CN215710857U CN202122051485.5U CN202122051485U CN215710857U CN 215710857 U CN215710857 U CN 215710857U CN 202122051485 U CN202122051485 U CN 202122051485U CN 215710857 U CN215710857 U CN 215710857U
Authority
CN
China
Prior art keywords
fixedly connected
chassis
cable
fly leaf
erection device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202122051485.5U
Other languages
Chinese (zh)
Inventor
王长明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202122051485.5U priority Critical patent/CN215710857U/en
Application granted granted Critical
Publication of CN215710857U publication Critical patent/CN215710857U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a cable erecting device for building electromechanical installation, which belongs to the technical field of building electromechanical, and the technical scheme comprises two chassis, wherein the top of the chassis is fixedly connected with two erecting device main bodies, a lifting mechanism is arranged between one opposite sides of the two erecting device main bodies, the opposite sides of the two chassis are movably connected with rollers, the top of the chassis is fixedly connected with a supporting rod matched with the erecting device main bodies for use, so that the effect that the conventional cable winding device is adjusted in height through the erecting device to facilitate the rotation for paying off is solved, the conventional height adjusting method is mostly lifted upwards through the rotation of a threaded rod, the operation force is large, the labor force demand is large, the cable winding device cannot be effectively and quickly lifted, and the cable winding device is easy to shake and poor in stability during the rotation, and the operation difficulty of a user is increased, inconvenient for users to use.

Description

Cable erecting device for building electromechanical installation
Technical Field
The utility model relates to the technical field of building electromechanics, in particular to a cable erecting device for building electromechanics installation.
Background
The cable is an electric energy or signal transmission device, usually it is made up of several or several groups of wire, the manufacturing of the wire and cable is totally different from the production mode of most electromechanical products, the electromechanical products usually adopt assembling the parts into parts, assembling several parts into a single product, the product is measured by the number of pieces or number of pieces, the wire and cable is the basic measuring unit of length, all the wire and cable are from the conductor processing, add insulation, shielding, cabling and sheath layer by layer on the periphery of the conductor to make the wire and cable product, the product structure is more complicated, the more the superimposed layer.
Cable erection is one of the important construction links in building electromechanics, and the current technical problem is: current cable coiling mechanism is many through the overhead mounting height-adjusting, and the effect of unwrapping wire is carried out in convenient rotation, and current height-adjusting method is rotatory through the threaded rod and upwards promotes more, and the operating force is big, and the labour demand is big, can't effectively swift promote cable coiling mechanism, and when rotatory, cable coiling mechanism rocks easily, poor stability increases the user and operates the degree of difficulty, and the person of not being convenient for uses.
SUMMERY OF THE UTILITY MODEL
The utility model provides a cable erecting device for building electromechanical installation, and aims to solve the problems that the existing cable winding device is mostly adjusted in height through the erecting device, the paying-off effect is convenient to rotate, the existing height adjusting method is mostly lifted upwards through the rotation of a threaded rod, the operation force is large, the labor demand is large, the cable winding device cannot be effectively and quickly lifted, and the cable winding device is easy to shake during rotation, poor in stability, increased in operation difficulty of a user and inconvenient to use by the user.
The utility model is realized in such a way that the cable erecting device for the electromechanical installation of the building comprises two chassis, wherein the top of the chassis is fixedly connected with two erecting device main bodies, a lifting mechanism is arranged between one opposite sides of the two erecting device main bodies, the opposite sides of the two chassis are movably connected with rollers, and the top of the chassis is fixedly connected with a supporting rod matched with the erecting device main bodies for use;
elevating system includes first fly leaf, the top fixedly connected with hydraulic lifting rod of fly leaf, the top fixedly connected with second fly leaf of hydraulic lifting rod, the left side of first fly leaf and second fly leaf and the equal fixedly connected with in right side and the deflector that erects the device main part cooperation and use, the inner chamber of deflector runs through threaded rod, the thread groove that uses with the threaded rod cooperation is all seted up to the inner chamber of deflector and erects the device main part.
In order to achieve the effect of limiting the rotating rod, the cable erecting device for building electromechanical installation is preferably provided with an arc-shaped groove formed in the top of the second movable plate, the top of the second movable plate is movably connected with a limiting plate, and the rotating rod matched with the arc-shaped groove for use is movably connected between the opposite sides of the two erecting device main bodies.
In order to achieve the effect of guiding and installing the limiting plate, the cable erecting device for building electromechanical installation is preferably used, the left side and the right side of the bottom of the limiting plate are fixedly connected with T-shaped plates, and the left side and the right side of the top of the second movable plate are provided with T-shaped grooves matched with the T-shaped plates for use.
In order to achieve the effect of limiting the rotating rod and the cable paying-off device, the cable erecting device for the electromechanical installation of the building is preferably characterized in that the surface of the rotating rod is movably connected with four first clamping plates, and the top of each first clamping plate is movably connected with a second clamping plate.
In order to achieve the effect of limiting the first clamping plate and the second clamping plate, the cable erecting device for building electromechanical installation is preferably characterized in that one side, opposite to the first clamping plate and the second clamping plate, of the cable erecting device is fixedly connected with a limiting rod, and the top and the bottom of the rotating rod are provided with limiting grooves matched with the limiting rod for use.
In order to achieve the effect of connecting the first clamping plate and the second clamping plate, the cable erecting device for building electromechanical installation is preferably used, friction pads are fixedly connected to the left side and the right side of the bottom of the second clamping plate, and friction grooves matched with the friction pads for use are formed in the left side and the right side of the top of the first clamping plate.
Compared with the prior art, the utility model has the beneficial effects that:
this cable handing equipment is used in building electromechanical installation, cooperation through setting up elevating system and bull stick is used, according to the size of cable coiling mechanism, highly adjust first fly leaf, the bull stick passes the cable coiling mechanism inner chamber, hydraulic pressure lifter drives cable coiling mechanism rebound, convenient rotation, at the unwrapping wire in-process, cooperation through setting up first splint and second splint is used, it is effectual spacing to cable coiling mechanism position, prevent the condition that the bull stick displacement breaks away from the arc wall simultaneously, thereby increase stability.
Drawings
Fig. 1 is an overall configuration view of a cable installation device for building machinery and electricity installation according to the present invention;
FIG. 2 is a perspective view of the lift mechanism of the present invention;
FIG. 3 is a schematic perspective view of a T-shaped plate and T-shaped groove of the present invention;
FIG. 4 is a perspective view of the main body and the thread groove of the present invention;
FIG. 5 is a schematic perspective view of a rotating rod and a limiting groove according to the present invention;
fig. 6 is a perspective view of the first and second cover plates of the present invention.
In the figure, 1, a chassis; 2. erecting a device main body; 3. a lifting mechanism; 301. a first movable plate; 302. a hydraulic lifting rod; 303. a second movable plate; 304. a guide plate; 305. a threaded rod; 306. a thread groove; 4. a roller; 5. a support bar; 6. an arc-shaped slot; 7. a limiting plate; 8. a rotating rod; 9. a T-shaped plate; 10. a T-shaped groove; 11. a first splint; 12. a second splint; 13. a limiting rod; 14. a limiting groove; 15. a friction pad; 16. and (4) rubbing the grooves.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention is described in further detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the utility model and are not intended to limit the utility model.
In the description of the present invention, it is to be understood that the terms "length", "width", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", and the like, indicate orientations or positional relationships based on the orientations or positional relationships illustrated in the drawings, and are used merely for convenience in describing the present invention and for simplicity in description, and do not indicate or imply that the devices or elements referred to must have a particular orientation, be constructed in a particular orientation, and be operated, and thus, are not to be construed as limiting the present invention. Further, in the description of the present invention, "a plurality" means two or more unless specifically defined otherwise.
Referring to fig. 1-6, the present invention provides a technical solution: a cable erection device for building electromechanical installation comprises two chassis 1, wherein the top of the chassis 1 is fixedly connected with two erection device main bodies 2, a lifting mechanism 3 is arranged between one opposite sides of the two erection device main bodies 2, the opposite sides of the two chassis 1 are movably connected with idler wheels 4, and the top of the chassis 1 is fixedly connected with a support rod 5 matched with the erection device main bodies 2;
the lifting mechanism 3 comprises a first movable plate 301, a hydraulic lifting rod 302 fixedly connected to the top of the movable plate, a second movable plate 303 fixedly connected to the top of the hydraulic lifting rod 302, a guide plate 304 fixedly connected to the left side and the right side of the first movable plate 301 and the second movable plate 303 and used in cooperation with the erection device main body 2, a threaded rod 305 penetrates through an inner cavity of the guide plate 304, and a threaded groove 306 used in cooperation with the threaded rod 305 is formed in the inner cavities of the guide plate 304 and the erection device main body 2.
In this embodiment: use through the cooperation that sets up elevating system 3 and bull stick 8, according to the size of cable winding device, highly adjust first fly leaf 301, bull stick 8 passes the cable winding device inner chamber, hydraulic pressure lifter 302 drives the cable winding device rebound, convenient rotation, at the unwrapping wire in-process, use through the cooperation that sets up first splint 11 and second splint 12, it is effectual spacing to cable winding device position, prevent the condition that 8 displacements of bull stick break away from arc wall 6 simultaneously, thereby increase stability.
As a technical optimization scheme of the utility model, the top of the second movable plate 303 is provided with an arc-shaped groove 6, the top of the second movable plate 303 is movably connected with a limiting plate 7, and a rotating rod 8 matched with the arc-shaped groove 6 is movably connected between the opposite sides of the two erection device main bodies 2.
In this embodiment: through setting up arc wall 6, the cooperation of limiting plate 7 and bull stick 8 is used, can make the bull stick 8 get into in the arc wall 6, installs limiting plate 7 and second fly leaf 303, makes things convenient for the bull stick 8 rotatory.
As a technical optimization scheme of the utility model, the left side and the right side of the bottom of the limiting plate 7 are both fixedly connected with a T-shaped plate 9, and the left side and the right side of the top of the second movable plate 303 are both provided with a T-shaped groove 10 matched with the T-shaped plate 9 for use.
In this embodiment: through the cooperation that sets up T template 9 and T type groove 10 and use, played the direction installation effect to limiting plate 7, and prevented that the condition of limiting plate 7 and fly leaf separation from top to bottom from appearing.
As a technical optimization scheme of the utility model, the surface of the rotating rod 8 is movably connected with four first clamping plates 11, and the top of each first clamping plate 11 is movably connected with a second clamping plate 12.
In this embodiment: through the cooperation that sets up first splint 11 and second splint 12, first splint 11 and second splint 12 quantity are four, install to the surface of bull stick 8, have played cable pay-off's spacing, prevent cable pay-off at 8 surface displacements of bull stick, and carry on spacingly to 8 positions of bull stick, prevent the effect of displacement in arc wall 6.
As a technical optimization scheme of the utility model, one side of the first clamping plate 11 opposite to one side of the second clamping plate 12 is fixedly connected with a limiting rod 13, and the top and the bottom of the rotating rod 8 are respectively provided with a limiting groove 14 matched with the limiting rod 13 for use.
In this embodiment: through the cooperation that sets up gag lever post 13 and spacing groove 14 and use, played the location effect to second splint 12 and first splint 11, prevented the effect at bull stick 8 surface displacement.
As a technical optimization scheme of the utility model, friction pads 15 are fixedly connected to the left side and the right side of the bottom of the second clamping plate 12, and friction grooves 16 matched with the friction pads 15 are formed in the left side and the right side of the top of the first clamping plate 11.
In this embodiment: the first clamping plate 11 and the second clamping plate 12 are effectively clamped and connected through the matched use of the friction pad 15 and the friction groove 16, and the separation is prevented.
The working principle is as follows: firstly, a user passes a rotating rod 8 through a cable pay-off device, the rotating rod 8 is arranged in an arc-shaped groove 6, a limiting plate 7 and a second movable plate 303 are installed, a T-shaped plate 9 enters a T-shaped groove 10, four first clamping plates 11 and four second clamping plates 12 are respectively sleeved on the surface of the rotating rod 8, a limiting rod 13 is clamped in a limiting groove 14, a friction pad 15 is clamped in a friction groove 16, limiting on the cable pay-off device and limiting on the rotating rod 8 are completed, the user assembles a guide plate 304 and an erection device main body 2 through a threaded rod 305, the first movable plate 301 moves up and down in the two erection device main bodies 2, the hydraulic lifting rod 302 drives the rotating rod 8 and the cable pay-off device to move upwards, the guide plate 304 on two sides of the second movable plate 303 is assembled through the threaded rod 305, fixing is formed, and the effects of labor-saving adjustment and rotation stability increase on the erection device main body 1 are achieved.
The present invention is not limited to the above preferred embodiments, and any modifications, equivalent substitutions and improvements made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (6)

1. The utility model provides a cable erection device for building electromechanical installation, includes two chassis (1), its characterized in that: the top of the chassis (1) is fixedly connected with two erection device main bodies (2), a lifting mechanism (3) is arranged between opposite sides of the two erection device main bodies (2), the opposite sides of the two chassis (1) are movably connected with rollers (4), and the top of the chassis (1) is fixedly connected with a support rod (5) matched with the erection device main bodies (2);
elevating system (3) include first fly leaf (301), the top fixedly connected with hydraulic lifting rod (302) of fly leaf, the top fixedly connected with second fly leaf (303) of hydraulic lifting rod (302), the equal fixedly connected with in left side and the right side of first fly leaf (301) and second fly leaf (303) and deflector (304) that bridging device main part (2) cooperation was used, threaded rod (305) has been run through to the inner chamber of deflector (304), thread groove (306) that cooperate with threaded rod (305) and use are all seted up to the inner chamber of deflector (304) and bridging device main part (2).
2. The cable erection device for building electromechanical installation of claim 1, wherein: arc wall (6) have been seted up at the top of second fly leaf (303), the top swing joint of second fly leaf (303) has limiting plate (7), swing joint has bull stick (8) with arc wall (6) cooperation use between the relative one side of two handing equipment main parts (2).
3. The cable erection device for building electromechanical installation of claim 2, wherein: the equal fixedly connected with T template (9) in left side and the right side of limiting plate (7) bottom, T type groove (10) that use with T template (9) cooperation are all seted up to the left side and the right side at second fly leaf (303) top.
4. The cable erection device for building electromechanical installation of claim 2, wherein: the surface of the rotating rod (8) is movably connected with four first clamping plates (11), and the top of each first clamping plate (11) is movably connected with a second clamping plate (12).
5. The cable erection device for building electromechanical installation of claim 4, wherein: the equal fixedly connected with gag lever post (13) in the relative one side of first splint (11) and second splint (12), spacing groove (14) that use with gag lever post (13) cooperation are all seted up to the top and the bottom of bull stick (8).
6. A cable erection device for building electromechanical installation according to claim 5, characterized in that: the left side and the right side of second splint (12) bottom all fixedly connected with friction pad (15), friction groove (16) that use with friction pad (15) cooperation are all seted up to the left side and the right side at first splint (11) top.
CN202122051485.5U 2021-08-27 2021-08-27 Cable erecting device for building electromechanical installation Expired - Fee Related CN215710857U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122051485.5U CN215710857U (en) 2021-08-27 2021-08-27 Cable erecting device for building electromechanical installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122051485.5U CN215710857U (en) 2021-08-27 2021-08-27 Cable erecting device for building electromechanical installation

Publications (1)

Publication Number Publication Date
CN215710857U true CN215710857U (en) 2022-02-01

Family

ID=80008578

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122051485.5U Expired - Fee Related CN215710857U (en) 2021-08-27 2021-08-27 Cable erecting device for building electromechanical installation

Country Status (1)

Country Link
CN (1) CN215710857U (en)

Similar Documents

Publication Publication Date Title
CN116914640B (en) Laying device for cable in cable trench
CN113896028A (en) Cable laying and moving device for railway
CN215710857U (en) Cable erecting device for building electromechanical installation
CN214059475U (en) Cable pay-off rack
CN111776841B (en) Pay-off device for hard cable
CN210594734U (en) Copper line unwinding device
CN209957118U (en) Cable pay-off winding displacement device
CN114843940A (en) Laying device for communication line of subway station
CN212010538U (en) Cage type cabling device for wires and cables
CN113852003A (en) Wire hanging pulley combination tool for equipotential operation of power transmission line and hanging method thereof
CN215733139U (en) Cable removes fixing device for electric power construction
CN217263919U (en) Circuit laying device for electrical design
CN214798595U (en) Cable erecting device for building electromechanical installation
CN220775190U (en) High-altitude wire clamping device pushing device
CN217126553U (en) Hydraulic pressure lift wire and cable winding and unwinding devices
CN220078136U (en) Active steel wire tensioning and paying-off device
CN216649078U (en) Underground cable lays and uses wiring frame convenient to corner
CN220578614U (en) Fitting piece of cable winding and unwinding machine
CN221216580U (en) Horizontal pay-off rack
CN216918424U (en) Assembled steel construction house built-in fitting construction equipment
CN217880975U (en) Wire core pull bench with adjustable access angle for processing super 6-type network cables
CN217215714U (en) Support device for paving railway traffic cable
CN220617965U (en) Cable processing unwrapping wire guider
CN219031597U (en) Assembled component lifting device
CN216272650U (en) Arm head convenient to adjust and stable for movable arm tower crane

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220201