CN215564896U CN202120008448.3U CN202120008448U CN215564896U CN 215564896 U CN215564896 U CN 215564896U CN 202120008448 U CN202120008448 U CN 202120008448U CN 215564896 U CN215564896 U CN 215564896U
Authority
CN
China
Prior art keywords
positioning
steel wire
hole
rotating shaft
groups
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120008448.3U
Other languages
Chinese (zh)
Inventor
金玲玲
李军
谢兰敏
史纪申
王东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN202120008448.3U priority Critical patent/CN215564896U/en
Application granted granted Critical
Publication of CN215564896U publication Critical patent/CN215564896U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Tents Or Canopies (AREA)

Abstract

The utility model discloses a multifunctional assembled canopy for pipe-jacking construction, which belongs to the field of pipe-jacking construction and comprises four groups of support rods and a steel wire rope, wherein the four groups of support rods are suitable for forming a square frame; the steel wire ropes are detachably connected with the support rods and are provided with three groups, and the three groups of steel wire ropes and the rotating shaft are suitable for being respectively connected with the four groups of support rods; the steel wire ropes comprise transverse steel wire ropes, connecting through holes are formed in two sides of the rain shielding cloth, and the two groups of transverse steel wire ropes are suitable for being connected with the connecting through holes respectively; the supporting rod is also provided with a positioning piece, and the positioning piece is suitable for pulling the rain shielding cloth along the axial direction of the transverse steel wire rope; the utility model solves the problems that different folding rainsheds are required to be adopted for different foundation pit sizes, the surface of the foundation pit needs to be ensured to be horizontal, and a plurality of groups of rainsheds are required for a larger foundation pit.

Description

Multi-functional equipment canopy of push pipe construction
Technical Field
The utility model belongs to the field of pipe jacking construction, and particularly relates to a multifunctional assembled canopy for pipe jacking construction.
Background
At present, the rain sewage reconstruction and new construction projects adopted on municipal roads mostly adopt pipe-jacking construction, the pipe-jacking construction not only meets the characteristic of not damaging the original ground, but also effectively guarantees the construction period due to the pushing technology of the pipe-jacking construction. On the basis of not influencing traffic, the vegetation on the ground and traffic infrastructure are effectively protected.
However, during pipe jacking construction, the loss caused by long-term soaking in rainwater is difficult to avoid, and timely drainage in seasons with much rainwater cannot meet the requirement of ensuring that the foundation pit of the working well is not damaged by rainwater. How to solve this problem, on-the-spot personnel adopt interim canopy to cover mostly.
The canopy adopts the foldable canopy on the market more, and four stabilizer blades are folding retractable promptly, but the cost is higher, and the scene is because of the size and the environmental impact of foundation ditch, and it is inconvenient to prop up the fender, and is too big in the in-process limitation of strutting moreover. In the engineering project, especially the engineering project of a plurality of road network pipe networks, purchasing hundreds of rainsheds is not economical and the reusability is not high.
SUMMERY OF THE UTILITY MODEL
The technical problem to be solved by the utility model is as follows: different folding rainsheds need to be adopted according to different foundation pit sizes, the foundation pit surface needs to be guaranteed to be level, and a larger foundation pit still needs a plurality of groups of rainsheds, and the reusability is not high.
In order to solve the technical problems, the inventor obtains the technical scheme of the utility model through practice and summary, and the utility model discloses a pipe-jacking construction multifunctional assembled canopy which comprises four groups of support rods and a steel wire rope, wherein the four groups of support rods are suitable for forming a square frame, a rotating shaft is arranged on each support rod and is detachably connected with the corresponding support rod, and rain shielding cloth is arranged on each rotating shaft and is fixedly connected with the corresponding rotating shaft;
the steel wire ropes are detachably connected with the support rods, three groups of steel wire ropes are arranged, and the three groups of steel wire ropes and the rotating shaft are suitable for being respectively connected with the four groups of support rods;
the steel wire ropes comprise transverse steel wire ropes, connecting through holes are formed in two sides of the rain shielding cloth, and the two groups of transverse steel wire ropes are suitable for being connected with the connecting through holes respectively;
the supporting rod is further provided with a positioning piece, and the positioning piece is suitable for pulling the rain shielding cloth along the axial direction of the transverse steel wire rope.
Preferably, a connecting piece is arranged at one end, opposite to the positioning piece, of the rain shielding cloth, the connecting piece is fixedly connected with the rain shielding cloth, a transition hole is formed in the connecting piece, and the transverse steel wire rope is suitable for penetrating through the transition hole to be connected with the connecting through hole;
the four groups of support rods are provided with mounting holes, mounting rods are mounted in the mounting holes and detachably connected with the mounting holes, and the mounting rods are suitable for limiting the distance between the support rods.
Preferably, the connecting piece includes horizontal cylinder and longitudinal cylinder, horizontal cylinder and longitudinal cylinder fixed connection, the transition hole is located horizontal cylinder, the last mounting hole that is provided with of longitudinal cylinder, the mounting hole is suitable for being connected with the one end of setting element.
Preferably, the inner side of the awning cloth is provided with a coil spring which is fixedly connected with the rotating shaft, and the coil spring is suitable for resetting the unfolded awning cloth.
Preferably, the setting element includes rotation axis and annular piece, is located and keeps away from the axis of rotation all install the locating piece on the bracing piece, the setting element is provided with two sets ofly, first centre bore has been seted up on the locating piece, the second centre bore has been seted up on the annular piece, the rotation axis is suitable for to run through the second centre bore and rotates with first centre bore to be connected, the rotation axis is kept away from the one end of locating piece and is installed the rocking handle, the rocking handle can be dismantled with the rotation axis and be connected, install on the annular piece and connect wire rope, the one end of connecting wire rope can be dismantled with the annular piece and be connected, the other end of connecting wire rope can be dismantled with vertical cylinder and be connected.
Preferably, a first bearing is installed in the first central hole, the first bearing is fixedly connected with the rotating shaft, the annular block is located on the outer surface of the positioning block, an annular groove is formed in the annular block, a spring is installed in the annular groove, one end of the spring is fixedly connected with the inner wall of the annular groove, a connecting block is installed at the other end of the spring, an internal thread is formed in one side, back to the spring, of the connecting block, a through hole is formed in the connecting block, and the rotating shaft is suitable for penetrating through the through hole;
the locking device is characterized in that a locking block is installed on the connecting block, a threaded hole is formed in the locking block, surface threads are arranged on the rotating shaft, the locking block is suitable for moving on the rotating shaft, external threads are arranged on the surface of the locking block, and the internal threads are matched with the external threads.
Preferably, install the positioning disk between rocking handle and the annular piece, install the second bearing in the positioning disk, install first bearing in the first centre bore, first bearing and second bearing respectively with rotation axis fixed connection, the annular piece is located between positioning disk and the locating piece, be provided with first locating hole on the locating piece, be provided with the second locating hole on the positioning disk, the third locating hole has been seted up on the rocking handle, install positioning bolt in the third locating hole, positioning bolt is suitable for running through third locating hole, second locating hole and first locating hole in proper order and can dismantle with the locating piece and be connected.
Preferably, a supporting table is installed at the bottom of the supporting rod, a friction pad is installed at the bottom end of the supporting table, and the friction pad is fixedly connected with the supporting table.
Preferably, the supporting table is provided with adjusting holes, the adjusting holes are distributed along the circumferential direction of the supporting table, the supporting rod is provided with adjusting grooves, and the adjusting holes are matched with the adjusting grooves.
Preferably, the support rods located far away from the rotating shaft are provided with rolling columns, the rolling columns are rotatably connected with the corresponding support rods, and the connecting steel wire ropes are suitable for being attached to the rolling columns.
Compared with the prior art, the utility model can obtain the following technical effects:
compared with the prior art, the utility model realizes the up-and-down setting of the supporting platform through the adjusting groove and the adjusting hole on the supporting platform aiming at the problems that different folding rainsheds are needed to be adopted for different sizes of foundation pits and the surfaces of the foundation pits are uneven when the existing jacking pipe is constructed, and different scenes are dealt with; the position of the supporting rod can be adjusted at will, the supporting rod is used for reinforcing and positioning, foundation pits with different sizes can be dealt with through rain shielding cloth with different sizes, and most of the rainsheds are detachable structures and can be recycled; the fixing mode of the connecting steel wire rope can be different by different modes of the positioning piece.
Drawings
In order to more clearly illustrate the embodiments or technical solutions in the prior art of the present invention, the drawings used in the description of the embodiments or prior art will be briefly described below, and it is obvious for those skilled in the art that other drawings can be obtained based on these drawings without creative efforts.
FIG. 1 is a structural view of embodiment 1 of the present invention;
FIG. 2 is an enlarged view A of a portion of FIG. 1 in accordance with the present invention;
FIG. 3 is an enlarged view B of a portion of FIG. 1 in accordance with the present invention;
FIG. 4 is an enlarged view C of the portion of FIG. 1 in accordance with the present invention;
FIG. 5 is a block diagram of the connector of the present invention;
FIG. 6 is a side view of the rainfly of the present invention on the rotating shaft;
FIG. 7 is a cross-sectional view of a spacer of the present invention (without connecting wire rope depicted);
FIG. 8 is a structural view of embodiment 2 of the present invention;
FIG. 9 is an enlarged view D of the portion of FIG. 8 of the present invention;
FIG. 10 is a cross-sectional view of a positioning member (not drawn with connecting wire rope) according to example 2 of the present invention;
fig. 11 is a side view of a spacer according to example 2 of the present invention (connecting wire ropes not shown).
In the figure: 1. a support bar; 2. a rotating shaft; 3. a rain cloth; 4. a transverse wire rope; 5. a connecting through hole; 6. a connecting member; 7. a transition hole; 8. mounting a rod; 9. a transverse cylinder; 10. a longitudinal cylinder; 11. mounting holes; 12. a coil spring; 13. a rotating shaft; 14. a ring block; 15. positioning blocks; 16. a first central aperture; 17. a second central aperture; 18. a rocking handle; 19. connecting a steel wire rope; 20. a first bearing; 21. an annular groove; 22. a spring; 23. connecting blocks; 24. a locking block; 25. positioning a plate; 26. a second bearing; 27. a first positioning hole; 28. a second positioning hole; 29. a third positioning hole; 30. positioning the bolt; 31. a support table; 32. a friction pad; 33. an adjustment hole; 34. an adjustment groove; 35. and (4) rolling the column.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention is further described in detail with reference to the following embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the utility model and are not intended to limit the utility model.
The application of the principles of the present invention will be further described with reference to the accompanying drawings and specific embodiments.
Example 1
As shown in fig. 1 to 7, which are an embodiment of the present invention, a pipe-jacking construction multifunctional assembled canopy includes four sets of support rods 1 and steel wire ropes, the support rods 1 are provided with four sets of support rods 1, the four sets of support rods 1 are suitable for forming a square frame, the support rods 1 are provided with rotating shafts 2, the rotating shafts 2 are detachably connected with the support rods 1, the rotating shafts 2 are provided with rain shielding cloths 3, and the rain shielding cloths 3 are fixedly connected with the rotating shafts 2;
the steel wire ropes are detachably connected with the support rods 1 and are provided with three groups, and the three groups of steel wire ropes and the rotating shaft 2 are suitable for being respectively connected with the four groups of support rods 1;
the steel wire ropes comprise transverse steel wire ropes 4, connecting through holes 5 are formed in two sides of the rain shielding cloth 3, and the two groups of transverse steel wire ropes 4 are suitable for being connected with the connecting through holes 5 respectively;
the support rod 1 is also provided with a positioning piece which is suitable for pulling the rain-shielding cloth 3 along the axial direction of the transverse steel wire rope 4.
One end of the rain shielding cloth 3, which is opposite to the positioning piece, is provided with a connecting piece 6, the connecting piece 6 is fixedly connected with the rain shielding cloth 3, the connecting piece 6 is provided with a transition hole 7, and the transverse steel wire rope 4 is suitable for penetrating through the transition hole 7 to be connected with the connecting through hole 5;
the mounting holes are formed in the four groups of supporting rods 1, the mounting rods 8 are mounted in the mounting holes, the mounting rods 8 are detachably connected with the mounting holes, and the mounting rods 8 are suitable for limiting the distance between the supporting rods 1.
The connecting piece 6 comprises a transverse cylinder 9 and a longitudinal cylinder 10, the transverse cylinder 9 is fixedly connected with the longitudinal cylinder 10, the transition hole 7 is located on the transverse cylinder 9, a mounting hole 11 is formed in the longitudinal cylinder 10, and the mounting hole 11 is suitable for being connected with one end of the positioning piece.
The inner side of the tarpaulin 3 is provided with a coil spring 12, the coil spring 12 being fixedly connected to the rotation shaft 2, the coil spring 12 being adapted to reset the unfolded tarpaulin 3.
The setting element includes rotation axis 13 and annular piece 14, be located and all install locating piece 15 on keeping away from the bracing piece 1 of axis of rotation 2, the setting element is provided with two sets ofly, first centre bore 16 has been seted up on the locating piece 15, second centre bore 17 has been seted up on the annular piece 14, rotation axis 13 is suitable for running through second centre bore 17 and rotates with first centre bore 16 to be connected, rotation axis 13 is kept away from the one end of locating piece 15 and is installed rocking handle 18, rocking handle 18 can dismantle with rotation axis 13 and be connected, install on the annular piece 14 and connect wire rope 19, the one end of connecting wire rope 19 can be dismantled with annular piece 14 and be connected, the other end of connecting wire rope 19 can be dismantled with vertical cylinder 10 and be connected.
A first bearing 20 is installed in the first central hole 16, the first bearing 20 is fixedly connected with the rotating shaft 13, the annular block 14 is located on the outer surface of the positioning block 15, an annular groove 21 is formed in the annular block 14, a spring 22 is installed in the annular groove 21, one end of the spring 22 is fixedly connected with the inner wall of the annular groove 21, the other end of the spring 22 is provided with a connecting block 23, one side, back to the spring 22, of the connecting block 23 is provided with internal threads, a through hole is formed in the connecting block 23, and the rotating shaft 13 is suitable for penetrating through the through hole;
the connecting block 23 is provided with a locking block 24, a threaded hole is formed in the locking block 24, surface threads are arranged on the rotating shaft 13, the locking block 24 is suitable for moving on the rotating shaft 13, external threads are arranged on the surface of the locking block 24, and the internal threads are matched with the external threads.
Example 2
As shown in fig. 8 to 11, another embodiment of the utility model is a pipe-jacking construction multifunctional assembled canopy, which comprises four sets of support rods 1 and steel wire ropes, wherein the four sets of support rods 1 are suitable for forming a square frame, a rotating shaft 2 is arranged on each support rod 1, the rotating shaft 2 is detachably connected with each support rod 1, a rain shielding cloth 3 is arranged on each rotating shaft 2, and each rain shielding cloth 3 is fixedly connected with each rotating shaft 2;
the steel wire ropes are detachably connected with the support rods 1 and are provided with three groups, and the three groups of steel wire ropes and the rotating shaft 2 are suitable for being respectively connected with the four groups of support rods 1;
the steel wire ropes comprise transverse steel wire ropes 4, connecting through holes 5 are formed in two sides of the rain shielding cloth 3, and the two groups of transverse steel wire ropes 4 are suitable for being connected with the connecting through holes 5 respectively;
the support rod 1 is also provided with a positioning piece which is suitable for pulling the rain-shielding cloth 3 along the axial direction of the transverse steel wire rope 4.
One end of the rain shielding cloth 3, which is opposite to the positioning piece, is provided with a connecting piece 6, the connecting piece 6 is fixedly connected with the rain shielding cloth 3, the connecting piece 6 is provided with a transition hole 7, and the transverse steel wire rope 4 is suitable for penetrating through the transition hole 7 to be connected with the connecting through hole 5;
the mounting holes are formed in the four groups of supporting rods 1, the mounting rods 8 are mounted in the mounting holes, the mounting rods 8 are detachably connected with the mounting holes, and the mounting rods 8 are suitable for limiting the distance between the supporting rods 1.
The connecting piece 6 comprises a transverse cylinder 9 and a longitudinal cylinder 10, the transverse cylinder 9 is fixedly connected with the longitudinal cylinder 10, the transition hole 7 is located on the transverse cylinder 9, a mounting hole 11 is formed in the longitudinal cylinder 10, and the mounting hole 11 is suitable for being connected with one end of the positioning piece.
The inner side of the tarpaulin 3 is provided with a coil spring 12, the coil spring 12 being fixedly connected to the rotation shaft 2, the coil spring 12 being adapted to reset the unfolded tarpaulin 3.
The setting element includes rotation axis 13 and annular piece 14, be located and all install locating piece 15 on keeping away from the bracing piece 1 of axis of rotation 2, the setting element is provided with two sets ofly, first centre bore 16 has been seted up on the locating piece 15, second centre bore 17 has been seted up on the annular piece 14, rotation axis 13 is suitable for running through second centre bore 17 and rotates with first centre bore 16 to be connected, rotation axis 13 is kept away from the one end of locating piece 15 and is installed rocking handle 18, rocking handle 18 can dismantle with rotation axis 13 and be connected, install on the annular piece 14 and connect wire rope 19, the one end of connecting wire rope 19 can be dismantled with annular piece 14 and be connected, the other end of connecting wire rope 19 can be dismantled with vertical cylinder 10 and be connected.
A positioning disc 25 is arranged between the rocking handle 18 and the annular block 14, a second bearing 26 is arranged in the positioning disc 25, a first bearing 20 is arranged in the first central hole 16, the first bearing 20 and the second bearing 26 are respectively and fixedly connected with the rotating shaft 13, the annular block 14 is positioned between the positioning disc 25 and the positioning block 15, a first positioning hole 27 is arranged on the positioning block 15, a second positioning hole 28 is arranged on the positioning disc 25, a third positioning hole 29 is arranged on the rocking handle 18, a positioning bolt 30 is arranged in the third positioning hole 29, and the positioning bolt 30 is suitable for sequentially penetrating through the third positioning hole 29, the second positioning hole 28 and the first positioning hole 27 and detachably connected with the positioning block 15.
The bottom of the support rod 1 is provided with a support platform 31, the bottom end of the support platform 31 is provided with a friction pad 32, and the friction pad 32 is fixedly connected with the support platform 31.
The support base 31 is provided with adjusting holes 33, the adjusting holes 33 are distributed along the circumferential direction of the support base 31, the support rod 1 is provided with adjusting grooves 34, and the adjusting holes 33 are matched with the adjusting grooves 34.
The support rods 1 far away from the rotating shaft 2 are respectively provided with a rolling column 35, the rolling columns 35 are rotatably connected with the corresponding support rods 1, and the connecting steel wire rope 19 is suitable for being attached to the rolling columns 35.
It will be evident to those skilled in the art that the utility model is not limited to the details of the foregoing illustrative embodiments, and that the present invention may be embodied in other specific forms without departing from the spirit or essential attributes thereof. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the utility model being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (10)

1. The utility model provides a multi-functional equipment canopy of push pipe construction which characterized in that: the novel steel wire rope support comprises support rods (1) and steel wire ropes, wherein four groups of support rods (1) are arranged, the four groups of support rods (1) are suitable for forming a square frame, a rotating shaft (2) is arranged on each support rod (1), the rotating shaft (2) is detachably connected with the support rods (1), rain shielding cloth (3) is arranged on each rotating shaft (2), and the rain shielding cloth (3) is fixedly connected with the rotating shaft (2);
the steel wire ropes are detachably connected with the support rods (1), three groups of steel wire ropes are arranged, and the three groups of steel wire ropes and the rotating shaft (2) are suitable for being respectively connected with the four groups of support rods (1);
the steel wire ropes comprise transverse steel wire ropes (4), connecting through holes (5) are formed in two sides of the rain shielding cloth (3), and the two groups of transverse steel wire ropes (4) are suitable for being connected with the connecting through holes (5) respectively;
the supporting rod (1) is further provided with a positioning piece, and the positioning piece is suitable for pulling the rain shielding cloth (3) along the axial direction of the transverse steel wire rope (4).
2. The pipe-jacking construction multifunctional assembled canopy according to claim 1, wherein: one end, opposite to the positioning piece, of the rain shielding cloth (3) is provided with a connecting piece (6), the connecting piece (6) is fixedly connected with the rain shielding cloth (3), the connecting piece (6) is provided with a transition hole (7), and the transverse steel wire rope (4) is suitable for penetrating through the transition hole (7) to be connected with the connecting through hole (5);
four group the mounting hole has all been seted up in bracing piece (1), install installation pole (8) in the mounting hole, installation pole (8) can be dismantled with the mounting hole and be connected, installation pole (8) are suitable for the interval of injecing bracing piece (1).
3. The pipe-jacking construction multifunctional assembled canopy according to claim 2, wherein: connecting piece (6) are including horizontal cylinder (9) and vertical cylinder (10), horizontal cylinder (9) and vertical cylinder (10) fixed connection, transition hole (7) are located horizontal cylinder (9), be provided with mounting hole (11) on vertical cylinder (10), mounting hole (11) are suitable for and are connected with the one end of setting element.
4. The pipe-jacking construction multifunctional assembled canopy according to claim 3, wherein: the inner side of the rain shielding cloth (3) is provided with a coil spring (12), the coil spring (12) is fixedly connected with the rotating shaft (2), and the coil spring (12) is suitable for resetting the unfolded rain shielding cloth (3).
5. The pipe-jacking construction multifunctional assembled canopy according to claim 4, wherein: the positioning piece comprises a rotating shaft (13) and an annular block (14), positioning blocks (15) are arranged on the supporting rods (1) far away from the rotating shaft (2), the positioning pieces are provided with two groups, a first central hole (16) is arranged on the positioning piece (15), a second central hole (17) is arranged on the annular block (14), the rotating shaft (13) is suitable for penetrating through the second central hole (17) and is rotationally connected with the first central hole (16), a rocking handle (18) is arranged at one end of the rotating shaft (13) far away from the positioning block (15), the rocking handle (18) is detachably connected with the rotating shaft (13), the annular block (14) is provided with a connecting steel wire rope (19), one end of the connecting steel wire rope (19) is detachably connected with the annular block (14), the other end of the connecting steel wire rope (19) is detachably connected with the longitudinal cylinder (10).
6. The pipe-jacking construction multifunctional assembled canopy according to claim 5, wherein: a first bearing (20) is installed in the first central hole (16), the first bearing (20) is fixedly connected with the rotating shaft (13), the annular block (14) is located on the outer surface of the positioning block (15), an annular groove (21) is formed in the annular block (14), a spring (22) is installed in the annular groove (21), one end of the spring (22) is fixedly connected with the inner wall of the annular groove (21), a connecting block (23) is installed at the other end of the spring (22), an internal thread is formed in one side, back to the spring (22), of the connecting block (23), a through hole is formed in the connecting block (23), and the rotating shaft (13) is suitable for penetrating through the through hole;
install latch segment (24) on connecting block (23), be provided with the screw hole in latch segment (24), be provided with surface screw thread on rotation axis (13), latch segment (24) are suitable for and move on rotation axis (13), latch segment (24) surface is provided with the external screw thread, internal thread and external screw thread looks adaptation.
7. The pipe-jacking construction multifunctional assembled canopy according to claim 5, wherein: a positioning disc (25) is arranged between the rocking handle (18) and the annular block (14), a second bearing (26) is arranged in the positioning disc (25), a first bearing (20) is arranged in the first central hole (16), the first bearing (20) and the second bearing (26) are respectively and fixedly connected with the rotating shaft (13), the annular block (14) is positioned between the positioning disc (25) and the positioning block (15), a first positioning hole (27) is arranged on the positioning block (15), a second positioning hole (28) is arranged on the positioning disc (25), a third positioning hole (29) is formed in the rocking handle (18), a positioning bolt (30) is arranged in the third positioning hole (29), the positioning bolt (30) is suitable for sequentially penetrating through the third positioning hole (29), the second positioning hole (28) and the first positioning hole (27) and is detachably connected with the positioning block (15).
8. The pipe-jacking construction multifunctional assembled canopy according to any one of claims 1 to 7, wherein: a supporting table (31) is installed at the bottom of the supporting rod (1), a friction pad (32) is installed at the bottom end of the supporting table (31), and the friction pad (32) is fixedly connected with the supporting table (31).
9. The pipe-jacking construction multifunctional assembled canopy according to claim 8, wherein: the supporting table is characterized in that adjusting holes (33) are formed in the supporting table (31), the adjusting holes (33) are distributed along the circumferential direction of the supporting table (31), adjusting grooves (34) are formed in the supporting rod (1), and the adjusting holes (33) are matched with the adjusting grooves (34).
10. The pipe-jacking construction multifunctional assembled canopy according to claim 5, wherein: all install the column (35) that rolls on being located bracing piece (1) of keeping away from axis of rotation (2) department, column (35) rotate with corresponding bracing piece (1) and are connected, connect wire rope (19) and be suitable for laminating column (35).
CN202120008448.3U 2021-01-05 2021-01-05 Multi-functional equipment canopy of push pipe construction Active CN215564896U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120008448.3U CN215564896U (en) 2021-01-05 2021-01-05 Multi-functional equipment canopy of push pipe construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120008448.3U CN215564896U (en) 2021-01-05 2021-01-05 Multi-functional equipment canopy of push pipe construction

Publications (1)

Publication Number Publication Date
CN215564896U true CN215564896U (en) 2022-01-18

Family

ID=79816149

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120008448.3U Active CN215564896U (en) 2021-01-05 2021-01-05 Multi-functional equipment canopy of push pipe construction

Country Status (1)

Country Link
CN (1) CN215564896U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116876894A (en) * 2023-08-03 2023-10-13 中国十七冶集团有限公司 Prefabricated part storage device for assembled building and use method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116876894A (en) * 2023-08-03 2023-10-13 中国十七冶集团有限公司 Prefabricated part storage device for assembled building and use method

Similar Documents

Publication Publication Date Title
CN215564896U (en) Multi-functional equipment canopy of push pipe construction
CN104273012A (en) Street tree lodging-resistant rope-connecting support
CN213952258U (en) Highway road slope protective structure
CN210163914U (en) Geotechnical engineering foundation pit collapse prevention supporting structure
KR102024683B1 (en) Rotation type pole for road facilities
CN208346714U (en) A kind of safeguard structure of hydraulic and hydroelectric engineering side slope
CN216641339U (en) Civil engineering construction support
CN213539639U (en) Civil engineering construction support
CN114182737A (en) Firm structure of foundation pit support pile
CN205033159U (en) Crane span structure leveling connecting device
CN210421106U (en) Foundation ditch excavation protection handling canopy
CN210888332U (en) Safety device for building site management
CN220266239U (en) Road construction template with quick assembly disassembly structure
CN220415047U (en) Surrounding baffle for civil engineering construction
CN210985993U (en) But angle of adjustment's installing support for solar panel concatenation
CN216588074U (en) Building construction foundation ditch safety device
CN215577384U (en) On-spot identification means for garden engineering
CN220582112U (en) Side slope monitoring Beidou mounting bracket
CN109997602A (en) A kind of plant fixed system and its application method
CN215714783U (en) Intelligent building site warning device for construction
CN221001021U (en) Well foundation pit foundation
CN219637869U (en) Rainproof reinforcing structure for foundation soil
CN215629990U (en) Inner supporting structure for foundation pit
CN216130657U (en) Transmission line iron tower assembled foundation structure
CN220246969U (en) Protective blocking net