CN215713249U - Spraying pipeline system for gold ore dump leaching - Google Patents
Spraying pipeline system for gold ore dump leaching Download PDFInfo
- Publication number
- CN215713249U CN215713249U CN202121149714.0U CN202121149714U CN215713249U CN 215713249 U CN215713249 U CN 215713249U CN 202121149714 U CN202121149714 U CN 202121149714U CN 215713249 U CN215713249 U CN 215713249U
- Authority
- CN
- China
- Prior art keywords
- pipe
- joint
- spray
- spraying
- main
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000005507 spraying Methods 0.000 title claims abstract description 44
- PCHJSUWPFVWCPO-UHFFFAOYSA-N gold Chemical compound [Au] PCHJSUWPFVWCPO-UHFFFAOYSA-N 0.000 title claims abstract description 20
- 239000010931 gold Substances 0.000 title claims abstract description 20
- 229910052737 gold Inorganic materials 0.000 title claims abstract description 20
- 238000002386 leaching Methods 0.000 title claims abstract description 20
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 40
- 239000007921 spray Substances 0.000 claims description 36
- 229910001018 Cast iron Inorganic materials 0.000 description 4
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 4
- 235000017166 Bambusa arundinacea Nutrition 0.000 description 3
- 235000017491 Bambusa tulda Nutrition 0.000 description 3
- 241001330002 Bambuseae Species 0.000 description 3
- 235000015334 Phyllostachys viridis Nutrition 0.000 description 3
- 239000011425 bamboo Substances 0.000 description 3
- 238000010586 diagram Methods 0.000 description 3
- 229910052742 iron Inorganic materials 0.000 description 2
- 238000007789 sealing Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000004744 fabric Substances 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000002093 peripheral effect Effects 0.000 description 1
- 238000011897 real-time detection Methods 0.000 description 1
- 238000002791 soaking Methods 0.000 description 1
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P10/00—Technologies related to metal processing
- Y02P10/20—Recycling
Landscapes
- Nozzles (AREA)
Abstract
The utility model discloses a gold ore dump leaching spraying pipeline system which comprises a connecting pipe group and a spraying assembly, wherein the connecting pipe group comprises a main water pipe, a shunt pipe and a plurality of secondary water pipes which are sequentially connected, the spraying assembly comprises a spraying branch pipe connected with the secondary water pipes and a plurality of spraying branch pipes communicated with the spraying branch pipes, the pipeline system realizes pipeline layout by arranging the connecting pipe group which is convenient to assemble, flexible treatment of gold ore dump leaching spraying is realized by matching with the spraying branch pipes with adjustable spraying positions, and the connecting pipe group and the spraying assembly have stronger practicability.
Description
Technical Field
The utility model relates to the related technical field of gold ore dump leaching spraying, in particular to a gold ore dump leaching spraying pipeline system.
Background
When the existing gold ore dump leaching spraying is carried out, 6 phi 40PE pipelines are generally connected with a phi 80 cast iron main pipe, the phi 80 cast iron main pipe is reduced to a phi 32 iron pipe, the phi 32 iron pipe is connected with a phi 32PVC branch pipe, and the phi 32PVC pipe is connected with a 0.7m/h internal rotation type spray head by a tee joint. Wherein cast iron is responsible for the quality big, and intensity of labour is big, and cast iron is responsible for because the flange bolted connection who uses, erects the stock dump at every turn and need connect, need unpack apart when tearing open the stock dump, and whole process is very troublesome, and the difficult adjustment of pipeline overall arrangement, sprays the direction and also can't adjust the change according to the in service behavior, causes whole stock dump cloth liquid inhomogeneous, and the local volume that sprays is not enough, influences golden effect of leaching.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a gold ore dump leaching spraying pipeline system to solve the problems in the background technology.
In order to achieve the purpose, the utility model provides the following technical scheme:
a gold ore heap leaching spray piping system, comprising:
the connecting pipe group comprises a main water pipe, a flow dividing pipe and a plurality of secondary water pipes, the flow dividing pipe is provided with an inlet end pipe and a plurality of outlet end pipes, the inlet end pipe is connected with one end of the main water pipe, and the outlet end pipe is connected with one end of the secondary water pipes;
and the spraying assembly is connected with the other end of the secondary water delivery pipe and is used for carrying out dump leaching spraying treatment on the gold ores.
As a still further scheme of the utility model: the water supply device is characterized in that a first joint and a second joint are respectively arranged at two ends of the main water pipe, a third joint is arranged on the inlet end pipe, the second joint is connected with the third joint, and a first pressure control valve is arranged on the main water pipe.
As a still further scheme of the utility model: the outlet end pipe is provided with a fourth joint, the two ends of the secondary water pipe are respectively provided with a fifth joint and a sixth joint, one end of the spraying assembly is provided with a seventh joint, the fourth joint is connected with the fifth joint, the sixth joint is connected with the seventh joint, and the secondary water pipe is provided with a second pressure control valve.
As a still further scheme of the utility model: the spraying assembly comprises a spraying main pipe and a plurality of spraying branch pipes communicated with the spraying main pipe, and a nozzle barrel is arranged at one end of the spraying main pipe, which is far away from the spraying main pipe.
As a still further scheme of the utility model: the spray branch pipe is kept away from and sprays main pipe one end and is provided with the extension board, the peripheral cover of extension board is equipped with the adjusting collar, adjusting collar outer wall connection is provided with the regulation handle, a shower nozzle section of thick bamboo one end communicates with the adjusting collar mutually, a shower nozzle section of thick bamboo slope is connected the one end of setting at the adjusting collar.
Compared with the prior art, the utility model has the beneficial effects that: this pipe-line system realizes that gold deposit heap leaching sprays the processing through setting up the cooperation of connecting nest of tubes and spray assembly, the quick montage is realized through setting up main raceway, shunt tubes and a plurality of times raceway cooperation to connecting nest of tubes, and it is very convenient to use, spray assembly sprays the person in charge and realizes the regulation to spraying the position with a plurality of branch pipe cooperations of spraying through setting up for whole pipe-line system flexibility is higher, and practical function is better.
Drawings
Fig. 1 is a schematic overall structure diagram of an embodiment of the present invention.
Fig. 2 is a schematic structural diagram of a spray assembly according to an embodiment of the present invention.
Fig. 3 is a schematic structural diagram of a spray branch pipe in the embodiment of the utility model.
Wherein: the device comprises a main water pipe-1, a first pressure control valve-2, a first joint-3, a shunt pipe-4, a sealing sleeve-5, a second joint-6, a third joint-7, a fourth joint-8, a fifth joint-9, a secondary water pipe-10, a second pressure control valve-11, a sixth joint-12, a seventh joint-13, a spray component-14, a spray main pipe-15, a spray branch pipe-16, an adjusting sleeve-17, a spray head cylinder-18, an extension plate-19, an annular groove-20 and an adjusting handle-21.
Detailed Description
It should be noted that the embodiments and features of the embodiments may be combined with each other without conflict.
In the description of the present invention, it is to be understood that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", and the like, indicate orientations or positional relationships based on those shown in the drawings, and are used only for convenience in describing the present invention and for simplicity in description, and do not indicate or imply that the referenced devices or elements must have a particular orientation, be constructed and operated in a particular orientation, and thus, are not to be construed as limiting the present invention. Furthermore, the terms "first", "second", etc. are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first," "second," etc. may explicitly or implicitly include one or more of that feature. In the description of the present invention, "a plurality" means two or more unless otherwise specified.
In the description of the present invention, it should be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, e.g., as meaning either a fixed connection, a removable connection, or an integral connection; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood by those of ordinary skill in the art through specific situations.
The present invention will be described in detail below with reference to the embodiments with reference to the attached drawings.
Example one
Referring to fig. 1, the gold ore heap leaching spraying pipeline system comprises a connecting pipe set and a spraying assembly 14, wherein the connecting pipe set comprises a main water pipe 1, a shunt pipe 4 and a plurality of secondary water pipes 10, the shunt pipe 4 is provided with an inlet end pipe and a plurality of outlet end pipes, two ends of the shunt pipe 4 are connected with sealing sleeves 5, the inlet end pipe is connected with one end of the main water pipe 1, the outlet end pipe is connected with one end of the secondary water pipe 10, the spraying assembly 14 is connected with the other end of the secondary water pipe 10, and the spraying assembly 14 is used for performing heap leaching spraying treatment on gold ores.
Referring to fig. 1, a first joint 3 and a second joint 6 are respectively arranged at two ends of the main water pipe 1, the inlet end pipe is provided with a third joint 7, the second joint 6 is connected with the third joint 7, a first pressure control valve 2 is arranged on the main water delivery pipe 1, a fourth joint 8 is arranged on the outlet end pipe, a fifth joint 9 and a sixth joint 12 are respectively arranged at two ends of the secondary water conveying pipe 10, a seventh joint 13 is arranged at one end of the spray assembly 14, the fourth joint 8 is connected with the fifth joint 9, the sixth joint 12 is connected with the seventh joint 13, the secondary water delivery pipe 10 is provided with a second pressure control valve 11, in this embodiment, the primary water pipe 1 and the secondary water pipe 10 are further provided with a pressure detector, the water pressure in the main water pipe 1 and the secondary water pipe 10 is detected in real time through the pressure detector, so that the adjustment can be better carried out through the first pressure control valve 2 and the second pressure control valve 11.
Example two
Referring to fig. 2 and 3, on the basis of the first embodiment, the spraying assembly 14 includes a main spraying pipe 15 and a plurality of branch spraying pipes 16 communicated with the main spraying pipe 15, and a nozzle barrel 18 is disposed at one end of the main spraying pipe 15, which is far away from the main spraying pipe 15.
Further, referring to fig. 3, an extension plate 19 is arranged at one end of the spray branch pipe 16, which is far away from the spray main pipe 15, an adjusting sleeve 17 is sleeved on the periphery of the extension plate 19, an annular groove 20 matched with the extension plate 19 is arranged on the inner wall of the adjusting sleeve 17, an adjusting handle 21 is connected to the outer wall of the adjusting sleeve 17, one end of the nozzle cylinder 18 is communicated with the adjusting sleeve 17, and the nozzle cylinder 18 is obliquely connected to one end of the adjusting sleeve 17.
The working principle is as follows: during the use, dock first joint 3 on the water delivery pump, dock second joint 6 and third joint 7, the position that soaks the gold ore heap more arranges the inferior raceway 10 of connecting suitable quantity, soaks when spraying the processing, adjust 21 through manual rotation and drive a shower nozzle section of thick bamboo 18 and rotate, and then adjust and spray the orientation, in order to realize the nimble processing when soaking and spraying with this, come the water pressure in the real-time detection pipeline through the pressure detector during spraying, and press valve 2 and the cooperation of second pressure control valve 11 to adjust through first pressure control valve.
Although the preferred embodiments of the present patent have been described in detail, the present patent is not limited to the above embodiments, and various changes can be made without departing from the spirit of the present patent within the knowledge of those skilled in the art.
Claims (5)
1. The utility model provides a gold ore heap leaching spraying pipe-line system which characterized in that includes:
the connecting pipe group comprises a main water pipe, a flow dividing pipe and a plurality of secondary water pipes, the flow dividing pipe is provided with an inlet end pipe and a plurality of outlet end pipes, the inlet end pipe is connected with one end of the main water pipe, and the outlet end pipe is connected with one end of the secondary water pipes;
and the spraying assembly is connected with the other end of the secondary water delivery pipe and is used for carrying out dump leaching spraying treatment on the gold ores.
2. The gold ore heap leaching spray pipeline system according to claim 1, wherein a first joint and a second joint are respectively arranged at two ends of the main water pipe, a third joint is arranged on the inlet end pipe, the second joint is connected with the third joint, and a first pressure control valve is arranged on the main water pipe.
3. The gold ore heap leaching spray pipeline system according to claim 2, wherein the outlet end pipe is provided with a fourth joint, both ends of the secondary water pipe are respectively provided with a fifth joint and a sixth joint, one end of the spray assembly is provided with a seventh joint, the fourth joint is connected with the fifth joint, the sixth joint is connected with the seventh joint, and the secondary water pipe is provided with a second pressure control valve.
4. The gold ore heap leaching spray pipeline system according to any one of claims 1 to 3, wherein the spray assembly comprises a main spray pipe and a plurality of branch spray pipes communicated with the main spray pipe, and a spray head barrel is arranged at one end of the main spray pipe, which is far away from the main spray pipe.
5. The gold ore heap leaching spray pipeline system according to claim 4, wherein an extension plate is arranged at one end of the spray branch pipe, which is far away from the main spray pipe, an adjusting sleeve is sleeved on the periphery of the extension plate, an adjusting handle is connected and arranged on the outer wall of the adjusting sleeve, one end of the spray head barrel is communicated with the adjusting sleeve, and the spray head barrel is obliquely connected and arranged at one end of the adjusting sleeve.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121149714.0U CN215713249U (en) | 2021-05-26 | 2021-05-26 | Spraying pipeline system for gold ore dump leaching |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121149714.0U CN215713249U (en) | 2021-05-26 | 2021-05-26 | Spraying pipeline system for gold ore dump leaching |
Publications (1)
Publication Number | Publication Date |
---|---|
CN215713249U true CN215713249U (en) | 2022-02-01 |
Family
ID=80032736
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202121149714.0U Expired - Fee Related CN215713249U (en) | 2021-05-26 | 2021-05-26 | Spraying pipeline system for gold ore dump leaching |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN215713249U (en) |
-
2021
- 2021-05-26 CN CN202121149714.0U patent/CN215713249U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110481785A (en) | A kind of push-in jet pipe pesticide spraying unmanned plane | |
CN215713249U (en) | Spraying pipeline system for gold ore dump leaching | |
CN207463765U (en) | A kind of spray drying tower on-line cleaning device | |
CN201760426U (en) | Pipe-line system of ultrasonic cleaning machine | |
CN211078592U (en) | Water distribution device of radial double-tube anaerobic UASB reactor | |
CN207899834U (en) | PVC polymeric kettles spray applies kettle liquid ejecting device | |
CN201628038U (en) | Stainless steel water centralized distributor main tube with planar bosses at positions of branch connectors | |
CN206276913U (en) | A kind of Fluid sprayer of powder used in metallurgy two | |
CN217929954U (en) | Automatic anti-blocking device for heat exchange station | |
CN209353312U (en) | Assemble the apparatus system of surface water surface contaminant | |
CN107096780B (en) | A kind of fine chemistry industry reactor inwall material removing apparatus | |
CN217234775U (en) | Water pipe pressure joint for maintenance | |
CN216556518U (en) | Water distributor | |
CN210287320U (en) | Cleaning device of biological fermentation tank | |
CN209214895U (en) | A kind of sealed sprinkler head water pressure resistance strength character verifying attachment | |
CN208032526U (en) | A kind of reaction kettle | |
CN206987992U (en) | Oil pipe wire connection structure for diesel engine unit | |
CN220361399U (en) | Device for corrosion prevention in pipeline | |
CN203814440U (en) | Electrical pipeline spraying device | |
CN209221656U (en) | A kind of multiple filtration spray piping opened and closed | |
CN204628894U (en) | Water knockout drum | |
CN209428253U (en) | Robot water cutting machine softening water treatment facilities | |
CN216555844U (en) | Water delivery soft belt convenient for bypass connection | |
CN206676254U (en) | A kind of water-repellent paint process units | |
CN201013278Y (en) | Drilling fluid tank sand cleaning device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20220201 |