CN215594524U - Assembled hanging system capable of being adjusted in three dimensions and positioned quickly - Google Patents

Assembled hanging system capable of being adjusted in three dimensions and positioned quickly Download PDF

Info

Publication number
CN215594524U
CN215594524U CN202121845660.1U CN202121845660U CN215594524U CN 215594524 U CN215594524 U CN 215594524U CN 202121845660 U CN202121845660 U CN 202121845660U CN 215594524 U CN215594524 U CN 215594524U
Authority
CN
China
Prior art keywords
vertical rib
positioning
horizontal
plate
prefabricated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121845660.1U
Other languages
Chinese (zh)
Inventor
杨友富
杜庆林
翟国占
黄庆祥
张忠明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Shenzhen Decoration Co Ltd
Original Assignee
China Construction Shenzhen Decoration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Shenzhen Decoration Co Ltd filed Critical China Construction Shenzhen Decoration Co Ltd
Priority to CN202121845660.1U priority Critical patent/CN215594524U/en
Application granted granted Critical
Publication of CN215594524U publication Critical patent/CN215594524U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

The utility model provides an assembled system that articulates that can three-dimensionally adjust and fix a position fast, includes prefabricated steel corbel support, three-dimensional adjusting bolt, prefabricated rotatory reinforcing bar and curtain steel skeleton, steel corbel support includes horizontal support plate, supports and erects floor, location and erects floor and locating plate reinforcement, and three-dimensional adjusting bolt includes two horizontal adjusting bolt and a vertical adjusting bolt, and prefabricated rotatory reinforcing bar is located the top of curtain steel skeleton, the bottom of prefabricated rotatory reinforcing bar and the upside surface welded connection of curtain steel skeleton. The utility model adopts the scheme that the prefabricated steel support, the three-dimensional adjusting bolt and the prefabricated rotating steel bar are matched, solves the problems of three-dimensional adjustment and reliable connection, improves the construction efficiency and reduces the cost.

Description

Assembled hanging system capable of being adjusted in three dimensions and positioned quickly
Technical Field
The utility model belongs to the field of curtain walls, and particularly relates to an assembled hanging system capable of being adjusted in a three-dimensional mode and positioned quickly.
Background
The current fabricated design is widely used in various curtain wall systems. From the vertical surface, the suspended ceiling to the roof, the assembly type is deeply approved by various circles due to the high construction speed and the controllable construction quality. However, how to quickly install the plate, how to perform three-dimensional adjustment, and how to perform quick and reliable positioning after adjustment are practical problems faced by each curtain wall system, especially the positioning after adjustment, most of the current design systems adopt modes of directly welding connecting pieces or increasing stacking piece welding and the like, and all need a large amount of welding and stacking pieces with various lengths, which is not beneficial to large-scale material purchasing and field construction. There is an urgent need for an assembled hanging system with three-dimensional adjustment and reliable connection for curtain walls to overcome the above-mentioned drawbacks.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide an assembled hanging system capable of being adjusted in three dimensions and positioned quickly, and aims to solve the technical problems that the existing positioning needs a large amount of welding work and pieces with various lengths, and is not beneficial to large-scale material purchasing and field construction.
In order to achieve the purpose, the utility model adopts the following technical scheme:
an assembled hanging system capable of being adjusted in three dimensions and positioned quickly comprises a prefabricated steel corbel support, a three-dimensional adjusting bolt, a prefabricated rotating steel bar and a curtain wall steel skeleton, wherein the prefabricated steel corbel support is fixedly connected to a vertical main steel structure, the surface of the parallel main steel structure in the horizontal direction is horizontal, the surface of the vertical main steel structure is longitudinal, the rear side is close to the main steel structure, the front side is far away from the main steel structure, the curtain wall steel skeleton is arranged horizontally,
the prefabricated steel bracket support is a main steel structure which comprises a horizontal supporting plate, a supporting vertical rib plate, a positioning vertical rib plate and a positioning plate reinforcing vertical rib plate,
the horizontal supporting plate is longitudinally arranged, the rear side of the horizontal supporting plate is fixedly connected with the front side of the main steel structure,
the supporting vertical rib plates are longitudinally arranged, the rear sides of the supporting vertical rib plates are also fixedly connected with the front side of the main steel structure,
the positioning vertical rib plates are transversely arranged, the bottom sides of the positioning vertical rib plates are fixedly connected with the upper side surface of the horizontal supporting plate, the front side and the rear side of the upper part are provided with two positioning vertical steel plates which are oppositely arranged in parallel at intervals along the longitudinal direction of the horizontal supporting plate,
the positioning plate reinforcing vertical rib plate is longitudinally arranged and is positioned between the back side of the positioning vertical rib plate and the horizontal supporting plate, the rear side of the positioning plate reinforcing vertical rib plate is fixedly connected with the front side of the positioning vertical rib plate, the bottom side of the positioning plate reinforcing vertical rib plate is fixedly connected with the upper side of the horizontal supporting plate,
the steel skeleton of the curtain wall is positioned between the positioning vertical rib plates and above the horizontal supporting plate,
the three-dimensional adjusting bolt comprises two horizontal adjusting bolts and a vertical adjusting bolt, the horizontal adjusting bolts respectively penetrate through the centers of the two positioning vertical rib plates towards the curtain wall steel framework and are respectively tightly propped against the front side surface and the rear side surface of the curtain wall steel framework, the vertical adjusting bolt upwards penetrates through the horizontal supporting plate, the penetrating position is positioned between the two positioning vertical rib plates and is tightly propped against the lower side surface of the curtain wall steel framework,
the prefabricated rotating reinforcing steel bars are located above the steel framework of the curtain wall, the two ends of the prefabricated rotating reinforcing steel bars respectively penetrate through the positioning vertical rib plates and are fixedly connected with the positioning vertical rib plates, and the bottom of the prefabricated rotating reinforcing steel bars is connected with the upper side surface of the steel framework of the curtain wall in a welded mode.
Two positioning plate reinforced vertical rib plates are arranged on the back side of each positioning vertical rib plate at intervals along the transverse direction.
The horizontal adjusting bolt comprises a horizontal adjusting screw and a horizontal adjusting nut, a horizontal adjusting bolt hole for the horizontal adjusting screw to pass through is formed in the positioning vertical rib plate, and the horizontal adjusting nut is welded on the back side of the positioning vertical rib plate and the position of the horizontal adjusting bolt hole.
The vertical adjusting bolt comprises a vertical adjusting screw and a vertical adjusting nut, a vertical adjusting bolt hole for the vertical adjusting screw to pass through is formed in the horizontal supporting plate, and the vertical adjusting nut is welded at the lower side of the horizontal supporting plate and the position of the vertical adjusting bolt hole.
And connecting holes for the prefabricated rotating reinforcing steel bars to pass through are formed in the positioning vertical rib plates and between the positioning plate reinforcing vertical rib plates.
The connecting hole is positioned on one side of the upper part of the horizontal adjusting bolt, which is not opposite to the direction.
Prefabricated rotating reinforcement includes the rotating part at both ends and middle connecting portion, the relative rotating part of connecting portion is protruding towards the lateral buckling, the rotating part passes the connecting hole and the connecting portion formation that makes prefabricated rotating reinforcement in downthehole rotation is connected with two kinds of contact and non-contact with the curtain steel skeleton.
The rotating part contacts with the curtain steel skeleton, and the rotating part is connected with the location vertical rib plate in connecting hole position welded connection, connecting portion keep being a straight line, the downside of connecting portion and the upside surface welded connection of curtain steel skeleton.
Compared with the prior art, the utility model has the following characteristics and beneficial effects:
the prefabricated steel bracket support, the three-dimensional adjusting bolt and the prefabricated rotating steel bar are adopted, so that unified purchasing and processing of materials are realized, and factory prefabrication is facilitated and direct delivery to a construction site is facilitated.
The curtain wall steel frame fixing device is provided with the three-dimensional adjusting bolts, so that adjustment of large space can be realized, and the curtain wall steel frame can be conveniently and reliably fixed by arranging the prefabricated rotating steel bars.
The utility model has the advantages of safe and reliable structure and convenient and quick construction, effectively reduces the use cost and labor intensity of construction equipment, and improves the construction efficiency and safety.
Drawings
The present invention will be described in further detail with reference to the accompanying drawings.
Fig. 1 is a schematic view of the overall structure of the present invention.
Fig. 2 is an exploded view of the overall structure of the present invention.
Fig. 3 is an exploded view of the prefabricated steel standoff of the present invention.
Fig. 4 is a vertical cross-sectional view of the present invention.
Fig. 5 is a transverse cross-sectional view of the present invention.
Reference numerals: the method comprises the following steps of 1-main steel structure, 2-prefabricated steel bracket support, 21-horizontal supporting plate, 22-supporting vertical ribbed plate, 23-positioning vertical ribbed plate, 24-positioning plate reinforced vertical ribbed plate, 25-horizontal adjusting bolt hole, 26-vertical adjusting bolt hole, 27-connecting hole, 3-prefabricated rotating steel bar, 31-rotating part, 32-connecting part, 4-curtain wall steel skeleton, 5-horizontal adjusting bolt, 51-horizontal adjusting screw, 52-horizontal adjusting nut, 6-vertical adjusting bolt, 61-vertical adjusting screw and 62-vertical adjusting nut.
Detailed Description
The embodiment is shown in figures 1-5, and an assembly type hanging system capable of being three-dimensionally adjusted and rapidly positioned comprises a prefabricated steel corbel support 2 fixedly connected to a vertical main steel structure 1, a three-dimensional adjusting bolt, a prefabricated rotating steel bar 3 and a curtain wall steel framework 4, wherein the surface of the parallel main steel structure 1 in the horizontal direction is horizontal, the surface of the vertical main steel structure 1 is vertical, the part close to the main steel structure 1 is the rear side, the part far away from the main steel structure 1 is the front side, and the curtain wall steel framework 4 is transversely arranged.
The prefabricated steel bracket support 2 is cantilevered out of the main steel structure 1 and comprises a horizontal supporting plate 21 in the middle, a supporting vertical rib plate 22 at the lower part, a positioning vertical rib plate 23 at the upper part and a positioning plate reinforcing vertical rib plate 24. In this embodiment, all the steel plates are subjected to corrosion prevention treatment after welding in a factory.
The horizontal supporting plate 21 is longitudinally arranged, and the rear side of the horizontal supporting plate is fixedly connected with the front side of the main steel structure 1. The support vertical rib plate 22 is longitudinally arranged, and the rear side of the support vertical rib plate is fixedly connected with the front side of the main steel structure 1. The positioning vertical rib plates 23 are transversely arranged, the bottom sides of the positioning vertical rib plates 23 are fixedly connected to the upper side surface of the horizontal supporting plate 21, and the two positioning vertical rib plates 23 are oppositely arranged in parallel at intervals along the longitudinal direction of the horizontal supporting plate 21. The positioning plate reinforcing vertical rib plates 24 are longitudinally arranged, and two positioning plate reinforcing vertical rib plates 24 are transversely arranged on the back side of each positioning vertical rib plate 23 at intervals. The rear side of the positioning plate reinforcing vertical rib plate 24 is fixedly connected with the front side of the positioning vertical rib plate 23, and the bottom side of the positioning plate reinforcing vertical rib plate 24 is fixedly connected with the upper side of the horizontal supporting plate 21.
The curtain wall steel framework 4 is positioned between the positioning vertical rib plates 23 and above the horizontal supporting plate 21.
The three-dimensional adjusting bolt comprises two horizontal adjusting bolts 5 and a vertical adjusting bolt 6, wherein the horizontal adjusting bolts 5 respectively penetrate through the centers of the two positioning vertical rib plates 23 towards the curtain wall steel framework 4 and respectively prop against the front side surface and the rear side surface of the curtain wall steel framework 4, the vertical adjusting bolt 6 upwards penetrates through the horizontal supporting plate 21, and the penetrating position is located between the two positioning vertical rib plates 23 and props against the lower side surface of the curtain wall steel framework 4. The horizontal adjusting bolt 5 comprises a horizontal adjusting screw 51 and a horizontal adjusting nut 52, the horizontal adjusting bolt hole 25 through which the horizontal adjusting screw 51 passes is formed in the positioning vertical rib plate 23, and the horizontal adjusting nut 52 is welded on the back side of the positioning vertical rib plate 23 and at the position of the horizontal adjusting bolt hole 25. Vertical adjusting bolt 6 includes vertical adjusting screw 61 and vertical adjusting nut 62, it has the vertical adjusting bolt hole 26 that supplies vertical adjusting screw 61 to pass to open on the horizontal support plate 21, vertical adjusting nut 62 welds the position at downside, vertical adjusting bolt hole 26 of horizontal support plate 21, and the regulation length of bolt should satisfy the demand of regulating variable to should do and relax the processing.
Prefabricated rotating reinforcement 3 is located the top of curtain steel skeleton 4, and the both ends of prefabricated rotating reinforcement 3 run through respectively and fix a position the upright floor 23 and rather than fixed connection, and the bottom of prefabricated rotating reinforcement 3 and the upside surface welded connection of curtain steel skeleton 4. And a connecting hole 27 for the prefabricated rotating steel bar 3 to pass through is formed on the positioning vertical rib plate 23 and between the positioning plate reinforcing vertical rib plates 24. The connecting hole 27 is positioned on one side of the upper part of the horizontal adjusting bolt 5 in the non-opposite direction. The prefabricated rotating steel bar 3 comprises rotating parts 31 at two ends and a middle connecting part 32, the connecting part 32 is bent and protruded towards one side relative to the rotating parts 31, and the rotating parts 32 penetrate through the connecting holes 27 and rotate in the holes to enable the connecting parts 32 of the prefabricated rotating steel bar 3 to be connected with the curtain wall steel framework 4 in a contact mode and a non-contact mode. The contact length of the prefabricated rotating reinforcing steel bar needs to meet the stress calculation and the requirement of the adjustment amount, and the prefabricated rotating reinforcing steel bar is uniformly bent in a factory and needs to be subjected to anti-corrosion treatment.
The fixed connection in this embodiment is a welded connection.
The rotating portion 32 is in contact with the curtain wall steel framework 4, the rotating portion 32 is connected with the positioning vertical rib plate 23 in a welding mode at the position of the connecting hole 27, the connecting portion 32 keeps a straight line, and the lower side of the connecting portion 32 is connected with the upper side surface of the curtain wall steel framework 4 in a welding mode.
The steel frame of the curtain wall comprises curtain wall structural forms in various styles, and is not limited to curtain walls such as facades, suspended ceilings, roofs and the like.
The specific application method of the utility model is as follows:
step one, determining the form of a steel frame 4 of the curtain wall according to the actual construction condition, and then prefabricating the size of the prefabricated steel bracket support 2 in a factory.
And step two, welding the prefabricated steel bracket support 2 on the main steel structure 1.
And step three, integrally hoisting the curtain wall steel skeleton 4 by using a truck crane or a tower crane, installing the curtain wall steel skeleton on more than two prefabricated steel bracket supports 2 which are arranged in parallel in the same row, and reserving an adjusting and installing space between the curtain wall steel skeleton and the prefabricated steel bracket supports 2.
And step four, the curtain wall steel framework 4 is three-dimensionally adjusted in position in the vertical and horizontal directions by rotating the horizontal adjusting bolt 5 and the vertical adjusting bolt 6.
And fifthly, mounting the prefabricated rotating reinforcing steel bar 3 on the prefabricated steel bracket support 2 through the connecting hole 27, fully contacting with the curtain wall steel framework 4 after rotation, and welding and fixing the prefabricated rotating reinforcing steel bar 3 and the prefabricated steel bracket support 2.
And step six, welding and fixing the prefabricated rotating steel bars 3 and the prefabricated steel bracket support 2 to complete reliable connection of the steel frame 4 of the curtain wall.

Claims (8)

1. The utility model provides a but assembled system that articulates of three-dimensional regulation and quick location which characterized in that: comprises a prefabricated steel bracket support (2), a three-dimensional adjusting bolt, a prefabricated rotating reinforcing steel bar (3) and a curtain wall steel framework (4) which are fixedly connected on a vertical main steel structure (1), wherein the surface of the parallel main steel structure (1) in the horizontal direction is horizontal, the surface of the vertical main steel structure (1) is longitudinal, the surface close to the main steel structure (1) is the rear side, the surface far away from the main steel structure (1) is the front side, the curtain wall steel framework (4) is transversely arranged,
the prefabricated steel bracket support (2) is cantilevered out of the main steel structure (1) and comprises a horizontal supporting plate (21) in the middle, a supporting vertical rib plate (22) at the lower part, a positioning vertical rib plate (23) at the upper part and a positioning plate reinforcing vertical rib plate (24),
the horizontal supporting plate (21) is longitudinally arranged, the rear side of the horizontal supporting plate is fixedly connected with the front side of the main steel structure (1),
the supporting vertical rib plate (22) is longitudinally arranged, the rear side of the supporting vertical rib plate is fixedly connected with the front side of the main steel structure (1),
the positioning vertical rib plates (23) are transversely arranged, the bottom sides of the positioning vertical rib plates are fixedly connected with the upper side surface of the horizontal supporting plate (21), the two positioning vertical rib plates (23) are oppositely arranged in parallel at intervals along the longitudinal direction of the horizontal supporting plate (21),
the positioning plate reinforcing vertical rib plate (24) is longitudinally arranged and is positioned between the back side of the positioning vertical rib plate (23) and the horizontal supporting plate (21), the rear side of the positioning plate reinforcing vertical rib plate (24) is fixedly connected with the front side of the positioning vertical rib plate (23), the bottom side of the positioning plate reinforcing vertical rib plate (24) is fixedly connected with the upper side of the horizontal supporting plate (21),
the steel frame (4) of the curtain wall is positioned between the positioning vertical rib plates (23) and above the horizontal supporting plate (21),
the three-dimensional adjusting bolt comprises two horizontal adjusting bolts (5) and a vertical adjusting bolt (6), wherein the horizontal adjusting bolt (5) respectively penetrates through the centers of the two positioning vertical rib plates (23) towards the curtain wall steel framework (4) and is respectively tightly propped against the front side surface and the rear side surface of the curtain wall steel framework (4), the vertical adjusting bolt (6) upwards penetrates through the horizontal supporting plate (21), the penetrating position is positioned between the two positioning vertical rib plates (23) and is tightly propped against the lower side surface of the curtain wall steel framework (4),
prefabricated rotating reinforcement (3) are located the top of curtain steel skeleton (4), and the both ends of prefabricated rotating reinforcement (3) run through respectively and fix a position upright floor (23) and rather than fixed connection, the upside surface welded connection of the bottom of prefabricated rotating reinforcement (3) and curtain steel skeleton (4).
2. The three-dimensionally adjustable and quickly positionable fabricated hitching system of claim 1, further comprising: two positioning plate reinforcing vertical rib plates (24) are arranged on the back side of each positioning vertical rib plate (23) at intervals along the transverse direction.
3. The three-dimensionally adjustable and quickly positionable fabricated hitching system of claim 1, further comprising: the horizontal adjusting bolt (5) comprises a horizontal adjusting screw rod (51) and a horizontal adjusting nut (52), a horizontal adjusting bolt hole (25) for the horizontal adjusting screw rod (51) to penetrate through is formed in the positioning vertical rib plate (23), and the horizontal adjusting nut (52) is welded on the back side of the positioning vertical rib plate (23) and at the position of the horizontal adjusting bolt hole (25).
4. The three-dimensionally adjustable and quickly positionable fabricated hitching system of claim 1, further comprising: the vertical adjusting bolt (6) comprises a vertical adjusting screw rod (61) and a vertical adjusting nut (62), a vertical adjusting bolt hole (26) for the vertical adjusting screw rod (61) to pass through is formed in the horizontal supporting plate (21), and the vertical adjusting nut (62) is welded at the position of the lower side of the horizontal supporting plate (21) and the position of the vertical adjusting bolt hole (26).
5. The three-dimensionally adjustable and quickly positionable fabricated hitching system of claim 1, further comprising: and a connecting hole (27) for the prefabricated rotating steel bar (3) to pass through is formed on the positioning vertical rib plate (23) and between the positioning plate reinforcing vertical rib plates (24).
6. The three-dimensionally adjustable and quickly positionable fabricated hitching system of claim 5, further comprising: the connecting hole (27) is positioned on one side of the upper part of the horizontal adjusting bolt (5) in the direction not opposite to the right direction.
7. The three-dimensionally adjustable and quickly positionable fabricated hitch system of claim 6, further comprising: prefabricated rotatory reinforcing bar (3) include rotating part (31) and the connecting portion (32) in the middle of both ends, connecting portion (32) are protruding towards one side bending relatively rotating part (31), connecting hole (27) are passed and connecting portion (32) that make prefabricated rotatory reinforcing bar (3) in downthehole rotation form with curtain wall steel skeleton (4) contact and two kinds of connections of non-contact to the rotating part (32).
8. The three-dimensionally adjustable and quickly positionable fabricated hitching system of claim 7, further comprising: the rotating portion (32) contacts with the curtain wall steel skeleton (4), the rotating portion (32) is connected with the positioning vertical rib plate (23) in a welding mode at the position of the connecting hole (27), the connecting portion (32) is kept to be a straight line, and the lower side of the connecting portion (32) is connected with the upper side surface of the curtain wall steel skeleton (4) in a welding mode.
CN202121845660.1U 2021-08-09 2021-08-09 Assembled hanging system capable of being adjusted in three dimensions and positioned quickly Active CN215594524U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121845660.1U CN215594524U (en) 2021-08-09 2021-08-09 Assembled hanging system capable of being adjusted in three dimensions and positioned quickly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121845660.1U CN215594524U (en) 2021-08-09 2021-08-09 Assembled hanging system capable of being adjusted in three dimensions and positioned quickly

Publications (1)

Publication Number Publication Date
CN215594524U true CN215594524U (en) 2022-01-21

Family

ID=79880731

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121845660.1U Active CN215594524U (en) 2021-08-09 2021-08-09 Assembled hanging system capable of being adjusted in three dimensions and positioned quickly

Country Status (1)

Country Link
CN (1) CN215594524U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115110676A (en) * 2022-07-28 2022-09-27 中国建筑第二工程局有限公司 Hanging frame supporting glass curtain wall system with uniformly distributed stress and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115110676A (en) * 2022-07-28 2022-09-27 中国建筑第二工程局有限公司 Hanging frame supporting glass curtain wall system with uniformly distributed stress and construction method thereof
CN115110676B (en) * 2022-07-28 2023-11-10 中国建筑第二工程局有限公司 Hanging frame supporting glass curtain wall system uniformly stressed and construction method thereof

Similar Documents

Publication Publication Date Title
CN215594524U (en) Assembled hanging system capable of being adjusted in three dimensions and positioned quickly
CN213484787U (en) Photovoltaic power generation board mounting and supporting structure with suspended steel beam foundation
CN103291042B (en) A kind of can the curtain wall pendant of three-dimensional regulation
CN202839658U (en) Photovoltaic support with adjustable inclination angle
CN210423968U (en) Assembled support and hanger and building using same
CN210867045U (en) Support frame for cable bridge
CN210032601U (en) Beam side supporting clamp
CN215107481U (en) Prefabricated outer wall auxiliary positioning combined member
CN220954101U (en) Stone curtain wall mounting structure
CN220600656U (en) Adjustable assembled channel-section steel gallows
CN220889405U (en) Concrete vertical member hanging basket
CN219322307U (en) Lattice formula photovoltaic support
CN217924340U (en) Novel suspended ceiling conversion layer system
CN216662175U (en) Simple bus hoisting tool
CN218564566U (en) double-C-shaped purline lower hanging pipeline mounting support and hanger device for steel structure roof
CN210713763U (en) Construction platform device
CN220577092U (en) Station lateral wall contact net hangs installation device
CN213682535U (en) Building installation portable built-in fitting
CN218563103U (en) Steel secondary beam and PC beam butt joint installation positioning device
CN210142885U (en) Adjustable assembled support of vertical generating line
CN210577607U (en) Indoor assembled faces electric jib
CN113944267B (en) Aluminum alloy steel-clad structure dry-hanging curtain wall with adjustable
CN219471661U (en) Detachable equipment rainproof shed
CN220732642U (en) Photovoltaic module mounting support structure
CN213204492U (en) Steel structure beam supporting device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant