CN215800736U - Splicing structure for new and old roadbed reconstruction and extension project face - Google Patents

Splicing structure for new and old roadbed reconstruction and extension project face Download PDF

Info

Publication number
CN215800736U
CN215800736U CN202122107729.7U CN202122107729U CN215800736U CN 215800736 U CN215800736 U CN 215800736U CN 202122107729 U CN202122107729 U CN 202122107729U CN 215800736 U CN215800736 U CN 215800736U
Authority
CN
China
Prior art keywords
wall
fixing plate
bolt
fixed plate
layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122107729.7U
Other languages
Chinese (zh)
Inventor
金哲彪
熊士祥
宋东恒
曾嘉文
罗杉艳
李定国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shao Yang Road & Bridge Construction Co ltd
Original Assignee
Shao Yang Road & Bridge Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shao Yang Road & Bridge Construction Co ltd filed Critical Shao Yang Road & Bridge Construction Co ltd
Priority to CN202122107729.7U priority Critical patent/CN215800736U/en
Application granted granted Critical
Publication of CN215800736U publication Critical patent/CN215800736U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model relates to the technical field of road construction, and discloses a splicing structure of a new and old road bed reconstruction and extension engineering surface, which comprises a road bed, wherein a bolt is arranged in the road bed, a first fixing plate is arranged in the road bed, a clamping block is arranged in the first fixing plate, a spring is arranged in the first fixing plate, a second fixing plate is arranged in the road bed, the inner wall of the road bed is connected with the outer wall of the second fixing plate, the inner wall of the road bed is connected with the outer wall of the first fixing plate, the inner wall of the first fixing plate is connected with one end of the spring, one end of the spring is connected with the outer wall of the clamping block, the outer wall of the clamping block is connected with the inner wall of the first fixing plate, the clamping block is clamped into the clamping groove under the action of the spring by arranging the road bed, the bolt, the clamping block, the spring, the clamping groove, the first fixing plate and the second fixing plate, the fixing effect is better, and the purpose of firmer splicing surface is achieved.

Description

Splicing structure for new and old roadbed reconstruction and extension project face
Technical Field
The utility model relates to the technical field of road construction, in particular to a splicing structure for a new and old roadbed reconstruction and extension project face.
Background
Along with the rapid development of Chinese economy and the rapid increase of traffic volume, the number of highway transportation requirements in China is increased year by year, the traffic flow of some existing highways is saturated, widening and modification are urgently needed to improve the traffic capacity of the highways, and the rapid development requirements of modern economy are further met, however, through vehicle loads for many years, the settlement deformation of original roadbeds of the highways reaches a stable state, and the roadbed fillers of widened parts can also generate compression deformation and settlement deformation, so that the strength difference between new and old roadbeds is different to generate differential settlement, and further the pavement structure at the joint part of the new and old roadbeds is seriously longitudinally cracked and separated; at present, only the pavement materials are repaired and poured during splicing, so that the supporting force of the pavement is insufficient; therefore, a splicing structure for a new and old roadbed reconstruction and extension project surface is needed.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a splicing structure for a new and old roadbed reconstruction and extension project face, and the purpose of solving the problems in the background technology is achieved.
In order to achieve the purpose, the utility model provides the following technical scheme: the utility model provides a new and old road bed rebuilds extension engineering face mosaic structure, includes the road bed, be equipped with the bolt in the road bed, be equipped with first fixed plate in the road bed, the inside of first fixed plate is provided with the fixture block, the inside of first fixed plate is equipped with the spring, be provided with the second fixed plate in the road bed.
Preferably, the inner wall of the roadbed is connected with the outer wall of the second fixing plate, the inner wall of the roadbed is connected with the outer wall of the first fixing plate, and the inner wall of the first fixing plate is connected with one end of the spring, so that the first fixing plate can provide supporting force for the spring.
Preferably, one end of the spring is connected with the outer wall of the clamping block, the outer wall of the clamping block is connected with the inner wall of the first fixing plate, one end of the clamping block penetrates through the inner wall of the first fixing plate and extends to the outside of the first fixing plate, and therefore the clamping block can limit the plug pin.
Preferably, the inner wall of first fixed plate and the outer wall connection of bolt, the one end of bolt runs through the outer wall of first fixed plate and extends to the outside of first fixed plate, the outer wall of bolt and the inner wall connection of second fixed plate, the one end of bolt runs through the outer wall of second fixed plate and extends to the outside of second fixed plate for the bolt can carry on spacingly to first fixed plate, second fixed plate.
Preferably, the outer wall of bolt and the inner wall connection of ground, the draw-in groove has been seted up to the surface of bolt, the inner wall of draw-in groove and the outer wall connection of fixture block, the draw-in groove is the same with length, the width homogeneous phase of fixture block, the protruding setting in top of bolt for the fixture block can be gone into in the draw-in groove.
Preferably, the outer wall of the second fixing plate is connected with the bottom of the stone layer, the sand layer is filled in the stone layer, and the top of the stone layer is connected with the bottom of the sand layer, so that the sand layer can fill the gap in the stone layer.
Preferably, the top of sandy soil layer is connected with the bottom of concrete layer, the top of concrete layer is connected with the bottom on pitch layer, stone layer, sandy soil layer, concrete layer, pitch layer all are connected with the road bed.
The utility model provides a splicing structure for a new and old roadbed reconstruction and extension project face. The method has the following beneficial effects:
(1) according to the utility model, the roadbed, the bolt, the fixture block, the spring, the clamping groove, the first fixing plate and the second fixing plate are arranged, the clamping groove is formed in the outer surface of the bolt, and when the bolt is driven into the first fixing plate through the hammer, the fixture block is clamped into the clamping groove under the action of the spring, so that the fixing effect is better, and the purpose of firmer splicing surface is achieved.
(2) The asphalt layer, the concrete layer, the sand layer and the stone layer are arranged, the sand layer is arranged, so that the concrete layer is firmer in the laying process, gaps among the stone layers are filled, the pavement can obtain enough supporting force, and the stone layer is arranged so that the foundation can obtain enough supporting force, so that the service life of the pavement is prolonged.
Drawings
FIG. 1 is a front view of the present invention;
FIG. 2 is a front cross-sectional view of the present invention;
FIG. 3 is a block diagram of the latch of the present invention;
fig. 4 is an enlarged view of the present invention a.
In the figure: 1 roadbed, 2 bolts, 3 fixture blocks, 4 springs, 5 draw-in grooves, 6 first fixed plates, 7 second fixed plates, 8 asphalt layers, 9 concrete layers, 10 sand soil layers and 11 stone layers.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments.
Examples of which are illustrated in the accompanying drawings, wherein like reference numerals refer to the same or similar elements or elements having the same or similar function throughout. The embodiments described below with reference to the drawings are illustrative and intended to be illustrative of the utility model and are not to be construed as limiting the utility model.
In the description of the present invention, it is to be understood that the terms "central," "longitudinal," "lateral," "length," "width," "thickness," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," "outer," "clockwise," "counterclockwise," "axial," "radial," "circumferential," and the like are used in the orientations and positional relationships indicated in the drawings for convenience in describing the utility model and to simplify the description, and are not intended to indicate or imply that the referenced devices or elements must have a particular orientation, be constructed and operated in a particular orientation, and are therefore not to be considered limiting of the utility model.
In the present invention, unless otherwise expressly stated or limited, the terms "mounted," "connected," "secured," and the like are to be construed broadly and can, for example, be fixedly connected, detachably connected, or integrally formed; can be mechanically or electrically connected; either directly or indirectly through intervening media, either internally or in any other relationship. The specific meanings of the above terms in the present invention can be understood by those skilled in the art according to specific situations.
As shown in fig. 1 to 4, the present invention provides a technical solution: a splicing structure for a new and old roadbed reconstruction and extension project comprises a roadbed 1, wherein a bolt 2 is arranged in the roadbed 1, a first fixing plate 6 is arranged in the roadbed 1, a clamping block 3 is arranged in the first fixing plate 6, a spring 4 is arranged in the first fixing plate 6, a second fixing plate 7 is arranged in the roadbed 1, the inner wall of the roadbed 1 is fixedly connected with the outer wall of the second fixing plate 7, the inner wall of the roadbed 1 is fixedly connected with the outer wall of the first fixing plate 6, the inner wall of the first fixing plate 6 is fixedly connected with one end of the spring 4, one end of the spring 4 is fixedly connected with the outer wall of the clamping block 3, the outer wall of the clamping block 3 is slidably connected with the inner wall of the first fixing plate 6, one end of the clamping block 3 penetrates through the inner wall of the first fixing plate 6 and extends to the outside of the first fixing plate 6, the inner wall of the first fixing plate 6 is slidably connected with the outer wall of the bolt 2, one end of the bolt 2 penetrates through the outer wall of the first fixing plate 6 and extends to the outside of the first fixing plate 6, the outer wall of the bolt 2 is in sliding connection with the inner wall of the second fixing plate 7, one end of the bolt 2 penetrates through the outer wall of the second fixing plate 7 and extends to the outside of the second fixing plate 7, the outer wall of the bolt 2 is in sliding connection with the inner wall of the foundation 1, the outer surface of the bolt 2 is provided with the clamping groove 5, the inner wall of the clamping groove 5 is in sliding connection with the outer wall of the clamping block 3, the length and the width of the clamping groove 5 are the same as those of the clamping block 3, and the top of the bolt 2 is convexly arranged, so that the bolt 2 does not have large bulges after being nailed into the roadbed 1 to influence the running of a vehicle, through the arrangement of the roadbed 1, the bolt 2, the clamping block 3, the spring 4, the clamping groove 5, the first fixing plate 6 and the second fixing plate 7, supporting force is provided for fillers through the second fixing plate 7 to prevent sinking, the first fixing plate 6 covers the uppermost surface, so that the stress of the road surface can be uniform when the vehicle passes through, and through the bolt 2 can evenly apply force to the first fixing plate 6, Second fixed plate 7 is spacing, through set up draw-in groove 5 at 2 surfaces of bolt, when driving bolt 2 into first fixed plate 6 through the hammer, make 3 card of fixture block go into draw-in groove 5 under the effect of spring 4 for fixed effect is better, has reached and has made the concatenation face more firm purpose.
The outer wall of the second fixing plate 7 is fixedly connected with the bottom of the stone layer 11, the inside of the stone layer 11 is filled with a sand layer 10, the top of the stone layer 11 is fixedly connected with the bottom of the sand layer 10, the top of the sand layer 10 is fixedly connected with the bottom of the concrete layer 9, the top of the concrete layer 9 is fixedly connected with the bottom of the asphalt layer 8, the stone layer 11, the sand layer 10, the concrete layer 9 and the asphalt layer 8 are all connected with the roadbed 1, by arranging the asphalt layer 8, the concrete layer 9, the sand layer 10 and the stone layer 11, the pavement can be more wear-resistant through the asphalt layer 8, vehicles run up without causing loss to the pavement, the pavement is not easy to break, the service life of the pavement is longer, through the concrete layer 9, the asphalt layer 8 can obtain enough supporting force when being laid, and the pavement is easy to flatten, the pavement is more durable, by arranging the sand layer 10, make concrete layer 9 foundation more firm when laying, all fill up the space between stone layer 11 for the road surface can obtain sufficient holding power, makes the foundation can obtain sufficient holding power through setting up stone layer 11, extension road surface live time.
When in use, the roadbed 1, the bolt 2, the fixture block 3, the spring 4, the clamping groove 5, the first fixing plate 6 and the second fixing plate 7 are arranged, the second fixing plate 7 provides supporting force for the filler to prevent sinking, the first fixing plate 6 covers the top of the road surface, so that the stress of the road surface can be uniform when a vehicle passes through the road surface, the first fixing plate 6 and the second fixing plate 7 are limited by the bolt 2, the clamping groove 5 is arranged on the outer surface of the bolt 2, when the bolt 2 is driven into the first fixing plate 6 by a hammer, the fixture block 3 is clamped into the clamping groove 5 under the action of the spring 4, so that the fixing effect is better, the purpose of firmer splicing surface is achieved, the asphalt layer 8, the concrete layer 9, the sand layer 10 and the stone layer 11 are arranged, the road surface can be more wear-resistant by the asphalt layer 8, and the vehicle cannot cause loss to the road surface when running, difficult breakage, make road surface life longer, through concrete layer 9, make asphalt layer 8 when laying, can obtain sufficient holding power, and flatten easily, make the road surface more durable, through setting up sand layer 10, make concrete layer 9 ground more firm when laying, all fill up the space between stone layer 11, make the road surface can obtain sufficient holding power, make the ground can obtain sufficient holding power through setting up stone head layer 11, prolong road surface live time.
In summary, the above embodiments are only preferred embodiments of the present invention, and the protection scope of the present invention is not limited thereby, so: all equivalent changes made according to the structure, shape and principle of the utility model are covered by the protection scope of the utility model.

Claims (7)

1. The utility model provides a new and old road bed rebuilds extension engineering face mosaic structure, includes road bed (1), its characterized in that: be equipped with bolt (2) in road bed (1), be equipped with first fixed plate (6) in road bed (1), the inside of first fixed plate (6) is provided with fixture block (3), the inside of first fixed plate (6) is equipped with spring (4), be provided with second fixed plate (7) in road bed (1).
2. The splicing structure of the new and old roadbed reconstruction and extension project face according to claim 1, characterized in that: the inner wall of road bed (1) and the outer wall connection of second fixed plate (7), the inner wall of road bed (1) and the outer wall connection of first fixed plate (6), the inner wall of first fixed plate (6) is connected with the one end of spring (4).
3. The splicing structure of the new and old roadbed reconstruction and extension project face according to claim 2, characterized in that: one end of the spring (4) is connected with the outer wall of the clamping block (3), the outer wall of the clamping block (3) is connected with the inner wall of the first fixing plate (6), and one end of the clamping block (3) penetrates through the inner wall of the first fixing plate (6) and extends to the outside of the first fixing plate (6).
4. The splicing structure of the new and old roadbed reconstruction and extension project face according to claim 3, wherein: the inner wall of first fixed plate (6) and the outer wall connection of bolt (2), the outside that the outer wall that first fixed plate (6) were run through to the one end of bolt (2) extended to first fixed plate (6), the outer wall of bolt (2) and the inner wall connection of second fixed plate (7), the outer wall that the one end of bolt (2) was run through second fixed plate (7) extends to the outside of second fixed plate (7).
5. The splicing structure of the new and old roadbed reconstruction and extension project face according to claim 4, wherein: the outer wall of bolt (2) and the inner wall connection of ground (1), draw-in groove (5) have been seted up to the surface of bolt (2), the inner wall of draw-in groove (5) and the outer wall connection of fixture block (3), length, the width homogeneous phase of draw-in groove (5) and fixture block (3) are the same, the protruding setting in top of bolt (2).
6. The splicing structure of the new and old roadbed reconstruction and extension project face according to claim 5, wherein: the outer wall of the second fixing plate (7) is connected with the bottom of the stone layer (11), a sand layer (10) is filled in the stone layer (11), and the top of the stone layer (11) is connected with the bottom of the sand layer (10).
7. The splicing structure of the new and old roadbed reconstruction and extension project face according to claim 6, wherein: the top of sand bed (10) is connected with the bottom of concrete layer (9), the top of concrete layer (9) is connected with the bottom of pitch layer (8), stone layer (11), sand bed (10), concrete layer (9), pitch layer (8) all are connected with road bed (1).
CN202122107729.7U 2021-09-02 2021-09-02 Splicing structure for new and old roadbed reconstruction and extension project face Active CN215800736U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122107729.7U CN215800736U (en) 2021-09-02 2021-09-02 Splicing structure for new and old roadbed reconstruction and extension project face

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122107729.7U CN215800736U (en) 2021-09-02 2021-09-02 Splicing structure for new and old roadbed reconstruction and extension project face

Publications (1)

Publication Number Publication Date
CN215800736U true CN215800736U (en) 2022-02-11

Family

ID=80155087

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122107729.7U Active CN215800736U (en) 2021-09-02 2021-09-02 Splicing structure for new and old roadbed reconstruction and extension project face

Country Status (1)

Country Link
CN (1) CN215800736U (en)

Similar Documents

Publication Publication Date Title
CN103628376B (en) Bumping at bridge-head control structure and laying method thereof based on concrete composite road surface
WO2011160562A1 (en) Double-direction interlocking brick, pavement and paving method using the same
CN215800736U (en) Splicing structure for new and old roadbed reconstruction and extension project face
CN203639841U (en) Steel plate-concrete combined reinforcement structure of hollow plate beam
CN112267337A (en) Assembled channel type soilless roadbed
CN208395602U (en) Steel joint structure of assembled road surface
CN214271531U (en) Road bed strutting arrangement is used in road bridge construction
CN214301069U (en) Crack reinforcing equipment for roads and bridges
CN214005284U (en) Widened and spliced roadbed structure of roadbed
CN113403903B (en) Roadbed reinforcing structure for highway construction and construction process thereof
CN214783018U (en) Be used for new and old road bed road surface mosaic structure
CN219568513U (en) Modified asphalt pavement structure
CN205711584U (en) For weakening interactional pellet type retaining wall structure between roadbed
CN111501579A (en) Road and bridge crack reinforced structure device
CN220888340U (en) Concrete paving device for construction of expressway bridge deck leveling layer
CN219732060U (en) Pile foundation structure applied to loose geological structure
CN221297458U (en) Reinforced concrete road surface roadbed
CN213142744U (en) Asphalt pavement crack repairing and filling structure
CN218203657U (en) Municipal works road laying structure
CN219218568U (en) New and old roadbed anchoring splicing structure
CN216193749U (en) Assembly type road structure for construction site
CN114908629A (en) Use stable driving road surface structure
CN217438600U (en) Anti-reflection crack modified asphalt pavement structure
CN213447908U (en) Widening and splicing roadbed structure of new and old roadbed
CN217710143U (en) Pavement structure of high-performance fine steel pavement

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant