CN215632991U - Construction power consumption voltage transformation system moving platform in tunnel - Google Patents
Construction power consumption voltage transformation system moving platform in tunnel Download PDFInfo
- Publication number
- CN215632991U CN215632991U CN202121614503.XU CN202121614503U CN215632991U CN 215632991 U CN215632991 U CN 215632991U CN 202121614503 U CN202121614503 U CN 202121614503U CN 215632991 U CN215632991 U CN 215632991U
- Authority
- CN
- China
- Prior art keywords
- fixed
- transformation system
- platform base
- wheels
- tunnel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 15
- 230000009466 transformation Effects 0.000 title claims abstract description 15
- 230000001681 protective effect Effects 0.000 claims abstract description 4
- 230000005540 biological transmission Effects 0.000 claims description 3
- 239000000969 carrier Substances 0.000 claims 1
- 238000004519 manufacturing process Methods 0.000 abstract description 4
- 238000013461 design Methods 0.000 abstract description 2
- 230000005611 electricity Effects 0.000 abstract 1
- 238000000034 method Methods 0.000 description 3
- 238000012986 modification Methods 0.000 description 3
- 230000004048 modification Effects 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
- 238000012546 transfer Methods 0.000 description 1
Images
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
The utility model provides a movable platform of an electricity transformation system for construction in a tunnel, which belongs to the technical field of machinery and comprises a platform base, an equipment frame, a protective guard, lifting travelling wheels and a traction frame; the equipment frame, the lifting travelling wheels and the traction frame are fixed on the platform base; a vertical rod is fixed on the platform base, and the guard rail is connected to the vertical rod; the design of the utility model can integrate the whole set of transformation system, and the transformation system does not need to be dismantled one by one during moving, thereby realizing integral moving, improving the perfectness rate of equipment, saving the time for transferring and assembling, improving the working efficiency and providing guarantee for construction and production.
Description
Technical Field
The utility model relates to the technical field of machinery, in particular to a movable platform of an electric transformation system for construction in a tunnel.
Background
In the tunnel construction process, the power consumption voltage transformation system is to follow up according to the continuous removal of tunnel tunnelling length, hoists the transportation to equipment one by one after the outage in the removal process, and the transportation is complicated, and the equipment time is longer, and the removal in-process equipment spoilage is higher, and needs a large amount of manual works and mechanical equipment cooperation, seriously influences construction production.
SUMMERY OF THE UTILITY MODEL
In view of the technical defects, the utility model aims to provide a mobile platform of a construction power transformation system in a tunnel, which can integrate the whole set of transformation system without being dismantled one by one during movement, realizes integral movement, can improve the perfectness rate of equipment, saves the transfer and assembly time, improves the working efficiency, and provides guarantee for construction and production.
In order to solve the technical problems, the utility model adopts the following technical scheme:
a movable platform of a power utilization and transformation system for construction in a tunnel is characterized by comprising a platform base, an equipment frame, a protective guard, lifting travelling wheels and a traction frame; the equipment frame, the lifting travelling wheels and the traction frame are fixed on the platform base; the platform base is fixed with a vertical rod, and the guard rail is connected to the vertical rod.
Preferably, the lifting travelling wheel comprises an oil cylinder, a wheel carrier, wheels and a driving motor; the oil cylinder is fixed on the platform base; the wheels are movably arranged on the wheel carrier; the wheel carrier is fixed at the bottom of the oil cylinder; the driving motor is fixed on the wheel carrier and is in transmission connection with the wheels.
The utility model has the beneficial effects that: the design of the utility model can integrate the whole set of transformation system, and the transformation system does not need to be dismantled one by one during moving, thereby realizing integral moving, improving the perfectness rate of equipment, saving the time for transferring and assembling, improving the working efficiency and providing guarantee for construction and production.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to the drawings without creative efforts.
Fig. 1 is a schematic structural diagram of a mobile platform of an electrical transformation system for construction in a tunnel according to an embodiment of the present invention.
Description of reference numerals:
the device comprises an equipment frame 1, an oil cylinder 2, a wheel frame 3, wheels 4, a platform base 5, a protective guard 6 and a traction frame 7.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
It should be noted that in the description of the present invention, the terms "in", "upper", "lower", "lateral", "inner", etc. indicate directions or positional relationships based on those shown in the drawings, which are merely for convenience of description, and do not indicate or imply that the device or element must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention.
Furthermore, it should be noted that, in the description of the present invention, unless otherwise explicitly specified or limited, the terms "disposed," "mounted," "connected," and "connected" are to be construed broadly and may be, for example, fixedly connected, detachably connected, or integrally connected; may be a mechanical connection; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meanings of the above terms in the present invention can be understood by those skilled in the art according to specific situations.
As shown in fig. 1, a moving platform of an electrical transformation system for construction in a tunnel comprises a platform base 5, an equipment frame 1, a guard rail 6, four lifting traveling wheels and a traction frame 7; the equipment frame 1, the lifting travelling wheels and the traction frame 7 are fixed on the platform base 5; the platform base 5 is fixed with a vertical rod, the bottom of the guard rail 6 is hinged on the platform base 5, and the top of the guard rail is connected to the vertical rod through a bolt.
Further, the lifting travelling wheel comprises an oil cylinder 2, a wheel carrier 3, wheels 4 and a driving motor; the oil cylinder 2 is fixed on the platform base 5; the wheels 4 are movably arranged on the wheel carrier 3; the wheel carrier 3 is fixed at the bottom of the oil cylinder 2; the driving motor is fixed on the wheel carrier 3 and is in transmission connection with the wheels 4.
When the device is used, the device frame 1 is assembled as required, and the transformer, the power cabinet, the distribution box and other devices are configured as required and are all arranged on the device frame; in a standing state, the bottom of the platform base 5 is completely and stably placed close to the ground, and all equipment lines are connected according to regulations and normally powered; when the platform needs to be moved, lines such as transformer input, distribution box output and grounding are disconnected, the four lifting traveling wheels are synchronously started to lift the platform base 5, the platform base is completely separated from the ground by 10cm-20cm, the platform base 5 is kept to be relatively balanced, the traction frame 7 at the advancing end is hung on a traction vehicle, the whole platform is dragged to a placement position by the traction vehicle, then the platform base 5 is placed down to the ground, the lines such as transformer input, distribution box output and grounding are connected, and normal power supply is realized after testing.
It will be apparent to those skilled in the art that various changes and modifications may be made in the present invention without departing from the spirit and scope of the utility model. Thus, if such modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include such modifications and variations.
Claims (2)
1. A movable platform of a power utilization and transformation system for construction in a tunnel is characterized by comprising a platform base, an equipment frame, a protective guard, lifting travelling wheels and a traction frame; the equipment frame, the lifting travelling wheels and the traction frame are fixed on the platform base; the platform base is fixed with a vertical rod, and the guard rail is connected to the vertical rod.
2. The electric transformer system moving platform for construction in a tunnel according to claim 1, wherein the lifting traveling wheels comprise oil cylinders, wheel carriers, wheels and driving motors; the oil cylinder is fixed on the platform base; the wheels are movably arranged on the wheel carrier; the wheel carrier is fixed at the bottom of the oil cylinder; the driving motor is fixed on the wheel carrier and is in transmission connection with the wheels.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121614503.XU CN215632991U (en) | 2021-07-14 | 2021-07-14 | Construction power consumption voltage transformation system moving platform in tunnel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121614503.XU CN215632991U (en) | 2021-07-14 | 2021-07-14 | Construction power consumption voltage transformation system moving platform in tunnel |
Publications (1)
Publication Number | Publication Date |
---|---|
CN215632991U true CN215632991U (en) | 2022-01-25 |
Family
ID=79890766
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202121614503.XU Active CN215632991U (en) | 2021-07-14 | 2021-07-14 | Construction power consumption voltage transformation system moving platform in tunnel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN215632991U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113374494A (en) * | 2021-07-14 | 2021-09-10 | 中铁三局集团桥隧工程有限公司 | Construction power consumption voltage transformation system moving platform in tunnel |
-
2021
- 2021-07-14 CN CN202121614503.XU patent/CN215632991U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113374494A (en) * | 2021-07-14 | 2021-09-10 | 中铁三局集团桥隧工程有限公司 | Construction power consumption voltage transformation system moving platform in tunnel |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105489808B (en) | A kind of battery component for engineering truck | |
CN206278872U (en) | A kind of lifter with electro-hydraulic lift pulley | |
CN215632991U (en) | Construction power consumption voltage transformation system moving platform in tunnel | |
CN101104498A (en) | Electric tyre type gantry container crane using aerial slide wire | |
CN103660956A (en) | Transportation system for coal mining | |
CN203373022U (en) | Self-lifting type cableway transportation device | |
CN209351619U (en) | A kind of unmanned plane draw off gear based on sliding rail | |
CN202491718U (en) | Movable ice-melting engineering vehicle | |
CN201102867Y (en) | Hybrid power tire type gantry crane | |
CN202968041U (en) | Special lifting platform for assembling transformer in field | |
CN113374494A (en) | Construction power consumption voltage transformation system moving platform in tunnel | |
CN201829791U (en) | Trolley line connector | |
CN202609828U (en) | Mine full-hydraulic sling cart | |
CN203242940U (en) | Novel carrying cart used for handcart switch | |
CN212195165U (en) | Gravity compensation type mobile contact net | |
CN202627605U (en) | Stereo parking lot | |
CN211198407U (en) | Small-size equipment lifting device for reconstruction and extension construction in operation transformer substation | |
CN205737547U (en) | A kind of ferry-boat transfer system for plate material | |
CN201296606Y (en) | Power supply structure for electrolysis shop centralization major service overhead traveling crane trolley line | |
CN205419487U (en) | Electric automobile puts up gallows | |
CN210084874U (en) | Multifunctional lifting operation vehicle with electric ladder | |
CN210706994U (en) | Non-contact power supply system of automobile chassis assembly trolley | |
CN2808840Y (en) | Electromagnetic loader | |
CN204135325U (en) | A kind of coverter pig 160t ladle car | |
CN202482002U (en) | Horizontal moving device of ice melting switch |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20220125 Address after: 030001 269 Yingze street, Yingze District, Taiyuan, Shanxi. Patentee after: CHINA RAILWAY NO.3 ENGINEERING GROUP Co.,Ltd. Patentee after: China Railway Third Bureau Group Bridge and Tunnel Engineering Co., Ltd Address before: No. 666, jinfenghuang Avenue, Jinniu hi tech Industrial Park, Chengdu, Sichuan 610000 Patentee before: CHINA RAILWAY THIRD ENGINEERING GROUP BRIDGE & TUNNEL ENGINEERING Co.,Ltd. |