CN215721953U - Tracking monitoring board for building engineering progress management - Google Patents

Tracking monitoring board for building engineering progress management Download PDF

Info

Publication number
CN215721953U
CN215721953U CN202122114555.7U CN202122114555U CN215721953U CN 215721953 U CN215721953 U CN 215721953U CN 202122114555 U CN202122114555 U CN 202122114555U CN 215721953 U CN215721953 U CN 215721953U
Authority
CN
China
Prior art keywords
tracking
monitoring
box
progress management
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122114555.7U
Other languages
Chinese (zh)
Inventor
张强
孙超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202122114555.7U priority Critical patent/CN215721953U/en
Application granted granted Critical
Publication of CN215721953U publication Critical patent/CN215721953U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to the technical field of building engineering, in particular to a tracking and monitoring board for managing the progress of building engineering, which comprises a monitoring device body, wherein the monitoring device body comprises a bottom board, universal wheels, a lifting component and a tracking component, the universal wheels are arranged at the corners of the bottom board, the lifting component is arranged on the base surface of the bottom board, the tracking component is arranged on the upper side of the lifting component, when the tracking box is required to be lifted, the tracking box can be driven to lift only by operating a driving motor and is stable when the tracking box is lifted, so that the tracking box can be adjusted to a proper height as required, when the tracking box is required to record, the monitoring board can be drawn out to record the monitoring board, and a plurality of monitoring boards are arranged, so that different contents can be recorded as required, and the recording is more convenient, the whole device is simple in structure and high in practicability.

Description

Tracking monitoring board for building engineering progress management
Technical Field
The utility model relates to the technical field of constructional engineering, in particular to a tracking and monitoring board for managing the progress of constructional engineering.
Background
In various processing workshops and building industries, a progress tracking monitoring edition is required to be used for progress management, and the management patrol of a company management layer can obtain project progress information in a most convenient form on site.
With the progress of a project and the change of actual conditions, it is often necessary to modify the project plan or add an improvement plan in the project plan, for which, the existing method is to mark new plan contents after project managers erase the original contents, and the existing progress management tracking and monitoring board is mostly a simple ordinary display board, which is inconvenient to record and adjust the height.
There is therefore a need for a tracking monitor panel for construction progress management that ameliorates the above problems.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a tracking and monitoring board for managing the progress of the building engineering, which aims to solve the problems in the background technology.
In order to achieve the purpose, the utility model provides the following technical scheme:
the utility model provides a building engineering progress management is with tracking control board, includes the monitoring device body, the monitoring device body is including bottom plate, universal wheel, lifting unit and tracking unit, the corner of bottom plate bottom is provided with the universal wheel, the base face of bottom plate is provided with lifting unit, lifting unit's upside is provided with tracking unit.
As a preferable scheme of the present invention, the lifting assembly includes a motor base, a threaded rod, a threaded sleeve, a driving motor, a first gear, a second gear, a first slide bar, and a second slide bar, the threaded rod is disposed on the left side of the base surface of the motor base, the threaded sleeve is sleeved on the outer wall of the threaded rod, the driving motor is disposed on the right side of the base surface of the motor base, the first gear is disposed inside the motor base and corresponds to the threaded rod, the second gear is disposed inside the motor base and corresponds to the driving motor, the first slide bars are symmetrically disposed on the front and back of the left side of the motor base, and the second slide bars are symmetrically disposed on the front and back of the right side of the motor base.
In a preferred embodiment of the present invention, the threaded rod and the threaded sleeve are connected by a threaded connection.
As a preferable scheme of the present invention, the motor base, the first slide bar and the second slide bar are respectively disposed on a base surface of the base plate.
According to a preferable scheme of the utility model, the tracking assembly comprises a tracking box, a box door, a box handle, a containing cavity, a monitoring cavity, a placing plate, a sliding strip, a monitoring plate and a connecting plate, wherein the box door is arranged on the front side of the tracking box, the box handle is arranged on the right side of the box door, the containing cavities are arranged on the upper and lower sides of the left side of the interior of the tracking box, the monitoring cavity is arranged on the right side of the interior of the tracking box, the placing plate is uniformly arranged in the monitoring cavity, the sliding strips are symmetrically arranged on the left side and the right side of the placing plate, the monitoring plate is embedded in a base surface of the placing plate, and the connecting plate is symmetrically arranged in front and back of the left side and the right side of the tracking box.
As a preferable aspect of the present invention, the placing plate and the monitoring chamber are connected by a sliding connection.
In a preferred embodiment of the present invention, the upper sides of the first slide bar and the second slide bar are slidably connected to the connecting plate, and the end of the threaded sleeve is connected to the bottom of the tracking box.
Compared with the prior art, the utility model has the beneficial effects that:
1. according to the utility model, through the arranged lifting assembly, when the tracking box needs to be lifted, the tracking box can be driven to lift only by operating the driving motor, and the lifting is stable, so that the tracking box can be adjusted to a proper height as required.
2. According to the utility model, through the arranged tracking boxes, when recording is required, the monitoring board can be recorded only by pulling out the monitoring board, and a plurality of monitoring boards are arranged, so that different contents can be recorded according to the requirement, the recording is more convenient, and the whole device is simple in structure and higher in practicability.
Drawings
FIG. 1 is an overall front view of the present invention;
FIG. 2 is a view of the interior of the tracking box of the present invention;
FIG. 3 is a partial block diagram of the present invention;
fig. 4 is an internal structure view of the motor base of the present invention.
In the figure: 1. a monitoring device body; 2. a base plate; 3. a universal wheel; 4. a lifting assembly; 5. a tracking component; 6. a motor base; 7. a threaded rod; 8. a threaded sleeve; 9. a drive motor; 10. a first gear; 11. a second gear; 12. a first slide bar; 13. a second slide bar; 14. a tracking box; 15. a box door; 16. a case handle; 17. a receiving cavity; 18. a monitoring chamber; 19. placing the plate; 20. a slide bar; 21. a monitor board; 22. a connecting plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, rather than all embodiments, and all other embodiments obtained by a person of ordinary skill in the art without any creative work based on the embodiments of the present invention belong to the protection scope of the present invention.
While several embodiments of the present invention will be described more fully hereinafter with reference to the accompanying drawings, in order to facilitate an understanding of the utility model, the utility model may be embodied in many different forms and should not be construed as limited to the embodiments set forth herein, but rather should be construed to provide a more complete disclosure of the utility model.
It will be understood that when an element is referred to as being "secured to" another element, it can be directly on the other element or intervening elements may also be present, that when an element is referred to as being "connected" to another element, it can be directly connected to the other element or intervening elements may also be present, and that the terms "vertical", "horizontal", "left", "right" and the like are used herein for descriptive purposes only.
Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs, and the terms used herein in the specification of the present invention are for the purpose of describing particular embodiments only and are not intended to limit the present invention, and the term "and/or" as used herein includes any and all combinations of one or more of the associated listed items.
Referring to fig. 1-4, the present invention provides a technical solution:
the utility model provides a building engineering progress management is with tracking control board, includes monitoring device body 1, monitoring device body 1 is provided with universal wheel 3 including bottom plate 2, universal wheel 3, lifting unit 4 and tracking unit 5, the corner of 2 bottoms of bottom plate, and the base face of bottom plate 2 is provided with lifting unit 4, and lifting unit 4's upside is provided with tracking unit 5.
In the embodiment, referring to fig. 1 and 4, the lifting assembly 4 includes a motor base 6, a threaded rod 7, a threaded sleeve 8, a driving motor 9, a first gear 10, a second gear 11, a first slide bar 12 and a second slide bar 13, the threaded rod 7 is disposed on the left side of the base surface of the motor base 6, the threaded sleeve 8 is sleeved on the outer wall of the threaded rod 7, the driving motor 9 is disposed on the right side of the base surface of the motor base 6, the first gear 10 is disposed inside the motor base 6 and corresponding to the threaded rod 7, the second gear 11 is disposed inside the motor base 6 and corresponding to the driving motor 9, the first slide bar 12 is symmetrically disposed on the front and back of the left side of the motor base 6, the second slide bar 13 is symmetrically disposed on the front and back of the right side of the motor base 6, and by the lifting assembly 4, when lifting is required, the tracking box 14 can be driven to lift only by operating the driving motor 9, and the lifting is stable, so that the tracking box 14 can be adjusted to a suitable height as required.
In the embodiment, referring to fig. 1, 2 and 3, the tracking assembly 5 includes a tracking box 14, a box door 15, a box handle 16, a containing cavity 17, a monitoring cavity 18, a placing plate 19, a sliding strip 20, a monitoring plate 21 and a connecting plate 22, the front of the tracking box 14 is provided with the box door 15, the right of the box door 15 is provided with the box handle 16, the left inside of the tracking box 14 is provided with the containing cavity 17 at the top and bottom, the right inside of the tracking box 14 is provided with the monitoring cavity 18, the inside of the monitoring cavity 18 is uniformly provided with the placing plate 19, the left and right sides of the placing plate 19 are symmetrically provided with the sliding strip 20, the base surface of the placing plate 19 is embedded with the monitoring plate 21, the front and back of the left and right sides of the tracking box 14 are symmetrically provided with the connecting plate 22, when recording is required, the monitoring plate 21 can be recorded only by pulling out, and the monitoring plates 21 are provided with a plurality of them, so as to record different contents as required, the recording is more convenient, and the whole device has simple structure and higher practicability.
The working process of the utility model is as follows: during the use, at first promote suitable position through universal wheel 3 with the integrated device and go out, when needs height-adjusting, operation driving motor 9, driving motor 9 drives second gear 11 when rotating and rotates, then drive threaded rod 7 through first gear 10 and rotate, thereby it goes up and down to suitable position department to drive tracking box 14 through threaded sleeve 8, when needs record, slide and place board 19, then will place board 19 and take out and place on tracking box 14, it can to carry out the record to it through control panel 21, can place some relevant article in accomodating the chamber 17.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides a building engineering progress management is with tracking control board, includes monitoring device body (1), its characterized in that: monitoring device body (1) is including bottom plate (2), universal wheel (3), lifting unit (4) and tracking subassembly (5), the corner of bottom plate (2) bottom is provided with universal wheel (3), the base plane of bottom plate (2) is provided with lifting unit (4), the upside of lifting unit (4) is provided with tracking subassembly (5).
2. The tracking and monitoring board for the progress management of the constructional engineering according to claim 1, wherein: the lifting component (4) comprises a motor base (6), a threaded rod (7), a threaded sleeve (8), a driving motor (9), a first gear (10), a second gear (11), a first sliding rod (12) and a second sliding rod (13), a threaded rod (7) is arranged on the left side of the base surface of the motor seat (6), a threaded sleeve (8) is sleeved on the outer wall of the threaded rod (7), a driving motor (9) is arranged on the right side of the base surface of the motor base (6), a first gear (10) is arranged in the motor base (6) and corresponds to the threaded rod (7), a second gear (11) is arranged in the motor base (6) and corresponds to the driving motor (9), a first sliding rod (12) is symmetrically arranged at the front and the rear of the left side of the motor base (6), and second sliding rods (13) are symmetrically arranged at the front and the back of the right side of the motor base (6).
3. The tracking and monitoring board for the progress management of the constructional engineering according to claim 2, wherein: the threaded rod (7) is in threaded connection with the threaded sleeve (8).
4. The tracking and monitoring board for the progress management of the constructional engineering according to claim 2, wherein: the motor base (6), the first sliding rod (12) and the second sliding rod (13) are respectively arranged on the base surface of the bottom plate (2).
5. The tracking and monitoring board for the progress management of the constructional engineering according to claim 1, wherein: the tracking component (5) comprises a tracking box (14), a box door (15), a box handle (16), a containing cavity (17), a monitoring cavity (18), a placing plate (19), a slide bar (20), a monitoring plate (21) and a connecting plate (22), a box door (15) is arranged on the front surface of the tracking box (14), a box handle (16) is arranged on the right side of the box door (15), the upper part and the lower part of the left side in the tracking box (14) are provided with a containing cavity (17), a monitoring cavity (18) is arranged at the right side in the tracking box (14), a placing plate (19) is uniformly arranged in the monitoring cavity (18), the left side and the right side of the placing plate (19) are symmetrically provided with sliding strips (20), a monitoring plate (21) is embedded in the base surface of the placing plate (19), and connecting plates (22) are symmetrically arranged in front of and behind the left side surface and the right side surface of the tracking box (14).
6. The tracking and monitoring board for the progress management of the constructional engineering according to claim 5, wherein: the placing plate (19) is connected with the monitoring cavity (18) in a sliding mode.
7. The tracking and monitoring board for the progress management of the constructional engineering according to claim 2, wherein: the upper sides of the first sliding rod (12) and the second sliding rod (13) are respectively connected with a connecting plate (22) in a sliding mode, and the end portion of the threaded sleeve (8) is connected with the bottom of the tracking box (14).
CN202122114555.7U 2021-09-02 2021-09-02 Tracking monitoring board for building engineering progress management Active CN215721953U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122114555.7U CN215721953U (en) 2021-09-02 2021-09-02 Tracking monitoring board for building engineering progress management

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122114555.7U CN215721953U (en) 2021-09-02 2021-09-02 Tracking monitoring board for building engineering progress management

Publications (1)

Publication Number Publication Date
CN215721953U true CN215721953U (en) 2022-02-01

Family

ID=80013904

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122114555.7U Active CN215721953U (en) 2021-09-02 2021-09-02 Tracking monitoring board for building engineering progress management

Country Status (1)

Country Link
CN (1) CN215721953U (en)

Similar Documents

Publication Publication Date Title
CN215721953U (en) Tracking monitoring board for building engineering progress management
CN206790641U (en) A kind of intelligent meter data recording equipment
CN212291485U (en) Three-dimensional space storage equipment
CN211143975U (en) Road construction is with removing rail
CN214631079U (en) Business administration is with teaching display device
CN112220291B (en) Scientific and technological achievement advance evaluation is collected and is reported and use display device based on big data
CN213303335U (en) Teaching experiment platform
CN213139892U (en) Automatic garbage bag dispenser based on Internet of things
CN211300862U (en) Shallow for clinical care
CN114578598A (en) Turnover mechanism for laminating processing of liquid crystal display screen and working method of turnover mechanism
CN218457632U (en) Dustproof image processing and computing platform
CN217675300U (en) Arraying device for conical workpieces
CN212193079U (en) Liquid crystal display semi-manufactured goods storage device
CN214175505U (en) Administrative management example model display auxiliary device
CN214136003U (en) Novel tool rack for building environment-friendly construction
CN216532260U (en) Big data storage management cabinet
CN213424385U (en) ERP sand table for economic management
CN211048788U (en) Manpower resource data statistics device
CN217292290U (en) Tool rack capable of being lifted and lowered for automobile repair based on workshop
CN219005999U (en) Workbench with storage function
CN219948926U (en) Logistics management classification collector
CN216806776U (en) Intelligent management three-dimensional warehouse cabinet data read-write equipment
CN219020591U (en) Liftable storage goods shelves
CN213502344U (en) Conveyer is used in production of noise check out test set
CN216166176U (en) Storage rack capable of lifting and moving files

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant