CN215829228U - Automatic construction equipment of marking off of compound marking integration - Google Patents

Automatic construction equipment of marking off of compound marking integration Download PDF

Info

Publication number
CN215829228U
CN215829228U CN202121681121.9U CN202121681121U CN215829228U CN 215829228 U CN215829228 U CN 215829228U CN 202121681121 U CN202121681121 U CN 202121681121U CN 215829228 U CN215829228 U CN 215829228U
Authority
CN
China
Prior art keywords
marking
construction
marking device
component
hot melting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121681121.9U
Other languages
Chinese (zh)
Inventor
冯少鹏
张晓�
曾少锋
陈慕贞
周杰英
钟传焕
周宇亮
黄春燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Jishi Construction Group Co ltd
Original Assignee
Guangzhou Jishi Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Jishi Construction Group Co ltd filed Critical Guangzhou Jishi Construction Group Co ltd
Priority to CN202121681121.9U priority Critical patent/CN215829228U/en
Application granted granted Critical
Publication of CN215829228U publication Critical patent/CN215829228U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Repair (AREA)

Abstract

The utility model relates to the technical field of road construction, and discloses a composite marking integrated automatic marking construction device which comprises an engineering vehicle, and a hot melting marking device and a two-component marking device which are arranged on the engineering vehicle, wherein the hot melting marking device is used for completing hot melting marking construction, the two-component marking device is used for completing two-component marking construction, a first spray head of the hot melting marking device is positioned in front of a second spray head of the two-component marking device, and the engineering vehicle is also provided with a diesel generator set connected with the hot melting marking device and the two-component marking device, so that power can be provided for the construction of the hot melting marking device and the two-component marking device, and the normal operation of the hot melting marking device and the two-component marking device is ensured. Compared with the prior art, the device has the advantages of ingenious structural design, optimized construction process, high construction efficiency and low construction cost.

Description

Automatic construction equipment of marking off of compound marking integration
Technical Field
The utility model relates to the technical field of road construction, in particular to integrated automatic marking construction equipment for composite marking lines.
Background
In the prior art, pavement marking construction is generally carried out by adopting a method of manually pushing marking equipment to carry out spraying, and meanwhile, a combined structure marking process is adopted, specifically, the process combines a hot-melt marking and a two-component marking for use, the construction of the hot-melt marking is firstly carried out at a specified position during construction, and the construction of the two-component marking is carried out at the same position after the construction of the hot-melt marking is finished.
Although the construction quality requirement of road surface marking can be satisfied by the construction process, the construction process needs manual operation, the construction time is long, the construction efficiency is low, and to the marking construction of partial long distance, a plurality of subsections need to be set for construction in order to guarantee the construction quality, and more manpower and machines need to be invested for construction when a plurality of subsections are constructed simultaneously, and the construction cost is improved while the data management is not facilitated.
SUMMERY OF THE UTILITY MODEL
In order to solve the technical problems, the utility model aims to provide the composite marking integrated automatic marking construction equipment which has the advantages of ingenious structural design, full-computerized intelligent control, high construction efficiency, good finished product quality and the like.
Based on this, the utility model provides an integrated automatic marking construction device for composite marking lines, which comprises:
a frame;
the hot melting marking device is arranged on the rack and used for finishing hot melting marking construction;
the two-component marking device is arranged on the rack and used for finishing two-component marking construction;
the air compressor is arranged on the rack and used for providing compressed air for the hot melting marking device and the two-component marking device;
the power device is arranged on the rack and used for providing power for the hot melting marking device, the two-component marking device and the air compressor;
the traveling device is used for driving the rack to move;
the first spray head connected with the hot-melting marking device is positioned in front of the second spray head connected with the two-component marking device.
In some embodiments of the present application, the traveling device is a work vehicle.
In some embodiments of the present application, the power plant is a diesel generator set.
In some embodiments of the present application, the mobile device further comprises a GPS positioning system disposed on the walking device or the rack.
In some embodiments of the present application, the mobile terminal further comprises a video positioning system, which comprises a camera and a display screen electrically connected to the camera, wherein the camera is installed in front of the walking device through a connecting rod, and the display screen is installed on the walking device or the rack.
In some embodiments of the present application, the connecting rod is a steerable telescopic rod.
In some embodiments of the present application, the dual component marking device further includes a numerical control device disposed on the rack, and the numerical control device is electrically connected to the hot melt marking device and the dual component marking device.
In some embodiments of the present application, the hot melt marking device and the two component marking device share a set of the air compressor.
The embodiment of the utility model provides a composite marking integrated automatic marking construction device, which has the following beneficial effects compared with the prior art:
the utility model provides a composite marking integrated automatic marking construction device, which integrates a hot melting marking device and a two-component marking device, wherein the hot melting marking device and the two-component marking device run simultaneously during actual construction, firstly, the hot melting marking device is used for spraying a hot melting marking on a road, and then, the two-component marking device is used for spraying again along the spraying position of the hot melting marking to finish the spraying construction of the two-component marking. Therefore, the automatic marking construction equipment integrating the composite marking lines realizes the synchronous operation of the hot melting marking line construction and the bi-component marking line construction, simplifies the construction process and improves the construction efficiency; meanwhile, the equipment moves by arranging the traveling device to drive the hot-melting marking device and the two-component marking device, manual pushing is avoided, the construction efficiency is further improved while manpower is saved, a good construction effect can be achieved on a long-distance construction marking section, the equipment does not need to be additionally input into a machine for subsection construction, and construction cost control is facilitated.
Drawings
Fig. 1 is a sectional view of a work vehicle and a marking line construction apparatus according to an embodiment of the present invention;
FIG. 2 is a schematic view of a reticle construction apparatus of an embodiment of the present invention;
FIG. 3 is a schematic diagram of the steps of the marking construction process according to the embodiment of the present invention.
In the figure, 1, a machineshop car; 2. a hot melting marking device; 3. a two-component marking device; 4. a power plant; 5. a numerical control device; 6. a GPS locator; 7. a camera; 8. a display screen; 9. a connecting rod; 10. a first nozzle; 11. and a second nozzle.
Detailed Description
The following detailed description of embodiments of the present invention is provided in connection with the accompanying drawings and examples. The following examples are intended to illustrate the utility model but are not intended to limit the scope of the utility model.
It should be understood that the terms "front", "rear", and the like are used herein to describe various information, but the information should not be limited to these terms, which are used only to distinguish one type of information from another. For example, "front" information may also be referred to as "rear" information, and "rear" information may also be referred to as "front" information without departing from the scope of the present invention. Further, in order to facilitate description of the structure of the present application, in the embodiment of the present invention, a floor where the external wall surface of the building is located is defined as the current floor, a next floor opposite to the floor where the external wall surface of the building is located is defined as a lower floor, and a next floor opposite to the floor where the external wall surface of the building is located is defined as a lower floor.
As shown in fig. 1 to 3, an embodiment of the present invention provides a composite marking integrated automatic marking construction equipment, which includes a rack, a hot melting marking device 2, a two-component marking device 3, an air compressor, a power device 4 and a traveling device, wherein the hot melting marking device 2 and the two-component marking device 3 are both disposed on the rack, the hot melting marking device 2 is used for completing hot melting marking construction, the two-component marking device 3 is used for completing two-component marking construction, and a first nozzle 10 connected with the hot melting marking device 2 is located in front of a second nozzle 11 connected with the two-component marking device 3; the air compressor is also arranged on the frame and used for providing compressed air for the hot melting marking device and the two-component marking device; the power device is arranged on the frame and used for providing power for the operation of the hot melting marking device 2, the two-component marking device 3 and the air compressor, and in the embodiment of the utility model, the power device 4 is preferably a diesel generator set; the traveling device is used for realizing the movement of the frame, and in the embodiment of the utility model, the traveling device is preferably the engineering truck 1.
Based on the structure, the automatic marking construction equipment integrating the composite marking lines integrates the hot melting marking device and the two-component marking device, the hot melting marking device and the two-component marking device run simultaneously during actual construction, the hot melting marking device firstly conducts spraying construction of the hot melting marking lines on a road, and then the two-component marking device conducts spraying construction of the two-component marking lines again along the spraying position of the hot melting marking lines. Therefore, the automatic marking construction equipment integrating the composite marking lines realizes the synchronous operation of the hot melting marking line construction and the bi-component marking line construction, simplifies the construction process and improves the construction efficiency; meanwhile, the equipment moves by arranging the traveling device to drive the hot-melting marking device and the two-component marking device, manual pushing is avoided, the construction efficiency is further improved while manpower is saved, a good construction effect can be achieved on a long-distance construction marking section, the equipment does not need to be additionally input into a machine for subsection construction, and construction cost control is facilitated.
It should be noted that the traveling device in the present application may have various other arrangements besides the engineering truck 1, and for a section with a short distance, the traveling device may also be preferably a flat car, and the hot-melt marking device 2 and the two-component marking device 3 are arranged on the flat car at the same time, and marking on the road surface is completed by manually pushing the flat car. In some special road surface environments, the traveling device may be preferably a crawler or the like, that is, the selection of the traveling device needs to be confirmed according to actual construction conditions.
Likewise, the power plant 4 is preferably a diesel generator set in the exemplary embodiment of the present invention, but it is of course also possible to adapt a gasoline generator set or an internal combustion engine set, etc., depending on the actual situation.
Further, in some embodiments of the present application, the composite marking integrated automatic marking construction equipment further includes a GPS positioning system provided on the traveling device or the machine frame. Specifically, in the embodiment of the utility model, the GPS positioning system comprises a GPS positioner 6 arranged at the top of the cab of the engineering truck 1, the GPS positioner 6 can monitor the driving path of the engineering truck and feed back the path information to workers in the cab in real time, and the workers can adjust the driving direction in time after knowing the position information through the GPS positioner, so that the spraying accuracy is further improved, and the deviation of the spraying path is reduced.
Furthermore, in order to finely identify the spraying route, in the embodiment of the utility model, the integrated bookmarking line construction equipment further comprises a video positioning component, specifically, the video positioning component comprises a camera 7 installed in front of the cab of the engineering truck 1 and a display screen 8 electrically connected with the camera 7. The camera 7 can take a fine picture of the road on the route and transmit the picture to the crew in the cab via the display 8. The staff can improve the accuracy of spraying through the quick concrete road condition of confirming of display screen 8. Furthermore, camera 7 is installed in the place ahead of machineshop car 1 through rotatable telescopic link 9, and the staff can in time adjust camera 7's the angle of making a video recording through telescopic link 9 according to the construction conditions during actual construction, ensures camera 7's monitoring effect, promotes marking construction precision.
In fact, besides the manual work of monitoring and adjusting the marking condition, the staff can also set up numerical control device 5 on machineshop car 1, numerical control device 5 with hot melt marking device 2 and two ingredient marking device 3 electricity be connected, numerical control device 5 still is connected with GPS locator and camera 7 electricity, numerical control device 5 can receive the road information that GPS locator 6 and camera 7 collected and analyze it, numerical control device 5 gives the instruction control hot melt marking device 2 and two ingredient marking device 3 and opens and close of hot melt marking device 2 and two ingredient marking device 3 afterwards, realize the automation mechanized operation of hot melt marking and two ingredient marking.
It should be noted that, for the hot-melt marking device 2 and the two-component marking device 3 in the embodiment of the present application, since both devices are used for spraying paint to a road to complete road marking construction, the two devices have repeated parts in specific structures, specifically, in the embodiment of the present invention, the engineering vehicle 1 is provided with an air compressor, the hot-melt marking device 2 and the two-component marking device 3 share one set of air compressor, the air compressor can respectively provide compressed air for the hot-melt marking device 2 and the two-component marking device 3, so as to implement road marking construction by the hot-melt marking device 2 and the two-component marking device 3, and this design can effectively simplify the structure of the integrated marking construction equipment and reduce construction cost. Likewise, to simplify construction, the power plant 4, preferably a diesel generator set, is also connected to the air compressor for powering the operation of the air compressor.
In addition, the application also provides a composite marking integrated marking construction process, which comprises the following steps:
s1, installing a hot-melting marking device and a two-component marking device on the engineering truck, and ensuring that a first nozzle connected with the hot-melting marking device is positioned in front of a second nozzle connected with the two-component marking device when the installation is finished;
s2, installing a numerical control device on the engineering truck and connecting the numerical control device with the hot-melting marking device and the two-component marking device;
s3, mounting a power device on the engineering truck and connecting the power device with the hot-melting marking device and the two-component marking device;
s4, installing a GPS positioner, a camera and a display screen on the engineering truck and electrically connecting the structure with the numerical control device;
s5, testing and correcting each connected device;
s6, driving the engineering truck to the starting point of the road to be marked;
s7, setting a traveling path and a traveling speed of the engineering truck through a numerical control device;
s8, setting the spraying speed of the hot-melting marking device and the spraying speed of the double-component marking device through a numerical control device;
s9, starting the engineering truck, and spraying the road surface by the hot-melting marking device and the two-component marking device along with the driving of the engineering truck;
s10, collecting driving coordinates by a GPS locator, collecting driving road information by a camera and transmitting the information to a display screen and a numerical control device;
s11, analyzing the collected information by the numerical control device and judging whether the driving path and the driving speed have deviation;
s12, the running path and the running speed are not deviated, and the original running path and the original running speed are kept to be continuously sprayed;
s13, when deviation occurs between the driving path and the driving speed, stopping the driving of the engineering truck and the spraying of the marking device, and sending out warning to the operator in the cab;
s14, correcting the running path and the running speed through the numerical control device by an operator, and determining a new running path and a new running speed;
and S15, finishing the running and the spraying.
In summary, the utility model provides an integrated automatic marking construction device for a composite marking, which comprises an engineering vehicle, and a hot melting marking device and a two-component marking device which are arranged on the engineering vehicle, wherein the hot melting marking device is used for completing construction of a hot melting marking, the two-component marking device is used for completing construction of a two-component marking, a first spray head of the hot melting marking device is positioned in front of a second spray head of the two-component marking device, and the engineering vehicle is also provided with a diesel generator set connected with the hot melting marking device and the two-component marking device, so that power can be provided for the construction of the hot melting marking device and the two-component marking device, and the normal operation of the hot melting marking device and the two-component marking device is ensured. Compared with the prior art, the device has the advantages of ingenious structural design, optimized construction process, high construction efficiency and low construction cost.
The above description is only a preferred embodiment of the present invention, and it should be noted that, for those skilled in the art, various modifications and substitutions can be made without departing from the technical principle of the present invention, and these modifications and substitutions should also be regarded as the protection scope of the present invention.

Claims (8)

1. The utility model provides an automatic construction equipment that marks off of compound marking integration which characterized in that includes:
a frame;
the hot melting marking device is arranged on the rack and used for finishing hot melting marking construction;
the two-component marking device is arranged on the rack and used for finishing two-component marking construction;
the air compressor is arranged on the rack and used for providing compressed air for the hot melting marking device and the two-component marking device;
the power device is arranged on the rack and used for providing power for the hot melting marking device, the two-component marking device and the air compressor;
the traveling device is used for driving the rack to move;
the first spray head connected with the hot-melting marking device is positioned in front of the second spray head connected with the two-component marking device.
2. The integrated automatic marking construction equipment for composite marking lines according to claim 1, wherein the walking device is an engineering vehicle.
3. The composite reticle integrated automatic scribing construction equipment according to claim 1, wherein the power device is a diesel generator set.
4. The integrated automatic marking construction equipment for composite marking lines according to claim 1, further comprising a GPS (global positioning system) arranged on the walking device or the machine frame.
5. The composite reticle integrated automatic scribing construction equipment according to claim 1, further comprising a video positioning system comprising a camera and a display screen electrically connected with the camera, wherein the camera is installed in front of the traveling device through a connecting rod, and the display screen is installed on the traveling device or the rack.
6. The composite reticle integrated automatic scribing construction equipment according to claim 5, wherein the connecting rod is a steerable telescopic rod.
7. The integrated automatic marking construction equipment for the composite marking line according to claim 1, further comprising a numerical control device arranged on the machine frame, wherein the numerical control device is electrically connected with the hot melting marking line device and the two-component marking line device.
8. The composite reticle integrated automatic scribing construction equipment according to claim 1, wherein the hot melt reticle device and the two-component reticle device share one set of the air compressor.
CN202121681121.9U 2021-07-22 2021-07-22 Automatic construction equipment of marking off of compound marking integration Active CN215829228U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121681121.9U CN215829228U (en) 2021-07-22 2021-07-22 Automatic construction equipment of marking off of compound marking integration

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121681121.9U CN215829228U (en) 2021-07-22 2021-07-22 Automatic construction equipment of marking off of compound marking integration

Publications (1)

Publication Number Publication Date
CN215829228U true CN215829228U (en) 2022-02-15

Family

ID=80192554

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121681121.9U Active CN215829228U (en) 2021-07-22 2021-07-22 Automatic construction equipment of marking off of compound marking integration

Country Status (1)

Country Link
CN (1) CN215829228U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113481812A (en) * 2021-07-22 2021-10-08 广州机施建设集团有限公司 Automatic construction equipment and construction process for composite marking

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113481812A (en) * 2021-07-22 2021-10-08 广州机施建设集团有限公司 Automatic construction equipment and construction process for composite marking

Similar Documents

Publication Publication Date Title
CN212229815U (en) Mining area shipment management system
DE69924441T2 (en) Automatic tracking control system of a vehicle
CN113687647A (en) Mine car transport driving control method and device, mine car and storage medium
CN215829228U (en) Automatic construction equipment of marking off of compound marking integration
CN106498834A (en) A kind of Athey wheel road face repair robot system and road surface repair method
DE102020117380A1 (en) SYSTEM AND METHOD OF RECHARGING MACHINERY
CN106498835A (en) Road traffic marking system for automatic marker making car
CN111074701B (en) Automatic intelligent fine adjustment construction device and construction method for CRTS III type plate ballastless track plate
CN111639505A (en) Hybrid positioning navigation system and method for indoor inspection robot
EP3951060A1 (en) Asphalt finisher
CN203414767U (en) Dedicated car-mounted terminal device for agricultural machine
CN111236010B (en) Operation control method and system for unmanned road roller group
CN108873906A (en) Roll the unmanned control method of engineering truck and device and readable storage medium storing program for executing
CN111794052B (en) Unmanned road roller capable of realizing clustered construction
CN109901576A (en) The long-range control method of road roller, tele-control system and road roller
CN106680848A (en) Compaction quality monitoring system based on cloud radiation
CN110430538B (en) Tunnel production command cockpit
CN110815255A (en) Automatic fastening robot for bolts of embedded lamps in airport
CN111350169A (en) Intelligent curve unmanned rolling construction system and method for high arch dam
CN113481812A (en) Automatic construction equipment and construction process for composite marking
CN108842578B (en) BIM-based road positioning marking equipment and automatic lofting method thereof
CN218976771U (en) Intelligent inspection robot for motor car chassis
CN112327925B (en) Road maintenance patrol cooperative auxiliary system
CN203441536U (en) Transportation monitoring system of underground coal mine tramcar
CN111294570B (en) Intelligent building construction system based on unmanned aerial vehicle and use method thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant