CN215715613U - Freezing pipe deviational survey frame - Google Patents
Freezing pipe deviational survey frame Download PDFInfo
- Publication number
- CN215715613U CN215715613U CN202122197322.8U CN202122197322U CN215715613U CN 215715613 U CN215715613 U CN 215715613U CN 202122197322 U CN202122197322 U CN 202122197322U CN 215715613 U CN215715613 U CN 215715613U
- Authority
- CN
- China
- Prior art keywords
- mounting
- freezing
- rods
- deviational survey
- pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
The utility model relates to a freeze pipe and survey sloping frame belongs to the technical field of freezing method construction, and it includes the sloping frame body, the sloping frame body includes that two articulate the first regulation pole in freezing a tub both sides, two first regulation pole is kept away from the one end of freezing the pipe articulates respectively has the second to adjust the pole, two it has the landing slab to articulate between the second regulation pole, the landing slab is used for placing the deviational survey instrument. This application has the effect that improves freezing pipe deviational survey efficiency.
Description
Technical Field
The application relates to the field of freezing method construction, in particular to a freezing pipe inclination measuring frame.
Background
The freezing method construction means that a freezing pipe is drilled and driven into a water-bearing soil layer, circulating liquid nitrogen is introduced, the surrounding stratum is frozen, and a hard frozen soil shell is formed. The device can not only ensure the stability of the stratum, but also play a role in water isolation, and can dig the soil of the deep foundation pit.
At present, because the angles of freezing pipes are different in freezing method construction, and the distances among partial freezing pipes are small, measurement is difficult when the freezing pipes are subjected to inclination measurement, and the measurement operation efficiency is low.
SUMMERY OF THE UTILITY MODEL
In order to improve the technical problem to freezing pipe deviational survey inefficiency, this application provides a freezing pipe deviational survey frame.
The application provides a freezing pipe deviational survey frame adopts following technical scheme:
the utility model provides a freeze pipe and survey sloping frame, includes the sloping frame body, the sloping frame body includes that two articulate the first regulation pole in freezing the pipe both sides, two the first regulation pole is kept away from the one end of freezing the pipe articulates respectively has the second to adjust the pole, two it has the landing slab to articulate between the second regulation pole, the landing slab is used for placing the deviational survey instrument.
Through adopting above-mentioned technical scheme, adjust the pole through rotating first regulation pole and second, can adjust the position relation of landing slab for freezing the distance of pipe, height and angle to the adjustment is installed the inclinometer instrument on the landing slab for freezing the position relation of pipe, can make the inclinometer instrument carry out the inclinometry operation to the freezing pipe that each angle set up, and this application regulative mode is simple, and the operation of being convenient for has improved the inclinometry efficiency to freezing the pipe.
Optionally, the inclinometer frame body further comprises an installation sleeve, the two first adjusting rods are hinged to two sides of the installation sleeve, and the installation sleeve is sleeved on the freezing pipe.
Through adopting above-mentioned technical scheme, can install the deviational survey frame body on freezing the pipe through the installation cover, the mounting means is simple, the installation of being convenient for.
Optionally, a through hole is formed in the top end of the peripheral wall of the mounting sleeve, a fixing nut is further fixedly arranged on the peripheral wall of the mounting sleeve, the fixing nut and the through hole are coaxially arranged, and a tightening bolt is screwed into the nut.
Through adopting above-mentioned technical scheme, through screwing up the puller bolt, make the puller bolt top tight on freezing the outer wall of pipe to it is more firm to make the installation of deviational survey frame body.
Optionally, mounting rods are fixedly arranged on two sides of the outer peripheral wall of the mounting sleeve respectively, first mounting rings are fixedly arranged at two ends of the first adjusting rod respectively, the first mounting ring close to the mounting sleeve is sleeved in the mounting rods, and nuts are screwed on the mounting rods; second mounting rings are fixedly arranged at two ends of the second adjusting rod respectively, one second mounting ring is aligned with the first mounting ring close to the second adjusting rod, a bolt is inserted into the second mounting ring, and a nut is screwed into the bolt; and cross rods are fixedly arranged on two sides of the platform plate respectively, the second mounting ring close to the platform plate is sleeved in the cross rods, and nuts are screwed on the cross rods.
Through adopting above-mentioned technical scheme, the articulated mode that first regulation pole and installation cover, second were adjusted pole and second, landing slab and second were adjusted the pole is simple, the installation of being convenient for to fix through the nut of screwing up after the position of first regulation pole, second regulation pole and landing slab has been adjusted, fixed mode is simple, the operation of being convenient for.
Optionally, an annular baffle is fixedly arranged on the top surface of the platform plate, the annular baffle is vertically arranged, and the measuring instrument is placed in the annular baffle.
Through adopting above-mentioned technical scheme, ring baffle can make the installation of deviational survey instrument more firm.
Optionally, a leveling bubble is fixedly arranged on the top surface of the platform plate.
Through adopting above-mentioned technical scheme, through observing the level bubble, can judge whether the landing slab is in horizontal position.
Optionally, the platform plate is a steel plate.
Through adopting above-mentioned technical scheme, steel sheet structural strength is high, indestructible, durable.
In summary, the present application includes at least one of the following beneficial technical effects:
1. the distance, height and angle position relation of the platform plate relative to the freezing pipe can be adjusted by rotating the first adjusting rod and the second adjusting rod, so that the position relation of an inclinometer installed on the platform plate relative to the freezing pipe is adjusted, the inclinometer can perform inclinometry operation on the freezing pipe arranged at each angle, the adjusting mode is simple, the operation is convenient, and the inclinometry efficiency of the freezing pipe is improved;
2. the first adjusting rod and the mounting sleeve, the second adjusting rod and the second adjusting rod, and the platform plate and the second adjusting rod are hinged in a simple mode and are convenient to mount, and the first adjusting rod, the second adjusting rod and the platform plate are fixed after the positions of the first adjusting rod, the second adjusting rod and the platform plate are adjusted through the tightening nuts, so that the fixing mode is simple and convenient to operate;
3. the annular baffle can make the installation of deviational survey instrument more firm.
Drawings
Fig. 1 is a schematic perspective view of the present application.
Description of reference numerals: 1. an inclinometer frame body; 11. installing a sleeve; 111. fixing a nut; 112. jacking the bolt; 113. mounting a rod; 12. a first adjusting lever; 121. a first mounting ring; 13. a second adjusting lever; 131. a second mounting ring; 14. a platform plate; 141. an annular baffle; 142. leveling air bubbles; 143. a cross bar; 2. freezing the tube.
Detailed Description
The present application is described in further detail below with reference to fig. 1.
The embodiment of the application discloses freezing pipe survey sloping frame. Referring to fig. 1, a freezing pipe inclinometer comprises an inclinometer body 1, wherein the inclinometer body 1 comprises a mounting sleeve 11, a first adjusting rod 12, a second adjusting rod 13 and a platform plate 14.
The installation cover 11 is made for circular steel pipe, and the installation cover 11 is used for installing the deviational survey frame body 1 on freezing pipe 2, has seted up the through-hole at 11 perisporium top surfaces of installation cover, and set firmly fixation nut 111 on 11 periphery walls of installation cover, and fixation nut 111 and the coaxial setting of through-hole, twist the jack-up bolt 112 of screwing in fixation nut 111, screw up jack-up bolt 112, make jack-up bolt 112 conflict on freezing pipe 2, thereby will survey the installation that the deviational survey frame body 1 is firm on freezing pipe 2.
Two first adjusting rods 12 are arranged, and the two first adjusting rods 12 are respectively hinged to two sides of the mounting sleeve 11; the two sides of the outer peripheral wall of the mounting sleeve 11 are respectively and fixedly provided with a mounting rod 113, the mounting rods 113 are horizontally arranged, the mounting rods 113 are screw rods, the two ends of the first adjusting rod 12 are respectively and fixedly welded with a first mounting ring 121, the first mounting ring 121 close to the mounting sleeve 11 is sleeved on the mounting rods 113, and nuts are screwed on the mounting rods 113, so that the first adjusting rod 12 is hinged to the mounting sleeve 11, and the first adjusting rod 12 can be fixed by screwing the nuts.
The second adjusting rods 13 are respectively arranged at one ends, far away from the mounting sleeve 11, of the two first adjusting rods 12, the two ends of each second adjusting rod 13 are respectively welded and fixed with second mounting rings 131, the second mounting rings 131 are aligned with the first mounting rings 121, bolts penetrate through the second mounting rings, nuts are screwed into the bolts, the second adjusting rods 13 are hinged to the second adjusting rods 13, and the second adjusting rods 13 can be fixedly connected with the first adjusting rods 12 by screwing the nuts.
The landing slab 14 is the rectangle flat board that the steel sheet was made, and landing slab 14 installs between two second regulation poles 13, has set firmly horizontal pole 143 respectively in landing slab 14 both sides, and horizontal pole 143 level sets up, and horizontal pole 143 also is the screw rod, and the second collar 131 cover that will keep away from first regulation pole 12 is established on horizontal pole 143 to twist the nut on horizontal pole 143, thereby it is fixed with landing slab 14.
Set firmly ring baffle 141 at landing slab 14 top surface, ring baffle 141 sets firmly puts at landing slab 14 central point, and ring baffle 141 is vertical to be set up, places the deviational survey instrument in ring baffle 141, can make the installation of deviational survey instrument more firm.
Still set firmly at landing slab 14 top surface and be equipped with level bubble 142, when adjusting deviational survey frame body 1, can observe whether landing slab 14 is in the horizontality through level bubble 142, when being in the horizontality with landing slab 14 adjustment, install the deviational survey instrument again to be convenient for more carry out the leveling to the deviational survey instrument.
The implementation principle of the freezing pipe inclination measuring frame in the embodiment of the application is as follows: establish installation cover 11 cover on freezing pipe 2, then through rotating first regulation pole 12 and second regulation pole 13, can be for freezing pipe 2 distance to landing slab 14, height position and angle are adjusted, thereby the adjustment deviational survey instrument is for freezing the position relation of pipe 2, and through rotating landing slab 14, can make landing slab 14 be in the horizontality and fixed, make the deviational survey instrument level install, this application can adjust the deviational survey instrument for freezing the position relation of pipe 2, thereby make the deviational survey instrument can carry out the deviational survey operation to freezing pipe 2 of any angle setting, and the regulative mode is simple, and convenient for operation has improved the operating efficiency.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.
Claims (7)
1. The utility model provides a freezing pipe bank of china, its characterized in that: including deviational survey frame body (1), deviational survey frame body (1) includes that two articulate first regulation pole (12) freezing pipe (2) both sides, two first regulation pole (12) are kept away from the one end of freezing pipe (2) articulates respectively has second regulation pole (13), two it has landing slab (14) to articulate between second regulation pole (13), landing slab (14) are used for placing deviational survey instrument.
2. A freezing tube ramp according to claim 1, wherein: the inclination measuring frame body (1) further comprises an installation sleeve (11), the two first adjusting rods (12) are hinged to two sides of the installation sleeve (11), and the freezing pipe (2) is sleeved with the installation sleeve (11).
3. A freezing tube ramp according to claim 2, wherein: the mounting sleeve is characterized in that a through hole is formed in the top end of the peripheral wall of the mounting sleeve (11), a fixing nut (111) is fixedly arranged on the peripheral wall of the mounting sleeve (11), the fixing nut (111) and the through hole are coaxially arranged, and a tightening bolt (112) is screwed into the nut.
4. A freezing tube ramp according to claim 2, wherein: mounting rods (113) are fixedly arranged on two sides of the outer peripheral wall of the mounting sleeve (11), first mounting rings (121) are fixedly arranged at two ends of the first adjusting rod (12), the first mounting rings (121) close to the mounting sleeve (11) are sleeved into the mounting rods (113), and nuts are screwed into the mounting rods (113); two ends of the second adjusting rod (13) are respectively and fixedly provided with a second mounting ring (131), one second mounting ring (131) is aligned with the first mounting ring (121) close to the second adjusting rod (13), a bolt is inserted into the second mounting ring, and a nut is screwed into the bolt; and cross rods (143) are fixedly arranged on two sides of the platform plate (14) respectively, the second mounting ring (131) close to the platform plate (14) is sleeved in the cross rods (143), and nuts are screwed on the cross rods (143).
5. A freezing tube ramp according to claim 1, wherein: the top surface of the platform plate (14) is fixedly provided with an annular baffle plate (141), the annular baffle plate (141) is vertically arranged, and the measuring instrument is placed in the annular baffle plate (141).
6. A freezing tube ramp according to claim 1, wherein: and a leveling bubble (142) is fixedly arranged on the top surface of the platform plate (14).
7. A freezing tube ramp according to claim 1, wherein: the platform plate (14) is a steel plate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202122197322.8U CN215715613U (en) | 2021-09-10 | 2021-09-10 | Freezing pipe deviational survey frame |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202122197322.8U CN215715613U (en) | 2021-09-10 | 2021-09-10 | Freezing pipe deviational survey frame |
Publications (1)
Publication Number | Publication Date |
---|---|
CN215715613U true CN215715613U (en) | 2022-02-01 |
Family
ID=80018593
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202122197322.8U Active CN215715613U (en) | 2021-09-10 | 2021-09-10 | Freezing pipe deviational survey frame |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN215715613U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113775333A (en) * | 2021-09-10 | 2021-12-10 | 中国水利水电第八工程局有限公司 | Freezing hole inclination measuring base frame |
CN115030382A (en) * | 2022-06-24 | 2022-09-09 | 广东省第四建筑工程有限公司 | Back-trough type hanging connection type clay plate curtain wall structure based on steel structure frame |
-
2021
- 2021-09-10 CN CN202122197322.8U patent/CN215715613U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113775333A (en) * | 2021-09-10 | 2021-12-10 | 中国水利水电第八工程局有限公司 | Freezing hole inclination measuring base frame |
CN115030382A (en) * | 2022-06-24 | 2022-09-09 | 广东省第四建筑工程有限公司 | Back-trough type hanging connection type clay plate curtain wall structure based on steel structure frame |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN215715613U (en) | Freezing pipe deviational survey frame | |
CN203603586U (en) | Equipment support regulating device | |
CN206204995U (en) | The tall and big side wall one side formwork erection of open trench tunnel agent structure | |
CN110185059B (en) | Suction barrel jacket fan foundation and construction method thereof | |
CN209443474U (en) | A kind of shallow foundation hole stull suspension device | |
CN208733646U (en) | A kind of internal support of foundation pit structure | |
CN206873957U (en) | A kind of ground photovoltaic column pre-embedded anchoring bolts constructing device | |
CN207796872U (en) | A kind of solar street lamp structure | |
CN212897513U (en) | Novel vertical rod for erecting full scaffold | |
CN216892489U (en) | Full-bolt-connected steel structure concrete-free foundation structure | |
CN212158562U (en) | Concrete placement detection device | |
CN210597285U (en) | Construction device for ground photovoltaic upright post cast-in-place reinforced concrete pile | |
CN110714653A (en) | Tower structure and method for distribution line water area emergency training | |
CN211423775U (en) | Ground deformation monitoring connecting device | |
CN219825295U (en) | Horizontal steel supporting structure for reverse construction method | |
CN218263964U (en) | Leveling upright rod foundation embedded part for high-wind-speed area | |
CN206205289U (en) | Rainwater hopper direct-buried reinforcing device | |
JPH10317391A (en) | Foundation structure for steel tower and method for constructing the same | |
CN221168938U (en) | Cement telegraph pole convenient to assemble and erect | |
CN221095146U (en) | Foundation pit diagonal bracing supporting structure | |
CN215629996U (en) | A bracket board supporting device for steel sheet pile | |
CN220394790U (en) | Suspended large-span drainage device | |
CN216340861U (en) | Diagonal bracing structure for aluminum alloy template | |
CN219794224U (en) | Street lamp foundation embedded part installation positioning device | |
CN218204329U (en) | Steel power steel pole foundation pipe pile |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |