CN215802860U - Building heat preservation hangs operation instrument futilely - Google Patents

Building heat preservation hangs operation instrument futilely Download PDF

Info

Publication number
CN215802860U
CN215802860U CN202121941524.2U CN202121941524U CN215802860U CN 215802860 U CN215802860 U CN 215802860U CN 202121941524 U CN202121941524 U CN 202121941524U CN 215802860 U CN215802860 U CN 215802860U
Authority
CN
China
Prior art keywords
block
connecting block
shape
metal
sliding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121941524.2U
Other languages
Chinese (zh)
Inventor
姜宏义
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Yueda Energy Saving Technology Co ltd
Original Assignee
Shanghai Yueda Energy Saving Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Yueda Energy Saving Technology Co ltd filed Critical Shanghai Yueda Energy Saving Technology Co ltd
Priority to CN202121941524.2U priority Critical patent/CN215802860U/en
Application granted granted Critical
Publication of CN215802860U publication Critical patent/CN215802860U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to the technical field of heat preservation dry hanging, in particular to an operation tool for dry hanging a building heat preservation, wherein a plurality of metal hangers are arranged, fixed grooves are respectively arranged on the right side of the front surface of each metal hanger, each fixed groove is in an inverted L shape, a through hole is respectively arranged on the left end surface of each fixed groove, a fixed cavity is respectively arranged in the middle of each through hole, a connecting block is respectively arranged in each fixed cavity, a baffle disc is arranged in the middle of each connecting block, a lifting block is arranged on the left side of each metal hanger, a plurality of groups of fixed grooves are respectively arranged on the right end surface of each lifting block, an angle steel is arranged on the right side of each metal hanger, an L-shaped fixture block is arranged on the left side of each angle steel, a fixed hole is respectively arranged on the left end surface of each L-shaped fixture block, compared with the existing heat-insulating layer dry-hanging operation tool, the heat-insulating layer dry-hanging operation tool has the advantages that the overall stability, safety, convenience and practicability of the heat-insulating layer dry-hanging operation tool can be improved through the design.

Description

Building heat preservation hangs operation instrument futilely
Technical Field
The utility model relates to the technical field of insulating layer dry hanging, in particular to an operating tool for building insulating layer dry hanging.
Background
As is well known, China has raised higher requirements for the heat preservation and insulation performance of house buildings at present, and many urban residential buildings are still simple flat roofs at present. External heat preservation is a building heat preservation energy-saving technology widely popularized at present. Compared with the internal heat insulation, the external heat insulation has reasonable technology and obvious superiority, and the external heat insulation has better effect than the internal heat insulation by using the heat insulation materials with the same specification, size and performance. The external heat insulation technology is not only suitable for newly-built structural engineering, but also suitable for reconstruction of old buildings, and has wide application range and high technical content; the outer heat insulation bag is arranged on the outer side of the main body structure, so that the main body structure can be protected, and the service life of a building is prolonged; the heat bridge of the building structure is effectively reduced, the effective space of the building is increased, and the dry hanging is a hanging construction method for firmly hanging the decorative material on the structure body by adopting the metal hanging piece to form the decorative surface.
But the connected mode of metal pendant and ornamental material is connected through bolt and nut at present, in order to guarantee the intensity of wall body and reduce the cost of material, the installation quantity of metal pendant is a plurality of in every wall body, makes ornamental material can only be by the equipment of workman one by one like this to the metal pendant has low to high and arranges, makes the workman be under construction and need assemble with the help of the companion ladder, and the process is comparatively inconvenient, consequently, we propose a building heat preservation and hang the handling tool futilely.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Aiming at the defects of the prior art, the utility model provides an operation tool for dry hanging of a building heat-insulating layer, which has higher overall stability, safety, convenience and practicability.
(II) technical scheme
In order to achieve the purpose, the utility model provides the following technical scheme: a building heat preservation dry hanging operation tool comprises metal hanging pieces and a wall body, wherein the number of the metal hanging pieces is multiple, the metal hanging pieces are all arranged on the front side of the wall body, a fixing groove is formed in the right side of the front side of each metal hanging piece and is in an inverted L shape, a through hole is formed in the left end face of each fixing groove, a fixing cavity is formed in the middle of each through hole, a connecting block is arranged inside each fixing cavity, a baffle disc is arranged in the middle of each connecting block, a spring is arranged inside each fixing cavity, the left side of each spring is in contact with the right end of the baffle disc, a lifting block is arranged on the left side of each metal hanging piece, a plurality of groups of fixing grooves are formed in the right end face of each lifting block, the number of the fixing grooves in each group of fixing grooves is two and is in a step-shaped arrangement, each connecting block is respectively matched with each group of fixing grooves, the right side of every metal pendant is provided with the angle steel to the left side of angle steel is provided with L shape fixture block, and every L shape fixture block cooperates with the fixed slot respectively, and the fixed orifices has all been seted up to the left side terminal surface of every L shape fixture block, and the right side and the fixed orifices of connecting block cooperate.
Furthermore, the metal hanger on the left side of the lowest part is provided with a supporting plate, only a threaded hole is formed in the middle of the top end of the supporting plate, a screw rod is connected inside the threaded hole, and the top end of the screw rod is fixedly connected with a connecting block through welding.
Still further, two sliding tray of the equal fixture block of left end of every metal pendant, the right-hand member of lifting block is provided with two sliding blocks to the sliding block is sliding fit in the inside that is located the sliding tray.
It should also be noted that the top of each slider is shaped as an inverted T and the shape of the sliding channel matches the shape of the slider.
On preceding basis, the shape of every fixed slot is the square to the fixed slot upper end surface that is located every group bottom sets up for the slope, and the left side shape of every connecting block is the same with the fixed slot shape, and the left side up end of connecting block sets up for the slope, and the connecting block tip of inclining parallels with the fixed slot tip of inclining.
Furthermore, the corner angle of the front end of each fixing groove is a chamfer.
(III) advantageous effects
Compared with the prior art, the utility model provides an operation tool for dry hanging of a building insulation layer, which has the following beneficial effects:
1. according to the utility model, through the design of the connecting block, the right side of the connecting block is matched with the fixing hole, the lifting block moves up and down to extrude the connecting block, so that the connecting block moves left and right and is inserted into the fixing hole to be matched, the L-shaped clamping block is fixed with the metal pendant, the metal pendant and the angle steel are further assembled at one time through the upgrading block, and the whole stability, safety, convenience and practicability are higher.
2. According to the utility model, through the design of the supporting plate, the screw rod is in threaded connection with the supporting plate, the supporting plate is a fixed part, the screw rod moves upwards due to the matching of the screw rod and the supporting plate, so that the lifting block is driven to move, the adjustment by an operator is convenient, meanwhile, the sliding block is positioned in the sliding groove and is in sliding fit, the lifting block is more stable when being positioned in the sliding groove and moves up and down, and the convenience, the lifting stability and the practicability of the whole operation are higher.
Drawings
FIG. 1 is a schematic front view of the present invention;
FIG. 2 is a left side view of the metal pendant of the present invention;
FIG. 3 is an enlarged, partial, schematic view of FIG. 1 at A;
FIG. 4 is a schematic top view of the present invention;
FIG. 5 is a schematic view of a portion of the structure shown at B in FIG. 4 according to the present invention;
fig. 6 is a partially enlarged structural view of the utility model shown at C in fig. 1.
In the figure: 1. a metal pendant; 2. a wall body; 3. connecting blocks; 4. a catch tray; 5. a spring; 6. a lifting block; 7. angle steel; 8. an L-shaped fixture block; 9. a support plate; 10. a screw; 11. and a slider.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-6, the present invention provides a technical solution.
In the embodiment, please read fig. 1, fig. 2 and fig. 3, a building insulation layer dry-hanging operation tool comprises a plurality of metal hangers 1 and a wall body 2, wherein the number of the metal hangers 1 is multiple, the plurality of metal hangers 1 are all arranged on the front surface of the wall body 2, a fixing groove is arranged on the right side of the front surface of each metal hanger 1, the fixing groove is in an inverted L shape, a through hole is arranged on the left end surface of each fixing groove, a fixing cavity is arranged in the middle of each through hole, a connecting block 3 is arranged inside each fixing cavity, a blocking disc 4 is arranged in the middle of each connecting block 3, a spring 5 is arranged inside each fixing cavity, the left side of each spring 5 is in contact with the right end of the blocking disc 4, a lifting block 6 is arranged on the left side of each metal hanger 1, a plurality of groups of fixing grooves are arranged on the right end surface of the lifting block 6, and the number of the fixing grooves in each group is two, each connecting block 3 is matched with each group of fixing grooves respectively, the shape of each fixing groove is a cube, the upper end surface of the fixing groove at the bottom of each group is obliquely arranged, the left side of each connecting block 3 is the same as that of the fixing groove, the upper end surface of the left side of each connecting block 3 is obliquely arranged, the oblique end of each connecting block 3 is parallel to that of the fixing groove, so that the lifting block 6 can lift the connecting block 3 more conveniently, the lifting block 6 and the connecting block 3 cannot be clamped due to the two same inclined planes, an angle steel 7 is arranged on the right side of each metal pendant 1, an L-shaped fixture block 8 is arranged on the left side of each angle steel 7, each L-shaped fixture block 8 is matched with the fixing groove respectively, the edge angle at the front end of each fixing groove is chamfered, so that the L-shaped fixture block 8 can be installed inside the fixing groove more smoothly, and a fixing hole is formed in the left end surface of each L-shaped fixture block 8, and the right side of connecting block 3 cooperates with the fixed orifices, and elevator 6 reciprocates extrusion connecting block 3 for remove about connecting block 3, and insert the inside of fixed orifices and cooperate, thereby realize that L shape fixture block 8 fixes with metal pendant 1, further make a plurality of metal pendant 1 and angle steel 7 once only accomplish the equipment through the upgrading piece, above make this hang the holistic stability of handling tool futilely, safe convenience and practicality higher.
In the embodiment, please read fig. 4, fig. 5 and fig. 6, a support plate 9 is disposed on the left side of the metal hanger 1 located at the lowest portion, only a threaded hole is formed in the middle of the top end of the support plate 9, a screw 10 is connected inside the threaded hole, the top end of the screw 10 is connected and fixed with the connecting block 3 by welding, the support plate 9 is a fixed component, the screw 10 moves upward by the cooperation of the screw 10 and the support plate 9, so as to drive the lifting block 6 to move, which is convenient for an operator to adjust, the left end of each metal hanger 1 is clamped with two sliding grooves, the right end of the lifting block 6 is provided with two sliding blocks 11, the sliding blocks 11 are located inside the sliding grooves and are in sliding fit, the top of each sliding block 11 is in an inverted T shape, and the shape of the sliding grooves is matched with the shape of the sliding blocks 11, so that the lifting block 6 is more stable when moving up and down inside the sliding grooves, the whole operation convenience, lifting stability and practicability of the dry-hanging operation tool are higher.
To sum up, this building heat preservation hangs operating means futilely, at first fix metal hanger 1 in wall body 2 when establishing wall body 2, angle steel 7 stands up again, and install L shape fixture block 8 that angle steel 7 was provided with in the fixed slot, screw rod 10 makes screw rod 10 upwards remove with the cooperation of layer board 9, thereby drive elevator 6 and remove, elevator 6 reciprocates extrusion connecting block 3, make connecting block 3 about remove, and insert the inside of fixed orifices and cooperate, thereby realize that L shape fixture block 8 fixes with metal hanger 1, install fossil fragments in angle steel 7 again, after the fossil fragments construction finishes, spread the fire prevention rock wool heat preservation in the fossil fragments intermediate layer.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a building heat preservation hangs operation instrument futilely, includes metal pendant (1) and wall body (2), its characterized in that: the number of the metal hangers (1) is multiple, the metal hangers (1) are all arranged on the front face of a wall body (2), each metal hanger (1) is provided with a fixing groove on the right side of the front face and is in an inverted L shape, a through hole is formed in the left end face of each fixing groove, a fixing cavity is formed in the middle of each through hole, each fixing cavity is internally provided with a connecting block (3), a baffle disc (4) is arranged in the middle of each connecting block (3), a spring (5) is arranged in each fixing cavity, the left side of each spring (5) is in contact with the right end of the baffle disc (4), a lifting block (6) is arranged on the left side of each metal hanger (1), multiple groups of fixing grooves are formed in the right end face of each lifting block (6), and the number of the fixing grooves in each group of fixing grooves is two, and be the step form setting, every connecting block (3) cooperate with every group fixed slot respectively, every the right side of metal pendant (1) is provided with angle steel (7) to the left side of angle steel (7) is provided with L shape fixture block (8), every L shape fixture block (8) cooperate with the fixed slot respectively, every the fixed orifices has all been seted up to the left side terminal surface of L shape fixture block (8), and the right side and the fixed orifices of connecting block (3) cooperate.
2. The building insulation dry-hanging operation tool according to claim 1, characterized in that: the left side of the metal pendant (1) positioned at the lowest part is provided with a supporting plate (9), only a threaded hole is formed in the middle of the top end of the supporting plate (9), a screw rod (10) is connected inside the threaded hole, and the top end of the screw rod (10) is fixedly connected with the connecting block (3) through welding.
3. The building insulation dry-hanging operation tool according to claim 1, characterized in that: every two sliding chutes of the left end equal fixture block of metal pendant (1), the right-hand member of elevator (6) is provided with two sliding blocks (11) to sliding block (11) are located the inside of sliding chute and are sliding fit.
4. The building insulation dry-hanging operation tool according to claim 3, characterized in that: the top of each sliding block (11) is in an inverted T shape, and the shape of the sliding groove is matched with that of the sliding block (11).
5. The building insulation dry-hanging operation tool according to claim 1, characterized in that: every the shape of fixed slot is the square to the fixed slot upper end surface that is located every group bottom sets up for the slope, every the left side shape of connecting block (3) is the same with the fixed slot shape, and the left side up end of connecting block (3) sets up for the slope, connecting block (3) slope end parallels with the fixed slot slope end.
6. The building insulation dry-hanging operation tool according to claim 1, characterized in that: every the front end edges and corners of fixed slot all set up to the chamfer.
CN202121941524.2U 2021-08-18 2021-08-18 Building heat preservation hangs operation instrument futilely Active CN215802860U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121941524.2U CN215802860U (en) 2021-08-18 2021-08-18 Building heat preservation hangs operation instrument futilely

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121941524.2U CN215802860U (en) 2021-08-18 2021-08-18 Building heat preservation hangs operation instrument futilely

Publications (1)

Publication Number Publication Date
CN215802860U true CN215802860U (en) 2022-02-11

Family

ID=80133115

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121941524.2U Active CN215802860U (en) 2021-08-18 2021-08-18 Building heat preservation hangs operation instrument futilely

Country Status (1)

Country Link
CN (1) CN215802860U (en)

Similar Documents

Publication Publication Date Title
CN215802860U (en) Building heat preservation hangs operation instrument futilely
CN113482269A (en) Adjustable installation design structure of big version width of cloth honeycomb rock plate of multiple spot dry-hanging
CN202831419U (en) Steel structure cold bridge preventing roofing system
CN209723414U (en) Roofing solar energy light collecting ejection device
CN213774026U (en) Assembled is exterior wallboard fossil fragments for building
CN207660137U (en) Assembled wall body structure
CN217027688U (en) Sliding suspended ceiling
CN203915834U (en) Smoke-proof pendant wall
CN210316324U (en) Plank mounting structure for building
CN218643659U (en) Green energy-conserving assembly type structure indoor structure
CN207298350U (en) A kind of bursting diaphragm being easily installed
CN216446259U (en) Green energy-conserving firm building curtain
CN219973760U (en) Building decoration board mounting structure
CN212405689U (en) Panel fixing structure for modular integrated ceiling
CN219952316U (en) Sound insulation type building board
CN209924247U (en) Simple keel mounting structure
CN217602208U (en) Bearing support device for building repair
CN216276627U (en) Fixing structure of decorative board for building
CN219060491U (en) Building energy-saving curtain wall capable of being spliced
CN217480540U (en) Glass curtain wall decoration strip mounting structure
CN209958620U (en) Tile hanging device and tile roof
CN213572608U (en) Locking device capable of being adjusted at multiple angles for ceiling board
CN220395139U (en) Building lifting hanging basket
CN215716371U (en) Fireproof building board with heat preservation and energy saving functions for building curtain wall
CN209909699U (en) Novel wall washing spotlight

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant