CN215600747U - Energy taking device at high voltage (10 kV) - Google Patents

Energy taking device at high voltage (10 kV) Download PDF

Info

Publication number
CN215600747U
CN215600747U CN202121064524.9U CN202121064524U CN215600747U CN 215600747 U CN215600747 U CN 215600747U CN 202121064524 U CN202121064524 U CN 202121064524U CN 215600747 U CN215600747 U CN 215600747U
Authority
CN
China
Prior art keywords
high voltage
casing
energy
wall
chuck
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121064524.9U
Other languages
Chinese (zh)
Inventor
闵文杰
陆艳青
段少明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Tianrui Electronic Co ltd
Original Assignee
Hubei Tianrui Electronic Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Tianrui Electronic Co ltd filed Critical Hubei Tianrui Electronic Co ltd
Priority to CN202121064524.9U priority Critical patent/CN215600747U/en
Application granted granted Critical
Publication of CN215600747U publication Critical patent/CN215600747U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Drying Of Solid Materials (AREA)

Abstract

The utility model discloses a device for obtaining energy at high voltage (10 kV), which adopts the technical scheme that: the solar water heater comprises a shell, wherein a mounting plate is mounted at the center position of the inner wall of the shell, converters are mounted on two sides of the rear end face of the mounting plate, a top cover is mounted at the top of the shell, a water inlet pipe is mounted at the center position of the bottom of the top cover, the bottom of the water inlet pipe is connected with the top of the shell, a drying box is mounted at the bottom of the shell, and mounting mechanisms are mounted above and below the rear end face of the shell, and the solar water heater has the beneficial effects that: through being equipped with the converter to installation solar panel on the top cap, utilize wiring board and outer fishplate bar on the converter can get the ability and the light source gets can the processing to the high pressure, realized getting can the device high efficiency get can the operation, simultaneously, through set up dry box bottom the casing, can carry out drying process to getting can the device, avoid receiving the steam influence and lead to the condition emergence of electric leakage or short circuit.

Description

Energy taking device at high voltage (10 kV)
Technical Field
The utility model relates to the technical field of energy taking devices, in particular to an energy taking device at high voltage (10 kV).
Background
In recent years, a large number of methods for online monitoring and fault diagnosis of power transmission line state parameters are proposed by scholars at home and abroad, but the problem of power supply is always unsolved. Therefore, a special power supply with good performance is developed and applied to an on-line monitoring system of the state parameters of the transmission line, and the power equipment arranged on the high-voltage side of the high-voltage transmission line comprises the following components: the device comprises a wire temperature, breeze vibration, waving, sub-span oscillation, tension, icing monitoring device and the like on the high-voltage overhead transmission line.
The existing high-pressure energy-taking device has the defects that: the majority is got and is able to the device and not set up protection device, leads to exposing outside getting easily for a long time and can the device receive the influence of environment, and reduces and get can efficiency, simultaneously, also causes to get can the device and appear damaging and get can the in-process and receive the condition emergence that influences easily and the effect is not good.
Therefore, it is necessary to invent a device for obtaining energy at high voltage (10 kV).
SUMMERY OF THE UTILITY MODEL
Therefore, the energy taking device at high voltage (10 kV) is provided, the converter and the solar panel are favorable for improving the efficient taking-out treatment of the energy taking device, meanwhile, the drying box is arranged, the energy taking device can be dried, the phenomenon of electric leakage or short circuit caused by the influence of water vapor is avoided, and the problems of energy taking treatment of the energy taking device and the safety of the device in the background technology are solved.
In order to achieve the above purpose, the utility model provides the following technical scheme: the utility model provides an energy taking device at high pressure (10 kV), includes the casing, the mounting panel is installed to the inner wall central point of casing position, the converter is all installed to the rear end face both sides of mounting panel, the top cap is installed at the top of casing, the bottom central point of top cap puts and installs the inlet wire pipe, the bottom of inlet wire pipe is connected with the top of casing, dry box is installed to the bottom of casing, installation mechanism is all installed to the rear end face top and the below of casing, installation mechanism includes chuck, lower chuck, fixed block, screw hole, fixed pin, loose axle and rubber pad, all install the fixed block on going up the chuck and one side outer wall of lower chuck.
Preferably, an insulating layer is arranged on the inner wall of the shell.
Preferably, install access door A on the outer wall of one side of casing, be connected through hinge A between access door A and the casing, access door A's preceding terminal surface top is provided with visual glass.
Preferably, an energy receiver is installed at the center of the top of the converter, and a coil is arranged on the outer wall of the energy receiver.
Preferably, the top of the energy receiver is provided with a wiring board, and wiring holes are formed in the upper portion and the lower portion of the front end face of the wiring board.
Preferably, outer connecting plates are arranged on two sides of the bottom of the converter.
Preferably, the center of the upper surface of the top cover is provided with a wire inlet hole, and the top of the top cover is provided with a solar panel.
Preferably, the drying box is internally provided with a drying agent, an access door B is arranged at the center of the outer wall on one side of the drying box, and the access door B is connected with the drying box through a hinge B.
Preferably, threaded holes are formed in the surface of the fixing block, the fixing pin is arranged in the threaded holes, external threads are arranged on the outer wall of the fixing pin, the external threads on the fixing pin are meshed with internal threads on the threaded holes and connected, and a movable shaft is arranged on the outer wall of the other side of the upper chuck and the outer wall of the lower chuck.
Preferably, rubber pads are arranged on the two sides of the bottom or the top of the upper chuck and the two sides of the top of the lower chuck, and the rubber pads are distributed in an annular array.
The utility model has the beneficial effects that:
through setting up the insulating layer on the inner wall with the casing, utilize the effect of insulating layer isolation power, prevent that the device in the casing from receiving the condition emergence that steam corrodes and lead to the device electric leakage, set up the mounting panel through the inner wall central point at the casing, and install the converter on the mounting panel, with the top installation energy receiver of converter, solar panel on the cooperation top cap, convert light energy into on the electric energy inserts the wiring board, and receive by energy receiver, and simultaneously, bottom at the converter sets up outer fishplate bar, can access high-voltage circuit and get the energy operation, it can get the energy device high efficiency and get the energy and handle to have realized, work efficiency is improved.
Through the bottom installation drying box with the casing to set up the through-hole between casing and drying box, place the drier in with the drying box, make the effect of drier volatilize to the casing in by the through-hole, can carry out drying process to the device in the casing, avoid exposing for a long time outside the device receives the influence of steam and causes the condition of damage or short circuit to take place, realized getting can the device and carry out drying process, improved the security of getting can the device.
Through setting up installation mechanism on with the rear end face of casing, utilize last chuck and lower chuck cooperation on the installation mechanism, will install the position that will get the ability at required high pressure, open last chuck, it is tight through the fixed block on last chuck and lower chuck, and be connected with the screw hole meshing on the fixed block by the external screw thread on the fixed pin, can lock the processing of dying to last chuck and lower chuck, and simultaneously, through setting up the rubber pad between last chuck and the lower chuck, and be annular array distribution with the rubber pad setting, can consolidate the dead place of last chuck and lower chuck lock, the condition of slip or aversion prevents to appear, it installs and dismantles the processing to have realized getting the ability device, therefore, the clothes hanger is strong in practicability.
Drawings
FIG. 1 is a front view provided by the present invention;
FIG. 2 is a left side view provided by the present invention;
FIG. 3 is a block diagram of a mounting mechanism provided by the present invention;
fig. 4 is a front view of a current transformer provided by the present invention;
fig. 5 is a perspective view of a portion of the structure provided by the present invention.
In the figure: 1. a housing; 101. an insulating layer; 102. an access door A; 103. a hinge A; 104. a visible glass; 2. mounting a plate; 201. a current transformer; 202. an energy source receiver; 203. a coil; 204. a wiring board; 205. a wiring hole; 206. an outer connecting plate; 3. a top cover; 301. a wire inlet pipe; 302. a wire inlet hole; 303. a solar panel; 4. drying the box; 401. a desiccant; 402. an access door B; 403. a hinge B; 5. an installation mechanism; 501. an upper chuck; 502. a lower chuck; 503. a fixed block; 504. a threaded hole; 505. a fixing pin; 506. a movable shaft; 507. and (7) a rubber pad.
Detailed Description
The preferred embodiments of the present invention will be described in conjunction with the accompanying drawings, and it will be understood that they are described herein for the purpose of illustration and explanation and not limitation.
Referring to the accompanying drawings 1-5, the utility model provides an energy taking device at high voltage (10 kV), which comprises a shell 1, wherein a mounting plate 2 is mounted at the center position of the inner wall of the shell 1, current transformers 201 are mounted on two sides of the rear end face of the mounting plate 2, a top cover 3 is mounted at the top of the shell 1, a wire inlet pipe 301 is mounted at the center position of the bottom of the top cover 3, the bottom of the wire inlet pipe 301 is connected with the top of the shell 1, a drying box 4 is mounted at the bottom of the shell 1, mounting mechanisms 5 are mounted above and below the rear end face of the shell 1, each mounting mechanism 5 comprises an upper chuck 501, a lower chuck 502, a fixing block 503, a threaded hole 504, a fixing pin 505, a movable shaft 506 and a rubber pad 507, and the fixing blocks 503 are mounted on the outer wall of one side of the upper chuck 501 and the lower chuck 502.
Further, an insulating layer 101 is disposed on an inner wall of the housing 1.
Furthermore, an access door A102 is installed on the outer wall of one side of the shell 1, the access door A102 is connected with the shell 1 through a hinge A103, and a visible glass 104 is arranged above the front end face of the access door A102.
Further, an energy receiver 202 is installed at the top center of the converter 201, and a coil 203 is arranged on the outer wall of the energy receiver 202, so that the energy obtaining device can keep stable output under the condition of line current change; the output voltage is stable, and the ripple is small; the output power can reach more than 200W; the device can continuously work under the current of more than 1000A, and can stably work for a short time under the current of more than 3000A; can be installed on a transmission line with any voltage class from 6kV to 500 kV.
Further, a wiring board 204 is mounted on the top of the energy receiver 202, and wiring holes 205 are formed above and below the front end face of the wiring board 204.
Further, outer connection plates 206 are arranged on two sides of the bottom of the converter 201, can be connected with external high-voltage current, and have rated power: 5W, 20W, 50W, 100W, etc.; rated voltage: 3.3V, 5V, 12V, 24V and the like.
Further, the upper surface central point of top cap 3 puts and has seted up entrance hole 302, the top of top cap 3 is provided with solar panel 303, increases the effect of getting energy, realizes getting energy device high efficiency and gets energy and handle.
Further, the inside of drying box 4 is provided with drier 401, access door B402 is installed to one side outer wall central point of drying box 4, be connected through hinge B403 between access door B402 and the drying box 4, utilize drier 401, carry out drying process to getting can the device, avoid external environment to lead to the fact the influence to getting can the device, reduce and get can efficiency.
Further, a threaded hole 504 is formed in the surface of the fixing block 503, a fixing pin 505 is arranged inside the threaded hole 504, an external thread is arranged on the outer wall of the fixing pin 505, the external thread on the fixing pin 505 is meshed with an internal thread on the threaded hole 504, and a movable shaft 506 is arranged on the outer wall of the other side of the upper chuck 501 and the lower chuck 502.
Further, rubber pads 507 are arranged on two sides of the bottom or the top of the upper chuck 501 and the lower chuck 502, and the rubber pads 507 are distributed in an annular array.
The using process of the utility model is as follows:
when getting the energy device high efficiency and getting can the processing, set up insulating layer 101 on the inner wall with casing 1, utilize insulating layer 101 to keep apart the effect of power, prevent that the device in the casing 1 from receiving the condition emergence that steam corrodes and lead to the device electric leakage, through setting up mounting panel 2 at the inner wall central point of casing 1, and install converter 201 on mounting panel 2, install energy receiver 202 with the top of converter 201, cooperate solar panel 303 on the top cap 3, convert light energy into electric energy and insert on wiring board 204, and receive by energy receiver 202, and simultaneously, set up outer fishplate bar 206 in the bottom of converter 201, can insert the high-voltage circuit and get and can operate, realized getting can the device high efficiency and get can the processing, and the work efficiency is improved.
When carrying out drying treatment to the device of getting can, with the bottom installation drying box 4 of casing 1 to set up the through-hole between casing 1 and drying box 4, place drier 401 in the drying box 4, make drier 401's effect volatilize to casing 1 in by the through-hole, can carry out drying treatment to the device in the casing 1, the influence that the device of avoiding exposing for a long time outside receives steam causes the condition of damage or short circuit to take place, realized getting can the device carry out drying treatment, the security that has improved the device of getting can.
When the energy taking device is mounted and dismounted, the mounting mechanism 5 is arranged on the rear end face of the shell 1, the upper chuck 501 and the lower chuck 502 on the mounting mechanism 5 are matched, the energy taking device is mounted in a required high-pressure energy taking position, the upper chuck 501 is opened, the upper chuck 501 and the lower chuck 502 are clamped tightly through the fixing block 503 on the upper chuck 501 and the lower chuck 502, the outer threads on the fixing pin 505 are meshed with the threaded holes 504 in the fixing block 503, the upper chuck 501 and the lower chuck 502 can be locked, meanwhile, the rubber pads 507 are arranged between the upper chuck 501 and the lower chuck 502 and distributed in an annular array mode, the locked positions of the upper chuck 501 and the lower chuck 502 can be reinforced, the sliding or shifting situation is prevented, the mounting and dismounting processing of the energy taking device is achieved, and the practicability is high.
The above description is only a preferred embodiment of the present invention, and any person skilled in the art may modify the present invention or modify it into an equivalent technical solution by using the technical solution described above. Therefore, any simple modifications or equivalent substitutions made in accordance with the technical solution of the present invention are within the scope of the claims of the present invention.

Claims (10)

1. An energy-taking device at high voltage (10 kV) comprising a housing (1), characterized in that: mounting panel (2) are installed to the inner wall central point of casing (1) puts, converter (201) are all installed to the rear end face both sides of mounting panel (2), top cap (3) are installed at the top of casing (1), bottom central point of top cap (3) puts and installs inlet tube (301), the bottom of inlet tube (301) is connected with the top of casing (1), dry box (4) are installed to the bottom of casing (1), installation mechanism (5) are all installed to the rear end face top and the below of casing (1), installation mechanism (5) include chuck (501), lower chuck (502), fixed block (503), screw hole (504), fixed pin (505), loose axle (506) and rubber pad (507), all install fixed block (503) on going up chuck (501) and one side outer wall of lower chuck (502).
2. A device for extracting energy at high voltage (10 kV) according to claim 1, characterized in that: an insulating layer (101) is arranged on the inner wall of the shell (1).
3. A device for extracting energy at high voltage (10 kV) according to claim 1, characterized in that: install access door A (102) on one side outer wall of casing (1), be connected through hinge A (103) between access door A (102) and casing (1), the preceding terminal surface top of access door A (102) is provided with visual glass (104).
4. A device for extracting energy at high voltage (10 kV) according to claim 1, characterized in that: an energy receiver (202) is installed at the center of the top of the converter (201), and a coil (203) is arranged on the outer wall of the energy receiver (202).
5. A device for extracting energy at high voltage (10 kV) according to claim 4, characterized in that: a wiring board (204) is installed at the top of the energy receiver (202), and wiring holes (205) are formed in the upper portion and the lower portion of the front end face of the wiring board (204).
6. A device for extracting energy at high voltage (10 kV) according to claim 1, characterized in that: outer connecting plates (206) are arranged on two sides of the bottom of the converter (201).
7. A device for extracting energy at high voltage (10 kV) according to claim 1, characterized in that: the solar energy water heater is characterized in that a wire inlet hole (302) is formed in the center of the upper surface of the top cover (3), and a solar panel (303) is arranged at the top of the top cover (3).
8. A device for extracting energy at high voltage (10 kV) according to claim 1, characterized in that: the drying box is characterized in that a drying agent (401) is arranged inside the drying box (4), an access door B (402) is installed in the center of the outer wall of one side of the drying box (4), and the access door B (402) is connected with the drying box (4) through a hinge B (403).
9. A device for extracting energy at high voltage (10 kV) according to claim 1, characterized in that: threaded hole (504) is seted up on the surface of fixed block (503), the inside of threaded hole (504) is provided with fixed pin (505), be provided with the external screw thread on the outer wall of fixed pin (505), external screw thread on fixed pin (505) is connected with the interior thread engagement on threaded hole (504), be provided with loose axle (506) on the opposite side outer wall of going up chuck (501) and lower chuck (502).
10. A device for extracting energy at high voltage (10 kV) according to claim 1, characterized in that: the rubber pads (507) are arranged on the two sides of the bottom or the top of the upper chuck (501) and the two sides of the top of the lower chuck (502), and the rubber pads (507) are distributed in an annular array.
CN202121064524.9U 2021-05-18 2021-05-18 Energy taking device at high voltage (10 kV) Active CN215600747U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121064524.9U CN215600747U (en) 2021-05-18 2021-05-18 Energy taking device at high voltage (10 kV)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121064524.9U CN215600747U (en) 2021-05-18 2021-05-18 Energy taking device at high voltage (10 kV)

Publications (1)

Publication Number Publication Date
CN215600747U true CN215600747U (en) 2022-01-21

Family

ID=79873232

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121064524.9U Active CN215600747U (en) 2021-05-18 2021-05-18 Energy taking device at high voltage (10 kV)

Country Status (1)

Country Link
CN (1) CN215600747U (en)

Similar Documents

Publication Publication Date Title
CN205670631U (en) A kind of low-voltage intelligent distribution box of new structure
CN111564283B (en) Heat dissipation type transformer with good protection performance and use method
CN215600747U (en) Energy taking device at high voltage (10 kV)
CN208046063U (en) A kind of insulated type low-tension switch cabinet
CN207398637U (en) A kind of integrated photovoltaic distribution box
CN108633211A (en) A kind of Multifunctional household external application traffic lights electronic control cabinet
CN206498017U (en) A kind of drawer switching device for power distribution cabinet
CN216625308U (en) Dustproof low-voltage complete reactive power compensation cabinet
CN201708551U (en) Low-pressure reactive power compensation drawer module
CN210325430U (en) Anti-theft device for distribution transformer
CN209561951U (en) A kind of High-voltage Incoming Cabinet being easily installed
CN107171260A (en) A kind of distribution box
CN208173898U (en) A kind of electrical connector facilitating maintenance
CN207459466U (en) A kind of cubicle switch
CN206697758U (en) A kind of bus connecting device of low-tension switch cabinet
CN205622312U (en) A power structure for surpassing HVDC circuit on -line monitoring
CN205304625U (en) Single -phase high frequency switching power supply
CN110568230A (en) Method for mounting partial discharge sensor in isolated-phase enclosed bus
CN218678457U (en) Reactive compensation equipment for low-voltage distribution network
CN219696981U (en) Electric system of wind generating set and wind generating set
CN211828446U (en) Energy-taking CT protection device
CN220325225U (en) Expansion transformation structure of copper bar branch box
CN214314442U (en) Low-voltage bus installation structure
CN219456370U (en) Overhead external signal generating device
CN211180333U (en) High-efficient heat dissipation is optic fibre commuting case for communication engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant