CN215597619U - Ventilation device for building engineering building - Google Patents
Ventilation device for building engineering building Download PDFInfo
- Publication number
- CN215597619U CN215597619U CN202121603254.4U CN202121603254U CN215597619U CN 215597619 U CN215597619 U CN 215597619U CN 202121603254 U CN202121603254 U CN 202121603254U CN 215597619 U CN215597619 U CN 215597619U
- Authority
- CN
- China
- Prior art keywords
- block
- fixing
- wall body
- ventilation
- ventilator
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Air-Flow Control Members (AREA)
Abstract
The utility model relates to a ventilation device for a building engineering building, which comprises a wall body, wherein a ventilator is inserted into the front surface of the wall body, a fixing device is installed on the outer side of the ventilator, the fixing device comprises a fixing block, a fixing sleeve, a fixing plate, a supporting block and a slide way, the fixing sleeve is installed on the front surface of the wall body, and the ventilator penetrates through the inside of the fixing sleeve; insert the assigned position with the ventilation blower from fixed cover, make two fixed plates and ventilation blower lateral wall contact under the cooperation of slide, then make the inside wall at the fixed block of the piece card that supports that the inserted bar is connected, through can be quick fix the ventilation blower fast like this, make the clearance brush place the inside that slides to the guide board from the end of guide board, make the clearance brush carry out the sanitization to the wind changing mouth of ventilation blower, when having avoided the air to be taken out like this, dust in the air adsorbs on the surface in the wind changing mouth, lead to the condition that the air inlet is inefficient, improve equipment's life.
Description
Technical Field
The utility model relates to the technical field of engineering construction, in particular to a ventilation device for a house construction engineering building.
Background
The building engineering refers to an engineering entity formed by the construction of various building constructions and their auxiliary facilities and the installation of lines, pipelines and equipment matched with them. The house building is characterized by comprising a top cover, a beam column, a wall, a foundation and a project which can form an internal space and meet the requirements of people on production, living, study and public activities.
At present most building often sets up ventilation unit, and most ventilation unit often installs fixedly through the bolt, need use a large amount of instruments in the operation, have complex operation and the problem of inefficiency, and then reduce the stability of equipment, increase the maintenance degree of difficulty of equipment, be unfavorable for the normal use of equipment, need improve to this.
SUMMERY OF THE UTILITY MODEL
The utility model aims to overcome the defects of the prior art and provides the ventilation device for the building construction engineering building, which has the advantages of being convenient for quickly fixing a ventilator, improving the stability of equipment, reducing the maintenance difficulty of the equipment and being convenient for the normal use of the equipment.
The technical scheme for realizing the purpose is as follows:
the utility model provides a ventilation device for a building construction engineering building, which comprises a wall body, wherein a ventilator is inserted into the front surface of the wall body, a fixing device is installed on the outer side of the ventilator and comprises fixing blocks, fixing sleeves, fixing plates, abutting blocks and slide ways, the fixing sleeves are installed on the front surface of the wall body, the ventilator penetrates through the inner part of the fixing sleeves, the slide ways are respectively installed above and below the front surface of the fixing sleeves, two fixing plates are connected between the two slide ways in a sliding manner and are respectively positioned on two sides of the ventilator, the fixing blocks are installed on the front surfaces of the two fixing plates and are connected through the abutting blocks, a cleaning device is installed at a ventilation opening on the rear surface of the wall body, the cleaning device comprises a handle, a cleaning brush and a guide plate, two guide plates are installed at the ventilation opening on the rear surface of the wall body, two sliding connection has the cleaning brush between the guide board, the brush face of cleaning brush hugs closely in the trade wind gap and goes out, the cleaning brush is kept away from the one end of wall body installs the handle.
Preferably, the end of the abutting block is provided with an inserting rod. To facilitate rotation of the dolly.
Preferably, arc-shaped grooves are formed in one sides, facing the ventilator, of the two fixing plates. In order to facilitate the close contact of the ventilator with the fixing plate.
Preferably, the limiting block is installed at the end of the guide plate, a stop block is connected to the limiting block in a sliding mode, the other end of the stop block is located at the top of the guide plate, a supporting block is installed on the outer side wall of the stop block, and the supporting block is located at the top of the limiting block. In order to avoid the cleaning brush slipping out of the end of the guide plate.
Preferably, the opposite surfaces of the two fixing plates are smooth structures. In order to avoid gaps when the two fixing plates are contacted.
Preferably, the brush of the cleaning brush is a nylon member. To avoid damage to the brush of the cleaning brush.
Preferably, the height of the two fixing plates is the same as that of the fixing sleeve. In order to avoid the two fixing plates from protruding from the top of the fixing sleeve.
The utility model has the beneficial effects that: in the process of using the utility model, the material,
1. the ventilator is inserted into a designated position from the fixing sleeve, the ventilator is supported through the fixing sleeve, the two fixing plates are in contact with the outer side wall of the ventilator under the matching of the slide way, then the inserting rod is pushed and rotated, the abutting block connected with the inserting rod is clamped on the inner side wall of the fixing block, and therefore the ventilator can be quickly and quickly fixed, most of devices are prevented from being installed and fixed through bolts, the stability of the devices is improved, the maintenance difficulty of the devices is reduced, and the normal use of the devices is facilitated;
2. when needs are cleared up the trade wind gap, extract the dog, make dog and restriction piece separation, make the cleaning brush slide to the inside of guide board from the place of the end of guide board, then circulation pulling handle, make the cleaning brush clear up the trade wind gap of ventilation blower, through having avoided the air when being taken out like this, the dust in the air adsorbs on the surface of trading the wind gap, lead to the circumstances that the air inlet is inefficiency, avoid traditional equipment to maintain through the method of cleaning often simultaneously, there is the circumstances that the efficiency is low, and then improve equipment's ease for use, improve equipment's life.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of the fixing device shown in FIG. 1 in a disassembled configuration;
FIG. 3 is an enlarged view of A in FIG. 2 according to the present invention;
FIG. 4 is a schematic view of the rear surface structure of the wall of FIG. 1 according to the present invention;
FIG. 5 is an enlarged view of B in FIG. 4 according to the present invention;
description of reference numerals:
1. a wall body; 2. a ventilator; 3. a fixing device; 31. a fixed block; 32. fixing a sleeve; 33. a fixing plate; 34. a resisting block; 35. a slideway; 36. inserting a rod; 4. a cleaning device; 41. a handle; 42. cleaning a brush; 43. a guide plate; 44. a support block; 45. a stopper; 46. and limiting the block.
Detailed Description
The utility model is further described with reference to the following figures and specific examples.
Referring to fig. 1 to 5, the present invention provides a ventilation apparatus for a building of a building construction, including a wall 1, a ventilator 2 is inserted into a front surface of the wall 1, a fixing device 3 is installed outside the ventilator 2, the fixing device 3 includes a fixing block 31, a fixing sleeve 32, a fixing plate 33, a resisting block 34 and a slide way 35, the fixing sleeve 32 is installed on the front surface of the wall 1, the ventilator 2 penetrates through the inside of the fixing sleeve 32, the slide way 35 is installed above and below the front surface of the fixing sleeve 32, two fixing plates 33 are slidably connected between the two slide ways 35, the two fixing plates 33 are respectively located on two sides of the ventilator 2, the fixing blocks 31 are installed on the front surfaces of the two fixing plates 33, the two fixing blocks 31 are connected through the resisting block 34, a cleaning device 4 is installed at a ventilation opening on a rear surface of the wall 1, the cleaning device 4 includes a handle 41, a cleaning brush 42 and a guide plate 43, two guide plates 43 are installed at the rear surface air exchange port of the wall body 1, a cleaning brush 42 is connected between the two guide plates 43 in a sliding mode, the brush surface of the cleaning brush 42 is tightly attached to the air exchange port, and a handle 41 is installed at one end, far away from the wall body 1, of the cleaning brush 42.
In this example, when needing to clear up the trade wind gap, extract dog 45, make dog 45 and limiting block 46 separate, make cleaning brush 42 slide to the inside of guide board 43 from the place of the end of guide board 43, then circulation pulling handle 41, make cleaning brush 42 clear up the trade wind gap of ventilation blower 2, through having avoided the air when being taken out like this, the dust in the air adsorbs on the surface in trade wind gap, lead to the circumstances that the air inlet is inefficient, avoid traditional equipment to maintain through the method of wiping often simultaneously, there is the circumstances that the efficiency is inefficient, and then improve equipment's ease of use, improve equipment's life.
In this example scheme, insert the assigned position with ventilation blower 2 from fixed cover 32, support ventilation blower 2 through fixed cover 32, make two fixed plates 33 and 2 lateral wall contacts of ventilation blower under the cooperation of slide 35, then promote and rotate inserted bar 36, make the inserted bar 36 connect support 34 card at the inside wall of fixed block 31, through can be quick fix ventilation blower 2 fast like this, avoid most equipment to install fixedly through the bolt, improve equipment's stability, reduce the maintenance degree of difficulty of equipment, the normal use of the equipment of being convenient for.
Furthermore, as shown in fig. 2, an insertion rod 36 is installed at an end of the abutting block 34, the abutting block 34 can be rotated by the insertion rod 36, and the insertion rod 36 is flat, so that the abutting block 34 can be conveniently rotated.
Further, as shown in fig. 2, the two fixing plates 33 are provided with arc-shaped grooves on the sides facing the ventilator 2, so that the ventilator 2 can be located in the arc-shaped grooves formed in the two fixing plates 33, and the ventilator 2 can be in close contact with the fixing plates 33 through the arc-shaped grooves.
Further, as shown in fig. 5, a limiting block 46 is installed at the end of the guide plate 43, a stopper 45 is connected to the inside of the limiting block 46 in a sliding manner, the other end of the stopper 45 is located at the top of the guide plate 43, a supporting block 44 is installed on the outer side wall of the stopper 45, the supporting block 44 is located at the top of the limiting block 46, after the cleaning brush 42 is placed inside the guide plate 43, the stopper 45 is inserted into the limiting block 46, the end of the guide plate 43 can be sealed through the limiting block 46, the cleaning brush 42 is prevented from sliding out, and when the cleaning brush 42 is not needed, the stopper 45 can slide out from the limiting block 46, and then the cleaning brush 42 can slide out from the end of the guide plate 43.
Further, as shown in fig. 2, the opposite surfaces of the two fixing plates 33 are smooth structures, by which the two fixing plates 33 can be prevented from being contacted to form a gap.
Further, as shown in fig. 5, the brush of the cleaning brush 42 is made of nylon, which has better wear resistance, so that the brush of the cleaning brush 42 can be prevented from being damaged during use.
Further, as shown in fig. 1, the two fixing plates 33 have the same height as the fixing sleeve 32, by which it is possible to prevent the two fixing plates 33 from protruding from the top of the fixing sleeve 32.
The working principle of the utility model is as follows: in the using process of the utility model, when the ventilator 2 needs to be fixed in the mounting process of the ventilator, the ventilator 2 is inserted into a designated position from the fixing sleeve 32, the ventilator 2 is supported by the fixing sleeve 32, the two fixing plates 33 are pushed to contact with the outer side wall of the ventilator 2, the inserting rod 36 is pushed and rotated, the abutting block 34 connected with the rod is clamped on the inner side wall of the fixing block 31, so that the ventilator 2 can be quickly fixed, most devices are prevented from being mounted and fixed through bolts, the stability of the devices is improved, the maintenance difficulty of the devices is reduced, the normal use of the devices is facilitated, the cleaning device 4 is placed at the air exchanging port of the ventilator 2, when the air exchanging port needs to be cleaned, the stop block 45 is pulled out, the stop block 45 is separated from the limiting block 46, the cleaning brush 42 slides into the guide plate 43 from the placing position at the end of the guide plate 43, the handle 41 is pulled, so that the air exchange port of the ventilator 2 is cleaned through the cleaning brush 42 in the moving process of the handle 41, the problem that air inlet efficiency is low due to the fact that dust in the air is adsorbed on the surface of the air exchange port when the air is pumped out is avoided, meanwhile, the problem that traditional equipment is low in efficiency due to the fact that the traditional equipment is frequently maintained through a wiping method is avoided, the usability of the equipment is improved, and the service life of the equipment is prolonged.
While the present invention has been described in detail and with reference to the embodiments thereof as illustrated in the accompanying drawings, it will be apparent to one skilled in the art that various changes and modifications can be made therein. Therefore, certain details of the embodiments are not to be interpreted as limiting, and the scope of the utility model is to be determined by the appended claims.
Claims (7)
1. The utility model provides a ventilation unit for building engineering construction, a serial communication port, including the wall body, the ventilation blower has been inserted to the front surface of wall body, fixing device is installed in the outside of ventilation blower, fixing device includes fixed block, fixed cover, fixed plate, supports piece and slide, the front surface mounting of wall body has fixed cover, just the ventilation blower runs through the inside of fixed cover, slide, two are installed respectively to the front surface top and the below of fixed cover sliding connection has two fixed plates between the slide, and two the fixed plate is located respectively the both sides of ventilation blower, two the fixed block is all installed to the front surface of fixed plate, and two connect through supporting the piece between the fixed block, the wind gap department of wall body rear surface installs cleaning device, cleaning device includes handle, clearance brush and guide board, two guide boards are installed to the rear surface wind gap department of wall body, two sliding connection has the cleaning brush between the guide board, the brush face of cleaning brush hugs closely in the trade wind gap and goes out, the cleaning brush is kept away from the one end of wall body installs the handle.
2. The ventilation device for the building construction engineering according to claim 1, wherein the end of the abutting block is provided with an insertion rod.
3. The ventilation device for building construction engineering according to claim 1, wherein the two fixing plates are provided with an arc-shaped groove on the side facing the ventilator.
4. The ventilation device for building construction engineering according to claim 1, wherein a limiting block is installed at the end of the guiding plate, a stop block is slidably connected inside the limiting block, the other end of the stop block is located at the top of the guiding plate, a supporting block is installed on the outer side wall of the stop block, and the supporting block is located at the top of the limiting block.
5. A ventilating device for buildings according to claim 1, wherein the opposite surfaces of the two fixing plates are of smooth construction.
6. A ventilating device for buildings according to claim 1, wherein the brushes of the cleaning brushes are nylon members.
7. The ventilation device for building construction engineering according to claim 1, wherein the height of the two fixing plates is the same as the height of the fixing sleeve.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121603254.4U CN215597619U (en) | 2021-07-15 | 2021-07-15 | Ventilation device for building engineering building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121603254.4U CN215597619U (en) | 2021-07-15 | 2021-07-15 | Ventilation device for building engineering building |
Publications (1)
Publication Number | Publication Date |
---|---|
CN215597619U true CN215597619U (en) | 2022-01-21 |
Family
ID=79878135
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202121603254.4U Active CN215597619U (en) | 2021-07-15 | 2021-07-15 | Ventilation device for building engineering building |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN215597619U (en) |
-
2021
- 2021-07-15 CN CN202121603254.4U patent/CN215597619U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN215597619U (en) | Ventilation device for building engineering building | |
CN216204112U (en) | DOP liquid groove type efficient air supply outlet | |
CN210950223U (en) | Adjustable anti-seismic support | |
CN211372664U (en) | Air conditioner with good heat dissipation effect | |
CN204772556U (en) | Full -automatic hanging air conditioner shell cleaning robot | |
CN204555219U (en) | A kind of indoor apparatus of air conditioner pressure tube plate structure | |
CN210770822U (en) | Ventilating duct connecting structure for electromechanical engineering | |
CN217131443U (en) | Sterilization feedback device and light hydrogen ion purification equipment | |
CN211950993U (en) | Cleanable fan and guide plate | |
CN219120058U (en) | Automatic balancing ventilating duct for industrial factory | |
CN214746478U (en) | Modularization swimming pool heat pump | |
CN214370739U (en) | Ventilation energy-saving equipment of high-efficient green building | |
CN219221553U (en) | Heating and ventilation pipeline connector | |
CN213574179U (en) | Underground wind dispelling pipeline for mine | |
CN213475838U (en) | Ventilating device for small compost | |
CN218864329U (en) | Air guide mechanism of air outlet of air conditioner | |
CN216342280U (en) | Subway shaft ventilation unit | |
CN220728418U (en) | Dust filter equipment for new trend system | |
CN209766986U (en) | Reactive compensation cabinet based on modular design | |
CN216529968U (en) | Energy-concerving and environment-protective switch board is with inside quick dust removal mechanism | |
CN220187013U (en) | Ventilating device for building engineering construction | |
CN219735590U (en) | Fresh air purifier ventilation piece capable of preventing condensate water from flowing backwards | |
CN215735343U (en) | Communication cabinet for electronic information engineering | |
CN203785195U (en) | Air conditioner with dust removing plate | |
CN213993123U (en) | Possess new trend system cash sales counter |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |