CN215758819U - Hydraulic engineering construction breakwater device - Google Patents

Hydraulic engineering construction breakwater device Download PDF

Info

Publication number
CN215758819U
CN215758819U CN202121903901.3U CN202121903901U CN215758819U CN 215758819 U CN215758819 U CN 215758819U CN 202121903901 U CN202121903901 U CN 202121903901U CN 215758819 U CN215758819 U CN 215758819U
Authority
CN
China
Prior art keywords
positioning
water baffle
bottom plate
base surface
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121903901.3U
Other languages
Chinese (zh)
Inventor
李启东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202121903901.3U priority Critical patent/CN215758819U/en
Application granted granted Critical
Publication of CN215758819U publication Critical patent/CN215758819U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The utility model relates to the technical field of hydraulic engineering construction, in particular to a hydraulic engineering construction water baffle device, which comprises a positioning bottom plate, wherein positioning support components are arranged on the left side and the right side of a base surface of the positioning bottom plate, a pushing and lifting driving component is arranged on the base surface of the positioning bottom plate, a positioning groove is arranged on the front side of the base surface of the positioning bottom plate, a water baffle is arranged on the base surface of the positioning bottom plate and corresponds to the positioning groove, the stress of the water baffle can be buffered to a certain degree through the arranged buffer plate, the protection of the water baffle can be effectively improved, the positioning support water baffle stability of the water baffle can be realized through the arranged positioning seat and the positioning support, the integral water baffle effect and stability are high, the pushing and lifting and folding of the water baffle can be simple and convenient through a pushing cylinder, and a certain pushing force can be provided for the water baffle through the arranged switching push plate, the water retaining plate has high water retaining stability, simple integral structure, convenient use and high practicability.

Description

Hydraulic engineering construction breakwater device
Technical Field
The utility model relates to the technical field of hydraulic engineering construction, in particular to a water baffle device for hydraulic engineering construction.
Background
The important measures in the infrastructure of China during the water conservancy project are that the water conservancy project has great promotion effect on traffic, transportation and agriculture, at present, a water baffle plate is used in the water conservancy construction process to block partial water flow so as to facilitate the construction,
the existing water baffle is inconvenient to support in water retaining construction, the water retaining protection effect is poor, the progress of the whole hydraulic engineering is dragged slowly, and serious economic loss is caused, so that the water baffle device for hydraulic engineering construction is needed to improve the problems.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a water deflector device for hydraulic engineering construction, which aims to solve the problems in the background technology.
In order to achieve the purpose, the utility model provides the following technical scheme:
the utility model provides a hydraulic engineering construction breakwater device, includes the location bottom plate, the base face left and right sides of location bottom plate is provided with the location support subassembly, the base face of location bottom plate is provided with and pushes up and rises drive assembly, the base face front side of location bottom plate is opened and is equipped with the constant head tank, the base face of location bottom plate is and be provided with the breakwater with the constant head tank correspondence.
According to the preferable scheme, the lower side of the water baffle is connected with the positioning bottom plate through an industrial heavy hinge, the front side of the water baffle is provided with an adapter, the front side of the adapter is provided with a buffer plate, and the back side of the water baffle is provided with an adapter hole.
As a preferable scheme of the present invention, the positioning support assembly includes a positioning seat and a positioning pillar, positioning holes are symmetrically formed on the front and back of the base surface of the positioning seat, one end of the positioning pillar is connected to the positioning seat through the positioning hole, and the other end of the positioning pillar is correspondingly connected to the through hole.
As a preferable scheme of the utility model, the pushing and lifting driving assembly comprises a pushing cylinder, a positioning sliding seat and a switching push plate, wherein the driving end of the pushing cylinder is connected with the positioning sliding seat, and the end part of the positioning sliding seat is also connected with the switching push plate by an industrial heavy hinge.
As the preferable scheme of the utility model, the other end of the adapting push plate is connected with the water baffle by an industrial heavy hinge.
As a preferable scheme of the present invention, the pushing cylinder is disposed at the middle of the rear side of the base surface of the positioning bottom plate, and the positioning slide is slidably connected to the positioning bottom plate.
Compared with the prior art, the utility model has the beneficial effects that:
1. according to the utility model, the stress of the water baffle can be buffered to a certain degree through the arranged buffer plate, the protection of the water baffle can be effectively improved, and the positioning support water baffle stability of the water baffle can be realized through the arranged positioning seat and the positioning support, so that the integral water baffle effect and stability are high.
2. According to the utility model, the pushing cylinder can be used for simply and conveniently pushing and folding the water baffle, and the set switching push plate can provide certain pushing force for the water baffle, so that the water baffle has high water retaining stability, simple overall structure and high practicability, and is convenient to use.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a partial schematic structural view of the present invention;
FIG. 3 is an enlarged view of part A of the present invention.
In the figure: 1. positioning the bottom plate; 101. positioning a groove; 102. a water baffle; 103. industrial heavy duty hinges; 104. a transfer seat; 105. a buffer plate; 106. switching the hole; 2. positioning the support assembly; 201. positioning seats; 202. positioning the strut; 203. positioning holes; 3. a push-up drive assembly; 301. a push cylinder; 302. a positioning slide seat; 303. and (4) switching the push plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all embodiments, and all other embodiments obtained by a person of ordinary skill in the art without creative efforts based on the embodiments of the present invention belong to the protection scope of the present invention.
In order to facilitate an understanding of the utility model, the utility model will now be described more fully hereinafter with reference to the accompanying drawings, in which several embodiments of the utility model are shown, but which can be embodied in many different forms and should not be construed as limited to the embodiments set forth herein. Rather, these embodiments are provided so that this disclosure will be thorough and complete.
It will be understood that when an element is referred to as being "secured to" another element, it can be directly on the other element or intervening elements may also be present. When an element is referred to as being "connected" to another element, it can be directly connected to the other element or intervening elements may also be present. The terms "vertical," "horizontal," "left," "right," and the like as used herein are for illustrative purposes only.
Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs. The terminology used in the description of the utility model herein is for the purpose of describing particular embodiments only and is not intended to be limiting of the utility model. As used herein, the term "and/or" includes any and all combinations of one or more of the associated listed items.
Referring to fig. 1-3, the present invention provides a technical solution:
the utility model provides a hydraulic engineering construction breakwater device, includes positioning bottom plate 1, and positioning bottom plate 1's base face left and right sides is provided with location supporting component 2, and positioning bottom plate 1's base face is provided with and pushes up and rises drive assembly 3, and positioning groove 101 has been seted up to positioning bottom plate 1's base face front side, and positioning bottom plate 1's base face corresponds with positioning groove 101 and is provided with breakwater 102.
In the embodiment, please refer to fig. 1 and 2, the lower side of the water guard 102 is connected with the positioning base plate 1 through an industrial heavy hinge 103, the front of the water guard 102 is provided with an adapter 104, the front of the adapter 104 is provided with a buffer 105, the back of the water guard 102 is provided with a switching hole 106, the positioning support assembly 2 comprises a positioning seat 201 and a positioning pillar 202, the front and the back of the base surface of the positioning seat 201 are symmetrically provided with positioning holes 203, one end of the positioning pillar 202 is connected with the positioning seat 201 through the positioning holes 203, the other end of the positioning pillar 202 is correspondingly connected with the switching hole 106, the stress of the water guard 102 can be buffered to a certain degree through the arranged buffer 105, the protection of the water guard 102 can be effectively improved, the positioning support water guard stability of the water guard 102 can be realized through the arranged positioning seat 201 and the positioning pillar 202, and the whole water guard effect and stability are high.
In an embodiment, referring to fig. 1 and 2, the pushing and lifting driving assembly 3 includes a pushing cylinder 301, a positioning sliding seat 302 and a transfer pushing plate 303, a driving end of the pushing cylinder 301 is connected to the positioning sliding seat 302, an end of the positioning sliding seat 302 is also connected to the transfer pushing plate 303 by using an industrial heavy hinge 103, another end of the transfer pushing plate 303 is connected to the water baffle 102 by using an industrial heavy hinge 103, the pushing cylinder 301 is located in the middle of the rear side of the base surface of the positioning base plate 1, the positioning sliding seat 302 is slidably connected to the positioning base plate 1, the water baffle 102 can be pushed and lifted and folded simply and conveniently by using the pushing cylinder 301, and a certain pushing force can be provided to the water baffle 102 by using the transfer pushing plate 303, so that the water baffle 102 has high water blocking stability, simple overall structure, convenient use and high practicability.
The working principle is as follows: when in use, the positioning slide base 302 is pushed by the pushing cylinder 301 to enable the transfer push plate 303 to push up the water baffle plate 102 to be connected with the positioning groove 101, then the two ends of the positioning support column 202 are respectively connected with the positioning hole 203 and the adapting hole 106, the water baffle 102 is positioned and supported, the stress of the water baffle 102 can be buffered to a certain extent through the arranged buffer plate 105, the protection of the water baffle 102 can be effectively improved, the positioning seat 201 and the positioning support column 202 can position and support the water baffle plate 102 to ensure high integral water baffle effect and stability, the pushing cylinder 301 can ensure that the water baffle plate 102 can be simply and conveniently pushed and folded, and the through-connection push plate 303 can provide certain thrust to the breakwater 102, so that the breakwater 102 has high water retaining stability, simple overall structure, convenient use and higher practicability.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a hydraulic engineering construction breakwater device, includes location bottom plate (1), its characterized in that: the positioning device is characterized in that positioning support assemblies (2) are arranged on the left side and the right side of a base surface of the positioning bottom plate (1), a pushing and lifting driving assembly (3) is arranged on the base surface of the positioning bottom plate (1), a positioning groove (101) is formed in the front side of the base surface of the positioning bottom plate (1), and a water baffle (102) is correspondingly arranged on the base surface of the positioning bottom plate (1) and corresponds to the positioning groove (101).
2. The water conservancy project construction breakwater device of claim 1, characterized in that: the lower side of the water baffle (102) is connected with the positioning base plate (1) through an industrial heavy hinge (103), the front side of the water baffle (102) is provided with an adapter (104), the front side of the adapter (104) is provided with a buffer plate (105), and the back side of the water baffle (102) is provided with a switching hole (106).
3. The water conservancy project construction breakwater device of claim 1, characterized in that: the positioning support assembly (2) comprises a positioning seat (201) and a positioning support column (202), positioning holes (203) are symmetrically formed in the front and back of a base surface of the positioning seat (201), one end of the positioning support column (202) is connected with the positioning seat (201) through the positioning holes (203), and the other end of the positioning support column (202) is correspondingly connected with the transfer hole (106).
4. The water conservancy project construction breakwater device of claim 1, characterized in that: the pushing and lifting driving assembly (3) comprises a pushing cylinder (301), a positioning sliding seat (302) and a switching push plate (303), the driving end of the pushing cylinder (301) is connected with the positioning sliding seat (302), and the end part of the positioning sliding seat (302) is connected with the switching push plate (303) through an industrial heavy hinge (103).
5. The water conservancy project construction breakwater device of claim 4, characterized in that: the other end of the adapting push plate (303) is connected with the water baffle (102) by an industrial heavy hinge (103).
6. The water conservancy project construction breakwater device of claim 4, characterized in that: the pushing cylinder (301) is arranged in the middle of the rear side of the base surface of the positioning bottom plate (1), and the positioning sliding seat (302) is connected with the positioning bottom plate (1) in a sliding mode.
CN202121903901.3U 2021-08-13 2021-08-13 Hydraulic engineering construction breakwater device Active CN215758819U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121903901.3U CN215758819U (en) 2021-08-13 2021-08-13 Hydraulic engineering construction breakwater device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121903901.3U CN215758819U (en) 2021-08-13 2021-08-13 Hydraulic engineering construction breakwater device

Publications (1)

Publication Number Publication Date
CN215758819U true CN215758819U (en) 2022-02-08

Family

ID=80074936

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121903901.3U Active CN215758819U (en) 2021-08-13 2021-08-13 Hydraulic engineering construction breakwater device

Country Status (1)

Country Link
CN (1) CN215758819U (en)

Similar Documents

Publication Publication Date Title
CN215758819U (en) Hydraulic engineering construction breakwater device
CN209202352U (en) A kind of novel intelligent accountancy exclusive table
CN201190576Y (en) Thrust gear suitable for hydraulic support
CN113843757A (en) Turning device is used in production of small-size ring gear
CN207990144U (en) A kind of collector timbering machine structure
CN213979949U (en) Large-volume concrete pumping device for building construction
CN201170108Y (en) Extension sleeve light placing support
CN215711536U (en) Front supporting leg structure suitable for forklift tail crane
CN212591001U (en) Novel cradle storage rack
CN217975882U (en) Detachable aluminum-wood door frame
CN219429474U (en) Hoisting device for toughened glass
CN215896739U (en) Distribution network ground protection device
CN218808180U (en) Line stick goods shelves with adjacent layer dislocation function
CN217304052U (en) Portable electromagnetic flowmeter
CN212292624U (en) Automobile maintenance platform
CN218779435U (en) Locking device with wedging function
CN219277086U (en) Kindergarten blackboard with lifting function
CN217296954U (en) Lifting appliance for lifting flywheel of diesel engine
CN211862187U (en) Cabinet is stored to archives with theftproof function
CN210344807U (en) Spliced liquid crystal display screen convenient to install
CN211524512U (en) Two-wing door beam structure
CN216470100U (en) Three-dimensional goods shelves are with supplementary fixed knot structure
CN212246126U (en) Track self-propelled equipment posture adjusting platform
CN218873784U (en) Clamping assembly of numerical control machine tool
CN220334715U (en) Ground grabbing structure of scissor type lifting platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant