CN215577578U - Engineering cost progress management device - Google Patents

Engineering cost progress management device Download PDF

Info

Publication number
CN215577578U
CN215577578U CN202122004663.9U CN202122004663U CN215577578U CN 215577578 U CN215577578 U CN 215577578U CN 202122004663 U CN202122004663 U CN 202122004663U CN 215577578 U CN215577578 U CN 215577578U
Authority
CN
China
Prior art keywords
progress management
management device
mounting box
main body
moving
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202122004663.9U
Other languages
Chinese (zh)
Inventor
杨晓琳
尹继洁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202122004663.9U priority Critical patent/CN215577578U/en
Application granted granted Critical
Publication of CN215577578U publication Critical patent/CN215577578U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The utility model discloses a project cost progress management device, which belongs to the technical field of project cost and comprises a progress management device main body, wherein a rain shelter is arranged above the progress management device main body, two vertical rods are arranged below the progress management device main body, and the progress management device main body is connected with the two vertical rods through a regulating device; the adjusting device comprises a moving plate, a motor, a mounting box, a first gear, a second gear and a screw rod, wherein the mounting box is mounted on one side, close to the progress management device body, of the two upright posts, and the moving plate is mounted on one side, close to the mounting box, of the progress management device body; according to the utility model, by arranging the adjusting device, a worker can control the motor to adjust the height of the progress management device body to a certain extent when needed, so that the height requirements under different conditions are better met, and the practicability of the device is further improved.

Description

Engineering cost progress management device
Technical Field
The utility model belongs to the technical field of construction cost, and particularly relates to a construction cost progress management device.
Background
The project cost refers to the construction cost expected or actually paid out during the construction period of the constituent project. The work process of forecasting, planning, controlling, accounting, analyzing and evaluating the engineering cost by comprehensively using knowledge and skills in the aspects of management, economics, engineering technology and the like is called engineering cost management.
Chinese patent application No. CN201920686338.5 discloses an engineering cost progress management device, be provided with a plurality of long frames through the front surface at the progress panel, can paste at the inside of long frame and have the engineering sticker, first magnetic paste and second magnetic paste, wherein, the engineering sticker is the work that needs to be accomplished, construction has been accomplished in first magnetic paste representation, the time of work is accomplished to second magnetic paste representation, thus, understanding work progress that can be clear when the engineering construction, to the time limit for a project, whether accomplish all more directly perceived, be connected with long box at progress panel rear, two in the long box hold the box-packed unnecessary first magnetic paste and second magnetic paste of being equipped with respectively, when dealing with the special circumstances and needing to adjust the engineering, can change the magnetic paste, and convenient operation.
The prior art has the following problems: 1. the above patent has the problem that the height of the progress display board and the structure thereon can not be adjusted to a certain extent according to the requirement, so that the height requirement under different conditions is met, and the practicability of the device is further reduced; 2. above-mentioned patent has the inconvenient problem of device position removal to improve user's work burden, and then reduced the convenience of device.
SUMMERY OF THE UTILITY MODEL
To solve the problems set forth in the background art described above. The utility model provides a project cost progress management device which has the characteristics of high practicability and strong convenience.
In order to achieve the purpose, the utility model provides the following technical scheme: a project cost progress management device comprises a progress management device main body, wherein a rain shelter is installed above the progress management device main body, two vertical rods are arranged below the progress management device main body, and the progress management device main body is connected with the two vertical rods through a regulating device;
adjusting device includes movable plate, motor, mounting box, first gear, second gear and lead screw, two the mounting box is installed to one side that the pole setting is close to progress management device main part, progress management device main part is close to one side of mounting box and installs the movable plate, the lead screw is all installed through the bearing in the position that just is located progress management device main part both sides on the mounting box, be connected through the screw thread between movable plate and the lead screw, the second gear is installed to the below of lead screw, the motor is installed to one side of mounting box, two first gears are installed in the outside of motor output and with two corresponding positions of second gear.
Preferably, the adjusting device further comprises a protective shell, and the protective shell is mounted on one side of the mounting box and located at the position outside the motor.
Preferably, the adjusting device further comprises a limiting plate, and the limiting plate is mounted above the screw rod.
Preferably, two the mobile device is installed to the below of pole setting, the mobile device includes backup pad, spliced pole, removal wheel and bottom plate, two the backup pad is installed to the below of pole setting, two spliced poles are installed to the below of backup pad, two the bottom plate is installed to the below of spliced pole, a plurality of removal wheels are installed to the below of bottom plate.
Preferably, the mobile device still includes the buckle, removes frame and extension spring, the outside of bottom plate is provided with removes the frame, the backup pad is connected through two buckles with removing between the frame, two extension springs are installed with the interior top surface of removing between the outer top surface of bottom plate and the interior top surface of removing the frame and with two spliced poles corresponding positions.
Preferably, the moving device further comprises a rubber frame, and the rubber frame is mounted below the moving frame.
Compared with the prior art, the utility model has the beneficial effects that:
1. according to the utility model, by arranging the adjusting device, a worker can control the motor to adjust the height of the progress management device body to a certain extent when needed, so that the height requirements under different conditions are better met, and the practicability of the device is further improved.
2. According to the utility model, by arranging the moving device, a worker can move the position of the device to a certain extent by moving the wheel when needed, so that the moving difficulty of the device is reduced, the labor burden of the worker is reduced, and the convenience of the device is further improved.
Drawings
FIG. 1 is a perspective view of the present invention;
FIG. 2 is a schematic structural view of the present invention;
FIG. 3 is a schematic view of the adjusting device according to the present invention;
fig. 4 is a schematic structural diagram of a mobile device according to the present invention.
In the figure: 1. a schedule management apparatus main body; 2. a rain shelter; 3. an adjustment device; 31. moving the plate; 32. a protective shell; 33. a motor; 34. mounting a box; 35. a first gear; 36. a second gear; 37. a screw rod; 38. a limiting plate; 4. a mobile device; 41. a support plate; 42. connecting columns; 43. buckling; 44. moving the frame; 45. a rubber frame; 46. an extension spring; 47. a moving wheel; 48. a base plate; 5. and (6) erecting a rod.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Example 1
Referring to fig. 1-4, the present invention provides the following technical solutions: a project cost progress management device comprises a progress management device main body 1, wherein a rain shelter 2 is arranged above the progress management device main body 1, two upright posts 5 are arranged below the progress management device main body 1, and the progress management device main body 1 is connected with the two upright posts 5 through a regulating device 3;
adjusting device 3 includes movable plate 31, motor 33, mounting box 34, first gear 35, second gear 36 and lead screw 37, mounting box 34 is installed to one side that two pole settings 5 are close to progress management device main part 1, moving plate 31 is installed to one side that progress management device main part 1 is close to mounting box 34, lead screw 37 is all installed through the bearing in the position that just is located progress management device main part 1 both sides on mounting box 34, be connected through the screw thread between movable plate 31 and the lead screw 37, second gear 36 is installed to the below of lead screw 37, motor 33 is installed to one side of mounting box 34, two first gear 35 are installed in the outside of motor 33 output and the position corresponding with two second gear 36.
Specifically, the adjusting device 3 further comprises a protective shell 32, the protective shell 32 is mounted at a position on one side of the mounting box 34 and outside the motor 33,
by adopting the technical scheme, the motor 33 can be protected to a certain extent.
Specifically, the adjusting device 3 further comprises a limit plate 38, the limit plate 38 is arranged above the screw rod 37,
by adopting the technical scheme, the moving plate 31 can be limited to a certain extent.
When the device is used, when the device needs to work, the device is moved to a needed position, then the progress management work can be carried out through the progress management device main body 1, and the rain shelter 2 plays a role in sheltering rainwater; when the height of the progress management device main body 1 needs to be adjusted, a motor 33 in the adjusting device 3 is started, the motor 33 drives two first gears 35 in the mounting box 34 to rotate, the two first gears 35 drive two screw rods 37 to synchronously rotate through two second gears 36, so that the moving plate 31 and the progress management device main body 1 on the moving plate are driven to move, after the progress management device main body 1 moves to a proper height, the motor 33 is closed, after the adjustment is finished, the protective shell 32 plays a role in protecting the motor 33, and the limiting plate 38 plays a limiting role;
example 2
The present embodiment is different from embodiment 1 in that: the moving device 4 is arranged below the two vertical rods 5, the moving device 4 comprises a support plate 41, connecting columns 42, moving wheels 47 and a bottom plate 48, the support plate 41 is arranged below the two vertical rods 5, the two connecting columns 42 are arranged below the support plate 41, the bottom plate 48 is arranged below the two connecting columns 42, the plurality of moving wheels 47 are arranged below the bottom plate 48,
through adopting above-mentioned technical scheme for the staff can carry out certain removal to the position of device through removing wheel 47, thereby has reduced the degree of difficulty that the device removed, has alleviateed staff's work burden.
Specifically, the moving device 4 further includes a buckle 43, a moving frame 44 and an extension spring 46, the moving frame 44 is disposed on the outer side of the bottom plate 48, the supporting plate 41 is connected to the moving frame 44 through the two buckles 43, the two extension springs 46 are mounted between the outer top surface of the bottom plate 48 and the inner top surface of the moving frame 44 and at positions corresponding to the two connecting posts 42,
through adopting above-mentioned technical scheme for the staff can prevent the device removal when needing.
Specifically, the moving device 4 further comprises a rubber frame 45, the rubber frame 45 is mounted below the moving frame 44,
by adopting the above technical scheme, the friction force between the moving frame 44 and the ground is ensured.
When the embodiment is used, when the position of the device needs to be moved, the moving frame 44 in the moving device 4 is pulled to drive the rubber frame 45 to be separated from the ground, then the supporting plate 41 and the moving frame 44 are fixedly connected through the two buckles 43, the device is pushed, so that the device is moved to a specified position through the moving wheel 47 below the bottom plate 48, then the two buckles 43 are operated, the supporting plate 41 is separated from the moving frame 44, the moving frame 44 moves downwards along the connecting column 42 under the action of the tension spring 46, the rubber frame 45 is driven to be abutted against the ground again, and the device is prevented from moving and the movement is finished.
The structure and principle of the schedule management apparatus body 1 and the canopy 2 of the present invention are disclosed in a construction cost schedule management apparatus disclosed in chinese patent application No. CN 201920686338.5.
The working principle and the using process of the utility model are as follows: when the device needs to work, the device is moved to a needed position, then the progress management work is carried out through the progress management device main body 1, and the rain shelter 2 plays a role in sheltering rainwater; when the height of the progress management device main body 1 needs to be adjusted, a motor 33 in the adjusting device 3 is started, the motor 33 drives two first gears 35 in the mounting box 34 to rotate, the two first gears 35 drive two screw rods 37 to synchronously rotate through two second gears 36, so that the moving plate 31 and the progress management device main body 1 on the moving plate are driven to move, after the progress management device main body 1 moves to a proper height, the motor 33 is closed, after the adjustment is finished, the protective shell 32 plays a role in protecting the motor 33, and the limiting plate 38 plays a limiting role; when the position of the device needs to be moved, the moving frame 44 in the moving device 4 is pulled to drive the rubber frame 45 to be separated from the ground, then the supporting plate 41 and the moving frame 44 are fixedly connected through the two buckles 43, the device is pushed, so that the device is moved to a specified position through the moving wheel 47 below the bottom plate 48, then the two buckles 43 are operated, the supporting plate 41 is separated from the moving frame 44, the moving frame 44 moves downwards along the connecting column 42 under the action of the stretching spring 46, the rubber frame 45 is driven to be abutted against the ground again, the device is prevented from moving, and the moving is finished.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. A construction cost progress management device includes a progress management device main body (1), characterized in that: a rain shelter (2) is installed above the progress management device body (1), two upright posts (5) are arranged below the progress management device body (1), and the progress management device body (1) is connected with the two upright posts (5) through an adjusting device (3);
the adjusting device (3) comprises a moving plate (31), a motor (33), a mounting box (34), a first gear (35), a second gear (36) and a screw rod (37), the mounting box (34) is mounted on one side, close to the progress management device body (1), of the two upright rods (5), a moving plate (31) is arranged on one side of the schedule management device main body (1) close to the mounting box (34), the positions on the mounting box (34) and at the two sides of the progress management device main body (1) are respectively provided with a screw rod (37) through a bearing, the moving plate (31) is connected with the screw rod (37) through threads, a second gear (36) is arranged below the screw rod (37), a motor (33) is arranged on one side of the mounting box (34), two first gears (35) are arranged at the outer side of the output end of the motor (33) and at positions corresponding to the two second gears (36).
2. A construction cost progress management apparatus according to claim 1, characterized in that: adjusting device (3) still includes protective housing (32), protective housing (32) are installed to one side of installation box (34) and the position that is located motor (33) outside.
3. A construction cost progress management apparatus according to claim 1, characterized in that: the adjusting device (3) further comprises a limiting plate (38), and the limiting plate (38) is installed above the screw rod (37).
4. A construction cost progress management apparatus according to claim 1, characterized in that: two mobile device (4) are installed to the below of pole setting (5), mobile device (4) are including backup pad (41), spliced pole (42), removal wheel (47) and bottom plate (48), two backup pad (41) are installed to the below of pole setting (5), two spliced poles (42), two are installed to the below of backup pad (41 bottom plate (48) are installed to the below of spliced pole (42), a plurality of removal wheels (47) are installed to the below of bottom plate (48).
5. A construction cost progress management apparatus according to claim 4, characterized in that: the mobile device (4) further comprises a buckle (43), a mobile frame (44) and an extension spring (46), the mobile frame (44) is arranged on the outer side of the bottom plate (48), the supporting plate (41) and the mobile frame (44) are connected through the two buckles (43), and the two extension springs (46) are arranged between the outer top surface of the bottom plate (48) and the inner top surface of the mobile frame (44) and at positions corresponding to the two connecting columns (42).
6. A construction cost progress management apparatus according to claim 5, characterized in that: the moving device (4) further comprises a rubber frame (45), and the rubber frame (45) is installed below the moving frame (44).
CN202122004663.9U 2021-08-24 2021-08-24 Engineering cost progress management device Expired - Fee Related CN215577578U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122004663.9U CN215577578U (en) 2021-08-24 2021-08-24 Engineering cost progress management device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122004663.9U CN215577578U (en) 2021-08-24 2021-08-24 Engineering cost progress management device

Publications (1)

Publication Number Publication Date
CN215577578U true CN215577578U (en) 2022-01-18

Family

ID=79841320

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122004663.9U Expired - Fee Related CN215577578U (en) 2021-08-24 2021-08-24 Engineering cost progress management device

Country Status (1)

Country Link
CN (1) CN215577578U (en)

Similar Documents

Publication Publication Date Title
CN107522147B (en) A kind of high security lift construction platform for building
CN111713296B (en) Vertical greening device
CN215577578U (en) Engineering cost progress management device
CN218149348U (en) Side-arranged plate type sunshade monomer
CN113809658B (en) Control cabinet convenient for maintenance of electrical elements
CN114431605A (en) Extensible table intelligent platform
CN112681701A (en) Scaffold for building construction
CN217697850U (en) Basketball equipment of jettisoninging for sports teaching
CN216143521U (en) Improved generation mounting structure that supervisory equipment used
CN219451487U (en) Support frame for building installation
CN219761508U (en) Device for producing virtual metal for integrated circuit
CN212256707U (en) Model display device for garden planning
CN215815078U (en) Information data display device for student management
CN219418442U (en) Propaganda display equipment
CN219202596U (en) Solar simulator for urban planning
CN219261819U (en) Building engineering protection network
CN218406840U (en) Special safety protection equipment for building
CN217305070U (en) Engineering supervision construction quality real-time detection device convenient to operate
CN219826327U (en) Garden corridor frame device
CN219066397U (en) Movable publicity column
CN216520516U (en) Portable reconnaissance design measuring equipment
CN219548508U (en) Outdoor charging pile folding waterproof shed
CN218597888U (en) Portable flood prevention emergency command is fluffy
CN221094922U (en) Traffic facility sign convenient to installation
CN220954555U (en) Hanging basket for constructional engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220118