CN215715317U - Wind power foundation concrete construction device - Google Patents

Wind power foundation concrete construction device Download PDF

Info

Publication number
CN215715317U
CN215715317U CN202122136660.0U CN202122136660U CN215715317U CN 215715317 U CN215715317 U CN 215715317U CN 202122136660 U CN202122136660 U CN 202122136660U CN 215715317 U CN215715317 U CN 215715317U
Authority
CN
China
Prior art keywords
plate
wind power
concrete construction
hydraulic
base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122136660.0U
Other languages
Chinese (zh)
Inventor
余登敏
邓任
朱宇坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Guizhou Engineering Co Ltd
Original Assignee
PowerChina Guizhou Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Guizhou Engineering Co Ltd filed Critical PowerChina Guizhou Engineering Co Ltd
Priority to CN202122136660.0U priority Critical patent/CN215715317U/en
Application granted granted Critical
Publication of CN215715317U publication Critical patent/CN215715317U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Wind Motors (AREA)

Abstract

The utility model provides a wind power foundation concrete construction device, which comprises a base; the universal wheel device and the fixing device are mounted at the bottom of the base, and the hydraulic device is arranged on the upper end face of the base; the hydraulic device is connected with a lifting device, and the lifting device is provided with a bolt device; according to the utility model, the sucker is arranged, so that the ground can be tightly sucked, the concrete construction device is fixed, the whole equipment is conveniently reinforced, the whole stability is improved, the normal use of the equipment is ensured, and the concrete pouring quality is improved; the rotating wheel and the screw rod are arranged, so that the sucking disc can move up and down, the sucking disc is prevented from being always rubbed with the ground when the equipment is moved, and the sucking disc is prevented from being damaged; through setting up pneumatic cylinder and hydraulic stem, can promote the loading board rebound for the concrete box conveniently carries out concrete placement in wind-powered electricity generation basis top, improves and pours efficiency.

Description

Wind power foundation concrete construction device
Technical Field
The utility model relates to a wind power foundation concrete construction device, and belongs to the technical field of building construction.
Background
Wind power is being developed in large quantities globally as a clean energy. Generally, a wind power plant is provided with a plurality of wind power towers, and each tower is correspondingly provided with a wind power foundation for fixing the wind power tower. The wind turbine foundation is made of mass concrete, and the middle part of the wind turbine foundation is higher than the ground and still needs to be poured by matching with a pump truck.
Current concrete construction equipment needs the staff to erect the chute, wastes time and energy, and poor stability, and then influences concrete placement quality, can't satisfy the user demand.
SUMMERY OF THE UTILITY MODEL
In order to solve the technical problems, the utility model provides a wind power foundation concrete construction device which solves the problems of time and labor waste and poor equipment stability.
The utility model is realized by the following technical scheme.
The utility model provides a wind power foundation concrete construction device, which comprises a base; the universal wheel device and the fixing device are mounted at the bottom of the base, and the hydraulic device is arranged on the upper end face of the base; the hydraulic device is connected with a lifting device, and the lifting device is provided with a bolt device;
the base comprises a bottom plate, one side of the bottom plate is connected with a fixed plate, and the universal wheel device is arranged at the bottom of the bottom plate; the lifting device comprises a concrete box, one side of the concrete box is connected with a box door, and the box door is connected with the concrete box through a bolt device; the bottom of the concrete box is provided with a plurality of electric telescopic rods, the lower ends of the electric telescopic rods are respectively connected with first connecting rods, and the first connecting rods are connected with a hydraulic device through a fixed seat; the hydraulic device comprises a hydraulic cylinder and a bearing plate, the fixing seat is arranged on the upper end face of the bearing plate, the hydraulic cylinder is installed on the upper end face of the bottom plate, and a hydraulic rod of the hydraulic cylinder is connected with the lower end face of the bearing plate.
The universal wheel device comprises a mounting plate and a roller, the mounting plate is connected with the bottom of the bottom plate, a mounting seat is connected to the lower end face of the mounting plate through a first rotating shaft, and the roller is connected with the mounting seat through a bolt.
The fixing device comprises a screw rod, one end of the screw rod penetrates through the upper end face of the bottom plate and is provided with a rotating wheel, and the other end of the screw rod is connected with the connecting plate; the connecting plate is provided with a plurality of connecting columns, and the lower end of each connecting column is connected with a sucker.
A first mounting groove is formed in the fixing seat, a second rotating shaft is arranged in the first mounting groove, and a first connecting rod is connected with the second rotating shaft.
A second mounting groove is formed in the lower end of the box door, and a third rotating shaft is arranged in the second mounting groove; a first through hole is formed in one side, connected with the box door, of the concrete box, and the third rotating shaft is matched with the first through hole.
The door bolt device comprises a U-shaped plate arranged on the box door and a fixed block arranged on the side wall of the concrete box, a clamping block is arranged on one side of the inner wall of the U-shaped plate, the end face of the clamping block is connected with a second connecting rod, one end of the second connecting rod penetrates through the side wall of the U-shaped plate to be exposed, and a limiting piece is connected to the exposed section; the joint block is sleeved with a joint plate, and the joint plate is connected with the fixed block through a rotating shaft.
And a pushing handle is arranged on the outer side of the fixing plate.
The mounting seat is provided with a first threaded hole, the roller is provided with a second through hole, and the bolt is matched with the first threaded hole and the second through hole.
And a second threaded hole is formed in the bottom plate and is matched with the screw rod.
And the second connecting rod is sleeved with a spring.
The utility model has the beneficial effects that:
1. the sucker can tightly suck the ground to fix the concrete construction device, so that the whole equipment is conveniently reinforced, the whole stability is improved, the normal use of the equipment is ensured, and the concrete pouring quality is improved;
2. the rotating wheel and the screw rod are arranged, so that the sucking disc can move up and down, the sucking disc is prevented from being always rubbed with the ground when the equipment is moved, and the sucking disc is prevented from being damaged;
3. by arranging the hydraulic cylinder and the hydraulic rod, the bearing plate can be pushed to move upwards, so that the concrete box is arranged above the wind power foundation, concrete pouring is facilitated, and the pouring efficiency is improved;
4. through setting up electric telescopic handle, can lift the concrete box, conveniently pour the concrete into wind-powered electricity generation basis in the concrete box.
Drawings
FIG. 1 is a right side view of the present invention;
FIG. 2 is a left side view of the present invention;
FIG. 3 is a front view of the present invention;
FIG. 4 is a schematic view of the construction of the caster assembly of FIG. 1;
FIG. 5 is an enlarged partial schematic view of FIG. 1 at A;
FIG. 6 is a schematic view of a portion of the enlarged structure at B in FIG. 3;
in the figure: 100-base, 110-base plate, 120-fixing plate, 130-pushing handle, 200-universal wheel device, 210-mounting plate, 220-first rotating shaft, 230-mounting base, 240-bolt, 250-roller, 300-fixing device, 310-connecting plate, 320-connecting column, 330-sucking disc, 340-screw rod, 350-rotating wheel, 400-hydraulic device, 410-bearing plate, 420-hydraulic cylinder, 430-hydraulic rod, 500-lifting device, 510-fixing base, 520-second rotating shaft, 530-concrete box, 540-third rotating shaft, 550-box door, 560-first connecting rod, 570-electric telescopic rod, 600-bolt device, 610-fixing block, 620-rotating shaft, 630-clamping plate, 640-U-shaped plate, 650-second connecting rod, 660-limiting plate, 670-spring and 680-clamping block.
Detailed Description
The technical solution of the present invention is further described below, but the scope of the claimed invention is not limited to the described.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front", "rear", "both ends", "one end", "the other end", and the like indicate orientations or positional relationships based on those shown in the drawings, and are only for convenience of description and simplicity of description, but do not indicate or imply that the referred device or element must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "disposed," "connected," and the like are to be construed broadly, such as "connected," which may be fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meanings of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Example 1
The wind power foundation concrete construction device shown in fig. 1 to 6 comprises a base 100; the bottom of the base 100 is provided with a universal wheel device 200 and a fixing device 300, and the upper end surface of the base 100 is provided with a hydraulic device 400; the hydraulic device 400 is connected with a lifting device 500, and the lifting device 500 is provided with a bolt device 600;
the base 100 comprises a bottom plate 110, a fixing plate 120 is connected to one side of the bottom plate 110, and a universal wheel device 200 is installed at the bottom of the bottom plate 110; the lifting device 500 comprises a concrete box 530, one side of the concrete box 530 is connected with a box door 550, and the box door 550 is connected with the concrete box 530 through a bolt device 600; the bottom of the concrete box 530 is provided with a plurality of electric telescopic rods 570, the lower ends of the electric telescopic rods 570 are respectively connected with a first connecting rod 560, and the first connecting rod 560 is connected with the hydraulic device 400 through a fixed seat 510; the hydraulic device 400 comprises a hydraulic cylinder 420 and a bearing plate 410, a fixing seat 510 is arranged on the upper end surface of the bearing plate 410, the hydraulic cylinder 420 is arranged on the upper end surface of the bottom plate 110, and a hydraulic rod 430 of the hydraulic cylinder 420 is connected with the lower end surface of the bearing plate 410.
Example 2
The protocol of example 1 was followed and: the universal wheel apparatus 200 includes a mounting plate 210 and a roller 250, the mounting plate 210 is connected to the bottom of the base plate 110, a mounting base 230 is connected to the lower end surface of the mounting plate 210 through a first rotating shaft 220, and the roller 250 is connected to the mounting base 230 through a bolt 240.
Example 3
The protocol of example 1 was followed and: the fixing device 300 comprises a screw 340, one end of the screw 340 penetrates through the upper end surface of the bottom plate 110 and is provided with a rotating wheel 350, and the other end of the screw is connected with the connecting plate 310; the connecting plate 310 is provided with a plurality of connecting columns 320, and the lower end of each connecting column 320 is connected with a suction cup 330.
Example 4
The protocol of example 1 was followed and: the fixing base 510 is provided with a first mounting groove, a second rotating shaft 520 is arranged in the first mounting groove, and the first connecting rod 560 is connected with the second rotating shaft 520.
Example 5
The protocol of example 1 was followed and: a second mounting groove is formed in the lower end of the box door 550, and a third rotating shaft 540 is arranged in the second mounting groove; a first through hole is formed at one side of the concrete box 530 connected to the box door 550, and the third rotating shaft 540 is matched with the first through hole.
Example 6
The protocol of example 1 was followed and: the bolt device 600 comprises a U-shaped plate 640 arranged on the box door 550 and a fixed block 610 arranged on the side wall of the concrete box 530, wherein a clamping block 680 is arranged on one side of the inner wall of the U-shaped plate 640, the end surface of the clamping block 680 is connected with a second connecting rod 650, one end of the second connecting rod 650 penetrates through the side wall of the U-shaped plate 640 to be exposed, and a limiting piece 660 is connected to the exposed section; the clamping block 680 is sleeved with a clamping plate 630, and the clamping plate 630 is connected with the fixing block 610 through a rotating shaft 620.
Example 7
The protocol of example 1 was followed and: a pushing handle 130 is arranged on the outer side of the fixing plate 120.
Example 8
The protocol of example 2 was followed and: a first threaded hole is formed in the mounting base 230, a second through hole is formed in the roller 250, and the bolt 240 is matched with the first threaded hole and the second through hole.
Example 9
The protocol of example 3 was followed and: a second threaded hole is formed in the bottom plate 110, and the second threaded hole is matched with the screw rod 340.
Example 10
The protocol of example 6 was followed and: the second connecting rod 650 is sleeved with a spring 670.
Example 11
Based on the above embodiment, specifically:
the utility model provides a wind-powered electricity generation basis concrete construction equipment, including base 100, universal wheel device 200, fixing device 300, hydraulic means 400, elevating gear 500 and keeper device 600, base 100 includes bottom plate 110 and fixed plate 120, fixed plate 120 side surface is connected with bottom plate 110 side surface, universal wheel device 200 includes mounting panel 210, first axis of rotation 220 and mount pad 230, a plurality of mounting panel 210 upper surfaces all are connected with bottom plate 110 lower surface, a plurality of mounting panels 210 are connected through first axis of rotation 220 with a plurality of mount pads 230 respectively, fixing device 300 includes connecting plate 310, spliced pole 320 and sucking disc 330, two spliced pole 320 upper surfaces all are connected with connecting plate 310 lower surface, two spliced pole 320 lower surfaces are connected with two sucking discs 330 upper surface respectively, hydraulic means 400 includes loading board 410, elevating gear 500 includes fixing base 510, second axis of rotation 520, concrete box 530, Third axis of rotation 540 and chamber door 550, two fixing base 510 lower surfaces all with loading board 410 upper surface connection, two fixing base 510 side surfaces all are equipped with first mounting groove, two second axis of rotation 520 are connected with two first mounting grooves respectively, chamber door 550 lower surface is equipped with the second mounting groove, third axis of rotation 540 is connected with the second mounting groove, concrete box 530 side surface is equipped with first through-hole, the side surface all is connected with first through-hole in third axis of rotation 540, keeper device 600 includes fixed block 610, rotation axis 620 and joint board 630, two fixed block 610 side surfaces all are connected with concrete box 530 side surface, two joint board 630 pass through rotation axis 620 with two fixed blocks 610 respectively and are connected.
Further, the base 100 further includes a push handle 130, a side surface of the push handle 130 is connected to a side surface of the fixing plate 120, and the push handle 130 is used to facilitate pushing the entire device, thereby facilitating the application of force.
Further, universal wheel device 200 still includes bolt 240 and gyro wheel 250, and a plurality of mount pads 230 both sides surface all is equipped with first screw hole, and a plurality of gyro wheels 250 are equipped with the second through-hole, and a plurality of mount pads 230 pass through bolt 240 with a plurality of gyro wheels 250 to be connected, and gyro wheel 250 is used for removing equipment to wind-powered electricity generation basis middle part position, conveniently adds the concrete.
Further, the fixing device 300 further includes a rotating wheel 350 and a screw rod 340, the upper surface of the bottom plate 110 is provided with a second threaded hole, the screw rod 340 is rotatably matched with the second threaded hole, two ends of the screw rod 340 are respectively connected with the lower surface of the rotating wheel 350 and the upper surface of the connecting plate 310, the rotating wheel 350 is used for rotating the screw rod 340, so that the suction cup 330 moves downwards to suck the ground, and the concrete construction is stable.
Further, hydraulic means 400 still includes pneumatic cylinder 420 and hydraulic stem 430, and two pneumatic cylinder 420 lower surfaces all with bottom plate 110 upper surface connection, and two pneumatic cylinder 420 upper surfaces are equipped with hydraulic stem 430, and two pneumatic cylinders 420 respectively with two hydraulic stem 430 sliding fit, two hydraulic stem 430 upper surfaces all with loading board 410 lower surface, and pneumatic cylinder 420 and hydraulic stem 430 are used for promoting loading board 410 and move upwards, conveniently carry out concrete placement.
Further, elevating gear 500 still includes head rod 560 and electric telescopic handle 570, and two head rod 560 side surfaces are equipped with the third through-hole, two second axis of rotation 520 respectively with two third through-hole normal running fit, electric telescopic handle 570 one end and head rod 560 upper surface connection, and electric telescopic handle 570 is used for raising concrete box 530, is convenient for pour the concrete into wind-powered electricity generation basis middle part.
Further, keeper device 600 still includes U template 640, second connecting rod 650, spacing piece 660, spring 670 and joint piece 680, and two U template 640 side surfaces all are connected with chamber door 550, and two second connecting rod 650 both ends are connected with two spacing piece 660 side surfaces and two joint piece 680 side surfaces respectively, and joint piece 680's effect is blocking joint plate 630, closes chamber door 550.
Further, the hydraulic cylinder 420 is model number PY 497.
The working principle of the utility model is as follows:
the concrete that will stir is poured into concrete box 530, promote pushing hands 130, with the equipment removal assigned position, rotate runner 350, it rotates to drive lead screw 340, lead screw 340 drives sucking disc 330 and moves down and holds ground, start hydraulic cylinder 420, it upwards slides to drive hydraulic stem 430, thereby move concrete box 530 to wind-powered electricity generation basis top, close hydraulic cylinder 420, start electric telescopic handle 570, can jack-up concrete box 530, close electric telescopic handle 570 after making concrete box 530 slope certain angle, pulling spacing piece 660, it extrudees spring 670 to drive joint piece 680, make joint piece 680 leave joint board 630, open chamber door 550, it can to pour the concrete into wind-powered electricity generation basis.
The foregoing shows and describes the general principles and broad features of the present invention and advantages thereof. It will be understood by those skilled in the art that the present invention is not limited to the embodiments described above, which are described in the specification and illustrated only to illustrate the principle of the present invention, but that various changes and modifications may be made therein without departing from the spirit and scope of the present invention, which fall within the scope of the utility model as claimed. The scope of the utility model is defined by the appended claims and equivalents thereof.

Claims (10)

1. The utility model provides a wind-powered electricity generation basis concrete construction equipment, includes base (100), its characterized in that: the bottom of the base (100) is provided with a universal wheel device (200) and a fixing device (300), and the upper end surface of the base (100) is provided with a hydraulic device (400); the hydraulic device (400) is connected with a lifting device (500), and the lifting device (500) is provided with a bolt device (600);
the base (100) comprises a bottom plate (110), one side of the bottom plate (110) is connected with a fixing plate (120), and the universal wheel device (200) is installed at the bottom of the bottom plate (110); the lifting device (500) comprises a concrete box (530), one side of the concrete box (530) is connected with a box door (550), and the box door (550) is connected with the concrete box (530) through a bolt device (600); the bottom of the concrete box (530) is provided with a plurality of electric telescopic rods (570), the lower ends of the electric telescopic rods (570) are respectively connected with a first connecting rod (560), and the first connecting rods (560) are connected with the hydraulic device (400) through fixing seats (510); the hydraulic device (400) comprises a hydraulic cylinder (420) and a bearing plate (410), a fixed seat (510) is arranged on the upper end face of the bearing plate (410), the hydraulic cylinder (420) is arranged on the upper end face of the base plate (110), and a hydraulic rod (430) of the hydraulic cylinder (420) is connected with the lower end face of the bearing plate (410).
2. The wind power foundation concrete construction device according to claim 1, characterized in that: the universal wheel device (200) comprises a mounting plate (210) and a roller (250), the mounting plate (210) is connected with the bottom of the base plate (110), a mounting seat (230) is connected to the lower end face of the mounting plate (210) through a first rotating shaft (220), and the roller (250) is connected with the mounting seat (230) through a bolt (240).
3. The wind power foundation concrete construction device according to claim 1, characterized in that: the fixing device (300) comprises a screw rod (340), one end of the screw rod (340) penetrates through the upper end face of the bottom plate (110) and is provided with a rotating wheel (350), and the other end of the screw rod (340) is connected with the connecting plate (310); the connecting plate (310) is provided with a plurality of connecting columns (320), and the lower end of each connecting column (320) is connected with a sucker (330).
4. The wind power foundation concrete construction device according to claim 1, characterized in that: the fixing seat (510) is provided with a first mounting groove, a second rotating shaft (520) is arranged in the first mounting groove, and the first connecting rod (560) is connected with the second rotating shaft (520).
5. The wind power foundation concrete construction device according to claim 1, characterized in that: a second mounting groove is formed in the lower end of the box door (550), and a third rotating shaft (540) is arranged in the second mounting groove; a first through hole is formed in one side, connected with the box door (550), of the concrete box (530), and the third rotating shaft (540) is matched with the first through hole.
6. The wind power foundation concrete construction device according to claim 1, characterized in that: the bolt device (600) comprises a U-shaped plate (640) arranged on the box door (550) and a fixing block (610) arranged on the side wall of the concrete box (530), wherein a clamping block (680) is arranged on one side of the inner wall of the U-shaped plate (640), the end face of the clamping block (680) is connected with a second connecting rod (650), one end of the second connecting rod (650) penetrates through the side wall of the U-shaped plate (640) to be exposed, and a limiting piece (660) is connected to the exposed section; the clamping block (680) is sleeved with a clamping plate (630), and the clamping plate (630) is connected with the fixing block (610) through a rotating shaft (620).
7. The wind power foundation concrete construction device according to claim 1, characterized in that: a pushing handle (130) is arranged on the outer side of the fixing plate (120).
8. The wind power foundation concrete construction device according to claim 2, characterized in that: the mounting seat (230) is provided with a first threaded hole, the roller (250) is provided with a second through hole, and the bolt (240) is matched with the first threaded hole and the second through hole.
9. The wind power foundation concrete construction device according to claim 3, characterized in that: and a second threaded hole is formed in the bottom plate (110), and the second threaded hole is matched with the screw rod (340).
10. The wind power foundation concrete construction device according to claim 6, characterized in that: the second connecting rod (650) is sleeved with a spring (670).
CN202122136660.0U 2021-09-06 2021-09-06 Wind power foundation concrete construction device Active CN215715317U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122136660.0U CN215715317U (en) 2021-09-06 2021-09-06 Wind power foundation concrete construction device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122136660.0U CN215715317U (en) 2021-09-06 2021-09-06 Wind power foundation concrete construction device

Publications (1)

Publication Number Publication Date
CN215715317U true CN215715317U (en) 2022-02-01

Family

ID=80015479

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122136660.0U Active CN215715317U (en) 2021-09-06 2021-09-06 Wind power foundation concrete construction device

Country Status (1)

Country Link
CN (1) CN215715317U (en)

Similar Documents

Publication Publication Date Title
CN210831271U (en) Environmental protection monitoring devices is used in municipal works construction
CN215715317U (en) Wind power foundation concrete construction device
CN213107367U (en) Efficient concrete PC component is with running flat device
CN213319982U (en) Electromechanical positioning device for electromechanical maintenance
CN210264031U (en) Stable aluminum formwork height adjusting device
CN218204476U (en) Slope reinforcing structure
CN216515600U (en) Novel equipment for cleaning earthwork between pile foundations
CN218557577U (en) Wall drilling equipment is used to house decoration
CN220566937U (en) Environment protection monitoring equipment convenient for assembly type green construction
CN219123763U (en) Energy-saving type electric power facility protection device
CN219287427U (en) Upright post fixing device for photovoltaic bracket installation
CN220579813U (en) Novel road bridge construction support device
CN217001037U (en) Auxiliary reinforcing device for building structure
CN214006551U (en) Environment-friendly wall body pours and uses securing device
CN220719258U (en) Rotary auxiliary maintenance device for Roots vacuum pump
CN220891548U (en) Positioning platform with supporting and reinforcing structure
CN218757461U (en) Building engineering pile driver equipment
CN219586727U (en) Pile pulling auxiliary device for building construction
CN220565655U (en) Construction frame for power engineering
CN220976319U (en) Auxiliary device
CN212715029U (en) Garden engineering is with decorating well lid
CN221120077U (en) Protection structure of underground turbine generator
CN215978321U (en) A receipts ray apparatus for engineering building ground
CN221006850U (en) Sample extraction equipment for rock and soil exploitation
CN216898657U (en) Safety drill rod inserting device for water and soil conservation monitoring

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant