CN215827858U - Clear stifled device and have its pipeline - Google Patents

Clear stifled device and have its pipeline Download PDF

Info

Publication number
CN215827858U
CN215827858U CN202121082756.7U CN202121082756U CN215827858U CN 215827858 U CN215827858 U CN 215827858U CN 202121082756 U CN202121082756 U CN 202121082756U CN 215827858 U CN215827858 U CN 215827858U
Authority
CN
China
Prior art keywords
connecting portion
pipe body
fixing
pipe
half ring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121082756.7U
Other languages
Chinese (zh)
Inventor
邹拥政
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Pinghu Kibing Glass Co ltd
Original Assignee
Pinghu Kibing Glass Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Pinghu Kibing Glass Co ltd filed Critical Pinghu Kibing Glass Co ltd
Priority to CN202121082756.7U priority Critical patent/CN215827858U/en
Application granted granted Critical
Publication of CN215827858U publication Critical patent/CN215827858U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Thermal Insulation (AREA)
  • Rigid Pipes And Flexible Pipes (AREA)

Abstract

This application is applicable to clear stifled equipment technical field of material transportation, provides a clear stifled device and has its pipeline, and clear stifled device includes: the fixing part is connected to the pipe body of the conveying pipeline; the power transmission part is arranged in the external heat insulation layer of the pipe body in a penetrating mode, the first end of the power transmission part is connected with the fixing part, and the second end of the power transmission part is provided with a knocking part to bear knocking. When discovery pipeline takes place to block up, can strike the portion of strikeing of biography power portion second end through the instrument, the impact force can run through on the body that outside heat preservation directly reachd pipeline through biography power portion, shakes the material that the inside knot wall of body and falls, plays the inside clear stifled purpose of entering of body, has effectively solved among the prior art because soft insulation material layer, can't strike and shake the problem of beating, can dredge on line and can't go on. Need not to stop production, can clear up, guarantee going on of normal production stability, the environmental protection flue gas treatment facility of being convenient for discharges up to standard.

Description

Clear stifled device and have its pipeline
Technical Field
The application belongs to the technical field of material transportation blockage removing equipment, and particularly relates to a blockage removing device and a conveying pipeline with the same.
Background
At present, solid materials are conveyed in a plurality of forms, under the common condition, particles are large, moisture is low, and closed pipeline pneumatic conveying is adopted for more long conveying distances, so that the materials are effectively conveyed to a storage warehouse through pressurized air under the working condition of pressure equalization. According to the difference of material composition and characteristic, some pipeline outsides need not to keep warm, and to the material that receives the temperature influence great and easily absorb damp crystallization wall, pipeline must keep warm in the whole journey.
Although the pneumatic conveying pipeline can prevent materials from absorbing moisture and agglomerating through heat preservation, the inner wall and the turning part of the pipeline are difficult to avoid forming dust and wall accumulation when the conveying pipeline after heat preservation is used day by day and month.
Although purging is carried out by pressurized air in daily life, the cleaning agent cannot be effectively removed, is not cleaned for a long time, and is easy to block a conveying pipeline.
And because the metal pipe is additionally provided with a soft heat-insulating material layer, knocking and shaking cannot be carried out, and online dredging cannot be carried out. Only production is stopped, the pipeline is cleaned after being cut off, and the normal stable production is extremely unfavorable, so that the environment-friendly flue gas treatment facility cannot reach the standard to discharge.
SUMMERY OF THE UTILITY MODEL
An object of the embodiment of the application is to provide a clear stifled device and have its pipeline, aim at solving the inside difficult technical problem who clears up of pipeline among the prior art.
To achieve the above object, according to one aspect of the present application, there is provided a blockage clearing device including: the fixing part is connected to the pipe body of the conveying pipeline; the power transmission part is arranged in the external heat insulation layer of the pipe body in a penetrating mode, the first end of the power transmission part is connected with the fixing part, and the second end of the power transmission part is provided with a knocking part to bear knocking.
Optionally, the fixed part includes the fixed plate, and the fixed plate welds on the outer wall of body, and the inner wall of fixed plate is provided with the curved surface, curved surface and the outer wall looks adaptation of body.
Optionally, the power transmission part comprises a power transmission pipe, the first end of the power transmission pipe is welded with the fixing part, and the second end of the power transmission pipe is welded with the knocking part.
Optionally, the fixed part includes solid fixed ring, and solid fixed ring cover is established in the outside of body, and solid fixed ring's position is adjustable along the axis direction of body.
Optionally, the force transmission part is provided in plurality, and the plurality of force transmission parts are arranged at intervals along the extending direction of the fixing part.
Optionally, the fixing ring includes a first half ring and a second half ring, the first half ring and the second half ring are buckled with each other, the first end of the first half ring is provided with a first connecting portion, the second end of the first half ring is provided with a second connecting portion, the first end of the second half ring is provided with a third connecting portion, the second end of the second half ring is provided with a fourth connecting portion, the first connecting portion is detachably connected with the third connecting portion, and the second connecting portion is detachably connected with the fourth connecting portion.
Optionally, the first connecting portion, the second connecting portion, the third connecting portion and the fourth connecting portion are connecting pieces, connecting holes are formed in the connecting pieces, and the connecting holes of the two connecting pieces are arranged oppositely and connected through bolts.
Optionally, the top of the knocking portion is provided with a guide portion, and the guide portion is gradually reduced along a direction away from the fixing portion.
According to another aspect of the application, a pipeline is provided, the pipeline includes a pipe body and an external heat-insulating layer sleeved outside the pipe body, the pipeline further includes at least one blockage cleaning device, and the blockage cleaning device is the blockage cleaning device.
Optionally, the pipe body comprises a straight pipe section and a bent pipe section connected with the straight pipe section, and the blockage removing device is installed on the bent pipe section.
The application provides a clear stifled device's beneficial effect lies in: compared with the prior art, the clear stifled device of this application passes through the fixed part and is connected fixedly with pipeline's body, and can run through the outside heat preservation of body through biography power portion, when discovery pipeline takes place to block up, the staff can strike the portion of striking that passes power portion second end through the instrument, the impact force can run through on the body that outside heat preservation directly reachs pipeline through passing power portion, shake the inside material that becomes the wall of body and fall, play the clear stifled purpose of going into the internal portion of body, effectively solved among the prior art because soft insulation material layer, can't strike and shake the problem of beating, can dredge on line and can't go on. Need not to stop production, can clear up, guarantee going on of normal production stability, the environmental protection flue gas treatment facility of being convenient for discharges up to standard.
Drawings
In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings needed to be used in the embodiments or the prior art descriptions will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present application, and it is obvious for those skilled in the art to obtain other drawings based on these drawings without inventive exercise.
Fig. 1 is a schematic cross-sectional view of a blockage removing device and a conveying pipeline provided in an embodiment of the present application;
fig. 2 is a schematic structural view of the pipe body provided by the embodiment of the present application, in which the blockage removing device is installed when the insulating layer is removed;
reference numerals referred to in the above figures are detailed below:
10. a fixed part;
11. a fixing ring;
20. a force transmission part;
21. a knocking portion;
30. a pipe body;
31. a straight pipe section;
32. bending the pipe section;
40. an outer insulation layer.
Detailed Description
In order to make the technical problems, technical solutions and advantageous effects to be solved by the present application clearer, the present application is further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the present application and are not intended to limit the present application.
It will be understood that when an element is referred to as being "secured to" or "disposed on" another element, it can be directly on the other element or be indirectly on the other element. When an element is referred to as being "connected to" another element, it can be directly connected to the other element or be indirectly connected to the other element. The embodiments and features of the embodiments in the present application may be combined with each other without conflict. The present application will be described in detail below with reference to the embodiments with reference to the attached drawings.
It will be understood that the terms "length," "width," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," "outer," and the like, as used herein, refer to an orientation or positional relationship indicated in the drawings that is solely for the purpose of facilitating the description and simplifying the description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus should not be considered as limiting the present application.
Furthermore, the terms "first", "second" and "first" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of the present application, "a plurality" means two or more unless specifically limited otherwise.
As described in the background art, although the pneumatic conveying pipeline can prevent moisture absorption and agglomeration of materials through heat preservation, the inner wall and the turning part of the pipeline are difficult to avoid forming dust deposit and wall formation in the long-term accumulated use of the conveying pipeline after heat preservation.
Although purging is carried out by pressurized air in daily life, the cleaning agent cannot be effectively removed, is not cleaned for a long time, and is easy to block a conveying pipeline.
And because the metal pipe is additionally provided with a soft heat-insulating material layer, knocking and shaking cannot be carried out, and online dredging cannot be carried out. Only production is stopped, the pipeline is cleaned after being cut off, and the normal stable production is extremely unfavorable, so that the environment-friendly flue gas treatment facility cannot reach the standard to discharge.
Referring to fig. 1 and 2, in order to solve the above problem, according to one aspect of the present application, an embodiment of the present application provides a blockage clearing device, which includes a fixing portion 10 and a force transmission portion 20, wherein the fixing portion 10 is connected to a pipe body 30 of a conveying pipeline; the force transmission part 20 is arranged in the external heat insulation layer 40 of the pipe body 30 in a penetrating mode, the first end of the force transmission part 20 is connected with the fixing part 10, and the second end of the force transmission part 20 is provided with a knocking part 21 to bear knocking. The utility model provides a clear stifled device passes through fixed part 10 and is connected fixedly with pipeline's body 30, and can run through the outside heat preservation 40 of body 30 through biography power portion 20, when discovery pipeline takes place to block up, the staff can strike the portion of striking 21 of passing power portion 20 second end through the instrument, the impact force can run through on the body 30 that outside heat preservation 40 directly reachs pipeline through passing power portion 20, shake the inside material that becomes the wall of body 30 and fall, play the inside clear stifled purpose of entering of body 30, effectively solved among the prior art because the mild insulation material layer, can't strike and shake the problem of beating, can dredge on line and can't go on. Need not to stop production, can clear up, guarantee going on of normal production stability, the environmental protection flue gas treatment facility of being convenient for discharges up to standard.
Specifically, in order to ensure the connection strength between the fixing portion 10 and the pipe body 30 of the conveying pipeline, the fixing portion 10 in this embodiment includes a fixing plate welded to the outer wall of the pipe body 30, the inner wall of the fixing plate is provided with a curved surface, and the curved surface is adapted to the outer wall of the pipe body 30. In a preferred embodiment, the fixing plate is an impact-proof steel plate with a thickness of 6mm, the steel plate needs to be fully welded around to prevent the conveying pipeline from being knocked, deformed or damaged, wherein the thickness and the area size of the steel plate can be selected according to the size and the material of the pipeline.
The force transmission part 20 in this embodiment comprises a force transmission tube, a first end of the force transmission tube is welded to the fixing part 10, and a second end of the force transmission tube is welded to the knocking part 21. In a specific embodiment, the force transmission pipe is a steel pipe, when the force transmission pipe is installed, a steel pipe with the length of 100mm is welded in the middle of the fixing plate, the extending part of the second end of the steel pipe is exposed outside the external heat insulation layer 40, and the knocking part 21 is a knocking steel plate with the thickness of 12mm and exposed outside the external heat insulation layer 40. The length of the force transmission steel pipe is not unique, the force transmission steel pipe can be selected according to the thickness of the heat insulation layer, the thickness of the knocking steel pipe is not unique, and the knocking steel pipe can be selected according to the knocking force required by pipeline blockage removal.
Because the power transmission part 20 runs through the external heat-insulating layer 40, when the power transmission part is installed, the blockage clearing device needs to be installed firstly, and then the external heat-insulating layer 40 is installed, therefore, the external heat-insulating layer 40 needs to be provided with holes so that the power transmission part 20 can pass through the holes, and in order to install the external heat-insulating layer 40, the power transmission part 20 can smoothly pass through the holes in the external heat-insulating layer 40, the top of the knocking part 21 in the embodiment is provided with a guide part, and the guide part is gradually reduced along the direction away from the fixing part 10. By providing the guide portion, the top of the knocking portion 21 is formed into a tapered structure so that the knocking portion 21 passes through the hole in the outer insulation layer 40.
Since some pipelines have a narrow installation space, if only one force transmission part 20 is provided, it may be inconvenient for workers to knock due to space limitation, and in a preferred embodiment, the force transmission part 20 is provided in plurality, and the plurality of force transmission parts 20 are spaced along the extending direction of the fixing part 10. When the space is restricted, the staff can select the power transmission part 20 convenient for construction flexibly to knock.
In another embodiment, the fixing portion 10 in this embodiment includes a fixing ring 11, the fixing ring 11 is disposed on the outer portion of the tube 30, and the position of the fixing ring 11 is adjustable along the axial direction of the tube 30. On the one hand, through setting up the area of contact between solid fixed ring 11 increase fixed part 10 and the body 30, avoid body 30 to damage, and can realize the inside 360 impact of body 30, on the other hand, through setting up solid fixed ring 11, also be convenient for adjust the point of striking of body 30, for example, strike the back when the point of striking to the certain position of body 30, clear stifled effect is not ideal, the outside heat preservation 40 of this section can be cut down to the staff, and remove solid fixed ring 11 and strike to the next position that probably appears blockking up, the clear stifled effect of this position is ideal, then fix solid fixed ring 11 in this position, and install outside heat preservation 40 again in the position department of dismantling outside heat preservation 40.
The force transmission portion 20 in this embodiment is provided in plurality, and the plurality of force transmission portions 20 are provided at intervals along the extending direction of the fixing portion 10. In a preferred embodiment, the force transmission parts 20 are arranged at intervals along the circumferential direction of the fixing ring 11, for example, when a knocking point at a certain position of the pipe body 30 is knocked, the blockage removing effect is not ideal, and workers can knock other force transmission parts 20 on the fixing ring 11, so that impact of various angles of the pipe body 30 is realized, and the blockage removing effect on the pipe body 30 is effectively improved.
In order to mount the fixing ring 11 of the present embodiment, it is convenient to adjust the tightness between the fixing ring 11 and the tube 30, so as to adjust the position of the fixing ring 11. The fixing ring 11 in this embodiment includes a first half ring and a second half ring, the first half ring and the second half ring are buckled with each other, a first connecting portion is disposed at a first end of the first half ring, a second connecting portion is disposed at a second end of the first half ring, a third connecting portion is disposed at a first end of the second half ring, a fourth connecting portion is disposed at a second end of the second half ring, the first connecting portion is detachably connected to the third connecting portion, and the second connecting portion is detachably connected to the fourth connecting portion. When the pipe body is installed, the first half ring is firstly buckled on the pipe body 30, the second half ring is buckled on the first half ring, the first connecting part and the third connecting part are connected, the second connecting part and the fourth connecting part are connected, so that the first half ring and the second half ring are tightly pressed on the pipe body 30, and the first half ring and the second half ring are fixed through friction force between the first half ring and the pipe body 30. When the position of the blockage removing device needs to be adjusted, the connection between the first connecting part and the third connecting part can be disconnected, or the connection between the second connecting part and the fourth connecting part can be disconnected, and then the blockage removing device is moved.
In a specific embodiment, the first connecting portion, the second connecting portion, the third connecting portion and the fourth connecting portion in this embodiment are all connecting pieces, connecting holes are formed in the connecting pieces, and the connecting holes of the two connecting pieces are oppositely arranged and connected through bolts. During installation, the first half ring is firstly buckled on the pipe body 30, the second half ring is buckled on the first half ring, the first connecting part is connected with the third connecting part, the second connecting part is connected with the fourth connecting part, specifically, bolts sequentially penetrate through the connecting holes which are oppositely arranged, nuts are screwed on the tail ends of the bolts, the first half ring and the second half ring are enabled to tightly press the pipe body 30 through the matching of the nuts and the bolts, and the fixing is realized through the friction force between the first half ring and the pipe body 30. When the position of the clear stifled device of needs is adjusted, can reverse revolve to twist the bolt for it is not hard up between first connecting portion and the third connecting portion, and/or, it is not hard up between second connecting portion and the fourth connecting portion, thereby need not to dismantle solid fixed ring 11, can realize the removal to clear stifled device.
According to another aspect of the present application, a conveying pipeline is provided, the conveying pipeline of the embodiment includes a pipe body 30 and an external insulating layer 40 sleeved outside the pipe body 30, and the conveying pipeline further includes at least one blockage clearing device, and the blockage clearing device is the above blockage clearing device.
The pipe body 30 in this embodiment includes a straight pipe section 31 and a bent pipe section 32 connected to the straight pipe section 31, and the blockage removing device is mounted on the bent pipe section 32. In a specific embodiment, one straight pipe section 31 can be designed to be 5 meters, two bend sections 32 can be designed to be two, and 1 bend section 32 can be designed to be 20cm in front of and behind the bending point according to the conveying distance of the conveying pipeline.
In summary, the blockage removing device provided by the embodiment at least has the following beneficial technical effects:
the utility model provides a clear stifled device passes through the fixed part and is connected fixedly with pipeline's body, and can run through the outside heat preservation of body through biography power portion, when discovery pipeline takes place to block up, the staff can strike the portion of striking of biography power portion second end through the instrument, the impact force can run through on the body that outside heat preservation directly reachs pipeline through biography power portion, shake the inside material that becomes the wall of body and fall, the clear stifled purpose of going into to the internal portion of body is played, effectively solved among the prior art because the mild insulation material layer, can't strike and shake the problem of beating, can dredge on line and can't go on. Need not to stop production, can clear up, guarantee going on of normal production stability, the environmental protection flue gas treatment facility of being convenient for discharges up to standard.
The present invention is not intended to be limited to the particular embodiments shown and described, but is to be accorded the widest scope consistent with the principles and novel features herein disclosed.

Claims (10)

1. A block clearing device, characterized in that the block clearing device comprises:
the fixing part is connected to the pipe body of the conveying pipeline;
the power transmission part penetrates through the external heat insulation layer of the pipe body, the first end of the power transmission part is connected with the fixing part, and the second end of the power transmission part is provided with a knocking part to bear knocking.
2. The blockage removing device according to claim 1, wherein the fixing part comprises a fixing plate welded to the outer wall of the pipe body, and the inner wall of the fixing plate is provided with a curved surface which is matched with the outer wall of the pipe body.
3. The clear stifled device of claim 1, characterized in that, the biography power portion includes the dowel pipe, the first end of biography power pipe with the fixed part welding, the second end of biography power pipe with strike the portion welding.
4. The blockage removing device according to claim 1, wherein the fixing part comprises a fixing ring, the fixing ring is sleeved outside the pipe body, and the position of the fixing ring is adjustable along the axial direction of the pipe body.
5. A blockage removal device according to claim 1 or 4, wherein the force transmission part is provided in plurality, and the force transmission parts are arranged at intervals along the extending direction of the fixing part.
6. The blockage removing device according to claim 4, wherein the fixing ring comprises a first half ring and a second half ring, the first half ring and the second half ring are buckled with each other, a first connecting portion is arranged at a first end of the first half ring, a second connecting portion is arranged at a second end of the first half ring, a third connecting portion is arranged at a first end of the second half ring, a fourth connecting portion is arranged at a second end of the second half ring, the first connecting portion is detachably connected with the third connecting portion, and the second connecting portion is detachably connected with the fourth connecting portion.
7. The blockage removing device according to claim 6, wherein the first connecting portion, the second connecting portion, the third connecting portion and the fourth connecting portion are connecting pieces, connecting holes are formed in the connecting pieces, and the connecting holes of the two connecting pieces are arranged oppositely and connected through bolts.
8. The blockage removing device according to claim 1, wherein the top of the knocking part is provided with a guide part, and the guide part is gradually reduced along the direction away from the fixing part.
9. A conveying pipeline, characterized in that, the conveying pipeline comprises a pipe body and an external heat-insulating layer sleeved outside the pipe body, the conveying pipeline further comprises at least one blockage removing device, and the blockage removing device is the blockage removing device of any one of claims 1 to 8.
10. A conveying pipe according to claim 9, wherein the pipe body comprises a straight pipe section and a bent pipe section connected with the straight pipe section, and the block clearing device is mounted on the bent pipe section.
CN202121082756.7U 2021-05-19 2021-05-19 Clear stifled device and have its pipeline Active CN215827858U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121082756.7U CN215827858U (en) 2021-05-19 2021-05-19 Clear stifled device and have its pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121082756.7U CN215827858U (en) 2021-05-19 2021-05-19 Clear stifled device and have its pipeline

Publications (1)

Publication Number Publication Date
CN215827858U true CN215827858U (en) 2022-02-15

Family

ID=80188892

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121082756.7U Active CN215827858U (en) 2021-05-19 2021-05-19 Clear stifled device and have its pipeline

Country Status (1)

Country Link
CN (1) CN215827858U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115448034A (en) * 2022-10-08 2022-12-09 上海琥崧智能科技股份有限公司 A conveyer for new forms of energy lithium battery material carries

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115448034A (en) * 2022-10-08 2022-12-09 上海琥崧智能科技股份有限公司 A conveyer for new forms of energy lithium battery material carries

Similar Documents

Publication Publication Date Title
CN215827858U (en) Clear stifled device and have its pipeline
CN109404628A (en) A kind of large-scale pipeline structure
CN212273431U (en) Take protector's crooked pipeline
CN210676230U (en) Anti-scaling spray gun for agglomeration dust removal system
CN112253878A (en) Novel semicircle formula low temperature expansion joint
CN208281064U (en) A kind of inner connecting structure of gas turbine array type silencer
CN208493799U (en) A kind of assembling structure of biomass boiler denitration spray gun and water-cooling wall
CN210510522U (en) Buried fixing support
CN206112296U (en) Rust -resistant heat retaining warm siphunculus
CN210876627U (en) Explosion-proof finished oil spherical pig serving device
CN205278590U (en) Compound steel pipes for coal mine
CN219596969U (en) Wet flue gas desulfurization tower shower and bearing structure
CN217683906U (en) Pipeline exhaust cap
KR200245020Y1 (en) device for forming of corrugated steel pipe
CN210601685U (en) Boiler flue with air cannon deashing
CN204852636U (en) Plumbing installation is fixed to pull rod formula
CN211624444U (en) Water outlet pipe for integrated circuit refrigeration system vehicle
CN210772137U (en) Armor formula hangs protector of pipe
CN218178623U (en) Injection facility for 90-degree turning pipeline
CN210921430U (en) Coal economizer structure of salt-containing waste liquid incineration boiler
CN208817480U (en) A kind of incinerator spray gun
CN212869816U (en) Boiler coiled pipe rapping dust-cleaning device
CN205650023U (en) A spray gun for reuniting system
CN209557877U (en) A kind of easy-to-mount silencer
CN207238675U (en) A kind of collapsible smoke pipe deashing cutter with double-deck blade

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant