wherein: and a first threaded column (15) fixedly connected with the upper end of the heightening column (12) is in threaded connection with a second threaded groove (18) formed in the lower end surface of the connecting column (13).
6. The prefabricated steel structural frame for boiler installation of claim 1, wherein: and a second threaded column (16) fixedly connected with the upper end of the supporting leg (9) is in threaded connection with a first threaded groove (17) formed in the lower end surface of the heightening column (12).
CN202122417957.4U 2021-10-08 2021-10-08 Prefabricated steel structure frame for boiler installation Active CN215831882U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122417957.4U CN215831882U (en) 2021-10-08 2021-10-08 Prefabricated steel structure frame for boiler installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122417957.4U CN215831882U (en) 2021-10-08 2021-10-08 Prefabricated steel structure frame for boiler installation

Publications (1)

Publication Number Publication Date
CN215831882U true CN215831882U (en) 2022-02-15

Family

ID=80202163

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122417957.4U Active CN215831882U (en) 2021-10-08 2021-10-08 Prefabricated steel structure frame for boiler installation

Country Status (1)

Country Link
CN (1) CN215831882U (en)

Similar Documents

Publication Publication Date Title
KR101813068B1 (en) Building integrated photovoltaic in wall
WO2013065130A1 (en) Solar cell module fixing structure
CN111453605A (en) Steel structure hoisting structure of incineration main plant
CN215831882U (en) Prefabricated steel structure frame for boiler installation
CN110005147A (en) Color steel tile roof photovoltaic support system
CN214994645U (en) Energy-saving heat-insulating light steel assembled house
CN215627567U (en) Adjustable stand column structure for glass kiln and glass kiln
CN214498508U (en) House capable of being built quickly
CN204794841U (en) Rotatable solar cell panel mounting bracket
CN208539830U (en) A kind of solar panels fixed frame applied on tile
CN210342340U (en) Steel construction house wall body and post roof beam connection structure
CN210979791U (en) Supporting and erecting device of environment-friendly boiler
TWM568558U (en) Modular support device
CN217984898U (en) Photovoltaic support convenient to install
CN211774643U (en) Be applied to assembly type structure's wallboard of dismantling
CN219643847U (en) Photovoltaic new energy source board erection support
CN212245884U (en) Steel structure hoisting structure of incineration main plant
CN218821018U (en) Spliced frame and equipment thereof
CN218622959U (en) Integrated installation fixed knot of steel construction roofing photovoltaic panel constructs
CN221609438U (en) Triangular supporting device for shear wall outer cantilever frame
CN218940999U (en) Easily-installed photovoltaic power generation device
CN219268770U (en) Photovoltaic power generation plate
CN218549408U (en) Bridge frame connecting structure
CN219710388U (en) Subway platform frame beam prefabricated structure
CN217282790U (en) Cabin body outer vertical surface solar cell module mounting device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant