CN215595070U - Strutting arrangement structure for building engineering construction - Google Patents

Strutting arrangement structure for building engineering construction Download PDF

Info

Publication number
CN215595070U
CN215595070U CN202121415657.6U CN202121415657U CN215595070U CN 215595070 U CN215595070 U CN 215595070U CN 202121415657 U CN202121415657 U CN 202121415657U CN 215595070 U CN215595070 U CN 215595070U
Authority
CN
China
Prior art keywords
movable shaft
supporting rod
fixedly arranged
fixed column
screw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202121415657.6U
Other languages
Chinese (zh)
Inventor
孙瑞亮
袁新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202121415657.6U priority Critical patent/CN215595070U/en
Application granted granted Critical
Publication of CN215595070U publication Critical patent/CN215595070U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a supporting device structure for building engineering construction, which comprises a fixed column, wherein connecting plates are fixedly arranged on two sides of the top end of the fixed column, a first movable shaft is fixedly arranged at the center of each connecting plate, a first supporting rod is fixedly arranged at the other end of each first movable shaft, a second movable shaft is fixedly arranged at the other end of each first supporting rod, a second supporting rod is fixedly arranged at the other end of each second movable shaft, a third movable shaft is fixedly arranged at the other end of each second supporting rod, and a fixed block is fixedly arranged at the end part of each third movable shaft. Through the cooperation that sets up fixed column, connecting plate, first loose axle, first bracing piece, second loose axle, second bracing piece, third loose axle and fixed block and use, it is less to have solved current strutting arrangement structure strong point for the building engineering construction, and the great inconvenient problem of transporting of structure volume as an organic whole.

Description

Strutting arrangement structure for building engineering construction
Technical Field
The utility model belongs to the field of constructional engineering, and particularly relates to a supporting device structure for constructional engineering construction.
Background
Building engineering construction need use strutting arrangement fixed with the template when partial engineering section construction, and current strutting arrangement is mostly a body structure, and the strong point is less, and the supporting effect is not good.
SUMMERY OF THE UTILITY MODEL
Aiming at the problems in the prior art, the utility model provides a supporting device structure for building engineering construction, wherein two sections of movably connected supporting rods are arranged, a fixing block is arranged at the lowest end of each supporting rod and slides up and down along a fixed column, when a sliding block slides to the top end, a first supporting rod is in a horizontal state and is horizontal to the top end of the fixed column, so that a part of supporting points are added to the whole device, and at the moment, the two supporting rods are fixed by fixing screws and first threaded holes to form a triangular stable structure.
The movable type solar cell module comprises a fixed column, wherein connecting plates are fixedly arranged on two sides of the top end of the fixed column, a first movable shaft is fixedly arranged in the center of each connecting plate, a first supporting rod is fixedly arranged at the other end of each first movable shaft, a second movable shaft is fixedly arranged at the other end of each first supporting rod, a second supporting rod is fixedly arranged at the other end of each second movable shaft, a third movable shaft is fixedly arranged at the other end of each second supporting rod, and a fixed block is fixedly arranged at the end part of each third movable shaft.
Preferably, the two sides of the fixing column are provided with sliding grooves corresponding to the two fixing blocks, the insides of the two sliding grooves are connected with sliding blocks in a sliding manner, and the outsides of the sliding blocks are fixedly connected with the corresponding fixing blocks.
Preferably, the lower ends of the two fixing blocks are respectively connected with a screw in a penetrating manner through threads, the upper end inside the sliding chute is provided with a first threaded hole, the lower end inside the sliding chute is provided with a second threaded hole, the first support rod is in a horizontal state when the screws are correspondingly positioned in the first threaded holes, and the first support rod is in a vertical state when the screws are positioned in the second threaded holes.
Compared with the prior art, the utility model has the following beneficial effects:
1. the supporting device for the building engineering construction is provided with the fixing column, the connecting plate, the first movable shaft, the first supporting rod, the second movable shaft, the second supporting rod, the third movable shaft and the fixing block, and solves the problems that the existing supporting device for the building engineering construction is few in structural supporting points, large in size and inconvenient to transport due to an integrated structure.
2. According to the utility model, the sliding chute and the sliding block are arranged, so that the fixed block at the lower end of the second supporting rod can slide up and down along the side surface of the fixed column, and the first supporting rod and the second supporting rod can be flexibly adjusted.
3. According to the utility model, the first support rod and the second support rod can be fixed after the screw is in threaded connection with the first threaded hole or the second threaded hole by arranging the screw, the first threaded hole and the second threaded hole.
Drawings
FIG. 1 is a schematic diagram of an overall structure provided by an embodiment of the present invention;
FIG. 2 is a schematic cross-sectional view of the overall structure provided by the embodiment of the present invention;
FIG. 3 is a structural diagram illustrating a connection state of a screw and a second threaded hole in an integral structure according to an embodiment of the present invention;
FIG. 4 is an enlarged view of the embodiment of the present invention shown in FIG. 2 at A;
in the figure: 1. fixing a column; 2. a connecting plate; 3. a first movable shaft; 4. a first support bar; 5. a second movable shaft; 6. a second support bar; 7. a third movable shaft; 8. a fixed block; 9. a chute; 10. a slider; 11. a screw; 12. a first threaded hole; 13. and a second threaded hole.
Detailed Description
In order to further understand the contents, features and effects of the present invention, the following embodiments are illustrated and described in detail with reference to the accompanying drawings.
The structure of the present invention will be described in detail below with reference to the accompanying drawings.
As shown in fig. 1 to 4, a supporting device structure for building engineering construction according to an embodiment of the present invention includes a fixed column 1, connecting plates 2 are fixedly disposed on both sides of a top end of the fixed column 1, a first movable shaft 3 is fixedly disposed at a center of the connecting plates 2, a first supporting rod 4 is fixedly disposed at the other end of the first movable shaft 3, a second movable shaft 5 is fixedly disposed at the other end of the first supporting rod 4, a second supporting rod 6 is fixedly disposed at the other end of the second movable shaft 5, a third movable shaft 7 is fixedly disposed at the other end of the second supporting rod 6, and a fixed block 8 is fixedly disposed at an end of the third movable shaft 7.
Referring to fig. 2, 3 and 4, the two sides of the fixing column 1 are provided with sliding grooves 9 corresponding to the positions of the two fixing blocks 8, the inside of the two sliding grooves 9 is connected with sliding blocks 10 in a sliding manner, and the outer sides of the sliding blocks 10 are fixedly connected with the corresponding fixing blocks 8.
Adopt above-mentioned scheme: through setting up spout 9 and slider 10, can be so that the fixed block 8 of second bracing piece 6 lower extreme slides from top to bottom along the side of fixed column 1, can be so that first bracing piece 4 and second bracing piece 6 can be adjusted in a flexible way.
Referring to fig. 2, 3 and 4, the lower ends of the two fixing blocks 8 are respectively connected with screws 11 through threads, first threaded holes 12 are formed in the upper ends of the inner portions of the sliding chutes 9, second threaded holes 13 are formed in the lower ends of the inner portions of the sliding chutes 9, the first supporting rods 4 are in a horizontal state when the screws 11 are located at the positions of the first threaded holes 12, and the first supporting rods 4 are in a vertical state when the screws 11 are located at the positions of the second threaded holes 13.
Adopt above-mentioned scheme: through setting up screw 11, first screw hole 12 and second screw hole 13, can be so that screw 11 and first screw hole 12 or second screw hole 13 threaded connection back realize fixed first bracing piece 4 and second bracing piece 6.
The working principle of the utility model is as follows:
when using, at first, constructor sets up fixed column 1 in the position that needs supported, then through upwards promoting fixed block 8, it slides along spout 9 to drive slider 10, make first bracing piece 4 and 1 top level of fixed column, then it is fixed with corresponding screw 11 and the 12 threaded connection of first screw hole, first bracing piece 4, form stable triangular structure between second bracing piece 6 and the fixed column 1, after finishing using, send screw 11 soon, promote fixed block 8 downwards, make laminating between first bracing piece 4 and second bracing piece 6 and the fixed column 1, then it is fixed with screw 1 corresponding 13 threaded connection of second screw hole, whole strutting arrangement structure is less this moment, be convenient for transport.
In summary, the following steps: this strutting arrangement structure for building engineering construction, through setting up fixed column 1, connecting plate 2, first loose axle 3, first bracing piece 4, second loose axle 5, second bracing piece 6, third loose axle 7, fixed block 8, spout 9, slider 10, screw 11, first screw hole 12 and the cooperation of second screw hole 13 use, it is less to have solved current strutting arrangement structure strong point for the building engineering construction, and the great inconvenient problem of transporting of structure volume as an organic whole.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (2)

1. The utility model provides a strutting arrangement structure for building engineering construction, includes fixed column (1), its characterized in that: two sides of the top end of the fixed column (1) are both fixedly provided with a connecting plate (2), the center of the connecting plate (2) is fixedly provided with a first movable shaft (3), the other end of the first movable shaft (3) is fixedly provided with a first supporting rod (4), a second movable shaft (5) is fixedly arranged at the other end of the first supporting rod (4), the other end of the second movable shaft (5) is fixedly provided with a second supporting rod (6), the other end of the second supporting rod (6) is fixedly provided with a third movable shaft (7), a fixed block (8) is fixedly arranged at the end part of the third movable shaft (7), sliding chutes (9) are formed in the two sides of the fixed column (1) corresponding to the two fixed blocks (8), sliding blocks (10) are connected inside the two sliding chutes (9) in a sliding manner, the outer side of the sliding block (10) is fixedly connected with the corresponding fixed block (8).
2. The supporting device structure for construction of construction engineering according to claim 1, wherein: two the lower extreme of fixed block (8) all runs through threaded connection and has screw (11), first screw hole (12) have been seted up to the inside upper end of spout (9), second screw hole (13) have been seted up to the inside lower extreme of spout (9), when screw (11) correspond the position that is in first screw hole (12), first bracing piece (4) are the horizontality, when screw (11) are in the position of second screw hole (13), first bracing piece (4) are vertical state.
CN202121415657.6U 2021-06-24 2021-06-24 Strutting arrangement structure for building engineering construction Expired - Fee Related CN215595070U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121415657.6U CN215595070U (en) 2021-06-24 2021-06-24 Strutting arrangement structure for building engineering construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121415657.6U CN215595070U (en) 2021-06-24 2021-06-24 Strutting arrangement structure for building engineering construction

Publications (1)

Publication Number Publication Date
CN215595070U true CN215595070U (en) 2022-01-21

Family

ID=79876156

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121415657.6U Expired - Fee Related CN215595070U (en) 2021-06-24 2021-06-24 Strutting arrangement structure for building engineering construction

Country Status (1)

Country Link
CN (1) CN215595070U (en)

Similar Documents

Publication Publication Date Title
CN215595070U (en) Strutting arrangement structure for building engineering construction
CN211898900U (en) Quakeproof building frame convenient to build
CN203638388U (en) Liquid crystal display panel placement frame
CN210416391U (en) Fixing and clamping device of transformer box
CN206628808U (en) A kind of adjustable support of screw rod transmission
CN206873628U (en) Assembled architecture steel construction
CN209132967U (en) A kind of traffic signal control
CN215253418U (en) Super-huge assembled steel structure supporting framework
CN208346659U (en) A kind of highly-safe road and bridge crack ruggedized construction
CN207724281U (en) Engineering pipe fitting rack that is a kind of easy to remove and adjusting
CN207260604U (en) A kind of assembled architecture wall board installation tool
CN220284009U (en) Desulfurization equipment for coal washing
CN206440029U (en) A kind of steel solar bracket
CN216110097U (en) Fence device for municipal construction
CN220096386U (en) Express delivery letter sorting transfer car (buggy)
CN207966433U (en) A kind of ideological and political propaganda movable stand
CN212923514U (en) Glass transportation frame for commodity circulation
CN216124018U (en) Portable drawing board frame for architectural design
CN220415378U (en) Landing leg device for adjusting trolley height
CN221319121U (en) Numerical control lifting frame
CN213394266U (en) Multifunctional numerical control experiment mobile workstation
CN212489293U (en) Children's bed with adjustable length
CN204125845U (en) Deck widening movable hanging basket device
CN214523031U (en) Multi-functional teaching blackboard convenient to remove
CN213904663U (en) A accounting show board for teaching

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220121