Prior art keywords
funnel
bottom plate
plate
funnel bottom
movable baffle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121842747.3U
Other languages
Chinese (zh)
Inventor
林波
王杰
姚学娜
贾必祥
李飞琛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Communications Construction Group Sixth Engineering Co ltd
Original Assignee
Third Engineering Co Ltd Of Cccc Fourth Highway Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Engineering Co Ltd Of Cccc Fourth Highway Engineering Co ltd filed Critical Third Engineering Co Ltd Of Cccc Fourth Highway Engineering Co ltd
Priority to CN202121842747.3U priority Critical patent/CN215594968U/en
Application granted granted Critical
Publication of CN215594968U publication Critical patent/CN215594968U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model discloses adjustable funnel and plugging integrated equipment for constructional column bell mouth construction, which comprises a funnel structure and a plugging structure, wherein the funnel structure is provided with a funnel opening; the funnel structure is provided with a funnel bottom plate and movable baffles positioned on two sides of the funnel bottom plate in the width direction; the movable baffles are connected with the funnel bottom plate in a sliding manner so as to adjust the distance between the two movable baffles; the bottom of the funnel bottom plate is provided with a support rod structure, and the support rod structure and the constructional column template jointly act on the funnel bottom plate to keep the inclination angle of the funnel bottom plate; the blocking structure is located on one side of the concrete output end of the funnel structure. The device has a novel structure and simple operation, can realize quick installation and disassembly, successfully solves the problem of long installation and disassembly period of the traditional formwork, and improves the construction efficiency and turnover rate; by adopting the equipment, the whole horn mouth is not required to be placed on the constructional column, and the equipment can be taken down along with the insertion and fixation of the supporting rod, so that the aim of saving concrete is fulfilled.

Description

Funnel and shutoff integration equipment with adjustable constructional column horn mouth
Technical Field
The utility model relates to the technical field of constructional engineering construction, in particular to adjustable funnel and plugging integrated equipment suitable for constructional column bell mouth construction.
Background
With the improvement of comprehensive national strength, the infrastructure industry is comprehensively and rapidly developed, the simplicity, the applicability and the economy of the construction process are particularly important, and the schedule of soft strength like the construction process is required while the hard strength of construction enterprises is greatly improved; the continuous improvement of the soft strength promotes the rapid development of construction enterprises, and particularly promotes the construction technology of the construction engineering industry to move to the international stage.
The improvement of soft strength improves the quality of construction engineering on one hand, and has very obvious improvement on the construction efficiency of construction enterprises on the other hand.
For a secondary structure of a building project, how to ensure the construction quality of the secondary structure and how to rapidly install and dismantle the secondary structure are all considered by construction managers; in the secondary structure construction, the pouring quality of concrete is more important except for the support of the embedded steel bars and the templates; the pain points of the forming quality of the secondary structure concrete in the prior art are the treatment of the bell mouth, how to fully pour the concrete, how to pour the concrete compactly, how to reduce the waste of the concrete and the like. The improvement of secondary structure concrete engineering efficiency of construction, the promotion of concrete construction quality mean the great reform to secondary structure is whole. The quality of the secondary structure affects the subsequent processes.
The secondary structure generally comprises the bar planting, reinforcement, the template is established, concrete placement process, summarize according to countless construction experience, secondary structure's among the prior art horn mouth sets up often because the restriction that receives factors such as concrete initial set time, need repeated setting horn mouth, even the workman is careful everywhere when the construction, but secondary structure constructional column concrete's shaping quality still is the management difficult point, consequently, technical staff in the field needs urgent need to develop a funnel and shutoff integration equipment that is applicable to constructional column horn mouth construction.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide adjustable funnel and plugging integrated equipment which is suitable for constructional column bell mouth construction and can control the molding quality of secondary structure concrete, reduce the waste of concrete and template materials and improve the operation efficiency.
In order to achieve the above purpose, the utility model provides the following technical scheme:
the utility model relates to a constructional column bell-mouth adjustable funnel and plugging integrated device, which comprises:
a funnel structure that guides concrete into a formwork of a construction column; and
a blocking structure located between the funnel structure and the construction column;
the funnel structure has:
a funnel bottom plate;
the movable baffles are positioned on two sides of the width direction of the funnel bottom plate;
the movable baffles are connected with the funnel bottom plate in a sliding manner so as to adjust the distance between the two movable baffles;
the bottom of the funnel bottom plate is provided with a support rod structure, and the support rod structure and the constructional column template jointly act on the funnel bottom plate to keep the inclination angle of the funnel bottom plate;
the blocking structure is located on one side of the concrete output end of the funnel structure.
Furthermore, the funnel bottom plate is made of a galvanized steel plate with the thickness of 250mm by 4 mm;
a clamping plate extending along the extending direction of the movable baffle is formed on one side, close to the funnel bottom plate, of the movable baffle, one end of the clamping plate is connected with the movable baffle into a whole, the other end of the clamping plate is separated from the movable baffle, and a sliding groove is formed between the clamping plate and the movable baffle;
the two end parts of the funnel bottom plate in the width direction are embedded into the sliding grooves;
two ends of the funnel bottom plate in the width direction are bent upwards to form end baffles, and the end baffles at the two ends can limit the movable baffle to slide down;
the space between the movable baffle plate and the funnel bottom plate is configured as a concrete drainage space.
Furthermore, one end of the clamping plate, which is separated from the movable baffle, is formed into a clamping plate sliding end;
the two sides of the bottom plate and the bottom of the funnel are provided with first mounting plates;
both sides install the slide bar between the first mounting panel, just the slide bar runs through joint board slip end is in order to order about adjustable fender follows the extending direction of slide bar removes.
Furthermore, a fixing plate capable of overlapping the template close to one side of the funnel bottom plate is arranged on one side of the funnel bottom plate close to the constructional column;
the fixing plates of the funnel bottom plate are lapped on the templates of the construction columns to maintain the position of the funnel bottom plate.
Further, the blocking structure comprises:
a plugging plate; and
a split screw structure;
one side of the movable baffle close to the plugging plate is configured to be an inclined surface, and when the funnel bottom plate and the movable baffle extend obliquely, the inclined surface of the movable baffle is attached to the plugging plate;
one end of the opposite-pulling screw structure is connected with the plugging plate, and the other end of the opposite-pulling screw structure is connected with the template on the other side of the constructional column.
Further, the split screw structure includes:
the outer surface of the counter-pulling screw rod is provided with an external thread;
the nuts are in threaded connection with the two ends of the counter-pulling screw rod; and
and the steel gasket is matched with the nut.
Furthermore, the plugging plate is provided with a long round hole along the axis in the vertical direction.
Further, the support rod structure includes:
the second mounting plates are connected to two sides of the bottom of the funnel bottom plate; and
the supporting rod is rotatably connected with the second mounting plate through a rotating shaft;
one end of the support rod, which is far away from the second mounting plate, extends obliquely downwards and forms a triangular support structure together with the funnel bottom plate and the plugging plate.
In the technical scheme, the funnel and the plugging integrated equipment with the adjustable constructional column bell mouth provided by the utility model has the following beneficial effects:
the device has a novel structure and simple operation, can realize quick installation and disassembly, successfully solves the problem of long installation and disassembly period of the traditional formwork, and improves the construction efficiency and turnover rate; by adopting the equipment, the whole horn mouth is not required to be placed on the constructional column, and the equipment can be taken down along with the insertion and fixation of the supporting rod, so that the aim of saving concrete is fulfilled.
Drawings
In order to more clearly illustrate the embodiments of the present application or technical solutions in the prior art, the drawings needed to be used in the embodiments will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments described in the present invention, and other drawings can be obtained by those skilled in the art according to the drawings.
Fig. 1 is a schematic structural view of a constructional column bell-mouth adjustable funnel and plugging integrated device provided in an embodiment of the present invention;
fig. 2 is a front view of a constructional column bell-mouth adjustable funnel and plugging integrated device provided in the embodiment of the present invention;
fig. 3 is a schematic structural view of a plugging plate of a constructional column bell-mouth adjustable funnel and plugging integrated equipment provided in the embodiment of the present invention.
Description of reference numerals:
1. a funnel bottom plate; 2. a movable baffle; 3. a blocking structure; 4. a support rod structure;
101. an end baffle; 102. a first mounting plate; 103. a slide bar; 104. a fixing plate;
201. a clamping and connecting plate; 202. a clamping plate sliding end; 203. a bevel;
301. a plugging plate; 302. oppositely pulling the screw rod; 303. a nut; 304. a steel gasket; 305. a long round hole; 401. a second mounting plate; 402. a support rod.
Detailed Description
In order to make the technical solutions of the present invention better understood, those skilled in the art will now describe the present invention in further detail with reference to the accompanying drawings.
See fig. 1-3;
the utility model relates to a constructional column bell-mouth adjustable funnel and plugging integrated device, which comprises:
a funnel structure that guides concrete into a formwork of a construction column; and
a blocking structure located between the funnel structure and the construction column;
the funnel structure has:
a funnel bottom plate 1;
the movable baffles 2 are positioned at the two sides of the width direction of the funnel bottom plate 1;
the movable baffles 2 are connected with the funnel bottom plate 1 in a sliding way so as to adjust the distance between the two movable baffles 2;
the bottom of the funnel bottom plate 1 is provided with a support rod structure 4, and the support rod structure 4 and the constructional column template jointly act on the funnel bottom plate 1 to keep the inclination angle of the funnel bottom plate 1;
the blocking structure is located on one side of the concrete output end of the funnel structure.
Specifically, the embodiment discloses a funnel and plugging integrated device suitable for constructional column bell mouth construction; the concrete pouring device comprises a funnel structure, a plugging structure and a corresponding support rod structure 4, wherein the funnel structure is mainly used for being arranged at a certain angle, and then flow guide is formed on concrete so as to realize accurate pouring; after pouring, the horn mouth of the constructional column is blocked by the blocking structure, and the angle can be adjusted by the support rod structure 4 in the whole construction process to form stable support so as to ensure smooth construction.
Preferably, the funnel bottom plate 1 of the present embodiment is made of a galvanized steel plate with a thickness of 250mm × 4 mm;
a clamping plate 201 extending along the extending direction of the movable baffle 2 is formed on one side, close to the funnel bottom plate 1, of the movable baffle 2, one end of the clamping plate 201 is connected with the movable baffle 2 into a whole, the other end of the clamping plate 201 is separated from the movable baffle 2, and a sliding groove is formed between the clamping plate 201 and the movable baffle 2;
two end parts of the funnel bottom plate 1 in the width direction are embedded into the sliding grooves;
two ends of the funnel bottom plate 1 in the width direction are bent upwards to form end baffles 101, and the end baffles 101 at the two ends can limit the movable baffle 2 to slide down;
the space between the flapper 2 and the funnel floor 1 is configured as a concrete drainage space.
The movable baffle plate 2 disclosed in the present embodiment is configured as a galvanized steel plate with a wedge-shaped structure having an upper end of 220mm, a lower end of 250mm, a height of 50mm, and a thickness of 4 mm; meanwhile, the material and parameters of the clamping plate 201 connected with the clamping plate are consistent. And the length of the clamping plate 201 is 100mm, and the width of the funnel can be changed by adjusting the relative distance of the movable baffle plates 2 at two sides, so that the funnel can be suitable for different sizes of constructional columns.
One end of the clamping plate 201 separated from the movable baffle 2 is formed into a clamping plate sliding end 202;
the two sides of the funnel bottom plate 1 and the bottom are provided with first mounting plates 102;
a sliding rod 103 is installed between the first installation plates 102 on both sides, and the sliding rod 103 penetrates through the sliding end 202 of the clamping plate to drive the movable baffle 2 to move along the extending direction of the sliding rod 103.
In addition, in order to connect the funnel bottom plate 1 with the template of the constructional column to stabilize the funnel bottom plate 1, the side of the funnel bottom plate 1 close to the constructional column is provided with a fixing plate 104 which can lap the template close to the side of the funnel bottom plate 1; the attachment plate 104 of the funnel base plate 1 is placed over the formwork of the construction post to maintain the position of the funnel base plate 1.
The slide rod 103 of the embodiment is made of galvanized round steel with a diameter of 8mm, and is welded between the first mounting plates of the funnel bottom plate 1, the welding position is 10mm away from the two side edges, and the distance from the upper end of the funnel bottom plate 1 is 100mm, so that the movable baffle plate 2 can be prevented from being deformed or overturned in the sliding process.
Preferably, the plugging structure of the present embodiment includes:
a plugging plate 301; and
a split screw structure;
one side of the movable baffle 2, which is close to the blocking plate 301, is configured into an inclined surface, and when the funnel bottom plate 1 and the movable baffle 2 extend obliquely, the inclined surface 203 of the movable baffle 2 is attached to the blocking plate 301;
one end of the opposite-pulling screw structure is connected with the plugging plate 301, and the other end of the opposite-pulling screw structure is connected with the template on the other side of the constructional column.
Wherein, foretell split screw structure includes:
the external surface of the counter-pull screw rod 302 is provided with external threads;
nuts 303 screwed to both ends of the counter screw 302; and
a steel washer 304 that mates with nut 303. The plugging plate 301 is provided with an oblong hole 305 along the vertical axis thereof.
Preferably, the support rod structure 4 of the present embodiment includes:
the second mounting plates 401 are connected to two sides of the bottom of the funnel bottom plate 1; and
a strut 402 rotatably connected to the second mounting plate 401 via a rotating shaft;
the end of the strut 402 away from the second mounting plate 401 extends obliquely downwards and forms a triangular support structure with the funnel bottom plate 1 and the blocking plate 301.
For connecting the funnel bottom plate 1 with the template, the height of the fixing plate 104 is 10mm, and the length is 200 mm; the plugging plate 301 can be conveniently inserted and the equipment can be quickly disassembled after the concrete pouring is finished. In addition, the plugging plate 301 of the embodiment is a galvanized steel plate with the thickness of 300mm × 150mm × 4mm, and a wedge with the thickness of 100mm × 15mm is arranged in the middle of the galvanized steel plate, so that after concrete pouring is facilitated, the plugging plate 301 is inserted into concrete, the counter-pulling screw 302 can penetrate through the plugging plate 301 to fix the plugging plate 301 on a constructional column, a bolt hole is formed in a formwork opposite to the reserved opening of the constructional column in advance before concrete pouring, the counter-pulling screw 302 is inserted in the counter-pulling screw, and the formwork is fastened by using a nut. The counter-pulling screw 302 according to the embodiment is an M14 screw, and the size of the steel gasket 304 is 150mm by 20mm by 2mm galvanized steel plate.
In addition, the supporting rods 402 are symmetrically arranged on two sides of the bottom of the funnel bottom plate 1 to form a supporting structure; the during operation only needs an operation personnel just can accomplish the operation, and when secondary structure template was established, reserved the feed inlet in advance, it is bigger to compare traditional feed inlet, difficult shutoff, shaping quality subalternation problem, and this equipment only need open 100 mm's opening just can carry out pouring of concrete. The two support rods 402 form a stable triangular support structure, support concrete enters the constructional column from the end baffle 101, after the concrete pouring surface reaches or exceeds the highest point of the constructional column, the support rods are inserted, the concrete and equipment are divided, and redundant concrete in the hopper is recovered.
In the technical scheme, the funnel and the plugging integrated equipment with the adjustable constructional column bell mouth provided by the utility model has the following beneficial effects:
the device has a novel structure and simple operation, can realize quick installation and disassembly, successfully solves the problem of long installation and disassembly period of the traditional formwork, and improves the construction efficiency and turnover rate; by adopting the equipment, the whole horn mouth is not required to be placed on the constructional column, and the equipment can be taken down along with the insertion and fixation of the supporting rod, so that the aim of saving concrete is fulfilled.
The equipment has good turnover performance, and can also effectively prevent the problems of concrete waste, poor forming quality of constructional columns and insufficient pouring.
While certain exemplary embodiments of the present invention have been described above by way of illustration only, it will be apparent to those of ordinary skill in the art that the described embodiments may be modified in various different ways without departing from the spirit and scope of the utility model. Accordingly, the drawings and description are illustrative in nature and should not be construed as limiting the scope of the utility model.

Claims (8)

1. Funnel and shutoff integration equipment with adjustable constructional column horn mouth, its characterized in that, this equipment includes:
a funnel structure that guides concrete into a formwork of a construction column; and
a blocking structure located between the funnel structure and the construction column;
the funnel structure has:
a funnel bottom plate (1);
the movable baffles (2) are positioned on two sides of the width direction of the funnel bottom plate (1);
the movable baffle plates (2) are in sliding connection with the funnel bottom plate (1) so as to adjust the distance between the two movable baffle plates (2);
the bottom of the funnel bottom plate (1) is provided with a support rod structure (4), and the support rod structure (4) and a constructional column template jointly act on the funnel bottom plate (1) to keep the inclination angle of the funnel bottom plate (1);
the blocking structure is located on one side of the concrete output end of the funnel structure.
2. The integrated apparatus of claim 1, wherein the funnel bottom plate (1) is made of galvanized steel sheet with thickness of 250mm x 4 mm;
a clamping and connecting plate (201) extending along the extending direction of the movable baffle (2) is formed on one side, close to the funnel bottom plate (1), of the movable baffle (2), one end of the clamping and connecting plate (201) is connected with the movable baffle (2) into a whole, the other end of the clamping and connecting plate (201) is separated from the movable baffle (2), and a sliding groove is formed between the clamping and connecting plate (201) and the movable baffle (2);
the two end parts of the funnel bottom plate (1) in the width direction are embedded into the sliding grooves;
two ends of the funnel bottom plate (1) in the width direction are bent upwards to form end baffles (101), and the end baffles (101) at the two ends can limit the movable baffle (2) to slide down;
the space between the movable baffle (2) and the funnel bottom plate (1) is configured as a concrete drainage space.
3. The constructional column bell-mouth adjustable funnel and sealing integrated equipment as claimed in claim 2, wherein the end of the clamping plate (201) separated from the movable baffle (2) is formed into a clamping plate sliding end (202);
the funnel bottom plate (1) and two sides of the bottom are provided with first mounting plates (102);
a sliding rod (103) is arranged between the first mounting plates (102) on the two sides, and the sliding rod (103) penetrates through the sliding end (202) of the clamping plate so as to drive the movable baffle (2) to move along the extending direction of the sliding rod (103).
4. The constructional column bell-mouth adjustable funnel and plugging integrated equipment as recited in claim 2, wherein the side of the funnel bottom plate (1) close to the constructional column is provided with a fixing plate (104) capable of overlapping the formwork close to the side of the funnel bottom plate (1);
the fastening plates (104) of the funnel bottom plate (1) are placed on the formwork of the construction column in order to maintain the position of the funnel bottom plate (1).
5. The integrated, construction column, flare-adjustable funnel and block apparatus of claim 4, wherein the block structure comprises:
a plugging plate (301); and
a split screw structure;
one side of the movable baffle (2), which is close to the blocking plate (301), is configured to be an inclined surface (203), and when the funnel bottom plate (1) and the movable baffle (2) extend obliquely, the inclined surface (203) of the movable baffle (2) is attached to the blocking plate (301);
one end of the split screw structure is connected with the plugging plate (301), and the other end of the split screw structure is connected with the template on the other side of the constructional column.
6. The integrated, construction post, flare-adjustable funnel and closure apparatus of claim 5, wherein the split screw structure comprises:
a counter-pull screw (302), the outer surface of the counter-pull screw (302) having external threads;
the nuts (303) are in threaded connection with two ends of the counter-pulling screw rod (302); and
a steel washer (304) cooperating with said nut (303).
7. The constructional column bell-mouth adjustable funnel and plugging integrated device as claimed in claim 6, wherein the plugging plate (301) is slotted with a slotted hole (305) along its vertical axis.
8. The constructional column bell-mouth adjustable funnel and plugging integrated equipment as claimed in claim 5, wherein said support rod structure (4) comprises:
the second mounting plates (401) are connected to two sides of the bottom of the funnel bottom plate (1); and
a support rod (402) rotatably connected with the second mounting plate (401) through a rotating shaft;
one end, far away from the second mounting plate (401), of the support rod (402) extends downwards in an inclined mode, and the support rod, the funnel bottom plate (1) and the plugging plate (301) form a triangular support structure.
CN202121842747.3U 2021-08-09 2021-08-09 Funnel and shutoff integration equipment with adjustable constructional column horn mouth Active CN215594968U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121842747.3U CN215594968U (en) 2021-08-09 2021-08-09 Funnel and shutoff integration equipment with adjustable constructional column horn mouth

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121842747.3U CN215594968U (en) 2021-08-09 2021-08-09 Funnel and shutoff integration equipment with adjustable constructional column horn mouth

Publications (1)

Publication Number Publication Date
CN215594968U true CN215594968U (en) 2022-01-21

Family

ID=79880603

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121842747.3U Active CN215594968U (en) 2021-08-09 2021-08-09 Funnel and shutoff integration equipment with adjustable constructional column horn mouth

Country Status (1)

Country Link
CN (1) CN215594968U (en)

Similar Documents

Publication Publication Date Title
CN107053440B (en) A kind of precast plate girder pedestal production method
CN215594968U (en) Funnel and shutoff integration equipment with adjustable constructional column horn mouth
CN107120128A (en) A kind of operate with method of the longitudinal waterstop positioning fixture of novel tunnel
CN207110466U (en) Pulling-on piece formula aluminum alloy mould plate reinforcing member and pulling-on piece formula template system
CN210658396U (en) Slope concrete construction template and slope concrete construction device
CN210032625U (en) Accurate stop device of template
CN107916786B (en) Building template fastening structure
CN217353554U (en) Reinforcing mechanism of building peripheral boundary beam side template
CN210508401U (en) Pull rod assembly for building shuttering
CN214658822U (en) Can have enough to meet need building templates anchor clamps of use
CN206360344U (en) Framed column template root square steel tube anchor ear part
CN205444893U (en) Template system is pour to rectangle post structure
CN212224611U (en) Shear force wall pouring template reinforcing apparatus
CN213890519U (en) Concrete discharging hopper for tubular pile production and distribution
CN115095142A (en) Beam hole plugging die and construction method thereof
CN210263915U (en) Exempt from interior propping, anti-bank template reinforcing apparatus of combination formula steel concrete stagnant water
CN210659281U (en) Vertical template demolishs instrument of combination aluminum alloy for building
CN208835580U (en) A kind of pipe trench high-tension cable concrete support installation fixed structure
CN210598136U (en) Screw rod reinforcing piece with fixing piece for side mold of building outer side beam
CN110017022A (en) A kind of template accurate limiting device and mold method
CN217601528U (en) Stagnant water steel sheet strutting arrangement
CN219365417U (en) Device for reserving middle-sized steel penetration holes of building shear wall
CN220247624U (en) Unilateral fixed water stop bolt reinforced structure
CN210013474U (en) Deviation prevention device for aluminum mould K plate
CN219773593U (en) Reinforcing template applied to parapet construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 100176, 4th Floor, Building 1, Courtyard 1, Kegu Fourth Street, Beijing Economic and Technological Development Zone, Daxing District, Beijing

Patentee after: China Communications Construction Group Sixth Engineering Co.,Ltd.

Address before: 100123 21st floor, international innovation and Exhibition Center, No.25, ganluyuan Nanli, Chaoyang District, Beijing

Patentee before: THIRD ENGINEERING CO., LTD. OF CCCC FOURTH HIGHWAY ENGINEERING Co.,Ltd.