CN215564109U - Wall structure on ground glue - Google Patents

Wall structure on ground glue Download PDF

Info

Publication number
CN215564109U
CN215564109U CN202121164986.8U CN202121164986U CN215564109U CN 215564109 U CN215564109 U CN 215564109U CN 202121164986 U CN202121164986 U CN 202121164986U CN 215564109 U CN215564109 U CN 215564109U
Authority
CN
China
Prior art keywords
connecting plate
ground
wall
plate
sets
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121164986.8U
Other languages
Chinese (zh)
Inventor
吴倩影
徐雅闰
郑凯文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Maihe Architectural Decoration Design Co ltd
Original Assignee
Suzhou Maihe Architectural Decoration Design Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Maihe Architectural Decoration Design Co ltd filed Critical Suzhou Maihe Architectural Decoration Design Co ltd
Priority to CN202121164986.8U priority Critical patent/CN215564109U/en
Application granted granted Critical
Publication of CN215564109U publication Critical patent/CN215564109U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Finishing Walls (AREA)

Abstract

The utility model belongs to the technical field of architectural decoration and specifically relates to a wall structure on earth relates to, it is including tiling the body on the subaerial earth, the position that the body is close to the wall body is glued to the earth sets up ascending turn-ups, the bottom of wall body is equipped with the connecting plate, the inside cavity that is of connecting plate, the spliced eye is seted up to one side that the connecting plate deviates from the wall body, one side that the turn-ups is close to the wall body sets up the neck strap, neck strap and connecting plate parallel arrangement, the position that the neck strap is close to the spliced eye sets up the spliced pole, the one end that the neck strap was kept away from to the spliced pole sets up spherical arch, spherical arch and spliced eye grafting cooperation, neck strap and connecting plate conflict, it is sealed to fill in the gap between neck strap and the connecting plate. This application has the effect that promotes wall structural stability on the earth's rubber.

Description

Wall structure on ground glue
Technical Field
The application relates to the field of architectural decoration, especially, relate to a wall structure on ground glue.
Background
The floor glue is also called floor glue board, which is a novel decorative material that can be installed on the ground, commonly called PVC floor. The floor slab is a novel light floor decoration material which is very popular in the world at present, and is a light floor material. The floor adhesive is widely used in places such as families, hospitals, schools, offices, factories, libraries, concert halls, supermarkets, shopping malls, stadiums and the like.
Can tile subaerial when gluey use on ground, utilize glue to glue subaerial with ground, the edge of ground glue is laid to the basement position, in order to make the difficult deposition in basement position at present, can set up ascending turn-ups in the edge of ground glue, and the turn-ups bonds with the wall body and is in the same place, makes basement department obtain covering, reaches the effect of the difficult deposition in corner department.
In view of the above related technologies, the inventor believes that, when the flange and the wall are bonded together by glue, the gap between the flange and the wall is not uniform due to the fact that the surface of the wall is not in a completely horizontal state, and it cannot be guaranteed that the gap between the flange and the wall is completely filled with the glue.
SUMMERY OF THE UTILITY MODEL
In order to promote the stability of wall structure on the ground, this application provides a wall structure on the ground.
The application provides a wall structure on earth adopts following technical scheme:
the utility model provides a wall structure on ground, includes the tiling and glues the body subaerial ground, the position that the body is close to the wall body is glued to ground sets up ascending turn-ups, the bottom of wall body is equipped with the connecting plate, the inside cavity that is of connecting plate, the spliced eye is seted up to one side that the connecting plate deviates from the wall body, one side that the turn-ups is close to the wall body sets up interior welt, interior welt and connecting plate parallel arrangement, the position that interior welt is close to the spliced eye sets up the spliced pole, the one end that interior welt was kept away from to the spliced pole sets up spherical arch, spherical arch and spliced eye are pegged graft the cooperation, interior welt contradicts with the connecting plate, it is sealed to fill in the gap between interior welt and the connecting plate.
Through adopting above-mentioned technical scheme, connect interior bushing plate on the turn-ups, the turn-ups passes through interior bushing plate and is connected with the connecting plate on the wall body, and the wall body is more level and more smooth compared to the connecting plate, makes interior bushing plate and connecting plate surface closely laminate, and the grafting cooperation of spherical protruding and spliced eye makes interior bushing plate be difficult for breaking away from the connecting plate, recycles sealed glue and further strengthens the joint strength between interior bushing plate and the connecting plate to the structure of wall is more stable on messenger's glue.
Optionally, the surface of the wall body is provided with a mortar leveling layer, the connecting plate is embedded inside the mortar leveling layer, and the connecting plate is flush with the surface of the mortar leveling layer.
Through adopting above-mentioned technical scheme, set up the mortar screed-coat and make the surface of wall body level more, inlay the connecting plate and establish inside the mortar screed-coat, it is more firm to make to be connected between connecting plate and the wall body, helps promoting the stability of wall structure on the ground.
Optionally, a plurality of the inserting holes are arranged along the horizontal direction, a plurality of the inserting columns are arranged along the horizontal direction, and the number of the inserting columns is consistent with that of the inserting holes.
By adopting the technical scheme, the plurality of inserting holes are matched with the plurality of inserting columns, so that the connection stability between the inner lining plate and the connecting plate is improved, and the inner lining plate is not easy to separate from the connecting plate.
Optionally, each plug hole is provided with a guide opening, and the guide opening gradually decreases along a direction from the position close to the inner lining plate to the position far away from the inner lining plate.
By adopting the technical scheme, the guide port is arranged to guide the insertion column when the insertion column is inserted into the insertion hole, so that the lining plate is conveniently connected to the connecting plate.
Optionally, a clamping strip is integrally formed at the top of the inner lining plate, a clamping groove is formed at the bottom of the clamping strip, and one side of the flanging, which is far away from the floor glue body, is in plug-in fit with the clamping groove.
Through adopting above-mentioned technical scheme, utilize the card strip to seal the seam crossing between inside lining board and the turn-ups, reduce the possibility that the gap appears in the junction between inside lining board and the turn-ups, fix a position and protect the turn-ups edge simultaneously.
Optionally, a screw is connected to the clamping strip through a thread, and the screw penetrates through the side wall of the clamping strip and is connected with the flanging through a thread.
Through adopting above-mentioned technical scheme, utilize the screw connection turn-ups and block the strip, reduce the turn-ups and break away from the possibility of draw-in groove, promote the job stabilization nature of blocking the strip.
Optionally, an arc transition portion is arranged at a joint of the flange and the floor glue body, an arc supporting portion is arranged on one side, close to the ground, of the inner lining plate, and the arc supporting portion is attached to the arc transition portion.
Through adopting above-mentioned technical scheme, the circular arc transition portion makes the difficult fracture that produces of junction of turn-ups and ground glue body, and difficult deposition, the clearance of being convenient for utilize the circular arc supporting part to support circular arc transition portion simultaneously, reduce circular arc transition portion and produce the possibility of warping and damage.
Optionally, one side of the arc supporting portion, which is far away from the arc transition portion, is provided with a supporting rib, the supporting rib abuts against the ground, and the supporting rib is arranged in a plurality at intervals along the length direction of the lining plate.
Through adopting above-mentioned technical scheme, utilize the brace rod to support interior welt, reduce interior welt and produce pivoted possibility, promote interior welt job stabilization nature.
In summary, the present application includes at least one of the following beneficial technical effects:
1. by arranging the inner lining plate and the connecting plate, the turned edge is connected with the connecting plate on the wall body through the inner lining plate, the connecting plate is smoother than the wall body, the inner lining plate is tightly attached to the surface of the connecting plate, the inner lining plate is not easy to separate from the connecting plate due to the insertion fit of the spherical protrusions and the insertion holes, and the connecting strength between the inner lining plate and the connecting plate is further enhanced by using sealant, so that the structure of the upper wall of the floor cement is more stable;
2. the surface of the wall body is smoother by arranging the mortar leveling layer, and the connecting plate is embedded in the mortar leveling layer, so that the connection between the connecting plate and the wall body is firmer, and the stability of a structure of the wall body on the ground is improved;
3. through setting up the card strip, utilize the card strip to seal the seam crossing between inside lining board and the turn-ups, reduce the possibility that the gap appears in the junction between inside lining board and the turn-ups, fix a position and protect turn-ups edge simultaneously.
Drawings
Fig. 1 is a schematic overall structure diagram of an embodiment of the present application.
Fig. 2 is a sectional view showing the entire structure in the embodiment of the present application.
Description of reference numerals: 1. a ground surface; 2. a wall body; 21. leveling mortar; 3. a floor gel body; 31. flanging; 32. a circular arc transition portion; 4. a connecting plate; 41. inserting holes; 42. a guide port; 5. an inner liner plate; 51. inserting the column; 511. a spherical bulge; 52. clamping the strip; 521. a card slot; 53. a screw; 54. an arc support portion; 55. and (7) supporting ribs.
Detailed Description
The present application is described in further detail below with reference to figures 1-2.
The embodiment of the application discloses a wall structure on ground. Referring to fig. 1, a wall structure on ground is glued includes the ground and glues body 3, and ground glue body 3 tiling is on ground 1 to splice with ground 1, glue body 3 and be close to the ascending turn-ups 31 of edge integrated into one piece of wall body 2, turn-ups 31 and the perpendicular setting of ground glue body 3, at the fixed interior welt 5 that sets up in one side that turn-ups 31 is close to wall body 2. The mortar leveling layer 21 is arranged on the surface of the wall body 2, the mortar leveling layer 21 is poured on the wall body 2, the connecting plate 4 is arranged at the position, close to the lining plate 5, of the mortar leveling layer 21, the connecting plate 4 is fixedly embedded inside the mortar leveling layer 21, and the connecting plate 4 is connected with the lining plate 5 in a clamped mode.
Referring to fig. 1 and 2, the connecting plate 4 is perpendicular to the ground 1, the connecting plate 4 is flush with the surface of the mortar leveling layer 21, a cavity is formed inside the connecting plate 4, and a circular insertion hole 41 is formed in one side, away from the wall body 2, of the connecting plate 4. The plug-in column 51 is fixedly arranged on one side of the inner lining plate 5 close to the connecting plate 4, the plug-in column 51 is arranged in a cylindrical shape, the plug-in column 51 is perpendicular to the surface of the inner lining plate 5, a spherical protrusion 511 is integrally formed at one end of the plug-in column 51 far away from the inner lining plate 5, and the spherical protrusion 511 is made of deformable materials, such as rubber. The radius of the plug hole 41 is slightly smaller than that of the spherical protrusion 511, the spherical protrusion 511 is in plug fit with the plug hole 41, and most of the spherical protrusion 511 is located inside the connecting plate 4, so that the inner lining plate 5 is positioned.
Referring to fig. 2, the inserting holes 41 are equidistantly formed along the length direction of the connecting plate 4, the inserting columns 51 are equidistantly formed along the horizontal direction, the single spherical protrusion 511 is inserted into the single inserting hole 41, in order to insert the spherical protrusion 511 into the inserting holes 41, a guide port 42 is arranged at each inserting hole 41, the guide port 42 is gradually reduced along the direction from the position close to the inner lining plate 5 to the position far away from the inner lining plate 5, and the spherical protrusion 511 inserted into the inserting holes 41 is guided.
Referring to fig. 2, after the spherical protrusion 511 is inserted into the insertion hole 41, the connecting plate 4 and the lining plate 5 are adhered together, and the joint between the connecting plate 4 and the lining plate 5 is filled with sealant, so that the connecting plate 4 and the lining plate 5 are connected more stably.
Referring to fig. 2, in order to protect and limit the top of the flange 31, a clamping strip 52 is integrally formed at the top of the inner liner 5, the clamping strip 52 is arranged along the length direction of the inner liner 5, the clamping strip 52 is higher than the top of the flange 31, a clamping groove 521 is formed in the bottom of the clamping strip 52 along the length direction of the clamping strip, one side of the flange 31, far away from the ground glue body 3, extends into the clamping groove 521, and is in plug-in fit with the clamping groove 521, so that the top of the flange 31 is coated.
Referring to fig. 2, a screw 53 is further disposed on a side of the clamping strip 52 away from the inner lining 5, the screw 53 is in threaded connection with the clamping strip 52, and simultaneously penetrates through a side wall of the clamping strip 52 to be in threaded connection with the flange 31, so that the flange 31 is fixedly connected to the clamping strip 52, and the possibility that the top of the flange 31 is separated from the clamping groove 521 is reduced.
Referring to fig. 2, in order to make the joint of the flange 31 and the floor glue body 3 not easily broken or broken, an arc transition part 32 is provided at the joint of the flange 31 and the floor glue body 3, so that the transition between the flange 31 and the floor glue body 3 is smooth and easy to clean. The arc support portion 54 is provided at a position on the inner panel 5 close to the floor surface 1, and one side of the arc support portion 54 close to the arc transition portion 32 is attached to the arc transition portion 32 to support the arc transition portion 32.
Referring to fig. 2, a plurality of support ribs 55 are disposed on one side of the arc support portion 54 away from the arc transition portion 32, the plurality of support ribs 55 are disposed along the length direction of the inner lining plate 5, the support ribs 55 are vertically disposed, the support ribs 55 are fixedly connected with the inner lining plate 5, one side of the support ribs 55 close to the ground 1 is abutted against the ground 1, and the inner lining plate 5 is supported, so that the inner lining plate 5 and the ground 1 are kept in a vertical state.
The implementation principle of a wall structure on the ground of this application embodiment does: through setting up mortar screed-coat 21 on wall body 2 to establish connecting plate 4 at mortar screed-coat 21 is inside to inlay, make connecting plate 4 firmly set up on wall body 2, at 31 one side fixed connection welt 5 in turn-ups, with welt 5 and the cooperation of connecting plate 4 joint, realize welt 5 and connecting plate 4's being connected, and fill sealed glue in welt 5 and connecting plate 4's seam, strengthen the joint strength between welt 5 and the connecting plate 4, finally make the structure of wall on the ground more stable.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. The utility model provides a wall structure is glued to ground, glues body (3) including the ground of tiling on ground (1), the position that ground glues body (3) and is close to wall body (2) sets up ascending turn-ups (31), its characterized in that: the bottom of wall body (2) is equipped with connecting plate (4), the inside cavity that is of connecting plate (4), spliced eye (41) are seted up to one side that connecting plate (4) deviates from wall body (2), one side that turn-ups (31) are close to wall body (2) sets up interior bushing plate (5), interior bushing plate (5) and connecting plate (4) parallel arrangement, the position that interior bushing plate (5) are close to spliced eye (41) sets up spliced pole (51), the one end that interior bushing plate (5) were kept away from in spliced pole (51) sets up spherical arch (511), cooperation is pegged graft with spliced eye (41) in spherical arch (511), interior bushing plate (5) contradict with connecting plate (4), it is sealed glue to fill in the gap between interior bushing plate (5) and connecting plate (4).
2. A wall structure on earth as in claim 1, wherein: the surface of wall body (2) sets up mortar screed-coat (21), connecting plate (4) are inlayed and are established inside mortar screed-coat (21), connecting plate (4) flush with mortar screed-coat (21) surface.
3. A wall structure on earth as in claim 1, wherein: the number of the plug holes (41) is a plurality along the horizontal direction, the number of the plug columns (51) is a plurality along the horizontal direction, and the number of the plug columns (51) is consistent with that of the plug holes (41).
4. A glue wall construction according to claim 3, characterised in that: each plug hole (41) is provided with a guide opening (42), and the guide openings (42) are gradually reduced along the direction from the position close to the lining plate (5) to the position far away from the lining plate (5).
5. A wall structure on earth as in claim 1, wherein: the top of interior welt (5) integrated into one piece has card strip (52), draw-in groove (521) have been seted up to the bottom of card strip (52), turn-ups (31) keep away from one side of ground gluey body (3) and draw-in groove (521) grafting cooperation.
6. A glue wall construction according to claim 5, characterised in that: the clamping strip (52) is in threaded connection with a screw (53), and the screw (53) penetrates through the side wall of the clamping strip (52) and is in threaded connection with the flanging (31).
7. A wall structure on earth as in claim 1, wherein: the connection part of the flanging (31) and the floor glue body (3) is provided with an arc transition part (32), one side of the inner lining plate (5) close to the ground (1) is provided with an arc supporting part (54), and the arc supporting part (54) is attached to the arc transition part (32).
8. A glue wall construction according to claim 7, characterised in that: one side of the arc supporting part (54) far away from the arc transition part (32) is provided with a plurality of supporting ribs (55), the supporting ribs (55) are abutted against the ground (1), and the supporting ribs (55) are arranged at intervals along the length direction of the inner lining plate (5).
CN202121164986.8U 2021-05-27 2021-05-27 Wall structure on ground glue Active CN215564109U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121164986.8U CN215564109U (en) 2021-05-27 2021-05-27 Wall structure on ground glue

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121164986.8U CN215564109U (en) 2021-05-27 2021-05-27 Wall structure on ground glue

Publications (1)

Publication Number Publication Date
CN215564109U true CN215564109U (en) 2022-01-18

Family

ID=79864429

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121164986.8U Active CN215564109U (en) 2021-05-27 2021-05-27 Wall structure on ground glue

Country Status (1)

Country Link
CN (1) CN215564109U (en)

Similar Documents

Publication Publication Date Title
AU2018229509B2 (en) Shower hob apparatus
CN215564109U (en) Wall structure on ground glue
US20040154245A1 (en) Structure of a combinative interlocking board enclosing vertical and horizontal pipes
CN214615152U (en) Split type external corner mounting bordures
CN215889059U (en) A wallboard mounting structure for wallboard corner
CN109779296A (en) A kind of assembled bamboo and wood ground, bamboo and wood low-rise dwelling and its construction method
CN211037622U (en) Right-angle corner stone material close-splicing structure
CN106677393A (en) Stand column structure adaptable to radian variation and curtain wall unit adopting column structure
CN209429448U (en) A kind of aluminium alloy furred ceiling and ceiling system that surrounding is hanging
CN113250403A (en) Ceramic tile composite board external corner connecting piece and mounting method
CN207812817U (en) A kind of wall barrier plate not gluing composite plate
CN211949367U (en) Fiber reinforced cement fast-assembling link plate structure
CN204960042U (en) Wallboard assembly structure
CN213837446U (en) Wallboard leveling and hanging system
CN213774236U (en) Large-plate ceramic tile butt-joint waterproof structure
CN212613097U (en) Whole bathroom waterproof plate and mosaic structure thereof
CN218406013U (en) Suspended ceiling plate mounting structure
CN210636728U (en) Seamless mounting structure of panel for building decoration
CN215563746U (en) Whole bathroom smallpox mosaic structure
CN218881191U (en) End sealing structure of glass curtain wall
KR102582317B1 (en) Corner joint method of curved exterior panel for construction
CN214006905U (en) Toilet cuts off stand flange for panel convenient to installation
CN217054826U (en) Passive building airtight window decorative structure
EP4342349A1 (en) Method for attaching a panel to a shower tray
CN216766599U (en) Socket type sealing splicing decoration panel structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant