CN215701273U - Bridge pile foundation filling pipe extracting tool - Google Patents
Bridge pile foundation filling pipe extracting tool Download PDFInfo
- Publication number
- CN215701273U CN215701273U CN202121883824.XU CN202121883824U CN215701273U CN 215701273 U CN215701273 U CN 215701273U CN 202121883824 U CN202121883824 U CN 202121883824U CN 215701273 U CN215701273 U CN 215701273U
- Authority
- CN
- China
- Prior art keywords
- shaped
- fixedly connected
- pile foundation
- bridge pile
- clamping
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Mutual Connection Of Rods And Tubes (AREA)
Abstract
The utility model belongs to the technical field of building construction tools, and particularly relates to a bridge pile foundation perfusion guide pipe dismounting tool which comprises an X-shaped hinged frame, wherein the front end of the X-shaped hinged frame is fixedly connected with a clamping part, the rear end of the X-shaped hinged frame is fixedly connected with an adjusting part, the clamping part and the X-shaped hinged frame are integrally formed, the clamping part comprises two arc-shaped clamping plates which are symmetrical to each other and are in a same circle, a plurality of sections of clamping teeth are machined on the two arc-shaped clamping plates, the adjusting part and the X-shaped hinged frame are integrally formed, the adjusting part comprises two connecting tables, and an adjusting component is arranged between the two connecting tables; the utility model solves the problems of inconvenient operation, easy slipping and labor waste caused by the manual screwing-out mode of surrounding the threaded steel sleeve by constructors.
Description
Technical Field
The utility model belongs to the technical field of building construction tools, and particularly relates to a bridge pile foundation pouring guide pipe dismounting tool.
Background
The concrete pouring of the pile foundation generally adopts a mode of matching a hopper with a guide pipe, the guide pipe is usually formed by splicing a plurality of sections of steel pipes 4, as shown in figure 3, the upper ends of the steel pipes 4 are usually provided with external threads 41, the lower ends of the steel pipes are provided with threaded steel sleeves 42, two adjacent sections of the steel pipes 4 are spliced through the threaded connection of the threaded steel sleeves 42 and the external threads 41,
in the pouring process, when the guide pipe is buried in the concrete to a certain depth, the buried depth of the guide pipe needs to be controlled, the guide pipe is lifted, and the lifted section of steel pipe is disassembled, so that the smooth pouring of the concrete can be facilitated.
SUMMERY OF THE UTILITY MODEL
The purpose of the utility model is: aims at providing a bridge pile foundation pouring guide pipe extracting tool to solve the problem that the operation is inconvenient and easy to slip and is harder to rotate by surrounding the mode of manually screwing out the threaded steel sleeve by constructors.
In order to achieve the technical purpose, the technical scheme adopted by the utility model is as follows:
a bridge pile foundation pouring guide pipe dismounting tool comprises an X-shaped hinged frame, wherein a clamping part is fixedly connected to the front end of the X-shaped hinged frame, and an adjusting part is fixedly connected to the rear end of the X-shaped hinged frame;
the clamping part and the X-shaped hinged frame are integrally formed, the clamping part comprises two symmetrical and co-circular arc-shaped clamping plates, and a plurality of sections of clamping teeth are machined on the two arc-shaped clamping plates;
the adjusting part with X-shaped hinge frame integrated into one piece, the adjusting part is including two connection platforms, two install adjusting part between the connection platform.
Through using adjusting part, make two of regulating part connect the platform and be close to each other, two arc splint of clamping part are close to each other and with screw thread steel bushing both sides centre gripping, promote the connection platform of regulating part at last and can rotate the screw thread steel bushing, dismantle the screw thread steel bushing, convenient operation is laborsaving.
The adjusting component comprises two rotating tables, the two rotating tables are respectively connected with the two connecting tables in a rotating mode, one rotating table faces the other rotating table one side is fixedly connected with a screw rod, and the other rotating table is rotatably connected with a threaded sleeve in threaded connection with the screw rod.
People can enable the threaded sleeve to slide out and in relative to the screw rod by rotating the threaded sleeve relative to the rotating tables, and the threaded sleeve can be prevented from being stuck by the rotary connection of the two rotating tables and the connecting table in the processes of sliding out and sliding in; when the threaded sleeve slides out relative to the screw rod, the two rotating tables can drive the two connecting tables to be away from each other, so that the two arc-shaped clamping plates of the clamping part are away from each other and are opened; when the threaded sleeve slides in relative to the screw rod, the two rotating tables can drive the two connecting tables to be close to each other, so that the two arc-shaped clamping plates of the clamping part are close to each other to clamp.
One end of the threaded sleeve, which is far away from the rotating table, is fixedly connected with a plum blossom handle.
Through setting up the plum blossom handle, can make the rotation threaded sleeve of people's convenient laborsaving more.
The other end of the threaded sleeve is fixedly connected with a limit stop matched with the rotating table.
Through setting up limit stop, when the screw sleeve for the screw rod roll-off, through limit stop and the stopping spacing between the rotation platform to avoid screw sleeve roll-off screw rod.
Two the equal processing of connection platform tip has the thickening lug, two the equal fixedly connected with of thickening lug tip pushes away the handle.
The push handle is arranged to facilitate pushing of people to connect the platform, and the thickened lug can improve the strength between the push handle and the connection platform.
The surface of the push handle is sleeved with a sponge sleeve.
When the push handle is used, people can hold the sponge sleeve, so that people feel comfortable.
People use the adjusting part, make two connection platforms of regulating part keep away from each other, transmission through the articulated frame of X-shaped, two arc splint that make the clamping part keep away from each other and open, make the screw thread steel bushing get into between two arc splint, then, people are through using the adjusting part, make two connection platforms of regulating part be close to each other, and on the same hand, two arc splint of clamping part are close to each other and with screw thread steel bushing both sides centre gripping, it is tight with screw thread steel bushing both sides clamp until two arc splint, avoid skidding, at last people can rotate the screw thread steel bushing through the connection platform that promotes the regulating part, dismantle the screw thread steel bushing, and convenient operation is laborsaving.
Drawings
The utility model is further illustrated by the non-limiting examples given in the accompanying drawings;
FIG. 1 is a schematic structural view of a bridge pile foundation pouring guide pipe dismounting tool according to an embodiment of the utility model in a clamping state;
FIG. 2 is a schematic structural diagram of an opened state of an embodiment of a bridge pile foundation pouring guide pipe dismounting tool according to the present invention;
FIG. 3 is a schematic structural view of an embodiment of the present invention in use;
the main element symbols are as follows:
the device comprises an X-shaped hinge frame 1, a clamping part 2, an arc-shaped clamping plate 21, a clamping tooth 211, an adjusting part 3, a connecting table 31, a rotating table 32, a screw rod 321, a threaded sleeve 322, a plum blossom-shaped handle 323, a limit stop 324, a thickening lug 33, a pushing handle 331, a sponge sleeve 332, a steel pipe 4, an external thread 41 and a threaded steel sleeve 42.
Detailed Description
In order that those skilled in the art can better understand the present invention, the following technical solutions are further described with reference to the accompanying drawings and examples.
As shown in fig. 1-3, the bridge pile foundation pouring guide pipe dismounting tool comprises an X-shaped hinge frame 1, wherein a clamping part 2 is fixedly connected to the front end of the X-shaped hinge frame 1, and an adjusting part 3 is fixedly connected to the rear end of the X-shaped hinge frame 1;
the clamping part 2 and the X-shaped hinged frame 1 are integrally formed, the clamping part 2 comprises two symmetrical and co-circular arc-shaped clamping plates 21, and a plurality of sections of clamping teeth 211 are machined on the two arc-shaped clamping plates 21;
regulating part 3 and X articulated frame 1 integrated into one piece that appears, regulating part 3 is including two connection platforms 31, installs adjusting part between two connection platforms 31.
The X-shaped hinged frame 1 is a conventional common support, the front end and the rear end of the X-shaped hinged frame 1 can be overturned relative to a hinged point in the middle, and when the adjusting parts 3 at the rear end of the X-shaped hinged frame 1 are overturned to be close to each other, the clamping parts 2 at the front end of the X-shaped hinged frame 1 are also overturned to be close to each other; when the two symmetrical arc-shaped clamping plates 21 which are in the same circle at the clamping part 2 are turned over and close to each other, the threaded steel sleeve 42 at the outer side of the conduit 4 can be clamped; the clamping teeth 211 can ensure that the arc-shaped clamping plate 21 clamps the threaded steel sleeve 42 more stably; the adjusting assembly is used for adjusting the two connecting tables 31 of the adjusting part 3 to approach and depart from each other;
when in use, people use the adjusting assembly to enable the two connecting tables 31 of the adjusting part 3 to be far away from each other, the two arc-shaped clamping plates 21 of the clamping part 2 are far away from each other and are opened through the transmission of the X-shaped hinged frame 1, so that the threaded steel sleeve 42 enters between the two arc-shaped clamping plates 21, then, people enable the two connecting tables 31 of the adjusting part 3 to be close to each other through the adjusting assembly, and similarly, the two arc-shaped clamping plates 21 of the clamping part 2 are close to each other to clamp the two sides of the threaded steel sleeve 42 until the two arc-shaped clamping plates 21 clamp the two sides of the threaded steel sleeve 42, so as to avoid skidding, finally, people can rotate the threaded steel sleeve 42 by pushing the connecting tables 31 of the adjusting part 3, so as to disassemble the threaded steel sleeve 42, and the operation is convenient and labor-saving;
and, when splicing multisection steel pipe 4, also can use this instrument to screw the installation to screw the screw-thread steel bushing 42, compare in people and encircle screw the screw-thread steel bushing 4 and screw, screw more tightly when can screw in the screw-thread steel bushing 42 external screw thread to the leakproofness of multisection steel pipe 4 has been guaranteed.
Referring to fig. 1 and 2, the adjusting assembly includes two rotating tables 32, the two rotating tables 32 are respectively rotatably connected to the two connecting tables 31, a screw 321 is fixedly connected to one side of one rotating table 32 facing the other rotating table 32, and a threaded sleeve 322 is rotatably connected to the other rotating table 32 and is in threaded connection with the screw 321.
People can enable the threaded sleeve 322 to slide out and in relative to the screw 321 by rotating the threaded sleeve 322 relative to the rotating table 32, and the threaded sleeve 322 can be prevented from being blocked by the rotating connection of the two rotating tables 32 and the connecting table 31 in the processes of sliding out and sliding in; when the threaded sleeve 322 slides out relative to the threaded rod 321, the two rotating tables 32 can drive the two connecting tables 31 to move away from each other, so that the two arc-shaped clamping plates 21 of the clamping part 2 move away from each other and are opened; when the threaded sleeve 322 is slid into the threaded rod 321, the two rotating tables 32 can bring the two connecting tables 31 closer to each other, and the two arc-shaped clamping plates 21 of the clamping portion 2 can be clamped by being brought closer to each other.
Referring to fig. 1 and 2, a plum blossom-shaped handle 323 is fixedly connected to an end of the threaded sleeve 322 away from the rotating table 32.
By arranging the plum blossom-shaped handle 323, the threaded sleeve 322 can be rotated more conveniently and more laborsavingly.
Referring to fig. 1 and 2, a limit stop 324 matched with the rotary table 32 is fixedly connected to the other end of the threaded sleeve 322.
By providing the limit stopper 324, when the threaded sleeve 322 slides out relative to the threaded rod 321, the threaded sleeve 322 is prevented from sliding out of the threaded rod 321 by the blocking limit between the limit stopper 324 and the rotating table 32.
Referring to fig. 1 and 2, thickened bumps 33 are formed at the ends of the two connecting platforms 31, and push handles 331 are fixedly connected to the ends of the two thickened bumps 33.
The pushing handle 331 is provided to enable a person to conveniently push the connecting platform 31, and the thickened bump 33 can improve the strength between the pushing handle 331 and the connecting platform 31.
Referring to fig. 1 and 2, a sponge sleeve 332 is sleeved on the surface of the pushing handle 331.
When the push handle 331 is used, a user can hold the sponge cover 332, so that the user feels comfortable.
The foregoing embodiments are merely illustrative of the principles of the present invention and its efficacy, and are not to be construed as limiting the utility model. Any person skilled in the art can modify or change the above-mentioned embodiments without departing from the spirit and scope of the present invention. Accordingly, it is intended that all equivalent modifications or changes which can be made by those skilled in the art without departing from the spirit and technical spirit of the present invention be covered by the claims of the present invention.
Claims (6)
1. The utility model provides a bridge pile foundation perfusion pipe extracting tool, includes X shape articulated frame, its characterized in that: the front end of the X-shaped hinged frame is fixedly connected with a clamping part, and the rear end of the X-shaped hinged frame is fixedly connected with an adjusting part;
the clamping part and the X-shaped hinged frame are integrally formed, the clamping part comprises two symmetrical and co-circular arc-shaped clamping plates, and a plurality of sections of clamping teeth are machined on the two arc-shaped clamping plates;
the adjusting part with X-shaped hinge frame integrated into one piece, the adjusting part is including two connection platforms, two install adjusting part between the connection platform.
2. The bridge pile foundation perfusion conduit extracting tool of claim 1, wherein: the adjusting component comprises two rotating tables, the two rotating tables are respectively connected with the two connecting tables in a rotating mode, one rotating table faces the other rotating table one side is fixedly connected with a screw rod, and the other rotating table is rotatably connected with a threaded sleeve in threaded connection with the screw rod.
3. The bridge pile foundation perfusion conduit disassembly tool of claim 2, wherein: one end of the threaded sleeve, which is far away from the rotating table, is fixedly connected with a plum blossom handle.
4. The bridge pile foundation perfusion conduit disassembly tool of claim 3, wherein: the other end of the threaded sleeve is fixedly connected with a limit stop matched with the rotating table.
5. The bridge pile foundation perfusion conduit extracting tool of claim 4, wherein: two the equal processing of connection platform tip has the thickening lug, two the equal fixedly connected with of thickening lug tip pushes away the handle.
6. The bridge pile foundation perfusion conduit disassembly tool of claim 5, wherein: the surface of the push handle is sleeved with a sponge sleeve.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121883824.XU CN215701273U (en) | 2021-08-12 | 2021-08-12 | Bridge pile foundation filling pipe extracting tool |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121883824.XU CN215701273U (en) | 2021-08-12 | 2021-08-12 | Bridge pile foundation filling pipe extracting tool |
Publications (1)
Publication Number | Publication Date |
---|---|
CN215701273U true CN215701273U (en) | 2022-02-01 |
Family
ID=79995291
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202121883824.XU Active CN215701273U (en) | 2021-08-12 | 2021-08-12 | Bridge pile foundation filling pipe extracting tool |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN215701273U (en) |
-
2021
- 2021-08-12 CN CN202121883824.XU patent/CN215701273U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106760225A (en) | A kind of straight screw sleeve connection device and its application method | |
CN215701273U (en) | Bridge pile foundation filling pipe extracting tool | |
CN211548394U (en) | Quick connecting device for steel bar sleeve | |
CN207223782U (en) | A kind of clamp pliers | |
CN219293808U (en) | Communication pipeline construction centering positioner | |
CN203988239U (en) | A kind of vertebrae reduction forceps of single hand type | |
CN210943405U (en) | Brick lifting device for building | |
CN109203208A (en) | A kind of auxiliary removing device | |
CN214490367U (en) | Portable telescopic jacking nut quick adjusting device | |
CN205526163U (en) | Laborsaving manual double -layered brick device | |
CN204826668U (en) | Switch connects for concrete spreader | |
CN213806576U (en) | Early-dismantling supporting device for wall pouring formwork | |
CN205548890U (en) | Novel nursing cabinet | |
CN205745628U (en) | A kind of valve key | |
CN214560420U (en) | Pipe wrench for maintaining water distribution valve of floor heating pipeline | |
CN216340050U (en) | Sewage pipeline blocks up uses telescopic cleaning device | |
CN210939113U (en) | Tool for uncovering composite cable trench cover plate | |
CN203438125U (en) | Pipe wrench locking device | |
CN208948136U (en) | A kind of building removes brick device | |
CN208845875U (en) | The pipeline template supporting tool blocked for casing | |
CN208527883U (en) | A kind of zinc-plated air hose linking machine of hand-held | |
CN204961525U (en) | Screw with handle | |
CN214804748U (en) | Novel needle holder | |
CN217054402U (en) | Reinforcing bar binding apparatus for construction | |
CN206572121U (en) | Snap joint |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |