CN215564725U - Temporary spiral pipe supporting device - Google Patents
Temporary spiral pipe supporting device Download PDFInfo
- Publication number
- CN215564725U CN215564725U CN202121748298.6U CN202121748298U CN215564725U CN 215564725 U CN215564725 U CN 215564725U CN 202121748298 U CN202121748298 U CN 202121748298U CN 215564725 U CN215564725 U CN 215564725U
- Authority
- CN
- China
- Prior art keywords
- spiral pipe
- supporting
- spiral
- temporary support
- support
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Abstract
The present invention provides a temporary support device for a spiral pipe, comprising: a spiral tube; the lateral stable inclined struts are uniformly distributed on the lower peripheral part of the spiral pipe; the two top supporting upright columns are respectively arranged at the two side ends of the top of the spiral pipe; and the supporting top cross beam is arranged between the two supporting top upright columns. The utility model can save technical measures and materials, is convenient to disassemble and can be repeatedly used.
Description
Technical Field
The utility model relates to a supporting device, in particular to a temporary spiral pipe supporting device.
Background
As large buildings are gradually increased, artistic and structural buildings become mainstream for future development. In order to support the whole building body and keep stress balance, a prestress system is formed by the prestress stay cables and the main beams, the structure of the building body is perfectly displayed, and the trend of the modern building steel structure is realized. Need set up interim support in the work progress in order to reduce girder mid-span moment of flexure and deformation, general interim support chooses for use lattice column to support, but lattice column supports and exists bulky, heavy, the member is many, dismantles defects such as inconvenient.
SUMMERY OF THE UTILITY MODEL
Aiming at the prior art, the utility model provides a temporary spiral pipe supporting device, so as to achieve the purposes of saving technical measures and materials and facilitating disassembly.
The utility model provides a temporary supporting device for a spiral pipe, which comprises:
a spiral tube;
the lateral stable inclined struts are uniformly distributed on the lower peripheral part of the spiral pipe;
the two top supporting upright columns are respectively arranged at the two side ends of the top of the spiral pipe;
and the supporting top cross beam is arranged between the two supporting top upright columns.
Preferably, a beam diagonal brace is arranged between the support top upright and the support top beam.
Preferably, the bottom of the spiral pipe is welded to the supporting buried member.
Preferably, the bottom of the lateral stabilizing diagonal brace is welded to the support insert.
Preferably, the lateral stabilising struts are provided in the form of four.
Preferably, the supporting top upright post and the lateral stabilizing inclined strut are both made of H-shaped steel.
Preferably, a connecting plate is arranged on the spiral pipe, and the top of the lateral stable inclined strut is connected with the connecting plate through a fastening bolt.
Compared with the prior art, the utility model has the beneficial effects that: according to the utility model, the spiral pipe support embedded part is placed in the structure construction process, the inclined struts are arranged on the periphery of the spiral pipe support, the H-shaped steel upright posts and the cross beams are welded on the two sides of the spiral pipe support, the connection mode of all parts of the temporary spiral pipe support device is improved, technical materials can be saved, the temporary spiral pipe support device is convenient to disassemble and can be repeatedly used.
Drawings
FIG. 1 is a front view of an embodiment of the present invention.
Fig. 2 is a top view of an embodiment of the present invention.
In the figure, 1-supporting embedded parts, 2-lateral stable inclined struts, 3-spiral pipes, 4-supporting top upright columns, 5-beam inclined struts, 6-supporting top beams, 7-connecting plates and 8-fastening bolts.
Detailed Description
In order to make the technical means, the creation characteristics, the achievement purposes and the effects of the utility model easy to understand, the utility model is further explained below by combining the specific drawings.
Examples
As shown in figures 1-2, a temporary supporting device for a spiral pipe, a supporting embedded part 1 is placed in advance before a structure is poured, lateral stabilizing inclined struts 2 are arranged at the height 1/3 of the spiral pipe 3 from the ground, the number of the lateral stabilizing inclined struts 2 is four, the lateral stabilizing inclined struts are uniformly distributed on the periphery of the spiral pipe 3, the top of each lateral stabilizing inclined strut 2 is connected with the spiral pipe 3 through a connecting plate 7 by using a fastening bolt 8, the bottom of each lateral stabilizing inclined strut is welded and fixed with the supporting embedded part 1, and the spiral pipe 3 is welded and fixed with the supporting embedded part 1. The two supporting top upright columns 4 are respectively welded and fixed on two side walls of the top of the spiral pipe 3, the supporting top cross beam 6 is arranged between the two supporting top upright columns 4 and is welded and fixed, the cross beam inclined strut 5 is positioned at the lower end of the supporting top cross beam 6, the upper end of the cross beam inclined strut is connected with the supporting top cross beam 6 in a welding mode, and the lower end of the cross beam inclined strut is fixed with the supporting top upright columns 4 in a welding mode; the supporting top upright post 4 and the lateral stable inclined strut 2 are both made of H-shaped steel.
This embodiment buries the piece through placing the support in advance, has improved the installation effectiveness, saves the time limit for a project to the spiral pipe replaces the lattice column as supporting rod spare, has saved the technical measure material greatly, practices thrift the cost, alleviates support weight, supports each part connected mode through optimizing, is convenient for install and dismantle, repeatedly usable.
The above description is only an embodiment of the present invention, and not intended to limit the scope of the present invention, and all equivalent structures made by using the contents of the present specification and the drawings can be directly or indirectly applied to other related technical fields, and are within the scope of the present invention.
Claims (7)
1. A temporary support apparatus for a spiral pipe, comprising:
a spiral tube;
the lateral stable inclined struts are uniformly distributed on the lower peripheral part of the spiral pipe;
the two top supporting upright columns are respectively arranged at the two side ends of the top of the spiral pipe;
and the supporting top cross beam is arranged between the two supporting top upright columns.
2. The spiral pipe temporary support apparatus as claimed in claim 1, wherein a beam brace is provided between the support top column and the support top beam.
3. A temporary support for spiral pipes as claimed in claim 1 or 2, wherein the bottom of the spiral pipe is welded to the support embedment.
4. A spiral pipe temporary support apparatus as claimed in claim 1 or 2, wherein the bottom of the lateral stabilizing brace is welded to the support embedment.
5. A spiral pipe temporary support apparatus as claimed in claim 1 or 2, wherein the lateral stabilizing struts are provided in four.
6. A spiral pipe temporary support apparatus as claimed in claim 1 or 2, wherein the supporting top pillars and the lateral stabilizing diagonal braces are made of H-shaped steel.
7. A temporary support device for spiral pipes according to claim 1 or 2, wherein a connection plate is provided on the spiral pipe, and the top of the lateral stabilizing diagonal support is connected to the connection plate by fastening bolts.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121748298.6U CN215564725U (en) | 2021-07-29 | 2021-07-29 | Temporary spiral pipe supporting device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121748298.6U CN215564725U (en) | 2021-07-29 | 2021-07-29 | Temporary spiral pipe supporting device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN215564725U true CN215564725U (en) | 2022-01-18 |
Family
ID=79829793
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202121748298.6U Active CN215564725U (en) | 2021-07-29 | 2021-07-29 | Temporary spiral pipe supporting device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN215564725U (en) |
-
2021
- 2021-07-29 CN CN202121748298.6U patent/CN215564725U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107090932B (en) | Construction method of large-span thin-wall plane arch truss based on stiff ring beam | |
CN104389419A (en) | Cantilevered formwork platform installation structure and construction method | |
CN202347446U (en) | Supporting structure for construction of zero block of reinforced concrete continuous beam | |
CN210529510U (en) | Temporary supporting device for transverse partition plate of precast beam | |
CN210164286U (en) | Support arrangement for high altitude large-span steel structure truss installation usefulness | |
CN211775609U (en) | Integrated form scaffold of independent post roof beam outer frame high-rise building | |
CN215564725U (en) | Temporary spiral pipe supporting device | |
CN103866692A (en) | Novel assembling method for bent cap bearing frame | |
CN204780635U (en) | Super wide nonprismatic continuous beam 0# piece concreties and relieves construction structures | |
CN202766974U (en) | Bent cap bearing frame without full framing | |
CN217479961U (en) | Independent few support of cross-river variable cross-section cast-in-place box girder | |
CN113585761B (en) | Construction platform structure of ultrahigh dome structure and construction method thereof | |
CN107476200B (en) | Full-hall support staggered overlapping structure and method | |
CN212582721U (en) | Bearing platform of tower crane for vertical tower of top plate of foundation garage | |
CN114837090A (en) | Combined support system for high tower beam construction and construction method | |
CN107237515A (en) | The support meanss and its application method of circular steel truss structure | |
CN110029671A (en) | A kind of steep slope pile foundation steel bar cage transfers construction technology using aperture bracket section by section | |
CN209760871U (en) | Transfinite beam support system | |
CN215053284U (en) | Novel independent support of post-cast strip for bearing stress by using original structure | |
CN216893723U (en) | Detachable supporting device for buckling constraint embedded part in column | |
CN219471585U (en) | Spliced supporting jig frame device | |
CN212359287U (en) | Steep slope iron tower leg heightening structure | |
CN203113384U (en) | Detachable top plate reinforcing supporting device | |
CN215631905U (en) | Silo storehouse top template strutting arrangement | |
CN219864095U (en) | Suspension type section steel platform hanging die supporting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |