CN215604293U - Drawing finishing device for engineering cost - Google Patents

Drawing finishing device for engineering cost Download PDF

Info

Publication number
CN215604293U
CN215604293U CN202121911974.7U CN202121911974U CN215604293U CN 215604293 U CN215604293 U CN 215604293U CN 202121911974 U CN202121911974 U CN 202121911974U CN 215604293 U CN215604293 U CN 215604293U
Authority
CN
China
Prior art keywords
screw
plate
template
installation
construction cost
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202121911974.7U
Other languages
Chinese (zh)
Inventor
徐霄楠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202121911974.7U priority Critical patent/CN215604293U/en
Application granted granted Critical
Publication of CN215604293U publication Critical patent/CN215604293U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Electrically Operated Instructional Devices (AREA)

Abstract

The utility model discloses a drawing arranging device for engineering cost, which comprises a bearing plate, wherein a U-shaped plate is installed on one side of the top of the bearing plate through a screw, a spring is installed on the bottom of the U-shaped plate through the screw and an installation frame, a pressing plate is installed on the bottom of the spring through a bolt and the installation frame, positioning screws are installed on the surfaces of two sides of the top of the U-shaped plate through reserved threaded holes, an upright post is installed on the top of the U-shaped plate through a reserved hole and the screw, the bottom of the upright post is connected with the pressing plate through the screw, a positioning groove is formed in the surface of one side of the bearing plate, and a placing box is inserted in the positioning groove in a sliding mode. The drawing arranging device for the engineering cost is reasonable in structure, convenient to use, capable of being moved conveniently and suitable for being widely popularized and used.

Description

Drawing finishing device for engineering cost
Technical Field
The utility model relates to the technical field of engineering cost, in particular to a drawing finishing device for engineering cost.
Background
The engineering cost refers to the construction cost expected or actually paid in the construction period of a construction project, and during the construction cost, a drawing is generally used for reference, and the drawing is easy to be confused in the using process and needs to be sorted by a drawing sorting device.
The drawing finishing device for common engineering cost has the following defects: 1. after the drawings are fixed, if the device is carried, the drawings are not neat any more due to insufficient pressing force, even more, the drawings are separated from the device, the use is affected, and 2, the stability of the corresponding storage mechanism is poor when the storage mechanism moves, and the files in the storage mechanism are prone to falling.
SUMMERY OF THE UTILITY MODEL
The utility model mainly aims to provide a drawing finishing device for engineering cost, which can effectively solve the problems in the background technology.
In order to achieve the purpose, the utility model adopts the technical scheme that:
drawing finishing device for engineering cost, including the loading board, screw installation U template is passed through to loading board top one side, and passes through screw and mounting bracket installation spring bottom the U template, bolt and mounting bracket installation clamp plate are passed through to the spring bottom, positioning screw is all installed through reserving the screw hole in U template top both sides surface, and U template top is through preformed hole and screw installation stand, the screwed connection clamp plate is passed through to the stand bottom, the constant head tank has been seted up on loading board one side surface, and slides in the constant head tank and insert and be equipped with and place the box.
Furthermore, a limiting groove is formed in the surface of one end of the top of the placing box, a magnet block is mounted at the top of the limiting groove through a screw, a circular groove is formed in the surface of the top of the bearing plate, a limiting rod is inserted into the circular groove, the bottom of the limiting rod is located in the limiting groove, and a handle is mounted on one side of the placing box through a screw; when the limiting rod is positioned in the limiting groove, the placing box can be fixed in the positioning groove.
Furthermore, the surface of the top of one side of the bearing plate is provided with a PTC ceramic heater through a preformed groove and a screw; the PTC ceramic heater can automatically control the heating temperature to prevent accidents.
Furthermore, a partition board is installed in the placing box through screws, and a Teflon non-adhesive layer is coated on the inner surface of the placing box.
Furthermore, a vertical plate is installed at one end of the bearing plate through a screw.
Compared with the prior art, the utility model has the following beneficial effects:
1. through setting up the spring, the clamp plate, stand and positioning screw, when using, personnel can manually exert certain power to the stand, thereby make clamp plate compression spring, and then make the clamp plate break away from the loading board, at this moment, personnel can place the drawing that corresponds at the loading board top, and with its one end laminating riser, afterwards, personnel can loosen the stand, thereby make the drawing that the clamp plate pushed down the loading board top under the effect of spring, and then fix the paper arrangement, and when needs carry this device, personnel can manual rotation set screw, make its bottom push down the clamp plate, and then fix the position of clamp plate, in order to prevent at the in-process that removes, because of the clamp plate is not enough to lead to the drawing no longer neat or drop to the packing force of drawing.
2. Through setting up magnet piece, gag lever post and spacing groove, personnel can place the file of putting in order in placing the box, when needs carry this device, personnel can insert the gag lever post in the spacing groove manually to make the magnet piece adsorb the gag lever post, and then make place the box and be fixed in the constant head tank, in order to prevent at the in-process that removes, place box one end and stretch out the constant head tank, lead to its inside file to lose.
Drawings
FIG. 1 is a schematic view showing the overall structure of a paper finishing device for construction cost according to the present invention.
FIG. 2 is a schematic cross-sectional view of the carrier plate of the paper collating unit for construction cost according to the present invention.
FIG. 3 is a schematic cross-sectional view of the material layer on the inner surface of the storage box of the paper arranging device for construction cost.
In the figure: 1. a carrier plate; 2. a vertical plate; 3. a U-shaped plate; 4. a spring; 5. pressing a plate; 6. positioning a screw rod; 7. placing the box; 8. a handle; 9. a limiting rod; 10. a circular groove; 11. a magnet block; 12. a limiting groove; 13. positioning a groove; 14. a partition plate; 15. a PTC ceramic heater; 16. a Teflon non-stick layer; 17. and (4) a column.
Detailed Description
In order to make the technical means, the creation characteristics, the achievement purposes and the effects of the utility model easy to understand, the utility model is further described with the specific embodiments.
As shown in fig. 1-3, drawing finishing device for engineering cost, including loading board 1, screw installation U template 3 is passed through to loading board 1 top one side, and passes through screw and mounting bracket installation spring 4 in U template 3 bottom, bolt and mounting bracket installation clamp plate 5 are passed through to spring 4 bottom, positioning screw 6 is all installed through the preformed screw hole in U template 3 top both sides surface, and 3 tops of U template are through preformed hole and screw installation stand 17, screwed connection clamp plate 5 is passed through to stand 17 bottom, constant head tank 13 has been seted up on loading board 1 one side surface, and slides to insert in constant head tank 13 and be equipped with and place box 7.
Wherein, place 7 top one end surfaces of box and seted up spacing groove 12, and screw installation magnet piece 11 is passed through at the top in the spacing groove 12, circular slot 10 has been seted up on 1 top surface of loading board, and the interpolation of circular slot 10 is equipped with gag lever post 9, gag lever post 9 bottom is located spacing groove 12, place 7 one side of box and pass through screw installation handle 8.
In this embodiment, as shown in fig. 1 and 2, a person can draw the placing box 7 out of the limiting groove 12 through the handle 8, and the diameter of the circular groove 10 is larger than that of the limiting rod 9, so that the person can operate the limiting rod 9 in the circular groove 10 more conveniently.
Wherein, PTC ceramic heater 15 is installed through reservation groove and screw on bearing board 1 one side top surface.
In this embodiment, as shown in fig. 2, the PTC ceramic heater 15 can heat the carrier plate 1, so as to dry the drawing with high moisture on the top of the carrier plate.
Wherein, the placing box 7 is internally provided with a clapboard 14 by a screw, and the inner surface of the placing box 7 is coated with a Teflon non-stick layer 16.
In the embodiment, as shown in fig. 2 and 3, the partition plates 14 may divide the storage box 7 into a plurality of spaces to facilitate sorting of documents by persons, and the teflon non-stick layer 16 may facilitate cleaning of the inside of the storage box 7.
Wherein, the bearing plate 1 one end is through screw installation riser 2.
In this embodiment, as shown in fig. 1, the vertical bar 2 can provide an alignment reference for a person to use when the person arranges drawings.
It should be noted that, the drawing arranging device for engineering cost of the utility model is characterized in that when in use, a worker can manually apply a certain force to the upright post 17, so that the pressing plate 5 compresses the spring 4, and further the pressing plate 5 is separated from the bearing plate 1, at this time, the worker can place the corresponding drawing on the top of the bearing plate 1 and attach one end of the drawing to the vertical plate 2, and then the worker can loosen the upright post 17, so that the pressing plate 5 presses the drawing on the top of the bearing plate 1 under the action of the spring 4, and further arranges and fixes the drawing, when carrying the device, the worker can manually rotate the positioning screw, so that the bottom of the worker presses the pressing plate 5 downwards, and further fixes the position of the pressing plate 5, so as to prevent the drawing from being tidy or falling off due to insufficient pressing force of the pressing plate 5 on the drawing in the moving process, and insert the limiting rod 9 into the limiting groove 12, so that the magnet block 11 adsorbs the limiting rod 9, thereby fixing the placing box 7 in the positioning groove 13 to prevent one end of the placing box 7 from extending out of the positioning groove 13 in the moving process, and leading to the loss of the files inside.
The foregoing shows and describes the general principles and broad features of the present invention and advantages thereof. It will be understood by those skilled in the art that the present invention is not limited to the embodiments described above, which are described in the specification and illustrated only to illustrate the principle of the present invention, but that various changes and modifications may be made therein without departing from the spirit and scope of the present invention, which fall within the scope of the utility model as claimed. The scope of the utility model is defined by the appended claims and equivalents thereof.

Claims (5)

1. Drawing finishing device for engineering cost includes loading board (1), its characterized in that: bearing board (1) top one side is through screw installation U template (3), and U template (3) bottom passes through screw and mounting bracket installation spring (4), bolt and mounting bracket installation clamp plate (5) are passed through to spring (4) bottom, positioning screw (6) are all installed through reserved screw hole in U template (3) top both sides surface, and U template (3) top is through reserved hole and screw installation stand (17), screwed connection clamp plate (5) are passed through to stand (17) bottom, constant head tank (13) have been seted up to bearing board (1) one side surface, and slide in constant head tank (13) and insert and be equipped with and place box (7).
2. The construction cost drawing collating device according to claim 1, characterized in that: place box (7) top one end surface and seted up spacing groove (12), and screw installation magnet piece (11) are passed through at the top in spacing groove (12), circular slot (10) have been seted up to loading board (1) top surface, and circular slot (10) interpolation is equipped with gag lever post (9), gag lever post (9) bottom is located spacing groove (12), place box (7) one side and pass through screw installation handle (8).
3. The construction cost drawing collating device according to claim 1, characterized in that: and the top surface of one side of the bearing plate (1) is provided with a PTC ceramic heater (15) through a preformed groove and a screw.
4. The construction cost drawing collating device according to claim 1, characterized in that: the partition plate (14) is installed in the placing box (7) through screws, and the inner surface of the placing box (7) is coated with a Teflon non-stick layer (16).
5. The construction cost drawing collating device according to claim 1, characterized in that: the bearing plate (1) is provided with a vertical plate (2) through a screw.
CN202121911974.7U 2021-08-16 2021-08-16 Drawing finishing device for engineering cost Expired - Fee Related CN215604293U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121911974.7U CN215604293U (en) 2021-08-16 2021-08-16 Drawing finishing device for engineering cost

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121911974.7U CN215604293U (en) 2021-08-16 2021-08-16 Drawing finishing device for engineering cost

Publications (1)

Publication Number Publication Date
CN215604293U true CN215604293U (en) 2022-01-25

Family

ID=79898228

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121911974.7U Expired - Fee Related CN215604293U (en) 2021-08-16 2021-08-16 Drawing finishing device for engineering cost

Country Status (1)

Country Link
CN (1) CN215604293U (en)

Similar Documents

Publication Publication Date Title
CN110586725A (en) Equipment for producing solar water heater
CN215604293U (en) Drawing finishing device for engineering cost
CN215746790U (en) Sawing anti-inclination device for rectangular material
CN110085456B (en) Closely heat setting anchor clamps of oval condenser core
CN208392903U (en) Accounting bill flattening device
CN213713570U (en) Energy-saving water heating device for hotels
CN211805700U (en) Clamp for producing solar assembly
CN105406396B (en) A kind of corner china bottle replacement device
CN212233892U (en) Rotation type strategy management is explanation device for teaching
CN111775587B (en) Accounting document automatic sequencing collator
CN216433960U (en) Automatic softening point tester
CN111929153A (en) Compression-resistant detection equipment for wood furniture production
CN208530017U (en) A kind of quick seal of finance
CN220700957U (en) Seat fixing mechanism for scooter
CN221024794U (en) Pipe storage rack
CN218892041U (en) Glazing machine for ceramic products
CN215544576U (en) Copper belt machine line base frock
CN210592258U (en) Adjustable electric bicycle basket
CN213246695U (en) Tea leaf finish machining device
CN216412517U (en) Portable architectural design display device
CN216368729U (en) Frame type wet film preparing device
CN214759784U (en) Chinese language and literature reading frame convenient to height-adjusting
CN219020522U (en) Drawing board frame convenient for drawing
CN215202437U (en) A clamping device for plank processing
CN219659210U (en) Installation device of outlet cabinet

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220125

CF01 Termination of patent right due to non-payment of annual fee