CN215803678U - Building construction safety control rail - Google Patents

Building construction safety control rail Download PDF

Info

Publication number
CN215803678U
CN215803678U CN202121410874.6U CN202121410874U CN215803678U CN 215803678 U CN215803678 U CN 215803678U CN 202121410874 U CN202121410874 U CN 202121410874U CN 215803678 U CN215803678 U CN 215803678U
Authority
CN
China
Prior art keywords
fence body
fence
water storage
building construction
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121410874.6U
Other languages
Chinese (zh)
Inventor
邓博
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202121410874.6U priority Critical patent/CN215803678U/en
Application granted granted Critical
Publication of CN215803678U publication Critical patent/CN215803678U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a building construction safety management fence in the technical field of building construction fences, which comprises a fence body, wherein a water storage cavity is arranged in the fence body, a water outlet is fixedly arranged on the right side of a base, a plurality of groups of convex blocks are arranged on the right side of the fence body, a plurality of groups of grooves are arranged on the left side of the fence body, a water injection port is fixedly arranged on the left side of the fence body, a water outlet matched with the water injection port is arranged on the right side of the fence body, a water storage opening is formed in the top end of the fence body, filter screens with mutually matched sizes are placed in the water storage opening, two groups of symmetrical solar panels are rotatably arranged at the upper end of the fence body, and a plurality of mounting buckles are fixedly arranged on the inner side surface of the fence body. The utility model has simple and reasonable integral structure arrangement, can effectively solve the problems of low installation efficiency, high expenditure cost of personnel and materials and fussy and inconvenient disassembly of the prior building construction fence, has better practical effect and is worthy of popularization and application in the prior market.

Description

Building construction safety control rail
Technical Field
The utility model relates to the technical field of building construction fences, in particular to a building construction safety management fence.
Background
The building construction fence is mainly used for constructing a circle of fence in the construction site range to isolate the construction site from the external environment, wherein the construction range is defined to determine the total construction area, and irrelevant personnel are prevented from entering the building construction site to bring safety problems, so that accident disputes are avoided.
Traditional construction site rail is for the enclosure of brick building or adopt the steelframe to build greatly, and the rail that this kind of traditional approach was built has guaranteed that the rail is firm relatively, but the texture of this kind of rail is heavier, causes the installation and dismantles comparatively loaded down with trivial details, needs a large amount of manpowers to go to accomplish, and the transportation of being more not convenient for causes the cost to be on the high side, and the practicality is not good.
Therefore, a building construction safety management fence is provided to solve the problems.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a building construction safety management fence for solving the defects in the prior art. In order to achieve the purpose, the utility model provides the following technical scheme:
a building construction safety management fence comprises a fence body, wherein a water storage cavity is arranged in the fence body, a base is fixedly arranged at the lower end of the fence body, a water outlet is fixedly arranged at the right side of the base, a plurality of groups of convex blocks are arranged at the right side of the fence body, a plurality of groups of grooves are arranged at the left side of the fence body, a water filling port is fixedly arranged at the left side of the fence body, a water outlet matched with the water filling port is arranged at the right side of the fence body, a water storage opening is formed in the top end of the fence body, filter screens with mutually matched sizes are placed in the water storage opening, clamping handles for fixing the filter screens are rotatably arranged at the left side and the right side of the water storage opening, two groups of symmetrical solar panels are rotatably arranged at the upper end of the fence body, a plurality of groups of supporting plates supported at the lower ends of the solar panels are rotatably arranged on the outer wall of the fence body, a plurality of mounting buckles are fixedly arranged on the inner side face of the fence body.
Preferably, the lug and the groove are mutually inserted and matched, and the lug outside the adjacent fence body is fixed through a screw after being inserted into the groove.
Preferably, the lower end of the water storage opening is butted with the water storage cavity, and the lower end of the water storage opening is provided with a plurality of sewer pipes leading to the water storage cavity.
Preferably, solar panel lower extreme face is provided with the spacing groove, solar panel rotates the upper end of connecting the rail body through first pivot, backup pad one end is rotated the outer wall of connecting the rail body through the second pivot, and backup pad other end butt spacing inslot wall.
Preferably, the upper end of rail body still is provided with the light, the light lower extreme is fixed through telescopic link fixed connection rail body.
Preferably, card hand one side is rotated through the connecting axle and is connected the open-ended inner wall of retaining, the position cover of connecting axle and retaining opening link is equipped with the coil spring, the fixed symmetry of card hand medial surface is provided with the multiunit staple, and the vertical activity of staple grafting filter screen, the fixed handle that is provided with of card hand lateral surface.
Compared with the prior art, the utility model has the beneficial effects that:
the fence is arranged in a hollow shape, the water storage cavities are arranged on the fence column body and the base, the plurality of fences are connected and fixed through the simple splicing structure, the water storage cavities are communicated, water is injected into the water storage cavities through the water injection pipes, the relative stability of fence placement is realized through the weight of water, after the project is finished, the water in the water storage cavities can be quickly drained through the water drainage ports, the fence body can be lightened, and compared with the traditional fence installation method, the fence is convenient to carry and install while the overall cost is reduced due to the fact that bricks or steel frames are needed for installing the fence.
In addition, a certain number of detachable retractable solar panels and illuminating lamps are arranged at the top end of the water storage cavity according to requirements, so that an auxiliary illuminating effect is provided for the whole water storage cavity, a water storage opening is further formed in the top of the fence for preventing water in the water storage cavity from evaporating, rainwater is collected and timely replenished, a filter screen is arranged at the upper end of the water storage opening through a simple and fast clamping structure for filtering some construction wastes, and the water storage opening and the water storage cavity are prevented from being blocked.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings used in the description of the embodiments will be briefly introduced below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art that other drawings can be obtained according to the drawings without creative efforts.
FIG. 1 is a schematic left side view of the present invention;
FIG. 2 is a schematic top view of the present invention;
FIG. 3 is a right side view of the present invention;
FIG. 4 is a schematic view of the structure of the card hand of the present invention;
FIG. 5 is a schematic cross-sectional view of the present invention;
FIG. 6 is a schematic bottom view of the present invention;
FIG. 7 is a schematic perspective view of the present invention.
The reference numbers in the figures are:
1 rail body, 2 retaining chambeies, 3 bases, 4 water filling ports, 5 delivery ports, 6 lugs, 7 recesses, 8 retaining openings, 801 downcomer, 9 solar panel, 901 first pivot, 902 spacing groove, 10 light, 1001 telescopic link, 11 installation are detained, 12 backup pads, 1201 second pivot, 13 drain outlet, 14 blocks hand, 1401 connecting axle, 1402 coil spring, 1403 staple, 1404 handle, 15 filter screen.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments.
Referring to fig. 1-7, a building construction safety management fence comprises a fence body 1, a water storage cavity 2 is arranged in the fence body 1, a base 3 is fixedly arranged at the lower end of the fence body 1, the base 3 is arranged to have a larger area and can provide more stable support for the fence body 1, a water outlet 13 is fixedly arranged on the right side of the base 3, the water outlet 13 is plugged by a leather plug, the fence can be waterproof by pulling out the leather plug, a plurality of groups of convex blocks 6 are arranged on the right side of the fence body 1, a plurality of groups of grooves 7 are arranged on the left side of the fence body 1, a water filling port 4 is fixedly arranged on the left side of the fence body 1, a water outlet 5 matched with the water filling port 4 is arranged on the right side of the fence body 1, rubber pads are arranged on the inner wall of the water filling port 4 and the outer wall of the water outlet 5, water seepage can be prevented while friction force is increased for convenient butt joint and fixation, a water storage opening 8 is arranged at the top end of the fence body 1, the filter screen 15 that the size was mutually supported has been placed in retaining opening 8, some building rubbish and other debris on the building site can be filtered to filter screen 15, prevent to cause the jam to retaining chamber 2 and retaining opening 8, retaining opening 8's the left and right sides is rotated and is provided with card hand 14 that fixes filter screen 15, the 15 outside of filter screen is provided with the fixed orifices that a plurality of cooperations card hand 14 are fixed, the solar panel 9 that is provided with two sets of symmetries is rotated to 1 upper end of rail body, the outer wall of rail body 1 rotates and is provided with the backup pad 12 that the multiunit supported at solar panel 9's lower extreme, 11 is detained in the fixed a plurality of installations that is provided with of medial surface of rail body 1, 11 cooperation screws of installation are detained can direct mount iron sheet or cystosepiment.
As shown in the accompanying drawings 1 and 3 of the specification, the projections 6 and the grooves 7 are mutually inserted and matched, the projections 6 outside the adjacent fence bodies 1 are inserted into the grooves 7 and then fixed through screws, and the projections 6 and the grooves 7 are directly fixed through screws after the projections 6 and the grooves 7 of the two adjacent fence bodies 1 are inserted into the grooves 7 so as to achieve the effect of fixing the fence bodies 1.
As shown in the attached figure 5, the lower end of the water storage opening 8 is butted with the water storage cavity 2, the lower end of the water storage opening 8 is provided with a plurality of sewer pipes 801 leading to the water storage cavity 2, the water storage opening can collect rainwater and supply water to the water storage cavity 2 through the sewer pipes 801, so that water in the water storage cavity 2 is prevented from evaporating, and water resources are saved.
As shown in the attached drawings 1 and 6 of the specification, the lower end face of the solar panel 9 is provided with a limiting groove 902, the solar panel 9 is rotatably connected with the upper end of the fence body 1 through a first rotating shaft 901, one end of the supporting plate 12 is rotatably connected with the outer wall of the fence body 1 through a second rotating shaft 1201, the other end of the supporting plate 12 is abutted to the inner wall of the limiting groove 902, the solar panel 9 and the supporting plate 12 are rotatably arranged, after the fence body 1 is disassembled after the engineering is finished, the solar panel 9 and the supporting plate 12 are flatly placed through a rotating structure, transportation and carrying are facilitated, and the solar panel 9 can be supported by the rotating structure supporting plate 12 again to work during use.
As shown in the attached drawing 3, the upper end of the fence body 1 is further provided with a lighting lamp 10, the lower end of the lighting lamp 10 is fixedly connected with the fence body 1 through a telescopic rod 1001, the height of the lighting lamp 10 can be adjusted through the telescopic rod 1001 during use, the lighting lamp 10 can be more comprehensive in irradiation range, and the risk that the lighting lamp 10 is scratched and damaged during transportation can be reduced while the lighting lamp 10 is conveniently transported through the telescopic rod 1001 during disassembly.
As shown in the attached specifications 2 and 4, one side of the clamping hand 14 is rotatably connected with the inner wall of the water storage opening 8 through a connecting shaft 1401, a coil spring 1402 is sleeved at the connecting end of the connecting shaft 1401 and the water storage opening 8, a plurality of groups of fixing nails 1403 are fixedly and symmetrically arranged on the inner side surface of the clamping hand 14, the fixing nail 1403 is movably inserted into the filter screen 15 in the longitudinal direction, the outer side surface of the clamping handle 14 is fixedly provided with a handle 1404, the catching hand 14 is pulled by the handle 1404, and the catching hand 14 is opened outward by the elasticity of the coil spring 1402, at which time the filter net 15 is placed on the water storage opening 8, after the filter screen 15 is matched with the water storage opening 8, the handle 1404 is loosened, the clamping hand 14 is closed inwards under the elastic action of the coil spring 1402, after the fixing nail 1403 is just inserted into the fixing hole on the outer side of the filter screen 15, the fixing is finished, the clamping hand 14 can be fixed to quickly fix the filter screen 15, the sundries on the subsequent filter screen 15 can be conveniently detached and cleaned while the filter screen 15 is prevented from shaking leftwards and rightwards.
The working steps of the building construction safety management fence are as follows:
at first transport multiunit rail body 1 to the building site scene, peg graft the cooperation after 7 through 6 butt joint recesses of lug and realize the rail that the concatenation of multiunit rail body formed the construction site to detain 11 cooperation screws through the installation and separate iron sheet or cystosepiment installation, make the equipment of a plurality of rail bodies 1 finish and separate building site and external world. Begin to carry out the water injection toward the retaining chamber 2 of 1 inner chamber of rail body through water filling port 4 to the rivers can flow to every rail body 1 through delivery port 5, fill up every rail body 1 until rivers, at this moment close the water source and can fix to the whole through rail body 1 after aggravating. A certain number of solar panels 9 can be installed according to the circumstances afterwards, and the solar panels are supported by the supporting plate 12 and the limiting grooves 901 on the solar panels 9 to generate electricity to supply power to the illuminating lamp 10, the height of the illuminating lamp 10 can be adjusted by the telescopic rod 1001, the good sight of the site at night is guaranteed, and the phenomenon of stealing can be prevented. In addition, the water storage opening 8 of the butt joint water storage cavity 2 is arranged at the top end of the fence body 1, the water storage opening 8 can receive rainwater to continuously supply water for the water storage cavity 2, the subsequent water adding is avoided, the water saving effect is achieved, the filter screen 15 can be installed rapidly in sequence through the clamping hand 14, and the filter screen 15 can effectively filter dust sundries on a building site and prevent the water storage opening 8 and the water storage cavity 2 from being blocked. After the building site engineering, through the water outlet 13 water in with retaining chamber 2 is discharged, dismantles the installation among the above-mentioned in proper order again, rail body 1 and other accessories alright use next time of loading.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the technical scope of the present invention, and equivalent alternatives or modifications according to the technical solution of the present invention and the inventive concept thereof should be covered by the scope of the present invention.

Claims (6)

1. The building construction safety management fence comprises a fence body (1), wherein a water storage cavity (2) is arranged in the fence body (1), and is characterized in that a base (3) is fixedly arranged at the lower end of the fence body (1), a water outlet (13) is fixedly arranged on the right side of the base (3), a plurality of groups of convex blocks (6) are arranged on the right side of the fence body (1), a plurality of groups of grooves (7) are arranged on the left side of the fence body (1), a water filling port (4) is fixedly arranged on the left side of the fence body (1), a water outlet (5) matched with the water filling port (4) is arranged on the right side of the fence body (1), a water storage opening (8) is formed in the top end of the fence body (1), filter screens (15) matched with each other in size are arranged in the water storage opening (8), clamping hands (14) for fixing the filter screens (15) are rotatably arranged on the left side and the right side of the water storage opening (8), the fence is characterized in that the upper end of the fence body (1) is rotatably provided with two sets of symmetrical solar panels (9), the outer wall of the fence body (1) is rotatably provided with a plurality of groups of supporting plates (12) which support the lower ends of the solar panels (9), and a plurality of installation buckles (11) are fixedly arranged on the inner side surface of the fence body (1).
2. The building construction safety management fence according to claim 1, characterized in that the projection (6) and the groove (7) are mutually inserted and matched, and the projection (6) outside the adjacent fence body (1) is inserted and fixed by a screw after being inserted and matched with the groove (7).
3. The construction safety management fence according to claim 1, characterized in that the lower end of the water storage opening (8) is butted with the water storage cavity (2), and the lower end of the water storage opening (8) is provided with a plurality of sewer pipes (801) leading to the water storage cavity (2).
4. The building construction safety management fence according to claim 1, characterized in that a limiting groove (902) is formed in the lower end face of the solar panel (9), the solar panel (9) is rotatably connected with the upper end of the fence body (1) through a first rotating shaft (901), one end of the supporting plate (12) is rotatably connected with the outer wall of the fence body (1) through a second rotating shaft (1201), and the other end of the supporting plate (12) abuts against the inner wall of the limiting groove (902).
5. The building construction safety management fence according to claim 1, characterized in that an illuminating lamp (10) is further arranged at the upper end of the fence body (1), and the lower end of the illuminating lamp (10) is fixedly connected with the fence body (1) through an expansion rod (1001).
6. The building construction safety management fence according to any one of claims 1 to 5, characterized in that one side of the clamping handle (14) is rotatably connected with the inner wall of the water storage opening (8) through a connecting shaft (1401), a coil spring (1402) is sleeved at the connecting end of the connecting shaft (1401) and the water storage opening (8), a plurality of groups of fixing nails (1403) are fixedly and symmetrically arranged on the inner side of the clamping handle (14), the fixing nails (1403) are longitudinally movably inserted into the filter screen (15), and a handle (1404) is fixedly arranged on the outer side of the clamping handle (14).
CN202121410874.6U 2021-06-24 2021-06-24 Building construction safety control rail Active CN215803678U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121410874.6U CN215803678U (en) 2021-06-24 2021-06-24 Building construction safety control rail

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121410874.6U CN215803678U (en) 2021-06-24 2021-06-24 Building construction safety control rail

Publications (1)

Publication Number Publication Date
CN215803678U true CN215803678U (en) 2022-02-11

Family

ID=80178294

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121410874.6U Active CN215803678U (en) 2021-06-24 2021-06-24 Building construction safety control rail

Country Status (1)

Country Link
CN (1) CN215803678U (en)

Similar Documents

Publication Publication Date Title
CN215803678U (en) Building construction safety control rail
CN207331827U (en) A kind of agriculture park rainwater stores and purifier
CN212079384U (en) Broken area supporting device of four lane super large section tunnel fault convenient to installation
CN213683462U (en) Movable telescopic tent framework
CN210316696U (en) Landscape garden corridor frame structure
CN213777431U (en) Tunnel lighting equipment for traffic engineering easy to assemble
CN214029623U (en) Pipeline spare arrangement frame for building engineering
CN111688009B (en) Building maintenance spray set for construction
CN213114759U (en) Stifled desilting system is prevented to town road engineering
CN109728771A (en) A kind of photovoltaic solar cell panels convenient for adjusting angle
CN210127129U (en) Water ecological restoration device
CN114411953A (en) Underground civil air defense engineering dysmorphism canopy frame of preventing collapsing
CN215565017U (en) Recycled concrete assembled enclosure wall
CN111894127A (en) Energy-conserving house of assembled timber structure
CN111395982A (en) Anti-floating anchor rod drilling construction mud collection device
CN215107713U (en) Assembled swimming pool
CN210276687U (en) Combined flower-frame vehicle
CN215630348U (en) A rainwater collection holds device for landscape architecture
CN219196813U (en) Protection device for foundation pit limb
CN213741518U (en) Construction structure of diversion wall of clean water tank
CN219568958U (en) Anchor bolt assembled retaining wall
CN210239345U (en) Instrument formula removes basic green environment-friendly and encloses fender
CN205530645U (en) Concatenation formula reservoir structure
CN218713183U (en) Building construction deep basal pit drainage device