CN215785837U - Tower barrel correction kit - Google Patents

Tower barrel correction kit Download PDF

Info

Publication number
CN215785837U
CN215785837U CN202121784332.5U CN202121784332U CN215785837U CN 215785837 U CN215785837 U CN 215785837U CN 202121784332 U CN202121784332 U CN 202121784332U CN 215785837 U CN215785837 U CN 215785837U
Authority
CN
China
Prior art keywords
quick
bolt
gasket
tower
pump station
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121784332.5U
Other languages
Chinese (zh)
Inventor
张树国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Bosi Great Machinery & Trade Co ltd
Original Assignee
Beijing Bosi Great Machinery & Trade Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Bosi Great Machinery & Trade Co ltd filed Critical Beijing Bosi Great Machinery & Trade Co ltd
Priority to CN202121784332.5U priority Critical patent/CN215785837U/en
Application granted granted Critical
Publication of CN215785837U publication Critical patent/CN215785837U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Structures Of Non-Positive Displacement Pumps (AREA)

Abstract

The utility model discloses a tower barrel correction kit which comprises a pump station, wherein a three-way distributor is arranged at the front end of the pump station, three first quick-insertion male connectors are arranged at the front end of the three-way distributor, the three first quick-insertion male connectors are respectively connected with an oil pipe through first quick-insertion female connectors, the other end of the oil pipe is connected with a second quick-insertion male connector, the second quick-insertion male connector is connected with a hollow jack through a second quick-insertion female connector, a bolt penetrates through the inside of the hollow jack, a conical sleeve is sleeved at the bottom end of the bolt, a gasket is sleeved at the top end of the bolt, and a nut is arranged at the upper end of the gasket. The utility model solves the problem that the bolt hole positions of the upper flange and the lower flange are dislocated to a certain extent, solves the problem that a connecting bolt is clamped in the process of penetrating into a bolt hole, improves the labor intensity and reduces the production efficiency.

Description

Tower barrel correction kit
Technical Field
The utility model relates to the technical field of correction kit tools, in particular to a tower drum correction kit tool.
Background
At present, when a fan tower cylinder is installed, bolt hole positions of an upper flange and a lower flange have certain dislocation, the phenomenon that a connecting bolt is clamped in the process of penetrating into a bolt hole is caused, the upper flange is large in size and weight and is manually finely adjusted, the bolt hole positions of the upper flange and the lower flange are very difficult to align, the labor intensity is increased, and the production efficiency is reduced.
SUMMERY OF THE UTILITY MODEL
In view of the above technical problems in the related art, the present invention provides a tower calibration kit, which can overcome the above disadvantages in the prior art.
In order to achieve the technical purpose, the technical scheme of the utility model is realized as follows:
the utility model provides a suit instrument is rectified to tower section of thick bamboo, includes the pump station, the pump station front end is equipped with an tripartite distributor, a tripartite distributor front end is equipped with three first male joint of inserting soon, and is three first male joint of inserting soon is connected with oil pipe through first female joint of inserting soon respectively, the male joint is inserted soon to the second is connected to the oil pipe other end, the second inserts soon the male joint and is connected with the cavity jack through the second female joint of inserting soon, and the inside bolt that has passed of cavity jack, bolt bottom pot head has the taper sleeve, bolt top cover has the gasket, and the gasket upper end is equipped with the nut, the bolt passes gasket and nut threaded connection.
Furthermore, the upper part of the pump station is provided with a frame.
Further, the outer surface of the tapered sleeve is provided with a concave plane.
Furthermore, a switch is arranged at the upper end of the three-way distributor.
Furthermore, the diameter of the bottom of the conical sleeve is larger than that of the through hole of the site construction part.
The utility model has the beneficial effects that: through the cooperation of taper sleeve and cavity jack, the bolt hole site of having solved upper flange and lower flange has certain dislocation, solves the phenomenon that the in-process that connecting bolt penetrated the bolt hole appears blocking, improves intensity of labour, reduces production efficiency.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings needed in the embodiments will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art to obtain other drawings without creative efforts.
FIG. 1 is a block diagram of a tower calibration kit according to an embodiment of the utility model.
FIG. 2 is a diagram illustrating the operation of a tower calibration kit according to an embodiment of the present invention.
In the figure: 1. pump station, 2, one minute distributor 3, first male joint of inserting soon, 4, first female joint of inserting soon, 5, oil pipe, 6, the male joint of inserting soon of second, 7, the female joint of inserting soon of second, 8, cavity jack, 9, bolt, 10, taper sleeve, 11 gaskets, 12, nut, 13, lower flange, 14, upper flange.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments that can be derived by one of ordinary skill in the art from the embodiments given herein are intended to be within the scope of the present invention.
As shown in fig. 1-2, the tower barrel correction kit according to the embodiment of the utility model includes a pump station 1, a first three-way distributor 2 is arranged at the front end of the pump station 1, a first quick-insertion male joint 3 is arranged at the front end of the first three-way distributor 2, the first quick-insertion male joints 3 are respectively connected with an oil pipe 5 through first quick-insertion female joints 4, the other end of the oil pipe 5 is connected with a second quick-insertion male joint 6, the second quick-insertion male joint 6 is connected with a hollow jack 8 through a second quick-insertion female joint 7, a bolt 9 penetrates through the hollow jack 8, a tapered sleeve 10 is sleeved at the bottom end of the bolt 9, a gasket 11 is sleeved at the top end of the bolt 9, a nut 12 is arranged at the upper end of the gasket 11, and the bolt 9 penetrates through the gasket 11 and is in threaded connection with the nut.
In a specific embodiment, the pump station 1 is provided with a frame on top.
In a specific embodiment, the outer surface of the tapered sleeve 10 is provided with a concave flat surface.
In one embodiment, a switch is provided at the upper end of the three distributors 2.
In one embodiment, the tapered sleeve 10 has a bottom diameter that is larger than the diameter of the field work piece.
In order to facilitate understanding of the above-described technical aspects of the present invention, the above-described technical aspects of the present invention will be described in detail below in terms of specific usage.
When the tool is used specifically, a three-way distributor 2 is arranged at the front end of a pump station 1 of the tower correction kit according to the utility model, three G1/4 quick-insertion male connectors 3 are arranged at the front end of the three-way distributor, the three G1/4 quick-insertion male connectors 3 are respectively connected with an oil pipe 5 through G1/4 quick-insertion female connectors 4, the other end of the oil pipe 5 is connected with an NPT3/8 quick-insertion male connector 6, the quick-insertion male connector is connected with a hollow jack 8 through an NPT3/8 quick-insertion female connector 7, then three bolts 9 sleeved with conical sleeves 10 are uniformly distributed with included angles of 120 degrees and are respectively inserted into a lower flange (construction site part) 13 and an upper flange (construction site part) 14 and the hollow jack 8, a gasket 11 is sleeved at the top end of each bolt, and a nut 12 is arranged on each gasket;
the pump station 1 is started, pressure is applied to three hollow jacks 8 with evenly distributed included angles of 120 degrees, the jack pistons drive the gaskets 11, the nuts 12 and the bolts 9 to move, the bolts drive the conical sleeves 10 to move, bolt holes of the upper flange (construction site part) 13 are extruded by the conical surfaces of the conical sleeves, and bolt holes of the lower flange (construction site part) 13 and the upper flange (construction site part) 14 are centered and corrected.
In conclusion, by means of the technical scheme, the problem that the bolt hole positions of the upper flange and the lower flange are staggered to a certain extent is solved through the matching of the conical sleeve and the hollow jack, the phenomenon that a connecting bolt is clamped in the process of penetrating into the bolt hole is solved, the labor efficiency is improved, the production time is reduced, and the working quality is greatly improved.
The above description is only for the purpose of illustrating the preferred embodiments of the present invention and is not to be construed as limiting the utility model, and any modifications, equivalents, improvements and the like that fall within the spirit and principle of the present invention are intended to be included therein.

Claims (5)

1. A tower barrel correction kit is characterized by comprising a pump station (1), wherein a three-distributor (2) is arranged at the front end of the pump station (1), the front end of the one-to-three distributor (2) is provided with three first quick-plug male connectors (3), the three first quick-plug male connectors (3) are respectively connected with an oil pipe (5) through first quick-plug female connectors (4), the other end of the oil pipe (5) is connected with a second quick-insert male connector (6), the second quick-insert male connector (6) is connected with a hollow jack (8) through a second quick-insert female connector (7), a bolt (9) penetrates through the hollow jack (8), the bottom end of the bolt (9) is sleeved with a conical sleeve (10), the top end of the bolt (9) is sleeved with a gasket (11), the upper end of the gasket (11) is provided with a nut (12), and the bolt (9) penetrates through the gasket (11) to be in threaded connection with the nut.
2. The tower calibration kit according to claim 1, characterized in that the pumping station (1) is provided with a frame on top.
3. The tower correction kit as claimed in claim 1, characterized in that the conical sleeve (10) is provided with a concave surface on its outer surface.
4. The tower calibration kit as claimed in claim 1, characterized in that a switch is provided at the upper end of the one-third distributor (2).
5. The tower correction kit as claimed in claim 1, wherein the tapered sleeve (10) has a base diameter greater than a diameter of a field-work part.
CN202121784332.5U 2021-08-02 2021-08-02 Tower barrel correction kit Active CN215785837U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121784332.5U CN215785837U (en) 2021-08-02 2021-08-02 Tower barrel correction kit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121784332.5U CN215785837U (en) 2021-08-02 2021-08-02 Tower barrel correction kit

Publications (1)

Publication Number Publication Date
CN215785837U true CN215785837U (en) 2022-02-11

Family

ID=80127593

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121784332.5U Active CN215785837U (en) 2021-08-02 2021-08-02 Tower barrel correction kit

Country Status (1)

Country Link
CN (1) CN215785837U (en)

Similar Documents

Publication Publication Date Title
CN204461885U (en) Fixture
CN215785837U (en) Tower barrel correction kit
CN101649668A (en) Large diameter steel bar connecting sleeve
CN211614978U (en) Automatic hydraulic tool for ratchet wrench
CN201560534U (en) Large-diameter reinforcing steel bar connecting sleeve
CN210334508U (en) High efficiency double-end milling cutter
CN213258260U (en) Multi-angle positioning fixture for cylindrical workpiece
CN214368322U (en) Novel hydraulic lifting joint
CN208033782U (en) Multitube cutter device
CN216757001U (en) Device for quickly smearing screw thread oil on threads of inner pipe and outer pipe
CN205852632U (en) For dismantling the anode unit oil cylinder of press machine special torque spanner of bar round nut
CN220980503U (en) Pipeline for hydraulic and hydroelectric engineering construction with stable connection
CN214816805U (en) Novel small hole drilling tool for water inlet section of QY submersible pump
CN216618210U (en) Long threaded rod for concrete wall
CN218543951U (en) Oil injection device for oil cylinder
CN220944007U (en) Air cock pressure equipment subassembly
CN2179455Y (en) Plug-in drill rod joint
CN210754660U (en) High-pressure pipe clamp and processing die thereof
CN212763101U (en) Flexible clamp for processing artware
CN214922064U (en) Tool for press fitting of aluminum pipe reinforcing iron sleeve
CN220248016U (en) Connecting mechanism of oil well fracturing pipeline
CN213531509U (en) Sprocket pressure equipment
CN115673386B (en) Hydraulic fixed type tail pipe drilling jig tool and use method
CN220783744U (en) Safety sleeve
CN220007649U (en) Piston assembly fixture

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant