CN215671105U - Building construction pouring template - Google Patents
Building construction pouring template Download PDFInfo
- Publication number
- CN215671105U CN215671105U CN202120848847.0U CN202120848847U CN215671105U CN 215671105 U CN215671105 U CN 215671105U CN 202120848847 U CN202120848847 U CN 202120848847U CN 215671105 U CN215671105 U CN 215671105U
- Authority
- CN
- China
- Prior art keywords
- plate
- connecting plate
- clamping
- assembling mechanism
- fixing plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000009435 building construction Methods 0.000 title abstract description 11
- 230000007246 mechanism Effects 0.000 claims abstract description 47
- 238000010276 construction Methods 0.000 claims description 9
- 238000005266 casting Methods 0.000 claims description 6
- 230000006978 adaptation Effects 0.000 claims 2
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 abstract description 8
- 239000002023 wood Substances 0.000 abstract description 7
- 229910052742 iron Inorganic materials 0.000 abstract description 4
- 239000004566 building material Substances 0.000 abstract description 2
- 230000007547 defect Effects 0.000 abstract description 2
- 238000009434 installation Methods 0.000 abstract description 2
- 238000009415 formwork Methods 0.000 description 4
- 230000004075 alteration Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Images
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility model discloses a building construction pouring template, and relates to the technical field of building materials. The building construction pouring template comprises a first assembling mechanism, a second assembling mechanism and a third assembling mechanism, wherein the first assembling mechanism, the second assembling mechanism and the third assembling mechanism are mutually clamped, the first assembling mechanism comprises a first fixing plate, a second fixing plate and a third fixing plate, the first fixing plate, the second fixing plate and the third fixing plate are mutually clamped, and the second assembling mechanism comprises a first connecting plate, a second connecting plate and a third connecting plate. The utility model realizes that the wood boards can be quickly assembled when being installed, the first assembling mechanism, the second assembling mechanism and the third assembling mechanism are assembled together, and the clamping bolts are sequentially placed in the cavity between the boards, so that the quick assembling of the wood boards can be completed, and the defects that the existing pouring template needs to consume a large amount of time and wastes iron nails during the installation are overcome.
Description
Technical Field
The utility model relates to the technical field of building materials, in particular to a building construction pouring template.
Background
The concrete structure and the member are formed according to the specified position and geometric dimension, the correct position is kept, the self weight of the building template and the external load acting on the building template are borne, the purpose of template engineering is achieved, the quality and the construction safety of the concrete engineering are guaranteed, the construction progress is accelerated, and the engineering cost is reduced.
At present, when the existing pouring template is installed, a wood board is usually placed at first, then the wood board is fixed by iron nails, so that a large amount of iron nails are consumed, a large amount of time is consumed in the working process, and therefore the existing pouring template for building construction needs to be provided to solve the problems.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a building construction pouring template to solve the problems in the background technology.
In order to achieve the purpose, the utility model provides the following technical scheme: building construction pouring formwork comprises a first assembling mechanism, a second assembling mechanism and a third assembling mechanism, wherein the first assembling mechanism, the second assembling mechanism and the third assembling mechanism are connected in a clamped mode, the first assembling mechanism comprises a first fixing plate, a second fixing plate and a third fixing plate, the first fixing plate, the second fixing plate and the third fixing plate are connected in a clamped mode, the second assembling mechanism comprises a first connecting plate, a second connecting plate and a third connecting plate, the first connecting plate, the second connecting plate and the third connecting plate are connected in a clamped mode, the third assembling mechanism comprises a first clamping plate, a second clamping plate and a third clamping plate, and the first clamping plate, the second clamping plate and the third clamping plate are connected in a clamped mode.
Preferably, first clamping grooves are formed in the tops of the back surfaces of the first fixing plate, the second fixing plate, the first connecting plate, the second connecting plate, the first clamping plate and the second clamping plate, and the first clamping grooves are multiple.
Preferably, the outer walls of the tops of the first fixing plate, the second fixing plate and the third fixing plate and the outer walls of the tops of the first connecting plate, the second connecting plate and the third connecting plate are provided with second clamping grooves.
Preferably, the outer walls of the other sides of the first connecting plate, the second connecting plate and the third connecting plate and the outer walls of one side of the first clamping plate, the second clamping plate and the third clamping plate are fixedly connected with second clamping blocks, and the second clamping blocks are multiple.
Preferably, the outer walls of the front surfaces of the second fixing plate, the third fixing plate, the second connecting plate, the third connecting plate, the second clamping plate and the third clamping plate are fixedly connected with first clamping blocks, and the first clamping blocks are multiple.
Preferably, the first clamping block is matched with the first clamping groove, the second clamping block is matched with the second clamping groove, cavities are formed in the outer walls of the first clamping groove, the outer walls of the second clamping groove, the outer walls of the first clamping block and the second clamping block, the inner wall of each cavity is sleeved with the corresponding clamping bolt, and the cavities and the corresponding clamping bolts are multiple.
Compared with the prior art, the utility model has the beneficial effects that:
the building construction pouring template has the advantages that when the wood boards are installed, the wood boards can be quickly assembled, the first assembling mechanism, the second assembling mechanism and the third assembling mechanism are assembled together, and then the clamping bolts are sequentially placed in the cavity between the boards, so that the wood boards can be quickly assembled, and the defects that a large amount of time is consumed and iron nails are wasted when the existing pouring template is installed are overcome.
Drawings
FIG. 1 is a front view of a construction casting form of the present invention;
FIG. 2 is a schematic view of the structure of FIG. 1;
FIG. 3 is an enlarged, disassembled view of the first assembly mechanism of FIG. 1;
FIG. 4 is an enlarged, disassembled view of the second assembly mechanism of FIG. 1;
FIG. 5 is an enlarged, disassembled view of the third assembly mechanism of FIG. 1;
FIG. 6 is an enlarged view of the latch.
In the figure: 1. a first assembling mechanism; 2. a second assembling mechanism; 3. a third assembling mechanism; 4. a first fixing plate; 5. a second fixing plate; 6. a third fixing plate; 7. a cavity; 8. fastening a bolt; 9. a first connecting plate; 10. a second connecting plate; 11. a first clamping connection plate; 12. a second clamping plate; 13. a third clamping plate; 14. a third connecting plate; 15. a first card slot; 16. a second card slot; 17. a first clamping block; 18. and a second clamping block.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
It should be noted that in the description of the present invention, the terms "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, which are only for convenience of description and simplification of description, and do not indicate or imply that the referred device or element must have a specific orientation, be configured in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention.
Further, it will be appreciated that the dimensions of the various elements shown in the figures are not drawn to scale, for ease of description, and that the thickness or width of some layers may be exaggerated relative to other layers, for example.
It should be noted that like reference numerals and letters refer to like items in the following figures, and thus, once an item is defined or illustrated in one figure, it will not need to be further discussed or illustrated in detail in the description of the following figure.
As shown in fig. 1 to 6, the present invention provides a technical solution: building construction pouring formwork comprises a first assembling mechanism 1, a second assembling mechanism 2 and a third assembling mechanism 3, wherein the first assembling mechanism 1, the second assembling mechanism 2 and the third assembling mechanism 3 are clamped mutually, the first assembling mechanism 1 comprises a first fixing plate 4, a second fixing plate 5 and a third fixing plate 6, the first fixing plate 4, the second fixing plate 5 and the third fixing plate 6 are clamped mutually, the second assembling mechanism 2 comprises a first connecting plate 9, a second connecting plate 10 and a third connecting plate 14, the first connecting plate 9, the second connecting plate 10 and the third connecting plate 14 are clamped mutually, the third assembling mechanism 3 comprises a first clamping plate 11, a second clamping plate 12 and a third clamping plate 13, and the first clamping plate 11, the second clamping plate 12 and the third clamping plate 13 are clamped mutually.
As shown in fig. 3-5, the first fixing plate 4, the second fixing plate 5, the first connecting plate 9, the second connecting plate 10, the first engaging plate 11 and the second engaging plate 12 are all provided with a plurality of first engaging slots 15 at the top of the back surface thereof, and the number of the first engaging slots 15 is plural.
As shown in fig. 3-4, the outer walls of the top portions of the first fixing plate 4, the second fixing plate 5 and the third fixing plate 6 and the outer walls of the top portions of the first connecting plate 9, the second connecting plate 10 and the third connecting plate 14 are provided with second locking grooves 16.
As shown in fig. 3-5, a plurality of second latches 18 are fixedly connected to the outer walls of the other sides of the first connecting plate 9, the second connecting plate 10 and the third connecting plate 14 and the outer walls of one sides of the first latch plate 11, the second latch plate 12 and the third latch plate 13, respectively.
As shown in fig. 3 to 5, the first engaging blocks 17 are fixedly connected to the outer walls of the front surfaces of the second fixing plate 5, the third fixing plate 6, the second connecting plate 10, the third connecting plate 14, the second engaging plate 12 and the third engaging plate 13, and the first engaging blocks 17 are plural.
As shown in fig. 2, the first clamping block 17 is adapted to the first clamping groove 15, the second clamping block 18 is adapted to the second clamping groove 16, the outer walls of the first clamping groove 15, the second clamping groove 16, the first clamping block 17 and the second clamping block 18 are all provided with a cavity 7, the inner wall of the cavity 7 is sleeved with a clamping bolt 8, and the cavity 7 and the clamping bolt 8 are both provided with a plurality of cavities.
The working principle is as follows: when the pouring formwork for building construction is assembled, a first fixing plate 4 needs to be placed on the ground firstly, then the second fixing plate 5 is taken out, a first clamping block 17 on the second fixing plate 5 is aligned with a first clamping groove 15 on the first fixing plate 4 and pushed in, then the third fixing plate 6 is taken out, a first clamping block 17 on the third fixing plate 6 is aligned with a first clamping groove 15 on the first fixing plate 4 and pushed in, at the moment, the first connecting plate 9 is taken out, a second clamping block 18 on one side of the first connecting plate 9 is aligned with a second clamping groove 16 on the outer wall on one side of the top of the first fixing plate 4 and pushed in, and the second connecting plate 10, the third connecting plate 14, the first clamping plate 11 and the third clamping plate 13 are sequentially assembled according to the same operation mode, after the assembling is completed, a clamping bolt 8 is sequentially placed in a cavity 7, the installation of the pouring formwork can be completed, and attention needs to be paid that, after the second fixing plate 5 is installed, the first clamping block 17 is aligned with the first clamping groove 15, the second clamping groove 15 is aligned with the first clamping plate, and the second clamping plate 6 is pushed in the second clamping groove 16, and then the second clamping plate is pushed in the first clamping plate, and then the second clamping plate is pushed in the second clamping plate is installed, and then the second clamping plate is installed, and then the second clamping plate is installed, and the first clamping plate is installed, and then the second clamping plate is installed, and the second clamping plate is installed, When the second connecting plate 10 and the second clamping plate 12 are used, the second fixing plate 5, the second connecting plate 10 and the second clamping plate 12 need to be added according to actual required lengths.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. Template is pour in construction, including first montage mechanism (1), second montage mechanism (2) and third montage mechanism (3), its characterized in that: the first assembling mechanism (1), the second assembling mechanism (2) and the third assembling mechanism (3) are clamped and connected, the first assembling mechanism (1) comprises a first fixing plate (4), a second fixing plate (5) and a third fixing plate (6), the first fixing plate (4), the second fixing plate (5) and the third fixing plate (6) are clamped, the second assembling mechanism (2) comprises a first connecting plate (9), a second connecting plate (10) and a third connecting plate (14), the first connecting plate (9), the second connecting plate (10) and the third connecting plate (14) are clamped, the third assembling mechanism (3) comprises a first clamping and connecting plate (11), a second clamping and connecting plate (12) and a third clamping and connecting plate (13), the first clamping connection plate (11), the second clamping connection plate (12) and the third clamping connection plate (13) are clamped mutually.
2. The construction casting template according to claim 1, wherein: first draw-in groove (15) have all been seted up at first fixed plate (4), second fixed plate (5), first connecting plate (9), second connecting plate (10), first joint board (11) and second joint board (12) back top, first draw-in groove (15) have a plurality ofly.
3. The construction casting template according to claim 1, wherein: and the outer walls of the tops of one sides of the first fixing plate (4), the second fixing plate (5) and the third fixing plate (6) and the outer walls of one sides of the tops of the first connecting plate (9), the second connecting plate (10) and the third connecting plate (14) are respectively provided with a second clamping groove (16).
4. The construction casting template according to claim 1, wherein: first connecting plate (9), second connecting plate (10) and third connecting plate (14) opposite side outer wall and first joint board (11), second joint board (12) and third joint board (13) one side outer wall equal fixedly connected with second fixture block (18), second fixture block (18) have a plurality ofly.
5. The construction casting template according to claim 1, wherein: the clamping device is characterized in that a first clamping block (17) is fixedly connected to the outer wall of the front face of the second fixing plate (5), the third fixing plate (6), the second connecting plate (10), the third connecting plate (14), the second clamping plate (12) and the third clamping plate (13), and the first clamping block (17) is multiple.
6. The construction casting template according to claim 1, wherein: first fixture block (17) and first draw-in groove (15) looks adaptation, second fixture block (18) and second draw-in groove (16) looks adaptation, cavity (7) have all been seted up to first draw-in groove (15), second draw-in groove (16), first fixture block (17) and second fixture block (18) outer wall, cavity (7) inner wall has cup jointed clip (8), cavity (7) all have a plurality ofly with clip (8).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120848847.0U CN215671105U (en) | 2021-04-23 | 2021-04-23 | Building construction pouring template |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120848847.0U CN215671105U (en) | 2021-04-23 | 2021-04-23 | Building construction pouring template |
Publications (1)
Publication Number | Publication Date |
---|---|
CN215671105U true CN215671105U (en) | 2022-01-28 |
Family
ID=79971051
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202120848847.0U Expired - Fee Related CN215671105U (en) | 2021-04-23 | 2021-04-23 | Building construction pouring template |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN215671105U (en) |
-
2021
- 2021-04-23 CN CN202120848847.0U patent/CN215671105U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN215671105U (en) | Building construction pouring template | |
CN212453627U (en) | Corner reinforcement for construction of column formwork | |
CN212773477U (en) | Stair aluminum alloy template | |
CN211114233U (en) | Vertical connection structure of assembled shear force wall | |
CN212053318U (en) | Assembled building wall | |
CN111809868A (en) | Corner reinforcement for constructing column formwork and formwork reinforcement method | |
CN216041945U (en) | Detachable design mounting structure of assembled composite light wallboard | |
CN214220236U (en) | Assembled wallboard with smooth outer surface for delicate construction | |
CN216142272U (en) | Ultra-high performance concrete assembled composite light wallboard | |
CN212772968U (en) | High-efficient assembly building structure | |
CN113482201A (en) | Detachable design mounting structure of assembled composite light wallboard | |
CN210976598U (en) | External corner template for building | |
CN211229115U (en) | Lock catch piece for building truss | |
CN113152878A (en) | Aluminum frame plastic formwork for building | |
CN215926741U (en) | Internal corner and corner connecting structure | |
CN112267594A (en) | Connecting structure of prefabricated shear wall and assembled inner wall plate | |
CN220725454U (en) | Constructional engineering assembled building steel structure | |
CN213868427U (en) | Concatenation formula PC component building wall | |
CN214090950U (en) | A building templates for building engineering's composite erection of being convenient for | |
CN221321386U (en) | Decoration wall body component of assembled form of exempting from to unpick | |
CN216810971U (en) | Combined column hoop locking block | |
CN217949869U (en) | Combined house structure | |
CN220080755U (en) | Die carrier, template and pouring system | |
CN218508727U (en) | Energy-efficient type building structure wall | |
CN221321387U (en) | Assembled form wall body component of exempting from to unpick |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20220128 |