CN215822546U - Integrated sewage treatment equipment - Google Patents

Integrated sewage treatment equipment Download PDF

Info

Publication number
CN215822546U
CN215822546U CN202023173683.0U CN202023173683U CN215822546U CN 215822546 U CN215822546 U CN 215822546U CN 202023173683 U CN202023173683 U CN 202023173683U CN 215822546 U CN215822546 U CN 215822546U
Authority
CN
China
Prior art keywords
water
machine body
fixedly arranged
water inlet
organism
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202023173683.0U
Other languages
Chinese (zh)
Inventor
谢映军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Jinjie Environmental Protection Equipment Co ltd
Original Assignee
Guangzhou Jinjie Environmental Protection Equipment Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Jinjie Environmental Protection Equipment Co ltd filed Critical Guangzhou Jinjie Environmental Protection Equipment Co ltd
Priority to CN202023173683.0U priority Critical patent/CN215822546U/en
Application granted granted Critical
Publication of CN215822546U publication Critical patent/CN215822546U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

The utility model relates to the technical field of sewage treatment, in particular to integrated sewage treatment equipment which comprises an organism, wherein a water dispersing piece is fixedly arranged in an inner cavity of the organism, a water inlet is fixedly arranged at one end of the inner wall of the organism, a reservoir is fixedly connected to the outside of the water inlet, a first fine filter screen is fixedly arranged at one end of the reservoir far away from the water inlet, a drain pipe is fixedly connected to one end of the first fine filter screen far away from the reservoir, a sewage discharge shell is fixedly connected to one side of the organism, and a sludge basket is slidably connected to the inside of the sewage discharge shell. The utility model has the advantages that: when the water resource flowed into the organism through the water-collecting plate inside, the debris that the aquatic was mixed all flowed into the organism inside along with water, and the floater will float on the surface of water, and water flows into the cistern through the water inlet after overflowing in, can effectual isolated floater through the fine filter screen of second, has promoted the pure degree of water, great improvement the utilization ratio of water resource.

Description

Integrated sewage treatment equipment
Technical Field
The utility model relates to the technical field of sewage treatment, in particular to integrated sewage treatment equipment.
Background
Sponge city construction must follow ecological priority principle such as, combines together natural way and artificial measures, under the prerequisite of guaranteeing urban drainage prevention waterlogging safety, furthest realizes that rainwater stores up in the urban area, infiltration and purification, promotes the utilization of rainwater resource and ecological environment protection. The construction of the sponge city is not a way of putting the weight down and replacing the traditional drainage system, but a way of reducing burden and supplementing the traditional drainage system, and the self effect of the city is exerted to the greatest extent. In the sponge city construction process, the systematicness of natural rainfall, surface water and underground water is planned, water recycling links such as water supply and drainage are coordinated, and the complexity and the long-term property of the links are considered. In addition, sponge city construction must combine local water resource condition, rainfall law, water environment protection and waterlogging prevention and treatment requirements and the like closely related, the construction according to local conditions guarantees people's life and property safety and social economy stability simultaneously, and current urban drainage pipe layout is that sewage and waste water flow into rivers together and then are salvaged out by manpower, has caused certain harm to the environment. Therefore, the urgent need is to add sewage treatment equipment which has simple structure, high efficiency, energy conservation and convenient operation on the original sewage collection pipeline of the city, and has important practical significance.
SUMMERY OF THE UTILITY MODEL
The utility model aims to overcome the defects of the prior art and provide an integrated sewage treatment device. The purpose of the utility model is realized by the following technical scheme: an integrated sewage treatment device comprises a machine body, wherein a water dispersing sheet is fixedly arranged in the inner cavity of the machine body, a water inlet is fixedly arranged at one end of the inner wall of the machine body, a reservoir is fixedly connected outside the water inlet, a first fine filter screen is fixedly arranged at one end of the reservoir far away from the water inlet, a drain pipe is fixedly connected at one end of the first fine filter screen far away from the reservoir, a sewage discharge shell is fixedly connected with one side of the machine body, a sludge basket is connected with the inside of the sewage discharge shell in a sliding way, an inclined slope is fixedly connected with the lower part of the interior of the machine body, a sewage draining hole is arranged on the lower part of one side surface of the inner wall of the machine body, a sewage discharge shell is fixedly connected to the outside of the sewage discharge hole, a water collecting plate is fixedly arranged on the surface of the machine body, the surface joint of blowdown shell has the blowdown shell closing cap, the fixed surface of blowdown shell closing cap installs the handle.
Optionally, the water retaining box is fixedly mounted above the water inlet, the water retaining box is fixedly mounted in the machine body, and when the water brings sundries such as broken stone particles and leaves to flow into the machine body, the sundries can be prevented from flowing into the water inlet through the water retaining box and then flowing into the water storage tank.
Optionally, the surface mounting of water inlet has the filter screen, the bottom fixed mounting of manger plate case has the thin filter screen of second, through the setting of the thin filter screen of second, when the internal full water that holds of machine, water overflows to the water inlet, and debris such as the leaf that at this moment floated will be isolated by the thin filter screen of second, can avoid it to flow into in the water inlet.
Optionally, the bottom of the sludge basket is provided with water leakage holes, when the sludge basket is pulled upwards, water in the sludge basket leaks out, and impurities in the sludge basket are retained in the basket.
Optionally, a rope is fixedly mounted above the sludge basket, and a handle is fixedly mounted at the other end of the rope.
Optionally, the inner wall fixed mounting of blowdown shell has the couple, the inside of handle joint at the couple when the debris of internal portion of machine flowed into the mud basket through the flow of water, opens drain shell closing cap and upwards stimulates the rope and pull out the mud basket, and it is inside to pull out the mud basket and clear away its inside debris and put into the blowdown shell again.
The utility model has the following advantages:
1. this integration sewage treatment device, it includes the organism, the cistern, the setting of delivery port and drain pipe, when the water resource passes through the water-collecting plate and flows into the organism inside, the impurity that the aquatic mixes is like the leaf, rubble granule and dust will all flow into the organism inside along with water, self contains the downward sediment of object of weight, objects such as levitate leaf will float on the surface of water, at this moment flow into the water of organism inside and flow into the cistern through the water inlet after overflowing, the blocking through the manger plate case can make objects such as levitate leaf completely cut off inside the organism, the fine filter screen of second through the manger plate bottom can effectual completely cut off showy debris, the purity of water has been promoted, great improvement the utilization ratio of water resource.
2. This integration sewage treatment device, through the organism, the setting of blowdown shell and sewage basket, install the slope in the bottom of organism, deposit when thing such as rubble granule flows into the organism inside along with water and downward, flow into the mud basket of blowdown shell bottom through the slope again, fill up behind debris in the mud basket, can open the blowdown shell closing cap on blowdown shell top, pull out and clear up inside debris with the mud basket through the rope, increase the device on original urban drainage pipe's basis like this, can the effectual utilization ratio that improves the water resource, and need not change the original drainage pipe's in city overall arrangement, the practicality of the device has been improved.
Drawings
FIG. 1 is a schematic structural view of the present invention;
fig. 2 is a schematic front view of the present invention.
In the figure: 1-machine body, 2-water dispersing sheet, 3-water inlet, 4-water storage tank, 5-first fine filter screen, 6-water discharge pipe, 7-sewage discharge shell, 8-sludge basket, 9-inclined slope, 10-sewage discharge hole, 11-water collecting plate, 12-sewage discharge shell closing cover, 13-handle, 14-water retaining tank, 15-filter screen, 16-second fine filter screen, 17-water leakage hole, 18-rope, 19-handle and 20-hook.
Detailed Description
The utility model will be further described with reference to the accompanying drawings, but the scope of the utility model is not limited to the following.
As shown in figures 1 and 2, the integrated sewage treatment device provided by the utility model comprises a machine body 1, a water dispersing sheet 2 is fixedly arranged in an inner cavity of the machine body 1, a flow dividing effect can be realized when a large amount of water flows into the machine body 1 through the arrangement of the water dispersing sheet 2, a water inlet 3 is fixedly arranged at one end of the inner wall of the machine body 1, a water storage tank 4 is fixedly connected to the outside of the water inlet 3, a first fine filter screen 5 is fixedly arranged at one end of the water storage tank 4 far away from the water inlet 3, a drain pipe 6 is fixedly connected to one end of the first fine filter screen 5 far away from the water storage tank 4, a sewage discharging shell 7 is fixedly connected to one side of the machine body 1, a sewage basket 8 is slidably connected to the inside of the sewage discharging shell 7, an inclined slope 9 is fixedly connected to the lower part of the inside of the machine body 1, a sewage discharging hole 10 is arranged below the inner wall of the machine body 1, and a sewage discharging shell 7 is fixedly connected to the outside of the sewage discharging hole 10, the surface fixed mounting of organism 1 has water-collecting plate 11, the surperficial joint of blowdown shell 7 has blowdown shell closing cap 12, and the surface fixed mounting of blowdown shell closing cap 12 has handle 13.
As a preferred technical scheme of the utility model: the water inlet 3's top fixed mounting has water retaining box 14, and water retaining box 14 fixed mounting is in the inside of organism 1, and when the water moved debris such as rubble granule and leaf when flowing into organism 1 inside, can avoid debris to flow into inside water inlet 3 through setting up of water retaining box 14, flow into inside cistern 4 again.
As a preferred technical scheme of the utility model: the surface mounting of water inlet 3 has filter screen 15, and the bottom fixed mounting of manger plate case 14 has the fine filter screen 16 of second, and through the setting of the fine filter screen 16 of second, hold full water back in organism 1, water overflows to water inlet 3, and debris such as the leaf that at this moment floated will be isolated by the fine filter screen 16 of second, can avoid it to flow into in the water inlet 3.
As a preferred technical scheme of the utility model: the hole 17 that leaks has been seted up to the bottom of mud basket 8, and when upwards stimulateeing mud basket 8, the inside water of mud basket 8 is discharged through hole 17 that leaks, and inside debris remain in the basket.
As a preferred technical scheme of the utility model: a rope 18 is fixedly arranged above the sludge basket 8, and a handle 19 is fixedly arranged at the other end of the rope 18.
As a preferred technical scheme of the utility model: the inner wall fixed mounting of blowdown shell 7 has couple 20, and handle 19 joint is in the inside of couple 20, when the inside debris of organism 1 flow into the mud basket 8 through the flow of water, opens blowdown shell closing cap 12 and upwards stimulates rope 18 and pulls out mud basket 8, pulls out mud basket 8 and clears away its inside debris and put into inside blowdown shell 7 again.
In summary, the following steps: the integrated sewage treatment equipment comprises a machine body 1, a water storage tank 4, a water outlet 3 and a water discharge pipe 6, when water flows into the machine body 1 through a water collection plate 11, impurities such as leaves, broken stone particles and dust mixed in the water flow into the machine body 1 along with the water, objects containing weight are deposited downwards, the floating leaves and the like float on the water surface, the water flowing into the machine body 1 overflows into the water storage tank 4 through the water inlet 3, the floating leaves and the like can be isolated in the machine body 1 through the blocking of a water baffle box 14, the floating impurities can be effectively isolated through a second fine filter screen 16 at the bottom of the water baffle box 14, the purity of the water is improved, the utilization rate of water resources is greatly improved, and through the arrangement of the machine body 1, a sewage discharge shell 7 and a sewage basket 8, an inclined slope 9 is arranged at the bottom of the machine body 1, when thing such as rubble granule flows into organism 1 inside along with water and downward deposit, flow into the mud basket 8 of blowdown shell 7 bottom through slope 9 again, after the full debris in the mud basket 8, can open the blowdown shell closing cap 12 on blowdown shell 7 top, pull out and clear up inside debris through rope 18 with the mud basket 8, increase the device on original urban drainage pipe's basis like this, can the effectual utilization ratio that improves the water resource, and need not change the overall arrangement of the original drainage pipe in city, the practicality of the device has been improved.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. Integration sewage treatment device, its characterized in that: comprises a machine body (1), wherein a water dispersing sheet (2) is fixedly arranged in an inner cavity of the machine body (1), a water inlet (3) is fixedly arranged at one end of an inner wall of the machine body (1), a reservoir (4) is fixedly connected to the outside of the water inlet (3), a first fine filter screen (5) is fixedly arranged at one end of the reservoir (4) far away from the water inlet (3), a drain pipe (6) is fixedly connected to one end of the first fine filter screen (5) far away from the reservoir (4), a sewage discharging shell (7) is fixedly connected to one side of the machine body (1), a sewage basket (8) is slidably connected to the inside of the sewage discharging shell (7), an inclined slope (9) is fixedly connected to the inside of the machine body (1), a sewage discharging hole (10) is formed in the lower part of the inner wall of the machine body (1), and the sewage discharging shell (7) is fixedly connected to the outside of the sewage discharging hole (10), the surface fixed mounting of organism (1) has water-collecting plate (11), the surperficial joint of blowdown shell (7) has blowdown shell closing cap (12), the surface fixed mounting of blowdown shell closing cap (12) has handle (13).
2. The integrated sewage treatment apparatus of claim 1, wherein: and a water retaining tank (14) is fixedly arranged above the water inlet (3), and the water retaining tank (14) is fixedly arranged inside the machine body (1).
3. The integrated sewage treatment apparatus of claim 2, wherein: the surface mounting of water inlet (3) has filter screen (15), the bottom fixed mounting of manger plate case (14) has second fine filter screen (16).
4. The integrated sewage treatment apparatus of claim 1, wherein: and water leakage holes (17) are formed in the bottom of the sludge basket (8).
5. The integrated sewage treatment apparatus of claim 1, wherein: a rope (18) is fixedly arranged above the sludge basket (8), and a handle (19) is fixedly arranged at the other end of the rope (18).
6. The integrated sewage treatment apparatus of claim 5, wherein: the inner wall fixed mounting of blowdown shell (7) has couple (20), handle (19) joint is in the inside of couple (20).
CN202023173683.0U 2020-12-25 2020-12-25 Integrated sewage treatment equipment Expired - Fee Related CN215822546U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202023173683.0U CN215822546U (en) 2020-12-25 2020-12-25 Integrated sewage treatment equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202023173683.0U CN215822546U (en) 2020-12-25 2020-12-25 Integrated sewage treatment equipment

Publications (1)

Publication Number Publication Date
CN215822546U true CN215822546U (en) 2022-02-15

Family

ID=80186529

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202023173683.0U Expired - Fee Related CN215822546U (en) 2020-12-25 2020-12-25 Integrated sewage treatment equipment

Country Status (1)

Country Link
CN (1) CN215822546U (en)

Similar Documents

Publication Publication Date Title
CN105130055A (en) Rainwater collecting, purifying and reusing system
CN206233333U (en) Initial rainwater filtering, precipitating, discarding and collecting treatment system
CN105013244B (en) Multistage rainwater purification processing equipment
CN108797756A (en) Rain penetration purifies savings system in a kind of landscape planting
CN210104906U (en) Rain and sewage flow dividing device
CN211817483U (en) Automatic rainwater shunting and filtering bucket for building
CN208532424U (en) A kind of eavesdrop collection device
CN208472830U (en) A kind of hillside fields rainwater-collecting gravity irrigation device on the spot
CN207582618U (en) A kind of pump discharges into water system
CN106902569B (en) A kind of collection pretreatment system of city overland runoff initial rainwater
CN204865241U (en) Multistage rain purifying water process equipment
CN206143851U (en) Building rainwater collection and utilization device
CN210656406U (en) Rainwater collecting and recycling system
CN215822546U (en) Integrated sewage treatment equipment
CN205907805U (en) High -order rainwater regulation pond silt rinse -system
CN212881422U (en) Rainwater collecting and utilizing device
CN215102348U (en) Overflow sewage treatment and regulation system for reducing bottom mud pollution of drainage pipe network
CN212294975U (en) Overflow well for sponge city construction
CN113846740A (en) Initial rainwater collecting device
CN212358883U (en) Green roof
CN211285799U (en) Distributed low-energy-consumption rainwater collecting and treating system
CN210367318U (en) Oil-separating sand-settling device for sewage of villages and towns
CN115110470A (en) Flood-running river channel storage device
CN110145016A (en) A kind of rainwater applied to pipe gallery enters corridor device
CN214497803U (en) Municipal water utilization rainwater pipe net mouth structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220215