CN215760334U - Curtain wall construction platform - Google Patents

Curtain wall construction platform Download PDF

Info

Publication number
CN215760334U
CN215760334U CN202121919751.5U CN202121919751U CN215760334U CN 215760334 U CN215760334 U CN 215760334U CN 202121919751 U CN202121919751 U CN 202121919751U CN 215760334 U CN215760334 U CN 215760334U
Authority
CN
China
Prior art keywords
base
wane
curtain wall
wire rope
steel wire
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121919751.5U
Other languages
Chinese (zh)
Inventor
孙琦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202121919751.5U priority Critical patent/CN215760334U/en
Application granted granted Critical
Publication of CN215760334U publication Critical patent/CN215760334U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

The utility model relates to the field of curtain wall construction equipment, and particularly discloses a curtain wall construction platform which comprises a base, a wane and a steel wire rope, wherein the wane is arranged on the base; the top end of the base is hinged with a wane; the rear end of the wane is fixedly connected with one end of a steel wire rope; the other end of the steel wire rope is connected with the lower part of the base; a sleeve is fixedly arranged on the bottom surface of the seesaw; a hinge shaft is sleeved in the sleeve; fixing rods are respectively fixedly arranged at two ends of the hinge shaft; the fixed rod is integrally connected with the hinge shaft in an I shape; the fixed rod is fixedly arranged at the top end of the base. Compared with the prior art, through the articulated setting on base top of wane, through the gradient of adjusting wire rope's length adjustment wane, the construction of glass curtain wall conveniently inclines, and has guaranteed the security.

Description

Curtain wall construction platform
Technical Field
The utility model relates to the field of curtain wall construction equipment, and particularly discloses a curtain wall construction platform.
Background
At present, roof steel structure platform's form is more and more, for example, roof steel structure platform's appearance is the fill crown shape and is high up in the air out and choose, and the anti-slope structure that leans out, when the slope glass curtain wall construction that carries out this roof steel structure platform, according to the characteristics of this roof steel structure platform engineering slope glass curtain wall, the specificity of job site steel structure platform and slope glass curtain wall steelframe, conventional hanging flower basket hangs the unable dress of counter weight frame, leads to slope glass curtain wall to be difficult to the construction, and construction safety is poor.
SUMMERY OF THE UTILITY MODEL
Aiming at the defects in the prior art, the utility model provides a curtain wall construction platform to solve the problems that the existing inclined glass curtain wall is difficult to construct and poor in construction safety and the like.
In order to achieve the purpose, the technical scheme of the utility model is as follows:
a curtain wall construction platform comprises a base, a wane and a steel wire rope; the top end of the base is hinged with a wane; the rear end of the wane is fixedly connected with one end of a steel wire rope; the other end of the steel wire rope is connected with the lower part of the base; a sleeve is fixedly arranged on the bottom surface of the seesaw; a hinge shaft is sleeved in the sleeve; fixing rods are respectively fixedly arranged at two ends of the hinge shaft; the fixed rod is integrally connected with the hinge shaft in an I shape; the fixed rod is fixedly arranged at the top end of the base. The H-shaped connection ensures the firmness of the hinge shaft and facilitates the fixation stability of the fixed rod. The wane passes through dead lever, hinge and sheathed tube setting, has accomplished the articulated setting on the base top, through adjusting wire rope's length, adjusts the perk height of wane front end, and the convenience is to the construction of slope glass curtain wall. The setting of base, the convenience is indoor fixed, and the convenience wane stretches out by the window.
Preferably, the sleeve pipe setting is between wane focus and wane and wire rope junction, and the personnel stand when the wane front end, can guarantee the balance when the wane inclines through adjusting wire rope's length.
Preferably, the base bottom is provided with the universal wheel, moves to suitable position locking universal wheel, makes things convenient for the removal of base.
Preferably, the two ends of the steel wire rope are connected through the lock turnbuckles, so that the length of the steel wire rope can be conveniently adjusted.
Preferably, the wane is whole to be frame construction, is provided with the rail all around, and the bottom surface is provided with the checkered plate, and convenient for material collection sets up simply, and the checkered plate makes things convenient for personnel to stand.
Preferably, the base is of a frame structure integrally, and materials are convenient to take.
The utility model has the beneficial effects that: through the articulated setting on base top of wane, through the gradient of adjusting wire rope's length adjustment wane, the construction of the glass curtain wall that conveniently inclines has just guaranteed the security.
Drawings
FIG. 1 is a schematic structural diagram of an embodiment of the present invention;
fig. 2 is a schematic structural view of a seesaw, a sleeve, a hinge shaft and a fixing rod according to an embodiment of the present invention;
description of reference numerals:
1-base, 2-wane, 3-steel wire rope, 4-sleeve, 5-hinge shaft, 6-fixed rod, 7-universal wheel and 8-lock screw.
Detailed Description
The present invention is further described below with reference to examples.
Example 1
As shown in fig. 1 and 2, the curtain wall construction platform comprises a base 1, a wane 2 and a steel wire rope 3; the top end of the base 1 is hinged with a wane 2; the rear end of the wane 2 is fixedly connected with one end of a steel wire rope 3; the other end of the steel wire rope 3 is connected with the lower part of the base 1;
a sleeve 4 is fixedly arranged on the bottom surface of the wane 2; a hinge shaft 5 is sleeved in the sleeve 4; two ends of the hinge shaft 5 are respectively and fixedly provided with a fixed rod 6; the fixed rod 6 is integrally connected with the hinge shaft 5 in an I shape; the fixed setting on 1 top of base has been accomplished on the articulated setting on 1 top of base to dead lever 6, and through the length of adjusting wire rope 3, the perk height of adjusting 2 front ends of wane is convenient to the construction of slope glass curtain wall. The H-shaped connection ensures the firmness of the hinge shaft 5 and facilitates the stability of the fixing rod 6. The setting of base 1 makes things convenient for indoor fixed, makes things convenient for wane 2 to stretch out by the window.
Among the above-mentioned setting, sleeve pipe 4 sets up between 2 centrobaries of wane and 2 and the 3 junctions of wane of wire rope, and the personnel stand when 2 front ends of wane, can guarantee the balance when 2 slopes of wane through the length of adjusting wire rope 3. The bottom of the base 1 is provided with a universal wheel 7, and the universal wheel 7 is locked at a proper position after being moved, so that the base 1 can be conveniently moved. Two ends of the steel wire rope 3 are connected through a lock turnbuckle 8, so that the length of the steel wire rope 3 can be conveniently adjusted.
The whole frame construction that is of wane 2 is provided with the rail all around, and the bottom surface is provided with the checkered plate, and convenient for material collection sets up simply, and the checkered plate makes things convenient for personnel to stand. The whole base 1 is of a frame structure, and materials are convenient to take.
During the use, utilize universal wheel 7 to remove base 1 to indoor suitable position, locking universal wheel 7 stretches out wane 2 by the window outdoors, utilizes tool to lock turnbuckle 8 to adjust wire rope 3's length and adjusts the inclination of wane 2, and the construction operation of the personnel of conveniently standing on the checkered plate of wane 2 sets up simply, has guaranteed personnel's construction safety.

Claims (6)

1. A curtain wall construction platform is characterized by comprising a base (1), a wane (2) and a steel wire rope (3); the top end of the base (1) is hinged with a wane (2); the rear end of the wane (2) is fixedly connected with one end of a steel wire rope (3); the other end of the steel wire rope (3) is connected with the lower part of the base (1); a sleeve (4) is fixedly arranged on the bottom surface of the seesaw (2); a hinge shaft (5) is sleeved in the sleeve (4); fixing rods (6) are respectively fixedly arranged at two ends of the hinge shaft (5); the fixed rod (6) is integrally connected with the hinge shaft (5) in an I shape; the fixing rod (6) is fixedly arranged at the top end of the base (1).
2. The curtain wall construction platform according to claim 1, wherein the sleeve (4) is arranged between the center of gravity of the rocker (2) and the joint of the rocker (2) and the steel wire rope (3).
3. The curtain wall construction platform according to claim 1, characterized in that universal wheels (7) are arranged at the bottom of the base (1).
4. The curtain wall construction platform according to claim 1, wherein two ends of the steel wire rope (3) are connected through a lock screw (8).
5. The curtain wall construction platform according to claim 1, wherein the warping plate (2) is of a frame structure integrally, a fence is arranged on the periphery of the warping plate, and a pattern plate is arranged on the bottom surface of the warping plate.
6. The curtain wall construction platform according to claim 1, characterized in that the base (1) is a frame structure as a whole.
CN202121919751.5U 2021-08-17 2021-08-17 Curtain wall construction platform Active CN215760334U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121919751.5U CN215760334U (en) 2021-08-17 2021-08-17 Curtain wall construction platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121919751.5U CN215760334U (en) 2021-08-17 2021-08-17 Curtain wall construction platform

Publications (1)

Publication Number Publication Date
CN215760334U true CN215760334U (en) 2022-02-08

Family

ID=80075341

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121919751.5U Active CN215760334U (en) 2021-08-17 2021-08-17 Curtain wall construction platform

Country Status (1)

Country Link
CN (1) CN215760334U (en)

Similar Documents

Publication Publication Date Title
CN215760334U (en) Curtain wall construction platform
CN209538635U (en) A kind of building decoration scaffold of safety convenient
CN216629590U (en) Adjustable basketball frame
CN211815749U (en) Movable warning device for construction
CN211964738U (en) Glass curtain wall spraying device with lifting structure
CN211499688U (en) Stable form scaffold moving platform
CN211817814U (en) Operation panel for construction convenient to adjust
CN213174709U (en) Scaffold for interior decoration
CN213061751U (en) Highway bridge and culvert supporting structure for bridge engineering
CN211850682U (en) Scaffold for building construction
CN220599093U (en) Construction scaffold
CN113154194A (en) Surveying instrument support convenient for accurate adjustment and connecting method thereof
CN209228013U (en) A kind of architectural engineering Portable scaffold
CN111119722A (en) Walking ascending ladder
CN206971699U (en) Combination hanging basket for the construction of wet seam
CN214575506U (en) Construction scaffold
CN217518107U (en) Platform for construction
CN217949688U (en) Scaffold frame that fitment was used
CN210368650U (en) Scaffold for highway bridge construction
CN217229926U (en) Tensile hanging flower basket that building engineering used
CN219579828U (en) Human body lifter
CN216974721U (en) High extension ladder of stability
CN216239615U (en) Assembled scaffold for building construction
CN213234209U (en) Erection bracing frame for building engineering
CN220365271U (en) Protective ladder for building decoration construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant