CN215701442U - Geological hammer for geological exploration - Google Patents

Geological hammer for geological exploration Download PDF

Info

Publication number
CN215701442U
CN215701442U CN202122097810.1U CN202122097810U CN215701442U CN 215701442 U CN215701442 U CN 215701442U CN 202122097810 U CN202122097810 U CN 202122097810U CN 215701442 U CN215701442 U CN 215701442U
Authority
CN
China
Prior art keywords
hammer
fixedly connected
geological
hammer body
sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202122097810.1U
Other languages
Chinese (zh)
Inventor
柏瑞
周荣志
胡跃亮
杨莹芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Gold Geological And Mineral Exploration Co ltd
Original Assignee
Shandong Gold Geological And Mineral Exploration Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Gold Geological And Mineral Exploration Co ltd filed Critical Shandong Gold Geological And Mineral Exploration Co ltd
Priority to CN202122097810.1U priority Critical patent/CN215701442U/en
Application granted granted Critical
Publication of CN215701442U publication Critical patent/CN215701442U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model discloses a geological hammer for geological exploration, which belongs to the technical field of geological hammers and comprises a hammer body, an installation block and a reinforcing block, wherein the left side of the hammer body is fixedly connected with a hammer head, the right side of the hammer body is fixedly connected with a hammer tail, the lower end of the right side of the hammer body is provided with a groove, the hammer body is provided with an installation groove, the left side and the right side of the lower end of the hammer body are respectively provided with a limiting groove, the hammer body is rotatably connected with an installation pin through threads, the hammer body is separated from a hammer rod and then is in sliding insertion connection with the installation block, the limiting block is in sliding insertion connection with the limiting groove, and then is fixedly connected with a nut through the installation pin, so that the hammer body is convenient to replace after the hammer body is damaged, the waste caused by scrapping the hammer rod together when the hammer body is scrapped is avoided, the stability of a connection part is also improved, the connection is more stable and firm, and simultaneously, an anti-slip sleeve and a buffer sleeve are arranged on the inner side of an outer protective sleeve, the vibration force brought by the hammer body is reduced when the hammer is used.

Description

Geological hammer for geological exploration
Technical Field
The utility model relates to the technical field of geological hammers, in particular to a geological hammer for geological exploration.
Background
The geological hammer is one of basic tools for geological work and is made of high-quality steel. The pattern varies with the nature of the rock in the area of work. Also known as a hand hammer. One of the basic tools for geological work is made of high-quality steel. The pattern varies with the nature of the rock in the area of work. A geologic hammer for igneous rock area is composed of a rectangular or square hammer body, and a wedge-shaped hammer body. For use in areas where sedimentary rock is developing, one end is often shaped like a crane beak. According to weight, the geological hammer is divided into a light weight type and a heavy weight type.
At present, in order to be firmly installed and convenient to manufacture, most of the hammer heads and the hammer handles of the existing geological hammer for geological exploration are fixedly connected, but the joints of the hammer heads and the hammer handles are easy to break after long-term use, so that the hammer heads and the hammer handles are not easy to use, and the hammer heads and the hammer handles can not be continuously used and can only be discarded and scrapped after being separated, so that waste is caused, and meanwhile, most of the protective sleeves sleeved by the existing hammer handles are poor in protection performance and usability, and some use requirements cannot be met.
SUMMERY OF THE UTILITY MODEL
Aiming at the problems in the prior art, the utility model aims to provide a geological hammer for geological exploration, which is characterized in that a hammer body is separated from a hammer rod, a mounting groove is in sliding insertion with a mounting block, a limiting block is in sliding insertion with a limiting groove, and the hammer body is conveniently replaced after the hammer body is damaged through a mounting pin and a nut which are fixedly connected, so that waste caused by scrapping of the hammer body together with the hammer rod when the hammer body is scrapped is avoided, the stability of a connecting part is improved, the connection is more stable and firm, meanwhile, an anti-slip sleeve and a buffer sleeve are arranged on the inner side of an outer protective sleeve, the vibration force brought by the hammer body when the geological hammer is used is reduced, the phenomenon that the hand of a user is separated from the hammer rod due to large vibration when the geological hammer is used is avoided, and the outer protective sleeve, the buffer sleeve and the anti-slip sleeve are also convenient to replace, and the disadvantage caused by continuous use after the damage is avoided.
In order to solve the above problems, the present invention adopts the following technical solutions.
A geological hammer for geological exploration comprises a hammer body, an installation block and a reinforcing block, wherein the left side of the hammer body is fixedly connected with a hammer head, the right side of the hammer body is fixedly connected with a hammer tail, the right side lower end of the hammer body is provided with a groove, the hammer body is provided with an installation groove, the left side and the right side of the lower end of the hammer body are respectively provided with a limiting groove, the hammer body is connected with an installation pin through threaded rotation, one end of the installation pin is connected with a nut through threaded rotation, the left side and the right side of the upper end of the reinforcing block are respectively and fixedly connected with a limiting block, the lower end of the reinforcing block is fixedly connected with a hammer rod, the hammer rod is sleeved with an anti-skidding sleeve in a sliding manner, the outer side of the anti-skidding sleeve is fixedly connected with a buffer sleeve, the outer side of the buffer sleeve is fixedly connected with an outer protection sleeve, the outer protection sleeve is fixedly connected with a plurality of anti-skidding blocks, and the hammer rod is fixedly connected with a limiting ring, the lower end of the hammer rod is rotationally connected with a thread block through threads, the lower end of the thread block is fixedly connected with a stop block, the hammer body is separated from the hammer rod, then the mounting groove is in sliding insertion with the mounting block, the limiting block is in sliding insertion with the limiting groove, and then the mounting pin is fixedly connected with the nut, so that the hammer body can be conveniently replaced after being damaged, the waste caused by scrapping the hammer body together with the hammer rod when the hammer body is scrapped is avoided, but also increases the stability of the connecting part to ensure more stable and firm connection, reduces the vibration force brought by the hammer body when in use by arranging the anti-slip sleeve and the buffer sleeve on the inner side of the outer protective sleeve, avoids the separation of the hand of a user from the hammer rod due to larger vibration when in use, meanwhile, the outer protective sleeve, the buffer sleeve and the anti-skid sleeve are convenient to replace, and the defect caused by continuous use after damage is avoided.
Further, the upper end fixedly connected with connecting block of hammer body, the upper end fixedly connected with of connecting block strikes the board, through the setting of striking the board, conveniently strikes the hard stone piece, plays the additional action.
Furthermore, the inside of mounting groove slides and pegs graft and has the installation piece, the lower extreme fixedly connected with boss of installation piece through the setting of boss, has increaseed the steadiness of installation piece and hammer stem junction.
Further, the stopper slides with the inside of spacing groove and pegs graft, the installation round pin passes the hammer body through the screw rotation and connects in the nut with the installation piece, passes the hammer body through the installation round pin through the screw rotation and connects in the nut with the installation piece, conveniently makes hammer body and hammer stem fixed connection.
Furthermore, the front side fixedly connected with phosphor strip of hammer stem, the phosphor strip is yellow, and the phosphor strip produces strong reflection of light effect under night light shines, arouses back staff's attention effectively, avoids taking place danger.
Furthermore, the thickness of cushion collar is greater than the thickness of antiskid cover, the material of cushion collar is rubber, through the setting of cushion collar, has increaseed the shock-absorbing capacity of outer lag, has reduced the vibrations that produce between user's hand and the hammer stem, avoids user's hand and hammer stem to take off.
Furthermore, the upper end surface of dog is hugged closely with the lower terminal surface of outer lag and is connected, the upper end surface of dog is hugged closely with the lower terminal surface of cushion collar and is connected, through the setting of spacing ring and dog, plays limiting displacement about respectively outer lag, avoids outer lag to take place to slide and drops the hammer stem.
Compared with the prior art, the utility model has the advantages that:
(1) this scheme is through separating hammer body and hammer stem, then the mounting groove is pegged graft with the installation piece slides, stopper and spacing groove slide and peg graft, then through installation round pin and nut fixed connection, conveniently change the hammer body after the hammer body damages, scrap the waste that causes together with the hammer stem when avoiding the hammer body to scrap, and the steadiness of junction has also been increaseed, make to connect more firm firmly, simultaneously through outside the inboard of lag set up antiskid cover and cushion collar, the vibrations power that the hammer body brought when having reduced the use, avoid because vibrations are great when using making user's hand and hammer stem to take off and leave, simultaneously also conveniently change outer lag, cushion collar and antiskid cover, avoid damaging the drawback that the back continuation was used and is brought.
(2) The upper end fixedly connected with connecting block of hammer body, the upper end fixedly connected with of connecting block strikes the board, through the setting of striking the board, conveniently strikes hard stone piece, plays the additional action.
(3) The inside of mounting groove slides and pegs graft and has the installation piece, and the lower extreme fixedly connected with boss of installation piece through the setting of boss, has increaseed the steadiness of installation piece and hammer stem junction.
(4) Stopper and the inside slip grafting of spacing groove, the installation round pin passes the hammer body through the screw rotation and is connected in the nut with the installation piece, passes the hammer body through the installation round pin through the screw rotation and connects in the nut with the installation piece, conveniently makes hammer body and hammer stem fixed connection.
(5) The front side fixedly connected with phosphor strip of hammer stem, the phosphor strip is yellow, and the phosphor strip produces strong reflection of light effect under night light irradiation, arouses back staff's attention effectively, avoids taking place danger.
(6) The thickness of cushion collar is greater than the thickness of antiskid cover, and the material of cushion collar is rubber, through the setting of cushion collar, has increaseed the shock-absorbing capacity of outer lag, has reduced the vibrations that produce between user's hand and the hammer stem, avoids user's hand and hammer stem to take off and leaves.
(7) The upper end surface of dog is hugged closely with the lower terminal surface of outer lag and is connected, and the upper end surface of dog is hugged closely with the lower terminal surface of cushion collar and is connected, through the setting of spacing ring and dog, plays limiting displacement about respectively outer lag, avoids outer lag to take place to slide and drops the hammer stem.
Drawings
FIG. 1 is a perspective view of the overall construction of the present invention;
FIG. 2 is a schematic view of the overall structure of the present invention;
FIG. 3 is a partial cross-sectional view of the overall structure of the present invention;
fig. 4 is a cross-sectional view of the hammer body of the present invention.
The reference numbers in the figures illustrate:
1 hammer body, 2 tups, 3 hammer tails, 4 recesses, 5 connecting blocks, 6 strike boards, 7 mounting grooves, 8 spacing grooves, 9 mounting pins, 10 nuts, 11 mounting blocks, 12 reinforcing blocks, 13 spacing blocks, 14 hammer stems, 15 fluorescent strips, 16 anti-skidding sleeves, 17 buffer sleeves, 18 outer protective sleeves, 19 anti-skidding blocks, 20 spacing rings, 21 threaded blocks, 22 stop blocks.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention; it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all embodiments, and all other embodiments obtained by those skilled in the art without any inventive work are within the scope of the present invention.
Referring to fig. 1-4, a geological hammer for geological exploration comprises a hammer body 1, a mounting block 11 and a reinforcing block 12, referring to fig. 2-3, a hammer head 2 is fixedly connected to the left side of the hammer body 1, a hammer tail 3 is fixedly connected to the right side of the hammer body 1, a groove 4 is arranged at the lower end of the right side of the hammer body 1, the hammer body 1 is provided with a mounting groove 7, a limiting groove 8 is respectively arranged at the left side and the right side of the lower end of the hammer body 1, the hammer body 1 is rotatably connected with a mounting pin 9 through a screw thread, one end of the mounting pin 9 is rotatably connected with a nut 10 through a screw thread, limiting blocks 13 are respectively fixedly connected to the left side and the right side of the upper end of the reinforcing block 12, a hammer rod 14 is fixedly connected to the lower end of the reinforcing block 12, an anti-slip sleeve 16 is slidably sleeved on the hammer rod 14, a buffer sleeve 17 is fixedly connected to the outer side of the anti-slip sleeve 16, an outer protective sleeve 18 is fixedly connected to the outer side of the buffer sleeve 17, a plurality of anti-slip blocks 19 are fixedly connected to the outer protective sleeve 18, the hammer rod 14 is fixedly connected with a limiting ring 20, the lower end of the hammer rod 14 is connected with a thread block 21 through thread rotation, the lower end of the thread block 21 is fixedly connected with a stop block 22, the hammer body 1 is separated from the hammer rod 14 through the stop block, then the mounting groove 7 is in sliding insertion connection with the mounting block 11, the stop block 13 is in sliding insertion connection with the limiting groove 8, then the hammer body 1 is conveniently replaced after the hammer body 1 is damaged through the mounting pin 9 and the nut 10, waste caused by scrapping of the hammer body 1 together with the hammer rod 14 when the hammer body 1 is scrapped is avoided, the stability of a joint is improved, connection is more stable and firm, meanwhile, an anti-skidding sleeve 16 and a buffer sleeve 17 are arranged on the inner side of the outer protection sleeve 18, vibration force caused by the hammer body 1 when the hammer is used is reduced, the phenomenon that the hand of a user is separated from the hammer rod 14 due to large vibration when the hammer is used is avoided, and meanwhile, the outer protection sleeve 18 is also convenient to replace, The buffer sleeve 17 and the anti-skid sleeve 16 avoid the defect caused by continuous use after damage.
Please refer to fig. 2-3, the upper end fixedly connected with connecting block 5 of hammer body 1, the upper end fixedly connected with of connecting block 5 strikes board 6, through the setting of striking board 6, conveniently strikes the hard stone piece, plays the auxiliary action, and the inside slip of mounting groove 7 is pegged graft and is had installation piece 11, and the lower extreme fixedly connected with boss 12 of installation piece 11 has strengthened the steadiness of installation piece 11 with the hammer stem 14 junction through the setting of boss 12.
Referring to fig. 2-3, the limiting block 13 is inserted into the limiting groove 8 in a sliding manner, the mounting pin 9 rotates through the screw thread to penetrate through the hammer body 1 and the mounting block 11 and is connected to the nut 10, the hammer body 1 is conveniently fixedly connected with the hammer rod 14, the fluorescent strip 15 is fixedly connected to the front side of the hammer rod 14, the fluorescent strip 15 is yellow, the fluorescent strip 15 generates a strong light reflecting effect under the illumination of light at night, the attention of a worker can be effectively brought to the rear, and the danger can be avoided.
Referring to fig. 2-3, the thickness of the buffer sleeve 17 is greater than that of the anti-slip sleeve 16, the buffer sleeve 17 is made of rubber, the buffer performance of the outer protective sleeve 18 is improved by the arrangement of the buffer sleeve 17, vibration generated between the hand of a user and the hammer rod 14 is reduced, the hand of the user is prevented from separating from the hammer rod 14, the upper end surface of the stop block 22 is in close contact with the lower end surface of the outer protective sleeve 18, the upper end surface of the stop block 22 is in close contact with the lower end surface of the buffer sleeve 17, and the limit rings 20 and the stop block 22 are arranged to respectively limit the upper and lower surfaces of the outer protective sleeve 18 and prevent the outer protective sleeve 18 from sliding off the hammer rod 14.
The hammer is characterized in that the mounting block 11 is inserted in the mounting groove 7 in a sliding manner, the limiting block 13 is inserted in the limiting groove 8 in a sliding manner, the mounting pin 9 and the nut 10 are mounted and fixed, the anti-slip sleeve 16 is sleeved on the hammer rod 14 in a sliding manner, the anti-slip sleeve 16 cannot move or rotate, the limiting ring 20 and the stop block 22 are respectively used for limiting and shielding up and down to prevent the outer protective sleeve 18 from falling off, the hammer body 1 is separated from the hammer rod 14, the mounting groove 7 is inserted in the mounting block 11 in a sliding manner, the limiting block 13 is inserted in the limiting groove 8 in a sliding manner, the mounting pin 9 is fixedly connected with the nut 10, the hammer body 1 can be conveniently replaced after the hammer body 1 is damaged, waste caused by scrapping the hammer body 1 together with the hammer rod 14 when the hammer body is scrapped is avoided, the stability of the joint is improved, the connection is more stable and firm, the anti-slip sleeve 16 and the buffer sleeve 17 are arranged on the inner side of the outer protective sleeve 18, the vibration force brought by the hammer body 1 in use is reduced, the phenomenon that the hands of a user are separated from the hammer rod 14 due to large vibration in use is avoided, meanwhile, the outer protective sleeve 18, the buffer sleeve 17 and the anti-skid sleeve 16 are convenient to replace, and the defect caused by continuous use after damage is avoided.
The foregoing is only a preferred embodiment of the present invention; the scope of the utility model is not limited thereto. Any person skilled in the art should be able to cover the technical scope of the present invention by equivalent or modified solutions and modifications within the technical scope of the present invention.

Claims (7)

1. The utility model provides a geological hammer for geological survey, includes hammer body (1), installation piece (11) and boss (12), its characterized in that: the hammer is characterized in that a hammer head (2) is fixedly connected to the left side of a hammer body (1), a hammer tail (3) is fixedly connected to the right side of the hammer body (1), a groove (4) is formed in the lower right side of the hammer body (1), a mounting groove (7) is formed in the hammer body (1), limiting grooves (8) are respectively formed in the left side and the right side of the lower end of the hammer body (1), the hammer body (1) is connected with a mounting pin (9) through threaded rotation, one end of the mounting pin (9) is connected with a nut (10) through threaded rotation, limiting blocks (13) are respectively fixedly connected to the left side and the right side of the upper end of a reinforcing block (12), a hammer rod (14) is fixedly connected to the lower end of the reinforcing block (12), an anti-slip sleeve (16) is sleeved on the hammer rod (14) in a sliding mode, a buffer sleeve (17) is fixedly connected to the outer side of the anti-slip sleeve (16), an outer protective sleeve (18) is fixedly connected to the outer side of the buffer sleeve (17), the outer protection sleeve (18) is fixedly connected with a plurality of anti-skidding blocks (19), the hammer rod (14) is fixedly connected with a limiting ring (20), the lower end of the hammer rod (14) is rotatably connected with a thread block (21) through threads, and the lower end of the thread block (21) is fixedly connected with a stop block (22).
2. A geological hammer for geological exploration, according to claim 1, characterized in that: the hammer is characterized in that the upper end of the hammer body (1) is fixedly connected with a connecting block (5), and the upper end of the connecting block (5) is fixedly connected with a knocking plate (6).
3. A geological hammer for geological exploration, according to claim 1, characterized in that: the inside of mounting groove (7) slides and is pegged graft and has installation piece (11), the lower extreme fixedly connected with boss (12) of installation piece (11).
4. A geological hammer for geological exploration, according to claim 1, characterized in that: the limiting block (13) is in sliding insertion connection with the inside of the limiting groove (8), and the mounting pin (9) is connected to the nut (10) through the hammer body (1) and the mounting block (11) in a threaded rotation mode.
5. A geological hammer for geological exploration, according to claim 1, characterized in that: the front side of the hammer lever (14) is fixedly connected with a fluorescent strip (15), and the fluorescent strip (15) is yellow.
6. A geological hammer for geological exploration, according to claim 1, characterized in that: the thickness of the buffer sleeve (17) is larger than that of the anti-skid sleeve (16), and the buffer sleeve (17) is made of rubber.
7. A geological hammer for geological exploration, according to claim 1, characterized in that: the upper end surface of the stop block (22) is connected with the lower end surface of the outer protective sleeve (18) in a clinging mode, and the upper end surface of the stop block (22) is connected with the lower end surface of the buffer sleeve (17) in a clinging mode.
CN202122097810.1U 2021-09-01 2021-09-01 Geological hammer for geological exploration Expired - Fee Related CN215701442U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122097810.1U CN215701442U (en) 2021-09-01 2021-09-01 Geological hammer for geological exploration

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122097810.1U CN215701442U (en) 2021-09-01 2021-09-01 Geological hammer for geological exploration

Publications (1)

Publication Number Publication Date
CN215701442U true CN215701442U (en) 2022-02-01

Family

ID=80010959

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122097810.1U Expired - Fee Related CN215701442U (en) 2021-09-01 2021-09-01 Geological hammer for geological exploration

Country Status (1)

Country Link
CN (1) CN215701442U (en)

Similar Documents

Publication Publication Date Title
CN201594714U (en) Special pin-removing restoring device for porcelain insulator
CN215701442U (en) Geological hammer for geological exploration
CN208934631U (en) A kind of more piece hinge type bullet card positioning mechanism of cord coring drill
CN210524996U (en) Square handle hexagonal rod four-groove tip chisel
CN109281627A (en) A kind of anti-dieback bullet card positioning mechanism of more piece hinge type
CN201507253U (en) A novel slip insert plate with high tooth and without distance
CN210314011U (en) Hard alloy glass cutter with high strength, toughness and high wear resistance
CN208681507U (en) A kind of foldable multifunctional war industry shovel
CN220599800U (en) Mining hammer convenient to mine
CN111232561A (en) Novel high-strength high-wear-resistance scraper with crushing function
CN206653829U (en) hard alloy graver
CN209849311U (en) A instrument that is used for ancient building sieve tile to strain tile
CN213918090U (en) Tool hammer for geological survey
CN208342760U (en) A kind of iron pick of geologic prospect multifunction retractable
CN217231629U (en) Ice remover
CN211163799U (en) Geological hammer for geological exploration field
CN211616156U (en) Drill bit structure of high-strength, high-toughness and high-abrasion-resistance hard alloy glass cutter drilling tool
CN220313266U (en) Geological hammer for mineral geological investigation field operation
CN216577702U (en) Hammering rod for hammering based on expansion bolts
CN213439459U (en) Multifunctional hammer for constructional engineering
CN220886015U (en) Stone unloading frame
CN208870535U (en) A kind of airleg rock drill drill bit
CN217168402U (en) Reassembling type geological hammer
CN211639769U (en) Geological hammer for rock stratum sampling
CN214424552U (en) Ventilation safety monitoring equipment for coal mine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220201

CF01 Termination of patent right due to non-payment of annual fee