CN215776442U - Building construction cost progress management device - Google Patents

Building construction cost progress management device Download PDF

Info

Publication number
CN215776442U
CN215776442U CN202120733519.6U CN202120733519U CN215776442U CN 215776442 U CN215776442 U CN 215776442U CN 202120733519 U CN202120733519 U CN 202120733519U CN 215776442 U CN215776442 U CN 215776442U
Authority
CN
China
Prior art keywords
slider
storage bin
limiting groove
bottom end
movable plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120733519.6U
Other languages
Chinese (zh)
Inventor
王铭轩
杨昕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202120733519.6U priority Critical patent/CN215776442U/en
Application granted granted Critical
Publication of CN215776442U publication Critical patent/CN215776442U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Assembled Shelves (AREA)

Abstract

The utility model discloses a building construction cost progress management device, which comprises a management cabinet solid, wherein a first partition plate is fixedly arranged in the management cabinet solid, a storage bin is arranged at the top end of the first partition plate, and a first limiting groove is fixedly arranged at the bottom end in the storage bin; the designed second partition plate can divide the storage bin into two large spaces, the spaces at the top end and the bottom end of the second partition plate can be divided into a plurality of small spaces through the first movable plate, the second movable plate, the third movable plate and the fourth movable plate, the movable plates can be moved under the action of the plurality of sliding blocks, the positions of the movable plates are further adjusted, the sizes of the small spaces can be adjusted, when the engineering construction cost progress data are stored, the data at different stages can be placed in the corresponding spaces, classified storage management is realized, and management and searching are facilitated; the spacing groove of design can carry out spacing fixed to the file box of dress data, prevents that the file box from empting.

Description

Building construction cost progress management device
Technical Field
The utility model belongs to the technical field of management cabinets, and particularly relates to a building construction cost progress management device.
Background
The project cost refers to the construction price of a project, and refers to the total sum of all expected or actually required expenses for completing the construction of a project, and the data of the project cost progress is generally stored in a management cabinet.
The existing management cabinet still has some defects when in use: the management cabinet is generally divided into an upper layer and a lower layer for storing the data of the project cost progress, because the data of the project cost progress are staged, the existing management cabinet cannot divide the interior of the management cabinet into a plurality of different spaces for storing the data of the project cost progress.
Therefore, in order to solve the above problems, the present invention provides a building construction cost progress management device.
An effective solution to the problems in the related art has not been proposed yet.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a building construction cost progress management device to solve the problems in the background technology.
In order to achieve the purpose, the utility model provides the following technical scheme: a building construction cost progress management device comprises a management cabinet body, wherein a first partition plate is fixedly installed inside the management cabinet body, a storage bin is arranged at the top end of the first partition plate, a first limiting groove is fixedly installed at the bottom end inside the storage bin, a first sliding groove is formed in the bottom end inside the storage bin, a first sliding block and a second sliding block are installed on the first sliding groove in a sliding connection mode, a second limiting groove is fixedly installed at the top end inside the storage bin, a second sliding groove is arranged at the top end inside the storage bin, a third sliding block and a fourth sliding block are installed on the second sliding groove in a sliding connection mode, a second partition plate is fixedly installed in the middle section inside the storage bin, a third limiting groove is fixedly installed at the bottom end of the second partition plate, a third sliding groove is formed in the bottom end of the second partition plate, and a fifth sliding block and a sixth sliding block are installed on the third sliding groove in a sliding connection mode, the top fixed mounting of second baffle has the fourth spacing groove, the top of second baffle is equipped with the fourth spout, the inside sliding connection of fourth spout installs seventh slider and eighth slider, the bottom of second baffle is equipped with first fly leaf and second fly leaf, the top of second baffle is equipped with third fly leaf and fourth fly leaf.
Further, the equal fixed mounting in the three-dimensional bottom four corners department of management cabinet has the supporting leg, the wheel mount pad is installed to the bottom of supporting leg, the wheel is installed to the bottom of wheel mount pad, wheel through connection installs the connection pivot.
Furthermore, a storage bin is arranged at the bottom end of the first partition plate, a first box door is installed on one side of the storage bin, the first box door is connected with the management cabinet in a three-dimensional hinged mode through a first hinge, and a first door handle is fixedly installed on one side of the first box door.
Further, a second box door is installed on one side of the storage bin, the second box door is connected with the management cabinet in a three-dimensional hinged mode through a second hinge, and a second door handle is fixedly installed on one side of the second box door.
Furthermore, the first limiting groove, the second limiting groove, the third limiting groove and the fourth limiting groove are provided with multiple groups, the first limiting groove and the third limiting groove are in one-to-one correspondence in position, and the second limiting groove and the fourth limiting groove are in one-to-one correspondence in position.
Further, the top end and the bottom end of the first movable plate are respectively and fixedly connected with the fifth slider and the first slider, the top end and the bottom end of the second movable plate are respectively and fixedly connected with the sixth slider and the second slider, the top end and the bottom end of the third movable plate are respectively and fixedly connected with the third slider and the seventh slider, and the top end and the bottom end of the fourth movable plate are respectively and fixedly connected with the fourth slider and the eighth slider.
Compared with the prior art, the utility model has the following beneficial effects:
1. according to the utility model, the storage bin can be divided into two large spaces by the designed second partition plate, the spaces at the top end and the bottom end of the second partition plate can be divided into a plurality of small spaces by the first movable plate, the second movable plate, the third movable plate and the fourth movable plate, the movable plates can be moved under the action of the plurality of sliding blocks, and further the positions of the movable plates are adjusted, so that the sizes of the small spaces can be adjusted, when the engineering construction cost progress data are stored, the data at different stages can be placed in the corresponding spaces, classified storage management is realized, and management and searching are facilitated.
2. According to the utility model, the designed limiting groove can limit and fix the file box containing data, so that the file box is prevented from toppling.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings needed in the embodiments will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art to obtain other drawings without creative efforts.
FIG. 1 is a schematic perspective view of a management cabinet according to the present invention;
FIG. 2 is a schematic plan view of the support leg of the present invention;
FIG. 3 is a view showing the internal structure of the management cabinet body according to the present invention;
FIG. 4 is a longitudinal cross-sectional view of the storage compartment of the present invention;
figure 5 is a cross-sectional view of the storage compartment of the present invention.
Reference numerals:
1. the management cabinet is three-dimensional; 2. supporting legs; 201. a wheel mount; 202. a wheel; 203. connecting the rotating shaft; 3. a first separator; 4. a storage bin; 401. a first door; 402. a first hinge; 403. a first door handle; 5. a storage bin; 501. a first limit groove; 502. a second limit groove; 503. a first chute; 504. a second chute; 505. a first slider; 506. a second slider; 507. a third slider; 508. a fourth slider; 509. a second door; 510. a second hinge; 511. a second door handle; 6. a second separator; 601. a third limiting groove; 602. a fourth limit groove; 603. a third chute; 604. a fourth chute; 605. a fifth slider; 606. a sixth slider; 607. a seventh slider; 608. an eighth slider; 7. a first movable plate; 8. a second movable plate; 9. a third movable plate; 10. a fourth movable plate.
Detailed Description
The following, with reference to the drawings and the detailed description, further description of the present invention is made:
referring to fig. 1-5, a building construction cost progress management device according to an embodiment of the present invention includes a management cabinet body 1, a first partition plate 3 is fixedly installed inside the management cabinet body 1, a storage bin 5 is installed at a top end of the first partition plate 3, a first limiting groove 501 is fixedly installed at a bottom end inside the storage bin 5, a first sliding groove 503 is installed at a bottom end inside the storage bin 5, a first sliding block 505 and a second sliding block 506 are slidably installed inside the first sliding groove 503, a second limiting groove 502 is fixedly installed at a top end inside the storage bin 5, a second sliding groove 504 is installed at a top end inside the storage bin 5, a third sliding block 507 and a fourth sliding block 508 are slidably installed inside the second sliding groove 504, a second partition plate 6 is fixedly installed at a middle section inside the storage bin 5, a third limiting groove 601 is fixedly installed at a bottom end of the second partition plate 6, the bottom end of the second partition plate 6 is provided with a third sliding groove 603, the inside of the third sliding groove 603 is slidably connected with a fifth sliding block 605 and a sixth sliding block 606, the top end of the second partition plate 6 is fixedly provided with a fourth limiting groove 602, the top end of the second partition plate 6 is provided with a fourth sliding groove 604, the inside of the fourth sliding groove 604 is slidably connected with a seventh sliding block 607 and an eighth sliding block 608, the bottom end of the second partition plate 6 is provided with a first movable plate 7 and a second movable plate 8, and the top end of the second partition plate 6 is provided with a third movable plate 9 and a fourth movable plate 10.
Through the scheme of the utility model, the four corners of the bottom end of the management cabinet three-dimensional body 1 are fixedly provided with the supporting legs 2, the bottom ends of the supporting legs 2 are provided with the wheel mounting seats 201, the bottom ends of the wheel mounting seats 201 are provided with the wheels 202, and the wheels 202 are provided with the connecting rotating shafts 203 in a penetrating connection mode; a storage bin 4 is arranged at the bottom end of the first partition plate 3, a first door 401 is installed on one side of the storage bin 4, the first door 401 is hinged with the management cabinet three-dimensional body 1 through a first hinge 402, and a first door handle 403 is fixedly installed on one side of the first door 401; a second door 509 is installed on one side of the storage bin 5, the second door 509 is hinged to the management cabinet three-dimensional 1 through a second hinge 510, and a second door handle 511 is fixedly installed on one side of the second door 509; a plurality of groups of first limiting grooves 501, second limiting grooves 502, third limiting grooves 601 and fourth limiting grooves 602 are arranged, the positions of the first limiting grooves 501 and the third limiting grooves 601 are in one-to-one correspondence, and the positions of the second limiting grooves 502 and the fourth limiting grooves 602 are in one-to-one correspondence; the top end and the bottom end of the first movable plate 7 are respectively and fixedly connected with the fifth slider 605 and the first slider 505, the top end and the bottom end of the second movable plate 8 are respectively and fixedly connected with the sixth slider 606 and the second slider 506, the top end and the bottom end of the third movable plate 9 are respectively and fixedly connected with the third slider 507 and the seventh slider 607, and the top end and the bottom end of the fourth movable plate 10 are respectively and fixedly connected with the fourth slider 508 and the eighth slider 608.
When in concrete application, when the file box needs to be stored, the file box can be placed in a small space at the lower left side in the storage bin 5, the file box can be limited and fixed through the action of the first limiting groove 501 and the third limiting groove 601, and is prevented from toppling over, after the data at the stage is stored, the first movable plate 7 is moved, so that the left side of the first movable plate 7 can be in contact with the file box, at the moment, the space between the right side of the first movable plate 7 and the second movable plate 8 and the space on the right side of the second movable plate 8 can store the file data, when the file data at the next stage are more, the second movable plate 8 can be moved to be overlapped with the first movable plate 7, so that a larger space can be formed to store more data, and the storage space above the second partition plate 6 can be operated in the same manner.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, those skilled in the art will understand that various changes, modifications and substitutions can be made without departing from the spirit and scope of the utility model as defined by the appended claims. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (6)

1. The building construction cost progress management device is characterized by comprising a management cabinet body (1), wherein a first partition plate (3) is fixedly arranged in the management cabinet body (1), a storage bin (5) is arranged at the top end of the first partition plate (3), a first limiting groove (501) is fixedly arranged at the bottom end in the storage bin (5), a first sliding groove (503) is arranged at the bottom end in the storage bin (5), a first sliding block (505) and a second sliding block (506) are arranged in the first sliding groove (503) in a sliding connection mode, a second limiting groove (502) is fixedly arranged at the top end in the storage bin (5), a second sliding groove (504) is arranged at the top end in the storage bin (5), a third sliding block (507) and a fourth sliding block (508) are arranged in the second sliding groove (504), a second partition plate (6) is fixedly arranged in the middle section in the storage bin (5), the bottom fixed mounting of second baffle (6) has third spacing groove (601), the bottom of second baffle (6) is equipped with third spout (603), the inside sliding connection of third spout (603) installs fifth slider (605) and sixth slider (606), the top fixed mounting of second baffle (6) has fourth spacing groove (602), the top of second baffle (6) is equipped with fourth spout (604), the inside sliding connection of fourth spout (604) installs seventh slider (607) and eighth slider (608), the bottom of second baffle (6) is equipped with first fly leaf (7) and second fly leaf (8), the top of second baffle (6) is equipped with third fly leaf (9) and fourth fly leaf (10).
2. The building construction cost progress management device according to claim 1, characterized in that supporting legs (2) are fixedly mounted at four corners of the bottom end of the management cabinet body (1), wheel mounting seats (201) are mounted at the bottom ends of the supporting legs (2), wheels (202) are mounted at the bottom ends of the wheel mounting seats (201), and connecting rotating shafts (203) are mounted in the wheels (202) in a penetrating connection mode.
3. The building construction cost progress management device according to claim 1, characterized in that a storage bin (4) is arranged at the bottom end of the first partition plate (3), a first door (401) is installed at one side of the storage bin (4), the first door (401) is hinged with the management cabinet body (1) through a first hinge (402), and a first door handle (403) is fixedly installed at one side of the first door (401).
4. The building construction cost progress management device according to claim 1, wherein a second door (509) is installed on one side of the storage bin (5), the second door (509) is hinged to the management cabinet body (1) through a second hinge (510), and a second door handle (511) is fixedly installed on one side of the second door (509).
5. The building construction cost progress management device according to claim 1, wherein a plurality of sets of the first limiting groove (501), the second limiting groove (502), the third limiting groove (601) and the fourth limiting groove (602) are provided, the positions of the first limiting groove (501) and the third limiting groove (601) are in one-to-one correspondence, and the positions of the second limiting groove (502) and the fourth limiting groove (602) are in one-to-one correspondence.
6. The building construction cost schedule management device according to claim 1, wherein the top end and the bottom end of the first movable plate (7) are fixedly connected with the fifth slider (605) and the first slider (505), respectively, the top end and the bottom end of the second movable plate (8) are fixedly connected with the sixth slider (606) and the second slider (506), respectively, the top end and the bottom end of the third movable plate (9) are fixedly connected with the third slider (507) and the seventh slider (607), respectively, and the top end and the bottom end of the fourth movable plate (10) are fixedly connected with the fourth slider (508) and the eighth slider (608), respectively.
CN202120733519.6U 2021-04-11 2021-04-11 Building construction cost progress management device Active CN215776442U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120733519.6U CN215776442U (en) 2021-04-11 2021-04-11 Building construction cost progress management device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120733519.6U CN215776442U (en) 2021-04-11 2021-04-11 Building construction cost progress management device

Publications (1)

Publication Number Publication Date
CN215776442U true CN215776442U (en) 2022-02-11

Family

ID=80163118

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120733519.6U Active CN215776442U (en) 2021-04-11 2021-04-11 Building construction cost progress management device

Country Status (1)

Country Link
CN (1) CN215776442U (en)

Similar Documents

Publication Publication Date Title
CN101434307A (en) Foldable containing apparatus
CN215776442U (en) Building construction cost progress management device
CN211062468U (en) External storage device management device for computer
CN207583035U (en) Automatic lifting slope double-deck parking device
CN214057580U (en) A conveyer for computer equipment
CN207876400U (en) A kind of cell piece packing case of adjustable liner base dimensions
CN217906871U (en) Financial affairs cabinet for financial affairs
CN209789083U (en) Western medicine is stored with categorised frame of putting
CN215501929U (en) Audit file storage cabinet
CN215913786U (en) BIM building design construction standard management device
CN216969418U (en) Heavy-duty-truck side-charging station layout structure unit
CN211940836U (en) But large capacity intelligence tool cabinet of pull baffle
CN207759234U (en) A kind of open air extension activity stage property storing unit
CN220663215U (en) Portable foldable storage box
CN208064780U (en) A kind of novel and multifunctional desk
CN202111380U (en) Novel distribution cabinet
CN2688123Y (en) Multi-layer stationery box with book-shelf
CN110946407A (en) Storage cabinet for adjusting number of clamped files for technology transfer
CN221314185U (en) Multi-layer folding tool box
CN220937238U (en) Expandable storage cabinet operation platform
CN220147839U (en) Collapsible rack of lithium ion battery material roll temporarily stores
CN213259424U (en) Electric power tool deposits case
CN205214705U (en) Multiunit closes seeing and hearing cabinet
CN212394287U (en) Business administration archives layering management case
CN219789733U (en) Bill occupying box

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant