CN215577537U - Engineering progress display device for building engineering management - Google Patents

Engineering progress display device for building engineering management Download PDF

Info

Publication number
CN215577537U
CN215577537U CN202121052618.4U CN202121052618U CN215577537U CN 215577537 U CN215577537 U CN 215577537U CN 202121052618 U CN202121052618 U CN 202121052618U CN 215577537 U CN215577537 U CN 215577537U
Authority
CN
China
Prior art keywords
frame
fixedly connected
display device
progress display
sliding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202121052618.4U
Other languages
Chinese (zh)
Inventor
李利丽
赵珍奇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202121052618.4U priority Critical patent/CN215577537U/en
Application granted granted Critical
Publication of CN215577537U publication Critical patent/CN215577537U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Devices For Indicating Variable Information By Combining Individual Elements (AREA)

Abstract

The utility model discloses an engineering progress display device for building engineering management, which comprises a frame, wherein a glass plate is fixedly connected to the front side of the frame, a through hole is formed in the right side of the frame, slide ways are fixedly connected to the upper end and the lower end of the inner side of the frame, a display structure is connected to the inner side of the frame in a sliding manner, a plurality of pulleys are fixedly connected to one side, opposite to the two slide ways, of the frame, a screw rod is hinged to the right side of the bottom of the frame, movable rods are fixedly connected to the left end and the right end of the bottom of the frame, and sleeves are connected to the bottoms of the outer surfaces of the movable rods in a sliding manner. This engineering progress display device for building engineering management, overall structure is simple, installs through adopting the gliding mode of side to the show board to cooperate by screw rod, gland nut and fixture block, realize spacing fixed to the show board, and dismantle portably, conveniently change easy and simple to handle, convenient to use to the show content on the show board.

Description

Engineering progress display device for building engineering management
Technical Field
The utility model belongs to the technical field of constructional engineering management, and particularly relates to an engineering progress display device for constructional engineering management.
Background
The building engineering refers to an engineering entity formed by the construction of various house buildings and their auxiliary facilities and the installation activities of lines, pipes and equipment matched with the house buildings, wherein the house buildings refer to the engineering which has a top cover, a beam column, a wall, a foundation and can form an internal space and meet the requirements of people on production, living, study and public activities.
Engineering progress show tablet is one of the indispensable tablet in the building engineering scientific management, and it is used for audio-visual show construction target value and progress condition, and the current engineering progress display device for the building engineering management on the market has the shortcoming of being not convenient for change at present, and when using, traditional engineering progress show generally adopts the mode of posting up to in being fixed in the show frame with the show board, be difficult to take off and change the show content to the show board, and is time-consuming and energy-consuming, operation and inconvenience.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a project progress display device for building project management, which solves the problem that the prior art is inconvenient to replace.
In order to achieve the purpose, the utility model provides the following technical scheme: the utility model provides an engineering progress display device for building engineering management, includes the frame, the positive fixedly connected with glass board of frame, the through-hole has been seted up on the right side of frame, the equal fixedly connected with slide in the upper and lower both ends of frame inboard, the inboard sliding connection of frame has the show structure, two the equal fixedly connected with quantity in one side that the slide is relative is a plurality of pulleys, the right side of frame bottom articulates there is the screw rod, the equal fixedly connected with movable rod in both ends about the frame bottom, the bottom sliding connection of movable rod surface has the sleeve, the positive top threaded connection of sleeve has spacing bolt.
Preferably, the display structure comprises a display board connected with the inner side of the frame in a sliding manner, the right side of the display board is fixedly connected with a sealing cover, sliding plates are fixedly connected to the upper end and the lower end of the display board, and a clamping block is fixedly connected to the bottom of the sealing cover.
Preferably, the inner side of the slide way is provided with a T-shaped slide way, and the slide plate is positioned inside the T-shaped slide way and is in sliding connection with the T-shaped slide way.
Preferably, the right side of the sealing cover is fixedly connected with a handle, the outer surface of the handle is sleeved with an anti-slip sleeve, the size of the sealing cover is matched with the size of the right side of the frame, and the inner side of the clamping block is provided with a clamping groove.
Preferably, the bottom of the outer surface of the screw rod is in threaded connection with a compression nut, the bottom of the sleeve is fixedly connected with a bottom plate, and the bottom of the bottom plate is fixedly connected with a damping pad.
Preferably, the front of the movable rod is provided with a plurality of grooves, the back of the limiting bolt is positioned in the grooves, and the back of the limiting bolt is semicircular.
Compared with the prior art, the utility model has the following beneficial effects:
1. the engineering progress display device for building engineering management further improves the convenience of the display board during disassembly and assembly movement by sticking progress display paper to the front of the display board, then placing the display board into the frame along the through hole, moving the sliding plate in the T-shaped sliding groove in the sliding way to ensure the convenience of the display board during installation, arranging the pulleys, when the display board is completely moved into the frame, the left side of the sealing cover is attached to the right side of the frame, then rotating the screw rod to the horizontal state, the screw rod is positioned in the clamping groove on the clamping block at the moment, and twisting the gland nut to limit the position of the screw rod, thereby completing the installation of the display board, otherwise, only the gland nut needs to be loosened without completely dismounting the screw rod, so that the screw rod is separated from the clamping groove, the handle can be pulled, the display board is taken out from the frame, and different display paper is re-pasted, the device overall structure is simple, installs through adopting the gliding mode of side to the show board to cooperate by screw rod, gland nut and fixture block, realize spacing fixed to the show board, and dismantle portably, conveniently change easy and simple to handle, convenient to use to the show content on the show board.
2. This engineering progress display device for building engineering management through not hard up spacing bolt for spacing bolt breaks away from the recess on the movable rod, because the front of movable rod is seted up quantity and is a plurality of recesses, can reciprocate the movable rod, and the height of adjusting frame, then through wrench movement spacing bolt once more, makes it cooperate with the recess, realizes spacing fixed after finishing the movable rod altitude mixture control, and it is convenient to adjust, and application scope is wide.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a side view of the frame and runner connection of the present invention;
FIG. 3 is a top view of the movable rod and sleeve connection of the present invention.
In the figure: the display structure comprises a frame 1, a glass plate 2, a through hole 3, a slideway 4, a display structure 5, a display plate 501, a cover 502, a sliding plate 503, a clamping block 504, a pulley 6, a screw 7, a movable rod 8, a sleeve 9 and a limiting bolt 10.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention.
Referring to fig. 1-3, an engineering progress display device for building engineering management comprises a frame 1, a glass plate 2 fixedly connected to the front of the frame 1, a through hole 3 formed on the right side of the frame 1, a slide 4 fixedly connected to the upper and lower ends of the inner side of the frame 1, a display structure 5 slidably connected to the inner side of the frame 1, the display structure 5 including a display plate 501 slidably connected to the inner side of the frame 1, a cover 502 fixedly connected to the right side of the display plate 501, a slide plate 503 fixedly connected to the upper and lower ends of the display plate 501, a T-shaped slide slot formed on the inner side of the slide 4, the slide plate 503 located inside the T-shaped slide slot and slidably connected to the T-shaped slide slot, a fixture block 504 fixedly connected to the bottom of the cover 502, a handle fixedly connected to the right side of the cover 502, an anti-slip cover sleeved on the outer surface of the handle, the size of the cover 502 matching the size of the right side of the frame 1, the draw-in groove has been seted up to fixture block 504's inboard, the equal fixedly connected with quantity in one side that two slides 4 are relative is a plurality of pulley 6, the right side of frame 1 bottom articulates there is screw rod 7, the equal fixedly connected with movable rod 8 in both ends about frame 1 bottom, the bottom sliding connection of movable rod 8 surface has sleeve 9, the bottom threaded connection of screw rod 7 surface has gland nut, sleeve 9's bottom fixedly connected with bottom plate, and the bottom fixedly connected with damping pad of bottom plate, the positive top threaded connection of sleeve 9 has stop bolt 10, quantity is a plurality of recess has been seted up in the front of movable rod 8, stop bolt 10's the back is located the inside of recess, and stop bolt 10's the back is semi-circular.
To sum up, the engineering progress display device for building engineering management further improves the convenience of mounting and dismounting the display board 501 by sticking progress display paper to the front of the display board 501, then placing the display board 501 into the frame 1 along the through hole 3, moving the sliding plate 503 in the T-shaped sliding groove in the sliding way 4, ensuring the convenience of mounting the display board 501, and arranging the pulley 6, when the display board 501 completely moves into the frame 1, the left side of the sealing cover 502 is attached to the right side of the frame 1, then rotating the screw 7 to a horizontal state, at this time, the screw 7 is in the clamping groove on the clamping block 504, and twisting the gland nut to limit the position of the screw 7, thus realizing the limit of the display board 501, and completing the mounting of the display board 501, otherwise, only the gland nut needs to be twisted and loosened without completely dismounting the screw 7, so that the screw 7 is separated from the clamping groove, can stimulate the handle, and take out show board 501 from frame 1, and again paste different show paper, the device overall structure is simple, install through adopting the gliding mode of side to show board 501, and by screw rod 7, gland nut and fixture block 504 cooperate, realize spacing fixed to show board 501, and dismantle portably, conveniently change the show content on show board 501, and easy and simple to handle, high durability and convenient use, through not hard up spacing bolt 10, make spacing bolt 10 break away from the recess on the movable rod 8, because the recess that quantity is a plurality of is seted up in the front of movable rod 8, can reciprocate movable rod 8, and the height of adjustment frame 1, then through twisting spacing bolt 10 once more, make it cooperate with the recess, realize spacing fixed after finishing to movable rod 8 altitude mixture control, convenient regulation, application scope is wide.

Claims (6)

1. The utility model provides a construction progress display device for building engineering management, includes frame (1), its characterized in that: the utility model discloses a frame, including frame (1), through-hole (3), the equal fixedly connected with slide (4) in both ends about frame (1) inboard, the inboard sliding connection of frame (1) has show structure (5), two the equal fixedly connected with quantity in one side that slide (4) are relative is a plurality of pulley (6), the right side of frame (1) bottom articulates there is screw rod (7), the equal fixedly connected with movable rod (8) in both ends about frame (1) bottom, the bottom sliding connection of movable rod (8) surface has sleeve (9), the positive top threaded connection of sleeve (9) has stop bolt (10).
2. The project progress display device for building project management according to claim 1, characterized in that: the display structure (5) comprises a display board (501) which is connected with the inner side of the frame (1) in a sliding mode, a sealing cover (502) is fixedly connected to the right side of the display board (501), sliding plates (503) are fixedly connected to the upper end and the lower end of the display board (501), and a clamping block (504) is fixedly connected to the bottom of the sealing cover (502).
3. The project progress display device for building project management according to claim 2, characterized in that: t-shaped sliding grooves are formed in the inner sides of the sliding ways (4), and the sliding plates (503) are located inside the T-shaped sliding grooves and are in sliding connection with the T-shaped sliding grooves.
4. The project progress display device for building project management according to claim 2, characterized in that: the right side of the sealing cover (502) is fixedly connected with a handle, the outer surface of the handle is sleeved with an anti-slip sleeve, the size of the sealing cover (502) is matched with the size of the right side of the frame (1), and the inner side of the clamping block (504) is provided with a clamping groove.
5. The project progress display device for building project management according to claim 1, characterized in that: the bottom of the outer surface of the screw rod (7) is in threaded connection with a compression nut, the bottom of the sleeve (9) is fixedly connected with a bottom plate, and the bottom of the bottom plate is fixedly connected with a damping pad.
6. The project progress display device for building project management according to claim 1, characterized in that: the front of the movable rod (8) is provided with a plurality of grooves, the back of the limiting bolt (10) is located inside the grooves, and the back of the limiting bolt (10) is semicircular.
CN202121052618.4U 2021-05-17 2021-05-17 Engineering progress display device for building engineering management Expired - Fee Related CN215577537U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121052618.4U CN215577537U (en) 2021-05-17 2021-05-17 Engineering progress display device for building engineering management

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121052618.4U CN215577537U (en) 2021-05-17 2021-05-17 Engineering progress display device for building engineering management

Publications (1)

Publication Number Publication Date
CN215577537U true CN215577537U (en) 2022-01-18

Family

ID=79861530

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121052618.4U Expired - Fee Related CN215577537U (en) 2021-05-17 2021-05-17 Engineering progress display device for building engineering management

Country Status (1)

Country Link
CN (1) CN215577537U (en)

Similar Documents

Publication Publication Date Title
CN111851900A (en) Quick locking device is used in assembly building fitment construction
CN216446579U (en) Building structure reinforcing apparatus
CN220628577U (en) Electrical equipment convenient for fixing drawing
CN215577537U (en) Engineering progress display device for building engineering management
CN211201013U (en) Installation mechanism of heat-insulation building energy-saving wallboard
CN208894933U (en) A kind of metal door and window processing cold moudling device
CN206982811U (en) A kind of aluminium-plastic panel slot-cutting machine
CN112177326B (en) Adjustable reserved hole pre-burying device and use method thereof
CN210901660U (en) Shoe supporting device for repairing shoes
CN210241080U (en) Electronic information display board
CN215981631U (en) Monitoring device for constructional engineering mechanical equipment
CN113184768A (en) High-altitude mounting method for advertising board
CN207177339U (en) A kind of easy-disassembling-assembling Construction of Civil Engineering Support bracket
CN221502551U (en) Wall body fitment board and wall body connection structure
CN220644983U (en) Environment-friendly building decorative board fixing device
CN216123192U (en) Control console
CN219411966U (en) Energy-saving type middle vertical column supporting structure
CN211949329U (en) Decorative board for architectural decoration
CN214072354U (en) Building engineering management comprehensive operation platform
CN219676846U (en) Advertisement design LED lamp house with upset function
CN216543117U (en) Bearing convenient to installation is dismantled
CN215497235U (en) Intelligent socket capable of monitoring indoor environment
CN219863360U (en) Connection structure for building element
CN214659081U (en) Support frame for civil engineering structural design
CN212408516U (en) Municipal administration environmental protection lighting apparatus for energy saving

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220118

CF01 Termination of patent right due to non-payment of annual fee