CN215670382U - Suspension type stone material curtain mounting structure - Google Patents

Suspension type stone material curtain mounting structure Download PDF

Info

Publication number
CN215670382U
CN215670382U CN202121981981.4U CN202121981981U CN215670382U CN 215670382 U CN215670382 U CN 215670382U CN 202121981981 U CN202121981981 U CN 202121981981U CN 215670382 U CN215670382 U CN 215670382U
Authority
CN
China
Prior art keywords
horizontal plate
hole
adjusting
gear
cross beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121981981.4U
Other languages
Chinese (zh)
Inventor
刘文斌
胡克
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Champs Elysees Curtain Wall Decoration Engineering Co ltd
Original Assignee
Hubei Champs Elysees Curtain Wall Decoration Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Champs Elysees Curtain Wall Decoration Engineering Co ltd filed Critical Hubei Champs Elysees Curtain Wall Decoration Engineering Co ltd
Priority to CN202121981981.4U priority Critical patent/CN215670382U/en
Application granted granted Critical
Publication of CN215670382U publication Critical patent/CN215670382U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

The utility model relates to a suspension type stone material curtain mounting structure, relate to the field of curtain installation technique, it includes the crossbeam, the connecting piece, first bolt and suspension subassembly, the connecting piece includes horizontal plate and vertical board, first regulation rectangular hole has been seted up along the horizontal direction on the horizontal plate, first bolt runs through first regulation rectangular hole and with crossbeam and horizontal plate fixed connection, suspension subassembly sets up between vertical board and stone material panel, suspension subassembly is used for being fixed in the stone material panel on vertical board, adjusting hole has been seted up on the horizontal plate, mounting hole has been seted up on the crossbeam, wear to be equipped with the regulation pole between adjusting hole and mounting hole, the rigid coupling has the gear on the regulation pole, it is equipped with the stopper to adjust the pole lower extreme, the rack has set firmly on the horizontal plate, rack and gear mesh, the length of rack is laid the length that the direction is on a parallel with adjusting hole and is laid the direction. This application has through the accurate removal of going on the horizontal plate, reaches the effect that improves surface parallel and level degree between a plurality of stone material panels.

Description

Suspension type stone material curtain mounting structure
Technical Field
The application relates to the field of curtain wall installation technology, in particular to a suspension type stone curtain wall installation structure.
Background
The stone curtain wall is a wall body with decorative effect commonly used in modern buildings, has higher freezing resistance and compressive strength, is generally composed of a stone panel and a supporting structure, can have a certain micromotion capability in a plane relative to a main body structure, and is a building maintenance structure which does not bear the load and the effect of the main body structure.
A chinese patent with application number CN201921328477.7 discloses a mounting structure of a back-bolt stone curtain wall, which comprises a beam, a connecting piece, a suspension component and a stone panel; the beam is provided with a lock hole; the connecting piece includes horizontal plate and vertical board, sets up first regulation rectangular hole along the X axle direction on the horizontal plate, passes first bolt, first bolt fixed cross beam and horizontal plate in lockhole and the first regulation rectangular hole. A second adjusting strip hole is formed in the vertical plate along the Z-axis direction; the suspension assembly comprises a supporting plate, a pressing plate and a hanging piece, wherein a first connecting hole and a first rack are formed in the supporting plate, a second connecting hole and a second rack are formed in the pressing plate, a second bolt penetrates through the second connecting hole, the first connecting hole and a second adjusting long-strip hole, and the second rack is meshed with the first rack; the pendant sets up on the layer board, and pendant upper portion sets up adjusting screw, and adjusting screw supports and leans on the layer board, rotates adjusting screw and pushes away the layer board and adjust the Y axle direction distance between pendant and the layer board, and the stone material panel sets up on the pendant.
With respect to the related art among the above, the inventors consider that the following drawbacks exist: after one stone panel is installed, in order to enable the outer surface of the stone panel to be flush with the outer surfaces of the other stone panels, fine adjustment needs to be carried out on the installation position of the stone panel in the horizontal direction, and at the moment, a first bolt needs to be loosened manually and a horizontal plate needs to be pushed along the length arrangement direction of a first adjusting strip hole; during the operation, because the staff is difficult to control the size of thrust when promoting the horizontal plate, make the shift position of vertical board difficult to carry out accurate control to the horizontal direction adjustment accuracy that makes the stone material panel is not high, leads to the parallel and level degree of surface not high between a plurality of stone material panels.
SUMMERY OF THE UTILITY MODEL
In order to realize the accurate removal to the horizontal plate to improve the parallel and level degree of surface between a plurality of stone material panels, this application provides a suspension type stone material curtain mounting structure.
The application provides a pair of suspension type stone material curtain mounting structure adopts following technical scheme:
a suspension type stone curtain wall mounting structure comprises a cross beam, a connecting piece, a first bolt and a suspension assembly, wherein the connecting piece comprises a horizontal plate and a vertical plate, a first adjusting strip hole is formed in the horizontal plate along the horizontal direction, the first bolt penetrates through the first adjusting strip hole and is used for fixedly connecting the cross beam and the horizontal plate, the suspension assembly is arranged between the vertical plate and a stone panel, and the suspension assembly is used for fixing the stone panel on the vertical plate;
the adjusting device is characterized in that an adjusting through hole is formed in the horizontal plate, the adjusting through hole and the first adjusting strip hole are arranged at intervals in parallel, an installing through hole is formed in the cross beam, an adjusting rod vertically penetrates through the adjusting through hole and the installing through hole, a gear is fixedly connected to the adjusting rod coaxially, the lower surface of the gear is attached to the upper surface of the horizontal plate, a limiting block is arranged at the lower end of the adjusting rod, the upper surface of the limiting block is attached to the lower surface of the cross beam, a rack is fixedly arranged on the horizontal plate, the length arranging direction of the rack (7) is parallel to the length arranging direction of the adjusting through hole (212), and the rack (7) is meshed with the gear (61).
By adopting the technical scheme, when the mounting position of the stone panel in the horizontal direction needs to be finely adjusted, a worker loosens the first bolt and rotates the adjusting rod, at the moment, the adjusting rod rotates in the mounting through hole and drives the gear to rotate, and the gear drives the rack to directionally move, so that the horizontal plate is driven to directionally slide along the length arrangement direction of the adjusting through hole; at the moment, the first bolt is matched with the first adjusting elongated hole, so that the horizontal plate can directionally slide relative to the first bolt along the length distribution direction of the first adjusting elongated hole, and the effect of guiding the sliding of the horizontal plate is achieved; the moving direction and the sliding length of the rack are controlled through the rotation of the gear, and then the sliding direction and the sliding length of the horizontal plate are controlled, so that the horizontal plate is accurately moved, and the effect of improving the outer surface parallel degree among the stone panels is achieved.
Optionally, an installation groove is formed in the upper surface of the horizontal plate, a spring is fixedly connected to the inner side wall of the installation groove far away from the gear in a horizontal mode, a clamping block is fixedly connected to one end, close to the gear, of the spring, the upper end of the clamping block protrudes out of the upper surface of the horizontal plate, and one end, far away from the spring, of the clamping block is movably inserted into the gear tooth groove.
By adopting the technical scheme, when the adjusting rod is used, the spring is compressed to enable the clamping block to be separated from the tooth grooves on the gear, and the rotation of the adjusting rod can be realized; when the horizontal plate moves to the preset position, the joint block is popped up through the restoring force of the spring, and one end, far away from the spring, of the joint block is inserted into a gear tooth groove, so that the gear is difficult to rotate, and the installation of the horizontal plate is more stable.
Optionally, the mounting groove is perpendicular to two opposite inner side walls in the width direction of the horizontal plate, two stop blocks are respectively arranged on the two opposite inner side walls, a gap for the clamping block to pass in and out is reserved between the two stop blocks, and elastic protrusions are arranged on one side, close to the two stop blocks, of the clamping block.
By adopting the technical scheme, when the gear needs to be rotated, a worker pushes the clamping block to separate the clamping block from the gear, the elastic bulge is extruded by the stop blocks at the two sides to deform and passes through a gap between the two stop blocks, and the spring is in a compressed state at the moment, so that the elastic bulge is abutted against one side of the stop block far away from the gear, the clamping block is separated from one side of the stop block far away from the gear, and the gear is convenient to rotate; when the rotation of needs restriction gear, the staff promotes the joint piece and makes elastic bulge take place deformation and pass through the clearance between two dogs through both sides dog extrusion, and the one end that the spring was kept away from to the joint piece this moment is pegged graft in the tooth's socket of gear, and two dogs form the shelves to two elastic bulge this moment, make the spring be difficult for being compressed to it is more firm to make the joint piece fix the gear.
Optionally, the upper end of the adjusting rod is fixedly provided with a twisting block, and the twisting block is provided with an anti-falling bulge.
Through adopting above-mentioned technical scheme, twist the piece through the setting and make things convenient for the staff to carry out the rotation of adjusting the pole, increase the staff through setting up the anticreep arch and rotate the area of contact when twisting the piece, make to rotate and twist difficult emergence when piece and rotate the pine smooth.
Optionally, a supporting piece is arranged on the horizontal plate, and the horizontal plate is supported on the cross beam through the supporting piece.
Through adopting above-mentioned technical scheme, because the focus of the horizontal plate of installing the stone material panel is located the one side of keeping away from the crossbeam, when the staff not hard up first bolt, through supporting piece with the horizontal plate bearing on the crossbeam, make the horizontal plate be difficult for taking place to turn over from the crossbeam because of the focus of skew to turn over, guarantee going on smoothly of staff's adjustment horizontal direction position, and guarantee construction safety.
Optionally, the supporting piece comprises a connecting portion and a supporting portion, the connecting portion is vertically arranged and fixedly connected to one side, away from the vertical plate, of the horizontal plate, the supporting portion is horizontally and fixedly connected to the lower end of the connecting portion, and the upper surface of the supporting portion is attached to the lower surface of the cross beam.
Through adopting above-mentioned technical scheme, connecting portion and supporting part make the horizontal plate laminate in the upper surface of crossbeam to after not hard up first bolt, the horizontal plate is difficult to take place to turn over along horizontal plate and vertical board junction and turns over, guarantees construction safety, and guarantees going on smoothly of adjustment horizontal plate horizontal direction position.
Optionally, the bearing piece includes connecting rod and bearing piece, follow on the crossbeam the length of adjusting the through-hole is laid the direction and has been seted up spacing through-hole, the connecting rod rigid coupling in the lower surface of horizontal plate, the connecting rod is vertical to be run through spacing through-hole, the bearing piece is located the lower extreme of connecting rod, the upper surface of bearing piece with the lower surface of crossbeam is laminated mutually.
By adopting the technical scheme, the horizontal plate is attached to the upper surface of the cross beam through the bearing block and the connecting rod, so that after a worker loosens the first bolt, the horizontal plate is not easy to turn over along the joint of the horizontal plate and the vertical plate, and the construction safety is ensured; when the staff operated to twist the piece and carry out the sliding of horizontal plate, the horizontal plate drove the connecting rod and lay the direction along the length of spacing through-hole and slide, and the connecting rod plays the direction and improves the effect of horizontal plate stability of sliding this moment.
Optionally, scales are arranged on the rack.
Through adopting above-mentioned technical scheme, the staff can audio-visually learn the length of sliding of horizontal plate through reading the scale, makes the removal of horizontal plate more accurate.
In summary, the present application includes at least one of the following beneficial technical effects:
1. the rack is driven to directionally move by controlling the gear to rotate along the axis, so that the sliding direction and the sliding length of the horizontal plate are controlled, the movement of the horizontal plate is accurately controlled, and the effect of improving the levelness of the outer surfaces among the stone panels is achieved;
2. when the horizontal plate moves to a preset position, the clamping block is popped up through the restoring force of the spring, and one end, far away from the spring, of the clamping block is inserted into the gear tooth groove, so that the gear is difficult to rotate, and the horizontal plate is more stably installed;
3. through the supporting piece with the horizontal plate bearing on the crossbeam, make not hard up first bolt after, the horizontal plate is difficult to turn over along taking place because of the focus of skew, can enough guarantee going on smoothly that the staff adjusted the horizontal direction position of horizontal plate, also guarantees construction safety.
Drawings
FIG. 1 is a schematic overall structure diagram of a first embodiment of the present application;
FIG. 2 is an enlarged partial schematic view of portion A of FIG. 1;
FIG. 3 is a top view of the first embodiment of the present application;
FIG. 4 is a schematic view of a connection structure of a cross beam, a connecting member and an adjusting rod according to an embodiment of the present disclosure;
fig. 5 is a schematic structural diagram of a second embodiment of the present application.
Reference numerals: 1. a cross beam; 11. mounting a through hole; 12. a limiting through hole; 2. a connecting member; 21. a horizontal plate; 211. a first adjustment elongated hole; 212. adjusting the through hole; 213. mounting grooves; 214. a stopper; 215. a gap; 22. a vertical plate; 3. a first bolt; 4. a suspension assembly; 5. a stone panel; 6. adjusting a rod; 61. a gear; 62. a limiting block; 63. screwing the block; 631. the anti-drop bulge; 7. a rack; 71. calibration; 8. a spring; 9. a clamping block; 91. an elastic bulge; 10. a support member; 101. a connecting portion; 102. a bearing part; 103. a connecting rod; 104. a bearing block; 105. the gap is adjusted.
Detailed Description
The present application is described in further detail below with reference to figures 1-5.
The embodiment of the application discloses suspension type stone material curtain mounting structure.
Example 1
Referring to fig. 1, a suspension type stone curtain wall mounting structure comprises a beam 1, a connecting piece 2, a first bolt 3 and a suspension assembly 4, wherein the beam 1 is an angle steel horizontally fixed on the outer side of a wall body, two keels are fixedly connected to the wall body at vertical intervals, two sides of the beam 1 in the length arrangement direction are respectively welded on one side, which is close to the two keels, of the horizontal part of the beam 1, a through hole is formed in the horizontal part of the beam 1, the connecting piece 2 comprises a horizontal plate 21 and a vertical plate 22, the horizontal plate 21 is horizontally arranged on the horizontal part of the beam 1, a first adjusting strip hole 211 in the width arrangement direction of the horizontal plate 21 is formed in the horizontal plate 21, the first bolt 3 penetrates through the first adjusting strip hole 211 and the through hole, a nut is assembled on the lower end thread of the first bolt 3, the first bolt 3 is matched with the nut to fix the beam 1 and the horizontal plate 21, the vertical plate 22 is vertically fixed on one side, which is close to a stone panel 5, the suspension elements 4 are arranged between the vertical plates 22 and the stone panels 5, and the suspension elements 4 are used for fixing the stone panels 5 on the vertical plates 22.
Referring to fig. 2 and 3, an adjusting through hole 212 is formed in a horizontal plate 21, the adjusting through hole 212 and a first adjusting strip hole 211 are arranged in parallel at intervals, a mounting through hole 11 is formed in a cross beam 1, an adjusting rod 6 vertically penetrates between the adjusting through hole 212 and the mounting through hole 11, the adjusting rod 6 is made of stainless steel, a gear 61 is coaxially welded on the adjusting rod 6, the lower surface of the gear 61 is attached to the upper surface of the horizontal plate 21, a screwing block 63 is fixedly connected to the upper end of the adjusting rod 6, eight anti-falling protrusions 631 are fixedly connected to the peripheral side wall of the screwing block 63 at intervals, the adjusting rod 6, the screwing block 63 and the eight anti-falling protrusions 631 are integrally formed, a limiting block 62 is welded to the lower end of the adjusting rod 6, the limiting block 62 is made of stainless steel, and the upper surface of the limiting block 62 is attached to the lower surface of the cross beam 1; the horizontal plate 21 is fixedly connected with a rack 7, the rack 7 is positioned on one side of the gear 61 far away from the first bolt 3, the length arrangement direction of the rack 7 is flush with the length arrangement direction of the adjusting through hole 212, the rack 7 is meshed with the gear 61, and the upper surface of the rack 7 is provided with scales 71.
The staff twists the piece 63 through rotating and makes gear 61 rotate, and gear 61 drives horizontal plate 21 through rack 7 and carries out accurate directional removal to realize the accurate control of staff to horizontal plate 21 shift position, and then reach the effect that improves surface parallel and level degree between a plurality of stone material panels 5.
Referring to fig. 2 and 3, an installation groove 213 has been seted up on one side of gear 61 on horizontal plate 21, install dog 214 on two relative inside walls of installation groove 213 perpendicular to horizontal plate 21 width direction, dog 214 and horizontal plate 21 integrated into one piece, leave the clearance 215 that supplies joint piece 9 business turn over between two dogs 214, horizontal welding has spring 8 on the inside wall that gear 61 was kept away from to installation groove 213, spring 8 has joint piece 9 near the one end welding of gear 61, joint piece 9 is located between the clearance 215 of two dogs 214, joint piece 9 all bonds elastic bulge 91 in one side that is close to two dogs 214, elastic bulge 91 is made by the rubber material, two elastic bulge 91 protrude the clearance 215 between two dogs 214, the upper surface of the outstanding horizontal plate 21 of upper end of joint piece 9, the one end that joint piece 9 kept away from spring 8 is dentate.
The worker pushes the clamping block 9 towards the side far away from the gear 61 to enable the elastic protrusion 91 to pass through the gap 215 between the two stoppers 214, and the spring 8 in the compressed state enables the elastic protrusion 91 to abut against the side, far away from the gear 61, of the stopper 214, so that the clamping block 9 is separated from the side, far away from the gear 61, of the stopper 214, and the gear 61 can conveniently rotate; when the staff promoted joint piece 9 towards the one side that is close to gear 61, elastic bulge 91 passed through clearance 215 between two dogs 214, and the one end that spring 8 was kept away from to joint piece 9 this moment is pegged graft in the tooth's socket of gear 61, and two dogs 214 form to two elastic bulge 91 and separate the shelves, make spring 8 be difficult for by the compression to it is more firm to make joint piece 9 fixed gear 61.
Referring to fig. 4, a supporting member 10 is arranged on the horizontal plate 21, the supporting member 10 includes a connecting portion 101 and a supporting portion 102, the connecting portion 101 is vertically arranged, the upper end of the connecting portion 101 is fixed on one side of the horizontal plate 21 away from the vertical plate 22, the supporting portion 102 is horizontally fixed at the lower end of the connecting portion 101 and located on one side close to the cross beam 1, an adjusting gap 105 is formed between the connecting portion 101 and the cross beam 1, the upper surface of the supporting portion 102 is attached to the lower surface of the cross beam 1, the supporting portion 102, the connecting portion 101 and the horizontal plate 21 are integrally formed, the horizontal plate 21 is attached to the upper surface of the cross beam 1 through the supporting portion 102 and the connecting portion 101, so that the horizontal plate 21 and the stone panel 5 are pre-supported on the cross beam 1, and therefore it is convenient for a worker to smoothly adjust the horizontal position of the horizontal plate 21.
The implementation principle of the embodiment 1 is as follows: when the mounted position to 5 horizontal directions of stone material panel is fine-tuning as required, the staff not hard up first bolt 3 and rotate and adjust pole 6, adjust pole 6 this moment and rotate in mounting hole 11 and drive gear 61 and rotate, drive rack 7 along axle center pivoted gear 61 and carry out directional movement, rack 7 drives horizontal plate 21 and lays the direction along the length of adjusting through hole 212 and carry out directional sliding, thereby realize the accurate removal of horizontal plate 21, reach the effect that improves surface parallel and level degree between a plurality of stone material panels 5.
Example 2
Referring to fig. 5, the difference between this embodiment and embodiment 1 is that the supporting member 10 includes a connecting rod 103 and a supporting block 104, a limiting through hole 12 is formed in the beam 1 along the length distribution direction of the adjusting through hole 212, the limiting through hole 12 is located between the adjusting through hole 212 and the first adjusting strip hole 211, the connecting rod 103 is located on one side of the horizontal plate 21 away from the vertical plate 22, the connecting rod 103 is welded to the lower surface of the horizontal plate 21, the connecting rod 103 vertically penetrates through the limiting through hole 12, the supporting block 104 is welded to the lower end of the connecting rod 103, and the upper surface of the supporting block 104 is attached to the lower surface of the beam 1; the supporting block 104 and the connecting rod 103 enable the horizontal plate 21 to be attached to the upper surface of the cross beam 1, so that after the worker loosens the first bolt 3, the horizontal plate 21 is not prone to being turned over along the joint of the horizontal plate 21 and the vertical plate 22, and smooth adjustment of the horizontal direction position of the horizontal plate 21 by the worker is guaranteed.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. A suspension type stone curtain wall mounting structure comprises a cross beam (1), a connecting piece (2), a first bolt (3) and a suspension assembly (4), wherein the connecting piece (2) comprises a horizontal plate (21) and a vertical plate (22), a through hole is formed in the cross beam (1), a first adjusting strip hole (211) is formed in the horizontal plate (21) along the horizontal direction, the first bolt (3) penetrates through the through hole and the first adjusting strip hole (211), the first bolt (3) is used for fixedly connecting the cross beam (1) and the horizontal plate (21), the suspension assembly (4) is arranged between the vertical plate (22) and a stone panel (5), and the suspension assembly (4) is used for fixing the stone panel (5) on the vertical plate (22);
the method is characterized in that: the horizontal plate (21) is provided with adjusting through holes (212), the adjusting through holes (212) and the first adjusting strip holes (211) are arranged in parallel at intervals, the cross beam (1) is provided with a mounting through hole (11), an adjusting rod (6) vertically penetrates between the adjusting through hole (212) and the mounting through hole (11), a gear (61) is coaxially and fixedly connected on the adjusting rod (6), the lower surface of the gear (61) is attached to the upper surface of the horizontal plate (21), the lower end of the adjusting rod (6) is provided with a limiting block (62), the upper surface of the limiting block (62) is attached to the lower surface of the cross beam (1), a rack (7) is fixedly arranged on the horizontal plate (21), the length arrangement direction of the rack (7) is parallel to the length arrangement direction of the adjusting through hole (212), and the rack (7) is meshed with the gear (61).
2. A suspended stone curtain wall mounting structure as claimed in claim 1, wherein: mounting groove (213) have been seted up to the upper surface of horizontal plate (21), mounting groove (213) are kept away from horizontal rigid coupling has spring (8) on the inside wall of gear (61), spring (8) are close to the one end rigid coupling of gear (61) has joint piece (9), the upper end of joint piece (9) is outstanding the upper surface of horizontal plate (21), joint piece (9) are kept away from the one end activity of spring (8) peg graft in the tooth's socket of gear (61).
3. A suspended stone curtain wall mounting structure as claimed in claim 2, wherein: mounting groove (213) perpendicular to be equipped with dog (214) on two relative inside walls of horizontal plate (21) width direction respectively, two leave the confession between dog (214) clearance (215) of joint piece (9) business turn over, joint piece (9) are close to two one side of dog (214) all is equipped with elastic bulge (91).
4. A suspended stone curtain wall mounting structure as claimed in claim 3, wherein: the upper end of the adjusting rod (6) is fixedly provided with a twisting block (63), and the twisting block (63) is provided with an anti-falling bulge (631).
5. A suspended stone curtain wall mounting structure as claimed in claim 4, wherein: the horizontal plate (21) is provided with a bearing piece (10), and the horizontal plate (21) is supported on the cross beam (1) through the bearing piece (10).
6. A suspended stone curtain wall mounting structure as claimed in claim 5, wherein: the supporting piece (10) comprises a connecting portion (101) and a supporting portion (102), the connecting portion (101) is vertically arranged and fixedly connected to one side, away from the vertical plate (22), of the horizontal plate (21), the supporting portion (102) is horizontally fixedly connected to the lower end of the connecting portion (101), and the upper surface of the supporting portion (102) is attached to the lower surface of the cross beam (1).
7. A suspended stone curtain wall mounting structure as claimed in claim 5, wherein: the bearing piece (10) comprises a connecting rod (103) and a bearing block (104), a limiting through hole (12) is formed in the length distribution direction of the adjusting through hole (212) on the cross beam (1), the connecting rod (103) is fixedly connected to the lower surface of the horizontal plate (21), the connecting rod (103) vertically penetrates through the limiting through hole (12), the bearing block (104) is arranged at the lower end of the connecting rod (103), and the upper surface of the bearing block (104) is attached to the lower surface of the cross beam (1).
8. A suspended stone curtain wall mounting structure as claimed in claim 7, wherein: scales (71) are arranged on the rack (7).
CN202121981981.4U 2021-08-23 2021-08-23 Suspension type stone material curtain mounting structure Active CN215670382U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121981981.4U CN215670382U (en) 2021-08-23 2021-08-23 Suspension type stone material curtain mounting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121981981.4U CN215670382U (en) 2021-08-23 2021-08-23 Suspension type stone material curtain mounting structure

Publications (1)

Publication Number Publication Date
CN215670382U true CN215670382U (en) 2022-01-28

Family

ID=79954709

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121981981.4U Active CN215670382U (en) 2021-08-23 2021-08-23 Suspension type stone material curtain mounting structure

Country Status (1)

Country Link
CN (1) CN215670382U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117721942A (en) * 2024-02-18 2024-03-19 中铁建工集团有限公司 Steel construction curtain

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117721942A (en) * 2024-02-18 2024-03-19 中铁建工集团有限公司 Steel construction curtain
CN117721942B (en) * 2024-02-18 2024-04-26 中铁建工集团有限公司 Steel construction curtain

Similar Documents

Publication Publication Date Title
CN215670382U (en) Suspension type stone material curtain mounting structure
CN116277405B (en) PC track beam mold
CN113357494A (en) Splicing support and display device
CN217811831U (en) Angle-adjustable ceramic brick curtain wall system
CN210195276U (en) Terrace construction mould with adjustable
CN113175134A (en) Connecting device for curtain wall keel and panel frame and construction method thereof
CN211716170U (en) Stand-alone height adjustment support
CN211114667U (en) Ceramic tile plastering device
CN210976209U (en) Super large monolithic curtain aluminum plate system
CN220928839U (en) Supporting structure for building structure design
CN220531950U (en) Auxiliary fixture for manufacturing steel structure bridge
CN109629965B (en) Suspension aluminum section
CN210857663U (en) Building curtain wall mounting and fixing support
CN215475709U (en) Unmanned aerial vehicle load installation focus adjustment support
CN213305181U (en) Gear motor easy to install
CN212534685U (en) Plug-in type hidden frame glass curtain wall
CN217460923U (en) Assembly type building component structure based on BIM
CN219100396U (en) Wall sound insulation design structure for assembly type building engineering
CN220814475U (en) YJ board mounting structure
CN218778572U (en) T-shaped guide rail bending-resistant assembly structure
CN214995529U (en) Veneer wallboard leveling fastener
CN220377610U (en) Assembled steel construction building curtain
CN209400856U (en) Pcb board reduces the optical plotter support leg of process by hidden word
CN217580794U (en) Novel ALC of accurate installation evaporates presses light aerated concrete board
CN214617453U (en) Sucker type hook

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant