CN215730270U - A personnel training equipment before post for manpower resources - Google Patents

A personnel training equipment before post for manpower resources Download PDF

Info

Publication number
CN215730270U
CN215730270U CN202122207584.8U CN202122207584U CN215730270U CN 215730270 U CN215730270 U CN 215730270U CN 202122207584 U CN202122207584 U CN 202122207584U CN 215730270 U CN215730270 U CN 215730270U
Authority
CN
China
Prior art keywords
block
column
rod
fixing
top end
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122207584.8U
Other languages
Chinese (zh)
Inventor
刘国强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202122207584.8U priority Critical patent/CN215730270U/en
Application granted granted Critical
Publication of CN215730270U publication Critical patent/CN215730270U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a personnel on-post training device for human resources, which relates to the technical field of on-post training devices and comprises the following components: the bottom end of the main body is provided with a supporting rod; the fixing column is positioned at the top end of the main body, and a connecting block is arranged at the top end of the fixing column; the U-shaped rod is located at one end of the connecting block, and a connecting rod is arranged at the top end of one side of the U-shaped rod. According to the device, the pre-connecting mechanism is arranged to push the push rod, the push rod moves to drive the movable clamping block to move, the movable clamping block moves to drive the second diagonal gear to rotate, the second diagonal gear rotates to drive the second threaded column to rotate, the second threaded column rotates to drive the clamping column to move, when the clamping column moves to the fixed groove in the movable block, the push rod can be stopped to push, and the structure is favorable for quickly fixing the connecting block and the fixed column, so that the mounting efficiency of the device is improved.

Description

A personnel training equipment before post for manpower resources
Technical Field
The utility model relates to the technical field of pre-post training equipment, in particular to pre-post training equipment for personnel of human resources.
Background
The personnel on-post training of the human resources refers to that aiming at the situation that the personnel on the human resources are trained systematically before going on post, the personnel on the human resources are enabled to know the development of the post and know the work of the personnel, enough preparation is made before going on post, the personnel on-post training of the human resources needs to use a projection screen, and the information stored in a computer is projected and amplified on the screen so as to be convenient to watch.
Present personnel's on-duty training equipment for manpower resources can't carry out the operation of pre-connection to the device when using to lead to when the installation overall arrangement, the installation effectiveness is lower, and present personnel's on-duty training equipment for manpower resources still has the operation that can't carry out quick fixed to projection curtain and device when using, also can't consolidate fixed of projection curtain simultaneously, has reduced the stability and the practicality of device.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide personnel on-post training equipment for human resources, so as to solve the problems in the background technology.
In order to achieve the purpose, the utility model provides the following technical scheme:
a personnel on-post training apparatus for human resources, comprising:
the bottom end of the main body is provided with a supporting rod;
the fixing column is positioned at the top end of the main body, and a connecting block is arranged at the top end of the fixing column;
the U-shaped rod is positioned at one end of the connecting block, and the top end of one side of the U-shaped rod is provided with a connecting rod;
the fixing block is positioned on one side of the connecting rod, and a projection curtain is arranged on one side of the fixing block;
the pre-connection mechanism is positioned inside the fixed column and is used for performing pre-connection operation on the connecting block and the fixed column;
and the fixing mechanism is positioned in the connecting rod and used for fixing the connecting rod and the fixing block.
As a still further scheme of the utility model: the pre-connecting mechanism comprises a pushing unit, a fixing unit and a linkage unit, wherein the pushing unit comprises a push rod which is arranged on one side of the fixed column and penetrates through the fixed column, a moving clamping block is arranged on one side of the push rod, a moving block which penetrates through the connecting block is arranged at the bottom end of the connecting block, a first spring is arranged at the top end of the moving block, the first spring is fixedly connected with the inner wall of the connecting block, an arc surface is arranged on one side of the moving clamping block and the bottom end of the moving block, and a clamping groove matched with the moving block is arranged at the top end of the moving clamping block.
As a still further scheme of the utility model: the linkage unit is including setting up the dead lever in removal fixture block one end, the one end of dead lever is provided with the second rack, the top of second rack is provided with the second gear, the one end of second gear is provided with the bull stick that runs through to the fixed column outside, the one end of bull stick to the inside that is located the fixed column is provided with first twill gear.
As a still further scheme of the utility model: the fixed unit is including setting up the second twill gear in first twill gear one end, one side of second twill gear is provided with second screw thread post, the card post has been cup jointed to one side of second screw thread post, the bottom of movable block one side be provided with card post assorted fixed slot.
As a still further scheme of the utility model: the fixing mechanism is composed of a rotating unit, a moving unit and a clamping unit, the rotating unit comprises a threaded rod which is arranged on one side of the U-shaped rod and penetrates through the inside of the U-shaped rod, a first rack is sleeved inside one side of the threaded rod and located inside the connecting rod, and threads matched with the threaded rod are arranged inside the first rack.
As a still further scheme of the utility model: the moving unit comprises a first gear arranged at the top end of the first rack, a first threaded column is arranged on one side of the first gear, a moving column is sleeved on one side of the first threaded column, and the moving column is in sliding connection with the inner wall of the connecting rod.
As a still further scheme of the utility model: the block unit is including setting up on fixed block inner wall top and running through to the inside locking piece of fixed block, the top of locking piece is provided with the second spring, one side of fixed block be provided with connecting rod assorted spout, and the inner wall of fixed block be provided with remove post assorted block groove, the top of connecting rod, bottom be provided with locking piece assorted draw-in groove.
Compared with the prior art, the utility model has the beneficial effects that:
1. the pre-connecting mechanism is arranged to push the push rod, the push rod moves to drive the movable clamping block to move, the movable clamping block moves to drive the second diagonal gear to rotate, the second diagonal gear rotates to drive the second threaded column to rotate, the second threaded column rotates to drive the clamping column to move, when the clamping column moves to a fixed groove in the movable block, the push rod can be stopped being pushed, and the structure is favorable for quickly fixing the connecting block and the fixed column, so that the installation efficiency of the device is improved;
2. through setting up fixed establishment, push the spout of projection curtain one side fixed block with the connecting rod, the connecting rod removes and extrudes the locking piece and removes, the extrusion of second spring atress, it is located same vertical position to move to the draw-in groove with the connecting block top when the locking piece, the second spring resets and drives the locking piece and resets, the locking piece resets and is fixed with the preliminary block of connecting rod, later the rotation threaded rod, the threaded rod rotates and drives the removal post and removes, can stop rotating the threaded rod when removing the post and removing to the inside fixed slot of fixed block, it is quick to be favorable to with the projection curtain through this structure, stable being fixed in the device top, be favorable to improving the stability and the practicality of device.
Drawings
FIG. 1 is a schematic diagram of a pre-job training facility for human resources;
FIG. 2 is a schematic diagram of a pre-attachment mechanism for a human resources personnel pre-post training facility;
FIG. 3 is a schematic view of a fastening mechanism for a pre-post human resource training apparatus;
FIG. 4 is an enlarged schematic view of a pre-job training facility for human resources at point A.
In the figure: 1. a main body; 2. fixing a column; 3. a support bar; 4. a push rod; 5. a rotating rod; 6. connecting blocks; 7. a U-shaped rod; 8. a connecting rod; 9. a fixed block; 10. a projection screen; 11. a threaded rod; 12. a moving block; 13. a first spring; 14. moving the fixture block; 15. a first rack; 16. a first gear; 17. a first threaded post; 18. moving the column; 19. a locking block; 20. a second spring; 21. fixing the rod; 22. a second rack; 23. a second gear; 24. a first twill gear; 25. a second twill gear; 26. a second threaded post; 27. and (5) clamping the column.
Detailed Description
Referring to fig. 1 to 4, in an embodiment of the present invention, an apparatus for training human resources before post includes:
the bottom end of the main body 1 is provided with a support rod 3;
the fixing column 2 is positioned at the top end of the main body 1, and a connecting block 6 is arranged at the top end of the fixing column 2;
the U-shaped rod 7 is positioned at one end of the connecting block 6, and the top end of one side of the U-shaped rod 7 is provided with a connecting rod 8;
the fixing block 9 is positioned on one side of the connecting rod 8, and a projection curtain 10 is arranged on one side of the fixing block 9;
the pre-connection mechanism is positioned inside the fixed column 2 and is used for performing pre-connection operation on the connecting block 6 and the fixed column 2;
and the fixing mechanism is positioned inside the connecting rod 8 and is used for fixing the connecting rod 8 and the fixing block 9.
This kind of a personnel training equipment before sentry post for manpower resources is favorable to carrying out the operation of pre-connection to the device through this structure, also is favorable to improving the installation effectiveness of device simultaneously to improve the stability and the practicality of device.
In fig. 2: the pre-connecting mechanism is composed of a pushing unit, a fixing unit and a linkage unit, the pushing unit comprises a push rod 4 which is arranged on one side of the fixing column 2 and penetrates through the fixing column 2, a moving clamping block 14 is arranged on one side of the push rod 4, a moving block 12 which penetrates through the connecting block 6 is arranged at the bottom end of the connecting block 6, a first spring 13 is arranged at the top end of the moving block 12, the first spring 13 is fixedly connected with the inner wall of the connecting block 6, one side of the moving clamping block 14 and the bottom end of the moving block 12 are arranged in an arc surface shape, and a clamping groove matched with the moving block 12 is formed in the top end of the moving clamping block 14.
The personnel on-post training equipment for human resources is beneficial to the movement of the push rod 4 through the structure and can drive the movable clamping block 14 to move.
In fig. 2, 4: the linkage unit is provided with second rack 22 including setting up the dead lever 21 in 14 one ends of removal fixture block, the one end of dead lever 21, and the top of second rack 22 is provided with second gear 23, and the one end of second gear 23 is provided with and runs through to the outside bull stick 5 of fixed column 2, the one end of bull stick 5 to the inside that is located fixed column 2 is provided with first twill gear 24.
This kind of a personnel training equipment before sentry post for manpower resources is favorable to removing fixture block 14 through this structure and removes and can drive first twill gear 24 and rotate the operation.
In fig. 2, 4: the fixed unit is provided with second screw thread post 26 including setting up the second twill gear 25 in first twill gear 24 one end, one side of second twill gear 25, and card post 27 has been cup jointed to one side of second screw thread post 26, and the bottom of movable block 12 one side is provided with and blocks post 27 assorted fixed slot.
This kind of a personnel training equipment before sentry post for manpower resources is favorable to first twill gear 24 to rotate through this structure and can drive card post 27 and remove to it is fixed to be favorable to the block of connecting block 6 and fixed column 2.
In fig. 3: the fixing mechanism comprises a rotating unit, a moving unit and a clamping unit, the rotating unit comprises a threaded rod 11 which is arranged on one side of the U-shaped rod 7 and penetrates into the U-shaped rod 7, one side of the threaded rod 11 is sleeved inside the connecting rod 8, a first rack 15 is sleeved inside the first rack 15, and threads matched with the threaded rod 11 are arranged inside the first rack 15.
This kind of a training equipment before personnel post for manpower resources is favorable to threaded rod 11 to rotate through this structure and can drives first rack 15 and remove.
In fig. 3: the moving unit comprises a first gear 16 arranged at the top end of the first rack 15, a first threaded column 17 is arranged on one side of the first gear 16, a moving column 18 is sleeved on one side of the first threaded column 17, and the moving column 18 is in sliding connection with the inner wall of the connecting rod 8.
The pre-post training equipment for the personnel of the human resources is beneficial to the operation that the first rack 15 moves to drive the moving column 18 to move through the structure.
In fig. 3: the clamping unit comprises a locking block 19 which is arranged on the top end of the inner wall of the fixing block 9 and penetrates into the fixing block 9, a second spring 20 is arranged on the top end of the locking block 19, a sliding groove matched with the connecting rod 8 is formed in one side of the fixing block 9, a clamping groove matched with the moving column 18 is formed in the inner wall of the fixing block 9, and a clamping groove matched with the locking block 19 is formed in the top end and the bottom end of the connecting rod 8.
This kind of a personnel training equipment before sentry post for manpower resources is favorable to connecting rod 8 and fixed block 9 to carry out preliminary fixed operation through this structure, is favorable to improving the fixed efficiency of device.
The working principle of the utility model is as follows: when the device is used, the supporting rod 3 is opened, the whole body is placed on a horizontal ground, then the operation of pre-connecting the fixed column 2 and the connecting block 6 is carried out, the moving block 12 at the bottom end of the connecting block 6 is inserted into the fixed column 2, then the push rod 4 is pushed, the push rod 4 moves to drive the moving clamping block 14 to move, the moving clamping block 14 moves to drive the moving block 12 to move upwards, the first spring 13 is extruded under stress, when the moving block 12 and the clamping groove at the top end of the moving clamping block 14 are positioned at the same vertical position, the first spring 13 resets and drives the moving block 12 to reset, the moving clamping block 14 moves to simultaneously drive the fixing rod 21 to move, the fixing rod 21 moves to drive the second rack 22 to move, the second rack 22 moves to drive the second gear 23 to rotate, the second gear 23 rotates to drive the rotating rod 5 to rotate, the rotating rod 5 rotates to drive the first twill gear 24 to rotate, the first twill gear 24 rotates to drive the second twill gear 25 to rotate, the second twill gear 25 rotates to drive the second threaded column 26 to rotate, the second threaded column 26 rotates to drive the clamping column 27 to move, when the clamping column 27 moves to a fixed groove in the inner part of the moving block 12, the push rod 4 can be stopped to push, the structure is favorable for quickly fixing the connecting block 6 and the fixed column 2, so that the installation efficiency of the device is improved, then the projection curtain 10 needs to be installed, the projection curtain 10 is opened, the connecting rod 8 is pushed into a sliding groove of a fixed block 9 on one side of the projection curtain 10, the connecting rod 8 moves and extrudes the locking block 19 to move, the second spring 20 is extruded under force, when the locking block 19 moves to be positioned at the same vertical position as a clamping groove at the top end of the connecting block 6, the second spring 20 resets and drives the locking block 19 to reset, the locking block 19 resets and is clamped and fixed with the connecting rod 8, then the threaded rod 11 is rotated, the threaded rod 11 rotates to drive the first rack 15 to move preliminarily, first rack 15 removes and drives first gear 16 and rotate, and first gear 16 rotates and drives first screw thread post 17 and rotate, and first screw thread post 17 rotates and drives and remove post 18 and remove, can stop rotating threaded rod 11 when removing post 18 and remove to the inside fixed slot of fixed block 9, is favorable to being fixed in the device top fast, stable with projection curtain 10 through this structure, is favorable to improving the stability and the practicality of device.
The above description is only a preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art of training apparatus in the technical field of the present invention shall be covered by the technical scope of the present invention, and equivalent alternatives or modifications thereof according to the technical solution of the present invention and the inventive concept thereof.

Claims (7)

1. An apparatus for personnel on-post training of human resources, comprising:
the bottom end of the main body (1) is provided with a support rod (3);
the fixing column (2) is positioned at the top end of the main body (1), and a connecting block (6) is arranged at the top end of the fixing column (2);
the U-shaped rod (7) is positioned at one end of the connecting block (6), and a connecting rod (8) is arranged at the top end of one side of the U-shaped rod (7);
the fixing block (9) is positioned on one side of the connecting rod (8), and a projection curtain (10) is arranged on one side of the fixing block (9);
the pre-connection mechanism is positioned inside the fixed column (2) and is used for performing pre-connection operation on the connecting block (6) and the fixed column (2);
and the fixing mechanism is positioned inside the connecting rod (8) and is used for fixing the connecting rod (8) and the fixing block (9).
2. The apparatus for personnel on-Shift training of human resources according to claim 1, the pre-connecting mechanism consists of a pushing unit, a fixing unit and a linkage unit, the pushing unit comprises a push rod (4) which is arranged on one side of the fixing column (2) and penetrates into the fixing column (2), a movable clamping block (14) is arranged on one side of the push rod (4), a movable block (12) penetrating into the connecting block (6) is arranged at the bottom end of the connecting block (6), a first spring (13) is arranged at the top end of the moving block (12), the first spring (13) is fixedly connected with the inner wall of the connecting block (6), one side of the movable fixture block (14) and the bottom end of the movable block (12) are arranged to be arc-surface-shaped, the top end of the movable clamping block (14) is provided with a clamping groove matched with the movable block (12).
3. The personnel post training equipment for human resources as claimed in claim 2, wherein the linkage unit comprises a fixed rod (21) arranged at one end of the movable clamping block (14), a second rack (22) is arranged at one end of the fixed rod (21), a second gear (23) is arranged at the top end of the second rack (22), a rotating rod (5) penetrating to the outside of the fixed column (2) is arranged at one end of the second gear (23), and a first inclined gear (24) is arranged at one end of the rotating rod (5) and located inside the fixed column (2).
4. The personnel on-duty training device for human resources as claimed in claim 2, wherein the fixing unit comprises a second diagonal gear (25) arranged at one end of the first diagonal gear (24), a second threaded column (26) is arranged at one side of the second diagonal gear (25), a clamping column (27) is sleeved at one side of the second threaded column (26), and a fixing groove matched with the clamping column (27) is arranged at the bottom end of one side of the moving block (12).
5. The personnel post training equipment for human resources as claimed in claim 1, wherein the fixing mechanism is composed of a rotating unit, a moving unit and a clamping unit, the rotating unit comprises a threaded rod (11) which is arranged on one side of the U-shaped rod (7) and penetrates into the U-shaped rod (7), a first rack (15) is sleeved on one side of the threaded rod (11) and is positioned inside the connecting rod (8), and a thread matched with the threaded rod (11) is arranged inside the first rack (15).
6. The personnel on-post training equipment for human resources as claimed in claim 5, wherein the moving unit comprises a first gear (16) arranged at the top end of the first rack (15), a first threaded column (17) is arranged on one side of the first gear (16), a moving column (18) is sleeved on one side of the first threaded column (17), and the moving column (18) is in sliding connection with the inner wall of the connecting rod (8).
7. The personnel before-post training equipment for human resources as claimed in claim 5, wherein the clamping unit comprises a locking block (19) arranged at the top end of the inner wall of the fixing block (9) and penetrating into the fixing block (9), a second spring (20) is arranged at the top end of the locking block (19), a sliding groove matched with the connecting rod (8) is arranged on one side of the fixing block (9), a clamping groove matched with the moving column (18) is arranged on the inner wall of the fixing block (9), and clamping grooves matched with the locking block (19) are arranged at the top end and the bottom end of the connecting rod (8).
CN202122207584.8U 2021-09-13 2021-09-13 A personnel training equipment before post for manpower resources Active CN215730270U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122207584.8U CN215730270U (en) 2021-09-13 2021-09-13 A personnel training equipment before post for manpower resources

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122207584.8U CN215730270U (en) 2021-09-13 2021-09-13 A personnel training equipment before post for manpower resources

Publications (1)

Publication Number Publication Date
CN215730270U true CN215730270U (en) 2022-02-01

Family

ID=80019062

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122207584.8U Active CN215730270U (en) 2021-09-13 2021-09-13 A personnel training equipment before post for manpower resources

Country Status (1)

Country Link
CN (1) CN215730270U (en)

Similar Documents

Publication Publication Date Title
CN106824602A (en) A kind of rotary main valve plate coating equipment
CN215730270U (en) A personnel training equipment before post for manpower resources
CN108889995A (en) A kind of liftable perforating device of construction
CN209859031U (en) Novel printing opacity knob
CN206090566U (en) Hydraulic engineering uses high -efficient pile -drawing machine
CN209760252U (en) construction is with excavation supporting construction of dismouting of being convenient for
CN204825243U (en) Discoloring head and angular adjustment fixing device thereof
CN210530404U (en) Detachable temporary support for constructional engineering construction
CN112798327A (en) Soil sampling device for environmental monitoring
CN215369102U (en) Safety protection structure for decoration
CN216926422U (en) Building material detects uses impact test device
CN213877001U (en) Safety warning device in city flood prevention operation
CN220338020U (en) Camera support
CN216194194U (en) Safety prompting device for rail transit construction management
CN209980738U (en) Human resource analysis allotment display device for business administration
CN215097734U (en) Pipe fitting placer is used in civil engineering construction
CN214276888U (en) High-stability positioning, moving and surveying and mapping tower ruler
CN216654654U (en) Clamping device of automatic extraction instrument
CN217030496U (en) Two-dimensional code scanning is with admission device
CN217461045U (en) Steel construction assembled wallboard node
CN212539676U (en) Hydraulic engineering geologic survey device
CN216433738U (en) Concrete pressure detection equipment
CN219665183U (en) Steel member drilling equipment capable of being fixed rapidly
CN210771346U (en) Camera shooting assembly fixing mechanism of face recognition system based on near-infrared imaging
CN214538656U (en) On-site supervision soil sampling device for railway engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant