CN215673928U - Support structure for drainage pipe of rock engineering - Google Patents

Support structure for drainage pipe of rock engineering Download PDF

Info

Publication number
CN215673928U
CN215673928U CN202122056972.0U CN202122056972U CN215673928U CN 215673928 U CN215673928 U CN 215673928U CN 202122056972 U CN202122056972 U CN 202122056972U CN 215673928 U CN215673928 U CN 215673928U
Authority
CN
China
Prior art keywords
rod
fixing
movable
abutting
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122056972.0U
Other languages
Chinese (zh)
Inventor
张春华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Chemical Mingda Fujian Geological Survey Co Ltd
Original Assignee
China Chemical Mingda Fujian Geological Survey Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Chemical Mingda Fujian Geological Survey Co Ltd filed Critical China Chemical Mingda Fujian Geological Survey Co Ltd
Priority to CN202122056972.0U priority Critical patent/CN215673928U/en
Application granted granted Critical
Publication of CN215673928U publication Critical patent/CN215673928U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The application discloses a support structure of a drainage pipe in a rock engineering, which relates to the field of the rock engineering, improves the problem that the support structure can not adapt to water pipes of different types, it includes first buckle, second buckle and base, first buckle includes a first arc board and sets up two first movable rods on first arc board, the second buckle includes a second arc board and sets up two second movable rods on the second arc board, first buckle and second buckle form the cavity of placing the water pipe, the fixed one side of keeping away from first arc board at the second arc board of base setting, be provided with the dead lever between first movable rod and the second movable rod, the first movable groove that supplies first movable rod to slide is seted up to the dead lever, the second movable groove that supplies the second movable rod to slide is seted up to the dead lever, still be provided with the fixed subassembly of first fixed subassembly and second on the dead lever, still be provided with the butt subassembly of fixing the water pipe on the dead lever. This application can conveniently fix the water pipe of different models.

Description

Support structure for drainage pipe of rock engineering
Technical Field
The application relates to the field of petrous-rider engineering, in particular to a petrous-rider engineering drain pipe supporting structure.
Background
Geotechnical engineering is a new technical system established in civil engineering practice in 60's of the 20 th century in the countries of the Europe and the America. Geotechnical engineering is to solve the problems of rock and soil engineering, including foundation and foundation, slope, underground engineering and the like, and is used as a research object of the geotechnical engineering. The arrangement of the drain pipe plays an important role in geotechnical engineering, and the arrangement of the position and the size of the drain pipe needs layout design.
Chinese patent No. CN206572064U discloses a drain pipe support structure, which comprises a base and a clamp, wherein a hook is arranged between the base and the clamp, and the base and the clamp can be connected together by the hook. An upper seam is arranged on one side of the bottom of the clamp, which is far away from the clamping hook, a lower seam is arranged on one side of the upper portion of the base, which is opposite to the upper seam, and a bolt hole fixed with the outside is arranged on the base.
With respect to the related art in the above, the inventors consider that: when the water pipe is fixed by the supporting structure, the water pipe fixing device cannot adapt to water pipes of different models, and the application range is small.
SUMMERY OF THE UTILITY MODEL
In order to fix the water pipe of different models conveniently, this application provides a rock-soldier engineering drain pipe bearing structure.
The application provides a rock-warrior engineering drain pipe bearing structure adopts following technical scheme:
a support structure for a drainage pipe in a rock engineering comprises a first retaining ring, a second retaining ring and a base, wherein the first retaining ring comprises a first arc plate and two first movable rods arranged on the first arc plate, the second retaining ring comprises a second arc plate and two second movable rods arranged on the second arc plate, the first retaining ring and the second retaining ring form a cavity for placing a water pipe, the base is fixedly arranged on one side of the second arc plate far away from the first arc plate, a fixed rod is arranged between the first movable rod and the second movable rod, the fixed rod is provided with a first movable groove for the first movable rod to slide, the dead lever is provided with a second movable groove for the second movable rod to slide, the dead lever is further provided with a first fixed component for fixing the first movable rod and a second fixed component for fixing the second movable rod, and the dead lever is further provided with a butt joint component for fixing the water pipe.
Through adopting above-mentioned technical scheme, first movable rod sliding connection adjusts at first movable tank, the first movable rod of rethread is fixed to first fixed subassembly, second movable rod sliding connection adjusts at second movable tank, the fixed subassembly of rethread second is fixed the second movable rod, it changes to make the cavity size between first buckle and the second buckle, fix the water pipe through the butt subassembly at last, thereby realize conveniently carrying out the effect of fixing to the water pipe of different models.
Optionally, the first fixing assembly includes a first latch rod, the first latch rod slides on the fixing rod along a direction perpendicular to the extending direction of the first movable rod, and the first movable rod is provided with a plurality of first fixing grooves into which the first latch rod is inserted;
the second fixing component comprises a second bolt rod, the second bolt rod slides on the fixing rod along the direction perpendicular to the extending direction of the second movable rod, and the second movable rod is provided with a plurality of second fixing grooves for the second bolt rod to insert.
Through adopting above-mentioned technical scheme, when first bolt pole inserted first fixed slot, restriction first movable rod realized the fixed effect between first movable rod and the dead lever at the removal in first movable slot. When the second bolt rod is inserted into the second fixing groove, the second movable rod is limited to move in the second movable groove, and the fixing effect between the second movable rod and the fixing rod is achieved.
Optionally, the first fixing assembly further includes a first tension spring, a first abutting disc is disposed on one side of the first plug pin rod, which is far away from the first movable groove, and the first tension spring is disposed between the first abutting disc and the fixing rod and enables the first plug pin rod to move in a direction close to the bottom of the first fixed groove;
the second fixing assembly further comprises a second tension spring, a second abutting disc is arranged on one side, away from the second movable groove, of the second bolt rod, and the second tension spring is arranged between the second abutting disc and the fixing rod and enables the second bolt rod to move in the direction close to the bottom of the second fixing groove.
Through adopting above-mentioned technical scheme, under the effect of first extension spring elasticity, first grafting pole receives the power of moving towards the tank bottom direction of being close to first fixed slot all the time, strengthens first grafting pole's fixed effect. Under the effect of the elastic force of the second tension spring, the second inserting rod always receives the force moving towards the direction close to the bottom of the two fixed grooves, and the fixing effect of the second inserting rod is enhanced.
Optionally, the butt subassembly includes butt board and slide plate, the butt board sets up in the cavity, slide plate along the first movable rod extending direction of perpendicular to on the dead lever, just butt board fixed connection is in one side of slide plate, the butt subassembly still includes the elastic component that the control slide plate was slided towards the direction of being close to water pipe position department.
Through adopting above-mentioned technical scheme, under the effect of elastic component, the butt board removes towards being close to the water pipe direction, until the butt board butt to the water pipe on, realize the fixed effect of butt subassembly to the water pipe.
Optionally, the elastic member is an abutting spring, one end of the abutting spring abuts against the fixing rod, and the other end of the abutting spring abuts against the abutting plate.
Through adopting above-mentioned technical scheme, the butt spring setting is between dead lever and butt plate, and the butt plate receives the elasticity that comes from the dead lever direction all the time, makes the butt plate move until the butt live the water pipe towards the water pipe direction.
Optionally, one side of the first abutting disc, which is far away from the fixing rod, is provided with a linkage strip, the linkage strip is fixedly connected with the first abutting disc, and the linkage strip is fixedly connected with the second abutting disc.
Through adopting above-mentioned technical scheme, the motion state of first bolt pole and second bolt pole can be controlled simultaneously to the accessible linkage strip.
Optionally, be provided with the joint strip on the linkage strip, joint strip extending direction is unanimous with first bolt pole extending direction, set up the shifting chute that supplies the joint strip to slide on the dead lever, set up the joint groove that a plurality of confession joint strip card was gone into on the slide plate.
Through adopting above-mentioned technical scheme, after the joint strip card income joint inslot, the joint strip can restrict the removal that removes the strip, strengthens the stability of butt joint board in the cavity simultaneously.
Optionally, the base is in threaded connection with a plurality of fixing bolts.
By adopting the technical scheme, the base is fixed on the ground or on the wall through the fixing bolt, so that the stability of the base is improved.
In summary, the present application includes at least one of the following benefits:
through adjusting first movable rod and second movable rod, make the cavity size change between first buckle and the second buckle to can place the water pipe of different models, fix the water pipe through the butt subassembly at last, realize conveniently carrying out the effect fixed to the water pipe of different models.
Drawings
FIG. 1 is a schematic structural view of the present embodiment;
FIG. 2 is an exploded view of the present embodiment;
FIG. 3 is an exploded view of the second active slot embodied in the present embodiment;
figure 4 is a schematic structural view of the abutment assembly and the fixing bar of the present embodiment.
Description of reference numerals: 1. a first retaining ring; 2. a second retaining ring; 3. a base; 4. fixing the bolt; 5. fixing the threaded hole; 6. a first arc plate; 7. a first movable bar; 8. a second arc plate; 9. a second movable bar; 10. a cavity; 11. a connecting strip; 12. fixing the rod; 13. a first movable slot; 14. a second movable slot; 15. a first fixed component; 16. a second fixed component; 17. a first latch lever; 18. a first tension spring; 19. a first sliding groove; 20. a first fixing groove; 21. a first abutting pad; 22. a first chamfer; 23. a second latch lever; 24. a second tension spring; 25. a second sliding groove; 26. a second fixing groove; 27. a second abutting joint disc; 29. an abutment assembly; 30. a butt joint plate; 31. a slide plate; 32. a horizontal groove; 33. an elastic member; 34. an abutment spring; 35. a control panel; 36. a water pipe; 37. a ground surface; 38. a linkage bar; 39. a clamping strip; 40. a clamping groove; 41. the slot is moved.
Detailed Description
The present application is described in further detail below with reference to figures 1-4.
The embodiment of the application discloses petrolifer engineering drain pipe bearing structure.
Referring to fig. 1 and 2, the support structure for the drainage pipe of the petroliferous engineering comprises a first retaining ring 1, a second retaining ring 2 and a base 3, wherein the base 3 is fixed on the ground by a fixing bolt 4, and the base 3 is installed on the ground 37 by the fixing bolt 4. The first retaining ring 1 comprises a first arc plate 6 and a first movable rod 7, the first movable rod 7 is provided with two arc plates and integrally formed on the first arc plate 6, the second retaining ring 2 comprises a second arc plate 8 and a second movable rod 9, and the second movable rod 9 is provided with two arc plates and integrally formed on the second arc plate 8.
Referring to fig. 2, the first and second clasps 1 and 2 form a cavity 10 in which a water pipe 36 is placed. The side of the base 3 far away from the ground 37 is extended with a connecting strip 11, and the connecting strip 11 is welded with the second arc plate 8.
Referring to fig. 2 and 3, a fixed rod 12 is installed between the first movable rod 7 and the second movable rod 9, a first movable groove 13 for the first movable rod 7 to slide in the vertical direction is formed in the upper end surface of the fixed rod 12, and a second movable groove 14 for the second movable rod 9 to slide in the vertical direction is formed in the lower end surface of the fixed rod 12.
Referring to fig. 2 and 4, a first fixing component 15 and a second fixing component 16 are further mounted on the fixing rod 12, the first fixing component 15 includes a first latch rod 17 and a first tension spring 18, the first latch rod 17 horizontally slides on the fixing rod 12, a first sliding groove 19 for the first latch rod 17 to slide is formed on the fixing rod 12, a plurality of first fixing grooves 20 for the first latch rod 17 to insert are formed at the upper end of the side wall of the first movable rod 7, when the first latch rod 17 is inserted into the first fixing grooves 20, the fixing effect on the first movable rod 7 is achieved, a first abutting disc 21 is welded on one side of the first latch rod 17 far from the first movable groove 13, one end of the first tension spring 18 abuts against the first abutting disc 21, the other end of the first tension spring 18 abuts against the fixing rod 12, and the first latch rod 17 moves towards the bottom of the first fixing groove 20 under the action of the elastic force of the first tension spring 18, until the first latch lever 17 is inserted into the first fixing groove 20.
Referring to fig. 2 and 4, the second fixing assembly 16 includes a second latch lever 23 and a second tension spring 24, the second latch lever 23 horizontally slides on the fixing lever 12, a second sliding groove 25 for the second bolt rod 23 to slide is arranged on the fixed rod 12, a plurality of second fixing grooves 26 for the second bolt rod 23 to insert are arranged at the upper end of the side wall of the second movable rod 9, when the second latch lever 23 is inserted into the second fixing groove 26, a fixing effect of the second movable lever 9 is achieved, a second abutting disc 27 is welded on one side of the second bolt rod 23 far away from the second movable groove 14, one end of a second tension spring 24 abuts on the second abutting disc 27, the other end of the second tension spring 24 abuts on the fixed rod 12, under the action of the elastic force of the second tension spring 24, the second latch rod 23 always moves toward the bottom of the second fixing groove 26 until the second latch rod 23 is inserted into the second fixing groove 26.
Referring to fig. 2 and 4, a linkage bar 38 is further installed on one side of the fixing rod 12 away from the cavity 10, the linkage bar 38 is welded to the first abutting disc 21 and the second abutting disc 27 at the same time, and the first latch rod 17 and the second latch rod 23 can be controlled at the same time through the linkage bar 38, so that the workload of a user is reduced.
Referring to fig. 2 and 4, an abutting assembly 29 is installed at the middle end position of the fixing rod 12, the abutting assembly 29 includes an abutting plate 30 and a sliding plate 31, the abutting plate 30 is located in the cavity 10, a horizontal groove 32 for the sliding plate 31 to slide in the horizontal direction is formed in the fixing rod 12, one side of the sliding plate 31 in the length direction is welded with the abutting plate 30, an elastic member 33 is further arranged between the abutting plate 30 and the fixing rod 12, the elastic member 33 is an abutting spring 34, one end of the abutting spring 34 abuts against the fixing rod 12, the other end of the abutting spring 34 abuts against the abutting plate 30, and under the action of the abutting spring 34, the abutting plate 30 finally abuts against the water pipe 36. In order to enhance the abutment effect of the abutment plate 30, the abutment plate 30 is provided in an arc shape.
Referring to fig. 2 and 4, in order to prevent the abutting plate 30 from shaking due to external influence, a clamping strip 39 is extended on the linkage strip 38, the length direction of the clamping strip 39 is parallel to the length direction of the first latch rod 17, a moving groove 41 for the clamping strip 39 to slide is formed in the fixed rod 12, and a plurality of clamping grooves 40 for the clamping strip 39 to be clamped in are formed in the sliding plate 31. After the clamping strip 39 is finally clamped into the clamping groove 40 through the moving groove 41, the clamping strip 39 can limit the movement of the sliding plate 31, and the stability of the abutting plate 30 in the cavity 10 is enhanced.
Referring to fig. 2 and 4, when the water pipe 36 needs to be taken out, in order to control the abutting plate 30, a control disc 35 is provided on the side of the sliding plate 31 away from the abutting plate 30.
The implementation principle of the 36 bearing structure of rock and river engineering drain pipe of the embodiment of the application is as follows:
remove first movable rod 7 until first bolt pole 17 with the first fixed slot 20 of appointed back of aiming at, first bolt pole 17 inserts in first fixed slot 20 under the effect of first extension spring 18, remove second movable rod 9 until second bolt pole 23 with the appointed second fixed slot 26 after aiming at, second bolt pole 23 inserts in second fixed slot 26 under the effect of second extension spring 24, under the effect through butt spring 34 elasticity, butt board 30 fixes water pipe 36, joint strip 39 blocks simultaneously in the joint groove 40, slide board 31 at this moment is restricted, the realization is convenient to carry out the effect fixed to the water pipe 36 of different models.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. The utility model provides a rock-warrior engineering drain pipe bearing structure which characterized in that: the water pipe type buckle comprises a first buckle ring (1), a second buckle ring (2) and a base (3), wherein the first buckle ring (1) comprises a first arc plate (6) and two first movable rods (7) arranged on the first arc plate (6), the second buckle ring (2) comprises a second arc plate (8) and two second movable rods (9) arranged on the second arc plate (8), the first buckle ring (1) and the second buckle ring (2) form a cavity (10) for placing a water pipe (36), the base (3) is fixedly arranged on one side, away from the first arc plate (6), of the second arc plate (8), a fixed rod (12) is arranged between the first movable rod (7) and the second movable rod (9), a first movable groove (13) for the first movable rod (7) to slide is formed in the fixed rod (12), and a second movable groove (14) for the second movable rod (9) to slide is formed in the fixed rod (12), the water pipe fixing device is characterized in that a first fixing component (15) for fixing the first movable rod (7) and a second fixing component (16) for fixing the second movable rod (9) are further arranged on the fixing rod (12), and an abutting component (29) for fixing the water pipe (36) is further arranged on the fixing rod (12).
2. The petro-graphic drainage pipe support structure of claim 1, wherein: the first fixing component (15) comprises a first bolt rod (17), the first bolt rod (17) slides on the fixing rod (12) along the direction perpendicular to the extending direction of the first movable rod (7), and the first movable rod (7) is provided with a plurality of first fixing grooves (20) for the first bolt rod (17) to be inserted into;
the second fixing assembly (16) comprises a second bolt rod (23), the second bolt rod (23) slides on the fixing rod (12) along the direction perpendicular to the extending direction of the second movable rod (9), and a plurality of second fixing grooves (26) for the second bolt rod (23) to insert are formed in the second movable rod (9).
3. The petro-graphic drainage pipe support structure of claim 2, wherein: the first fixing assembly (15) further comprises a first tension spring (18), a first abutting disc (21) is arranged on one side, away from the first movable groove (13), of the first bolt rod (17), and the first tension spring (18) is arranged between the first abutting disc (21) and the fixing rod (12) and enables the first bolt rod (17) to move in the direction close to the bottom of the first fixing groove (20);
the second fixing component (16) further comprises a second tension spring (24), a second abutting disc (27) is arranged on one side, away from the second movable groove (14), of the second bolt rod (23), and the second tension spring (24) is arranged between the second abutting disc (27) and the fixing rod (12) and enables the second bolt rod (23) to move in the direction close to the bottom of the second fixing groove (26).
4. The petro-graphic drainage pipe support structure of claim 3, wherein: butt subassembly (29) include butt plate (30) and slide plate (31), butt plate (30) set up in cavity (10), slide plate (31) along the first movable rod of perpendicular to (7) extending direction slide on dead lever (12), just butt plate (30) fixed connection is in one side of slide plate (31), butt subassembly (29) still include control slide plate (31) towards elastic component (33) that is close to water pipe (36) position prescription and slides.
5. The petro-graphic drainage pipe support structure of claim 4, wherein: the elastic piece (33) is an abutting spring (34), one end of the abutting spring (34) abuts against the fixing rod (12), and the other end of the abutting spring (34) abuts against the abutting plate (30).
6. A petroliferous drainage pipe (36) support structure as claimed in claim 4, wherein: one side of the first abutting disc (21) far away from the fixing rod (12) is provided with a linkage strip (38), the linkage strip (38) is fixedly connected with the first abutting disc (21), and the linkage strip (38) is fixedly connected with the second abutting disc (27).
7. A petroliferous drainage pipe (36) support structure as claimed in claim 6, wherein: be provided with joint strip (39) on linkage strip (38), joint strip (39) extending direction is unanimous with first bolt pole (17) extending direction, set up shifting chute (41) that supply joint strip (39) to slide on dead lever (12), set up joint groove (40) that a plurality of confession joint strip (39) were gone into on slide plate (31).
8. The petro-graphic drainage pipe support structure of claim 1, wherein: the base (3) is in threaded connection with a plurality of fixing bolts (4).
CN202122056972.0U 2021-08-30 2021-08-30 Support structure for drainage pipe of rock engineering Active CN215673928U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122056972.0U CN215673928U (en) 2021-08-30 2021-08-30 Support structure for drainage pipe of rock engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122056972.0U CN215673928U (en) 2021-08-30 2021-08-30 Support structure for drainage pipe of rock engineering

Publications (1)

Publication Number Publication Date
CN215673928U true CN215673928U (en) 2022-01-28

Family

ID=79957885

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122056972.0U Active CN215673928U (en) 2021-08-30 2021-08-30 Support structure for drainage pipe of rock engineering

Country Status (1)

Country Link
CN (1) CN215673928U (en)

Similar Documents

Publication Publication Date Title
CN215673928U (en) Support structure for drainage pipe of rock engineering
CN113653066A (en) Foundation pit slope supporting structure
CN218147581U (en) Geocell connecting piece and geocell
CN215948413U (en) Municipal works are with device for municipal drainage construction
CN218027722U (en) Supporting structure of deep foundation pit structure wall
CN217053455U (en) Retaining wall for hydraulic engineering
CN216765907U (en) Slope protection mechanism for deep foundation pit of high-rise building
CN210976020U (en) Municipal pipe network fluting pipe laying structure
CN214783618U (en) Water conservancy flood control baffle
CN214784562U (en) Drainage ditch
CN115095717A (en) Hydraulic pipeline that hydraulic engineering used supports coupling mechanism
CN219862919U (en) Mounting structure for improving stability of garden lamp
CN219343053U (en) River course slope protection structure
CN218346075U (en) Fixed support plate for water conservancy construction
CN211621446U (en) River channel dredging water storage and drainage combined type retaining dam
CN214737883U (en) Gravity pressure water delivery device with automatic adjustment weir well
CN111636369A (en) Retaining structure for river channel
CN211006706U (en) Foundation ditch steel sheet pile supporting construction
CN220184053U (en) Blocking net assembly for rock and soil construction
CN214573792U (en) Fishway structure beneficial to growth of river fish
CN219062833U (en) Pre-buried formula pump package base
CN209114441U (en) New Forestry engineering drainage canal
CN211425595U (en) Civil engineering detects with water level detection support connection structure
CN218116322U (en) Water conservancy slope protection net
JP3241430U (en) A device that improves slope construction efficiency