CN215717352U CN202120181254.3U CN202120181254U CN215717352U CN 215717352 U CN215717352 U CN 215717352U CN 202120181254 U CN202120181254 U CN 202120181254U CN 215717352 U CN215717352 U CN 215717352U
Authority
CN
China
Prior art keywords
positioning
harness cord
sleeve
steel ball
external wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120181254.3U
Other languages
Chinese (zh)
Inventor
周龙辉
孟祥璞
杨勇茂
张向远
方尚远
毛佳琦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Henan Engineering Co Ltd
Original Assignee
PowerChina Henan Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Henan Engineering Co Ltd filed Critical PowerChina Henan Engineering Co Ltd
Priority to CN202120181254.3U priority Critical patent/CN215717352U/en
Application granted granted Critical
Publication of CN215717352U publication Critical patent/CN215717352U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses an auxiliary device for installing external wall panels of an assembled factory building, which comprises a base layer support, an upper layer support and four adjusting devices, wherein the upper layer support is positioned above the base layer support, the upper layer support is connected with the base layer support through bolts, and the bottom of the base layer support is provided with the four first adjusting devices; be provided with two "U" types in the upper end of upper support and press from both sides, press from both sides the below of right-hand member at every "U" type and be provided with the montant perpendicularly, be provided with the limiting plate at the tip of montant, the cover is equipped with the removal frame on the montant, is provided with second adjusting device in the inner of removing the frame. The utility model can ensure that an installer can directly carry out the installation operation of the external wall panel on the upper layer bracket and the base layer bracket, ensures the safety of the operator, greatly reduces the investment of manpower, material resources and financial resources, improves the labor efficiency and has good practical value and application prospect.

Description

Auxiliary device for installing external wall panel of assembly type factory building
The technical field is as follows:
the utility model relates to an auxiliary device for installing an external wall panel, in particular to an auxiliary device for installing an external wall panel of an assembly type workshop.
Background art:
with the economic development of China, assembly type buildings are greatly promoted in China in recent years, factories, transformer substations and the like are located in suburbs or outdoors, the traditional safety protection structures such as double-row landing scaffolds and mobile scaffolds have high requirements on the flatness of construction sites, the bearing capacity of foundations and the like, the problems of long construction period for erecting frame bodies, large construction risk of installation and removal, high cost and the like are increasingly highlighted, in addition, if the distance between the frame bodies and the outer wall is erected according to the standards, the distance is too small, construction is inconvenient, manpower and material resources are wasted invisibly, the construction period is prolonged, if the distance between the frame bodies and the outer wall is larger than the relevant standard requirements, the stability of the frame bodies cannot be guaranteed, and the safety protection effect cannot be achieved.
The utility model has the following contents:
the technical problem to be solved by the utility model is as follows: the utility model provides an assembly type factory building side fascia installation auxiliary device, when the installation of assembly type factory building side fascia, the use of cooperation safety belt can let installer directly go up the ladder and carry out the side fascia installation operation, saves the trouble of setting up the scaffold frame.
The technical scheme adopted by the utility model for solving the technical problem is as follows:
the auxiliary device for installing the external wall panels of the assembled factory building comprises a base layer support, upper layer supports and four adjusting devices, wherein the upper layer supports are positioned above the base layer supports, the upper layer supports are connected with the base layer supports through bolts, and first adjusting devices are arranged at the bottom of the base layer supports; the upper end of upper strata support is provided with two "U" type and presss from both sides, every "U" type presss from both sides the below of right-hand member and is provided with the montant perpendicularly the tip of montant is provided with the limiting plate the cover is equipped with the removal frame on the montant the interior terminal surface of removing the frame is provided with second adjusting device.
The foundation support comprises four first upright posts, four first cross frames, four first positioning sleeves and four first positioning screws, wherein the first upright posts are distributed in a hollow tubular structure; one side of the top of each first upright post is respectively provided with a first positioning sleeve with internal threads, a first positioning screw rod is respectively connected in each first positioning sleeve through threads, and the end part of each first positioning screw rod is directly communicated with the inside of the first upright post; at least three first cross frames which are distributed in a rectangular shape are arranged among the four first upright posts, and the first cross frames are distributed in an upper and lower parallel shape.
The four corners of each first transverse frame are welded with the corresponding first upright posts, and the distance between the upper adjacent first transverse frame and the lower adjacent first transverse frame is the same.
The upper layer bracket consists of four second upright posts and four second cross frames, and each second upright post is distributed in a hollow tubular structure; a second positioning sleeve with internal threads is arranged on the side face of the top of each second upright column respectively, a second positioning screw rod is connected in each second positioning sleeve through threads, and the end part of each second positioning screw rod is directly communicated with the inside of each second upright column; at least three second cross frames which are distributed in a rectangular shape are arranged among the four second upright posts, and the second cross frames are distributed in an upper and lower parallel shape; the bottom of the second upright post is welded with the inserted rods, and each inserted rod is respectively inserted into the upper end of the first upright post below and is rotationally and tightly propped together through the first positioning screw rod.
The four corners of each second transverse frame are welded with corresponding second upright posts, and the distances between the upper and lower adjacent second transverse frames are the same; the first upright post and the second upright post are two pipelines with the same inner diameter.
One U-shaped clamp is fixed with the top ends of two second upright columns longitudinally distributed on the upper layer bracket through bolts and matched nuts; the other U-shaped clamp is fixed with the top ends of the other two second upright columns longitudinally distributed on the upper layer bracket through bolts and matched nuts.
A third positioning sleeve with an internal thread is arranged on one side face of the movable frame, a third positioning screw rod is connected into the third positioning sleeve through threads, a positioning hole is formed in the side face, corresponding to the vertical rod, of the third positioning sleeve, and the end portion of the third positioning screw rod is directly communicated with the inside of the movable frame and inserted into the corresponding positioning hole.
The first adjusting device consists of a steel base plate, steel balls, a harness cord screw and a harness cord sleeve, the bottom of each first upright post is welded with the harness cord sleeve, and the other end of each harness cord sleeve is connected with the harness cord screw through threads; and a steel ball groove is dug in the upper end surface of the steel base plate, a steel ball is embedded in the steel ball groove, and one end of the harness cord screw is welded with the steel ball.
The second adjusting device is composed of a steel backing plate, a steel ball, a harness cord screw and a harness cord sleeve, the harness cord sleeve is fixedly connected to the inner end face of the moving frame, the other end of the harness cord sleeve is connected with the harness cord screw through threads, the other end of the harness cord screw is fixedly connected with the steel ball, and the steel ball is embedded in a steel ball groove in the inner side face of the steel backing plate.
The utility model has the following positive beneficial effects:
1. the bottom of a base layer support is provided with a first adjusting device, the inner end face of a movable frame is provided with a second adjusting device, an upper layer support and the base layer support lean against a parapet wall obliquely before use, and a steel base plate in the second adjusting device is tightly propped against and fixed with the parapet wall by adjusting a thread screw in the second adjusting device; meanwhile, a steel base plate in the first adjusting device is clamped and fixed with the ground in a butting mode through a harness cord screw in the first adjusting device; during the use, when utilizing this device can make the installation of assembled factory building side fascia, the use of cooperation safety belt can let installer directly carry out side fascia installation operation on upper support and basic unit's support, conveniently removes the operation.
2. The utility model has simple and convenient use and high efficiency, solves the problems of high requirement on construction sites, long construction period, high risk, high cost and inconvenience caused by using double-row floor scaffolds and movable scaffolds originally, ensures the safety of operators, greatly reduces the investment of manpower, material resources and financial resources, improves the labor efficiency, and has good practical value and application prospect.
3. According to the utility model, the steel ball is embedded in the steel ball groove, and the harness cord screw and the steel ball are welded together, so that when the steel ball is used, when the construction ground is uneven, the rotation of the steel ball can be automatically adjusted, and meanwhile, the harness cord screw on the first adjusting device is adjusted, so that the first adjusting device is tightly propped against the ground, and the second adjusting device is tightly propped against the parapet.
4. The upper layer bracket and the lower layer bracket are fixed together through the bolts, so that the assembly on a construction site is facilitated; through setting up the montant below the U type presss from both sides right-hand member, the cover is established and is removed the frame on the montant, can be according to the construction wall, adjusts the position of removing the frame on the montant to will remove the frame through third positioning screw and fix together with the montant.
Description of the drawings:
FIG. 1 is a schematic structural view of the present invention;
fig. 2 is a schematic structural diagram of a second adjusting device according to the present invention (the first adjusting device is identical to the second adjusting device in structure, so the first adjusting device is omitted).
The specific implementation mode is as follows:
the utility model will be further explained and explained with reference to the drawings, in which:
referring to fig. 1-2, an auxiliary device for installing external wall panels of an assembly type factory building comprises a base layer support, upper layer supports and four adjusting devices, wherein the upper layer supports are positioned above the base layer supports and are connected with the base layer supports through bolts, and the bottom of each base layer support is provided with four first adjusting devices; be provided with two "U" types in the upper end of upper support and press from both sides 10, press from both sides the below of 10 right-hand members at every "U" type and be provided with montant 12 perpendicularly, be provided with the limiting plate at the tip of montant 12, the cover is equipped with on montant 12 and removes frame 13, is provided with second adjusting device in the inner that removes frame 13.
The base layer support comprises four first upright posts 1, four first cross frames 2, four first positioning sleeves 3 and four first positioning screws 4, wherein the first upright posts are distributed in a hollow tubular structure (the first upright posts are hollow inside and open at two ends); one side of the top of each first upright post 1 is respectively provided with a first positioning sleeve 3 with internal threads, a first positioning screw rod 4 is respectively connected in each first positioning sleeve 3 through threads, and the end part of each first positioning screw rod 4 is directly communicated with the inside of the first upright post 1; at least three first cross frames 2 which are distributed in a rectangular shape are arranged among the four first upright posts 1, and the first cross frames 2 are distributed in an up-and-down parallel shape.
The four corners of each first transverse frame 2 are welded with the corresponding first upright posts 1 respectively, and the distances between the upper and lower adjacent first transverse frames 2 are the same.
The upper layer bracket consists of four second upright posts 5 and four second cross frames 9, and each second upright post 5 is distributed in a hollow tubular structure (the second upright posts are hollow inside and open at two ends); a second positioning sleeve 7 with internal threads is arranged on the side surface of the top of each second upright post 5, a second positioning screw 8 is connected in the second positioning sleeve 7 through threads, and the end part of the second positioning screw 8 is directly communicated with the inside of the second upright post 5; at least three second cross frames 9 which are distributed in a rectangular shape are arranged among the four second upright posts 5, and the second cross frames 9 are distributed in an up-and-down parallel shape; the bottom of the second upright post 5 is welded with the inserted rods 6, and each inserted rod 6 is respectively inserted into the upper port of the first upright post 1 below and is rotationally propped together through the first positioning screw rod 4.
The four corners of each second transverse frame 9 are welded with the corresponding second upright posts 5 respectively, and the distances between the upper and lower adjacent second transverse frames 9 are the same; the first upright column 1 and the second upright column 5 are two pipelines with the same inner diameter.
One U-shaped clamp 10 is fixed with the top ends of two second upright posts 5 longitudinally distributed on the upper layer bracket through bolts 11 and matched nuts; the other U-shaped clamp 10 is fixed with the top ends of the other two second upright posts 5 longitudinally distributed on the upper layer bracket through bolts 11 and matched nuts.
A third positioning sleeve 14 with internal threads is arranged on one side surface of the movable frame 13, a third positioning screw 15 is connected in the third positioning sleeve 14 through threads, a positioning hole 12-1 is formed in the side surface, corresponding to the vertical rod 12, of the third positioning sleeve 14, and the end part of the third positioning screw 15 is directly communicated with the inside of the movable frame 13 and inserted into the corresponding positioning hole 12-1.
The first adjusting device consists of a steel backing plate 16, steel balls 20, a harness cord screw 17 and a harness cord sleeve 18, the bottom of each first upright post 1 is respectively welded with the harness cord sleeve 18, and the other end of the harness cord sleeve 18 is respectively connected with the harness cord screw 17 through threads; a steel ball groove 19 is dug in the upper end face of the steel backing plate 16, a steel ball 20 is embedded in the steel ball groove 19, and one end of the lead screw 17 is welded with the steel ball 20.
The second adjusting device is composed of a steel base plate 16, a steel ball 20, a harness cord screw 17 and a harness cord sleeve 18, the harness cord sleeve 18 is fixedly connected to the inner end face of the moving frame 13, the harness cord screw 17 is connected to the other end of the harness cord sleeve 18 through threads, the other end of the harness cord screw 17 is fixedly connected with the steel ball 20, and the steel ball 20 is embedded in a steel ball groove 19 in the inner side face of the steel base plate 16.
In the above description, the insertion rod at the bottom of each second support column in the upper layer support is respectively and correspondingly inserted into the top of the corresponding first support column below, and is tightly supported and fixed by the first positioning screw rod 4; and each inserted bar is welded with the bottom of the second support column.
In the above description, each U-shaped frame is respectively sleeved at the upper ends of two second vertical columns which are longitudinally distributed correspondingly, and the bolt 11 is arranged at the hinge point in a penetrating manner, and the other end of the bolt 11 is screwed and fixed by a matching nut.
In the above description, the movable frame 13 can move up and down along the vertical rod 12, and the limiting plate is arranged at the lower end of the vertical rod, so that the condition that the movable frame falls off when moving is avoided.
In the above description, the lower end of the harness cord screw 17 is fixed to the upper end face of the steel ball 20, and when in use, the steel ball can rotate in the steel ball groove by rotating the harness cord screw 17, so that the angle can be adjusted.
In actual operation, an upper support can be inserted at the upper end of the upper support according to the height of the construction wall until the construction height is met, and the U-shaped clamp and the second adjusting device are always positioned at the top of the upper support at the uppermost end.
The device is simple and convenient to use and high in efficiency, and solves the problems that the prior double-row landing scaffold and the prior movable scaffold have high requirements on construction sites, long construction period, high risk, high cost and inconvenience; the safety of operators is guaranteed, meanwhile, the investment of manpower, material resources and financial resources is greatly reduced, the labor efficiency is improved, and the method has good practical value and application prospect.

Claims (8)

1. The utility model provides an assembled factory building side fascia installation auxiliary device, includes basic unit's support, upper support and adjusting device, its characterized in that: the upper-layer support is positioned above the base layer support, the upper-layer support and the base layer support are connected together through bolts, and the number of the first adjusting devices is four; the upper end of upper strata support is provided with two "U" type and presss from both sides (10), every "U" type presss from both sides the below of (10) right-hand member and is provided with montant (12) perpendicularly the tip of montant (12) is provided with the limiting plate the cover is equipped with on montant (12) and removes frame (13) the inner of removing frame (13) is provided with second adjusting device.
2. The auxiliary device for installing the external wall panel of the fabricated factory building according to claim 1, wherein: the base layer support is composed of four first upright columns (1), four first cross frames (2), four first positioning sleeves (3) and four first positioning screws (4), and the first upright columns are distributed in a hollow tubular structure; one side of the top of each first upright post (1) is provided with a first positioning sleeve (3) with internal threads, a first positioning screw (4) is connected in each first positioning sleeve (3) through threads, and the end part of each first positioning screw (4) is directly communicated with the inside of the first upright post (1); at least three first cross frames (2) which are distributed in a rectangular shape are arranged among the four first upright posts (1), and the first cross frames (2) are distributed in an up-and-down parallel shape; the first adjusting device is composed of a steel base plate (16), steel balls (20), a harness cord screw (17) and a harness cord sleeve (18), the bottom of each first upright post (1) is welded with the harness cord sleeve (18), and the other end of the harness cord sleeve (18) is connected with the harness cord screw (17) through threads; the steel ball screw is characterized in that a steel ball groove (19) is dug in the upper end face of the steel base plate (16), a steel ball (20) is embedded in the steel ball groove (19), and one end of the harness cord screw (17) is welded with the steel ball (20).
3. The auxiliary device for installing the external wall panel of the fabricated factory building as claimed in claim 2, wherein: the four corners of each first transverse frame (2) are welded with the corresponding first upright posts (1), and the distance between the upper adjacent first transverse frame (2) and the lower adjacent first transverse frame (2) is the same.
4. The auxiliary device for installing the external wall panel of the fabricated factory building according to claim 1, wherein: the upper-layer support is composed of four second upright posts (5) and four second cross frames (9), and each second upright post (5) is distributed in a hollow tubular structure; a second positioning sleeve (7) with internal threads is arranged on the side face of the top of each second upright post (5), a second positioning screw rod (8) is connected in the second positioning sleeve (7) through threads, and the end part of the second positioning screw rod (8) is directly communicated with the inside of the second upright post (5); at least three second cross frames (9) which are distributed in a rectangular shape are arranged among the four second upright posts (5), and the second cross frames (9) are distributed in an up-and-down parallel shape; inserting rods (6) are welded at the bottom of the second upright post (5), and each inserting rod (6) is respectively inserted into the upper end of the first upright post (1) below and is rotationally and tightly jacked together through a first positioning screw rod (4).
5. The auxiliary device for installing the external wall panel of the fabricated factory building as claimed in claim 4, wherein: the four corners of each second transverse frame (9) are respectively welded with the corresponding second upright posts (5), and the distances between the upper and lower adjacent second transverse frames (9) are the same; the first upright post (1) and the second upright post (5) are two pipelines with the same inner diameter.
6. The auxiliary device for installing the external wall panel of the fabricated factory building according to claim 1, wherein: one U-shaped clamp (10) is fixed with the top ends of two second upright posts (5) longitudinally distributed on the upper layer bracket through bolts (11) and matched nuts; the other U-shaped clamp (10) is fixed with the top ends of the other two second upright posts (5) longitudinally distributed on the upper layer bracket through bolts (11) and matched nuts.
7. The auxiliary device for installing the external wall panel of the fabricated factory building according to claim 1, wherein: a third positioning sleeve (14) with an internal thread is arranged on one side face of the movable frame (13), a third positioning screw (15) is connected into the third positioning sleeve (14) through a thread, a positioning hole (12-1) is formed in the side face, corresponding to the vertical rod (12), of the third positioning sleeve (14), and the end portion of the third positioning screw (15) is directly communicated with the inside of the movable frame (13) and inserted into the corresponding positioning hole (12-1).
8. The auxiliary device for installing the external wall panel of the fabricated factory building as claimed in claim 1 or 2, wherein: the second adjusting device is composed of a steel base plate (16), a steel ball (20), a harness cord screw (17) and a harness cord sleeve (18), the inner end face of the movable frame (13) is fixedly connected with the harness cord sleeve (18), the other end of the harness cord sleeve (18) is connected with the harness cord screw (17) through threads, the other end of the harness cord screw (17) is fixedly connected with the steel ball (20), and the steel ball (20) is embedded in a steel ball groove (19) in the inner side face of the steel base plate (16).
CN202120181254.3U 2021-01-22 2021-01-22 Auxiliary device for installing external wall panel of assembly type factory building Active CN215717352U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120181254.3U CN215717352U (en) 2021-01-22 2021-01-22 Auxiliary device for installing external wall panel of assembly type factory building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120181254.3U CN215717352U (en) 2021-01-22 2021-01-22 Auxiliary device for installing external wall panel of assembly type factory building

Publications (1)

Publication Number Publication Date
CN215717352U true CN215717352U (en) 2022-02-01

Family

ID=79986123

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120181254.3U Active CN215717352U (en) 2021-01-22 2021-01-22 Auxiliary device for installing external wall panel of assembly type factory building

Country Status (1)

Country Link
CN (1) CN215717352U (en)

Similar Documents

Publication Publication Date Title
CN214834590U (en) Mounting structure of external hanging operation platform of precast concrete outer wall
CN214195539U (en) Disc buckle type template support
CN111173249B (en) Overhanging support system attached to rectangular beam and column
CN215717352U (en) Auxiliary device for installing external wall panel of assembly type factory building
CN207131160U (en) Lifting electric rod-type makes somebody a mere figurehead temporary electricity cable unit
CN112523604A (en) Recyclable enclosure suitable for building construction and installation method thereof
CN210263832U (en) Movable cantilever platform
CN214798586U (en) Adjustable convenient cable drum erecting device
CN210273901U (en) Connecting assembly for photovoltaic support and prestressed concrete pipe pile
CN212743445U (en) Movable telescopic folding shed frame
CN211369493U (en) External scaffolding base device used on slope surface
CN211143839U (en) Assembled side top supporting device
CN209924441U (en) Adjustable bracket of formwork support
CN214869959U (en) Clamping device for preventing deflection of building jacking
CN213952974U (en) Die carrier support system
CN111946047A (en) A protection adjustable shelter covering or awning on a car, boat, etc. for building scaffold
CN220469334U (en) Scaffold convenient to splice
CN216308995U (en) Comprehensive wiring device for architectural measurement
CN220620961U (en) Building construction has building construction frame of anti falling structure
CN216043048U (en) Assembled enclosure guardrail
CN213806472U (en) Scaffold structure for constructional engineering
CN218479575U (en) Device for adjusting verticality of vertical structure
CN219638732U (en) Railing tripe convenient to location installation
CN218493622U (en) Geological drilling anti-collapse equipment
CN220814858U (en) Scaffold frame

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant