CN215564092U - Artificial stone slab hanging plate assembly - Google Patents

Artificial stone slab hanging plate assembly Download PDF

Info

Publication number
CN215564092U
CN215564092U CN202122105535.3U CN202122105535U CN215564092U CN 215564092 U CN215564092 U CN 215564092U CN 202122105535 U CN202122105535 U CN 202122105535U CN 215564092 U CN215564092 U CN 215564092U
Authority
CN
China
Prior art keywords
artificial stone
connecting rod
nut
plate
stone slab
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122105535.3U
Other languages
Chinese (zh)
Inventor
郭君建
汝宗林
李宇龙
郭森
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Dianyue New Building Material Co ltd
Original Assignee
Suzhou Dianyue New Building Material Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Dianyue New Building Material Co ltd filed Critical Suzhou Dianyue New Building Material Co ltd
Priority to CN202122105535.3U priority Critical patent/CN215564092U/en
Application granted granted Critical
Publication of CN215564092U publication Critical patent/CN215564092U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Finishing Walls (AREA)

Abstract

The utility model relates to the technical field of artificial stone plate mounting structures, in particular to an artificial stone plate hanging plate assembly which comprises an artificial stone plate and a keel transverse supporting frame fixed on a wall body, wherein nuts are pre-buried in the artificial stone plate, the opening side of each nut is positioned on the back side of the artificial stone plate, the hanging plate assembly further comprises a connecting rod, threads are arranged on the outer circumference of the connecting rod, one end of the connecting rod is in threaded connection with the nuts, the other end of the connecting rod is inserted with a supporting plate in a penetrating mode, the connecting rod is positioned on two sides of the supporting plate and is in threaded connection with nuts, and the supporting plate is mounted on the keel transverse supporting frame in a matching mode. This artificial stone panel's link plate component passes through prefabricated bolt location mounted position, and the nut has saved installation time greatly in the front and back position of adjusting panel, improves the installation effectiveness, has also improved the accuracy of mounted position when easy to assemble, and panel interface gap is big when having avoided artificial stone panel installation, aligns the difficulty, adjusts the shortcoming of difficulty.

Description

Artificial stone slab hanging plate assembly
Technical Field
The utility model relates to the technical field of artificial stone plate mounting structures, in particular to an artificial stone plate hanging plate assembly.
Background
At present rostone link plate current situation, with the bonding steel construction of structural adhesive for the grooving in the panel back, treat the structural adhesive solidification back, the manual work shifts panel to mounted position, reuse structural adhesive bonds the steel construction that glues well on with the panel and the steel fossil fragments that burn well, because of can't finely tune panel after bonding, will be very high to constructor's gimmick during the bonding.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the defect that the artificial stone plate is difficult to install in the prior art, and provides an artificial stone plate hanging plate component.
In order to achieve the purpose, the utility model adopts the following technical scheme:
the utility model provides an artificial stone board link plate subassembly, includes artificial stone board, fixes the horizontal support frame of fossil fragments on the wall body, pre-buried the nut in the artificial stone board, the nut opening side is located the artificial stone board back, the link plate subassembly still includes the connecting rod, the outer circumference of connecting rod is equipped with the screw thread, connecting rod one end and nut threaded connection, the connecting rod other end runs through to be inserted and is equipped with the backup pad that has the jack, the connecting rod is located the equal threaded connection in backup pad both sides and has the nut, the backup pad cooperation is installed on the horizontal support frame of fossil fragments.
The horizontal support frame of fossil fragments has the open mounting groove in top, the spacing support of backup pad is in the mounting groove.
One end of the nut, which is far away from the connecting rod, is integrally formed with an outer edge part which extends outwards along the radial direction of the nut.
And an inner hexagonal groove is formed in one end, far away from the screw cap, of the connecting rod.
The artificial stone slab is embedded with a metal net, and the outer edge part is provided with a notch which is embedded with the metal net.
The insertion hole is arranged to be deviated from the center of the support plate.
The artificial stone slab hanging plate assembly provided by the utility model has the beneficial effects that: this artificial stone panel's link plate component passes through prefabricated bolt location mounted position, and nut adjusting plate around the position and panel can be controlled on fossil fragments and adjust, have saved installation time greatly, improve the installation effectiveness, also improved mounted position's accuracy when easy to assemble, the panel interface gap is big when having avoided artificial stone panel installation, aligns the difficulty, adjusts the shortcoming of difficulty.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic right-view structural diagram of the nut shown in FIG. 1;
fig. 3 is a right-side view of the support plate of fig. 1.
In the figure: nut 1, connecting rod 2, backup pad 3, nut 4, fossil fragments horizontal support frame 5, rostone panel 6, outer fringe portion 7.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments.
Referring to fig. 1-2, an artificial stone slab hanging plate assembly comprises an artificial stone slab 6 and a keel transverse supporting frame 5 fixed on a wall body, wherein a nut 1 is pre-embedded in the artificial stone slab 6, the opening side of the nut 1 is positioned on the back side of the artificial stone slab 6, the hanging plate assembly further comprises a connecting rod 2, the outer circumference of the connecting rod 2 is provided with threads, one end of the connecting rod 2 is in threaded connection with the nut 1, the other end of the connecting rod 2 is inserted with a supporting plate 3 with a jack, referring to fig. 3, the jack is preferably arranged to deviate from the center of the supporting plate 3, thus when the supporting height of the supporting plate 3 needs to be adjusted, because of the jack segregation arrangement, the height position of the connecting rod can be directly adjusted by rotating the supporting plate 3, when the jack is arranged, for example, the center of the jack is 20mm away from the top edge of the supporting plate 3, 25mm away from the left edge, 30mm away from the lower edge and 35mm away from the right edge, connecting rod 2 is located 3 both sides equal threaded connection of backup pad and has nut 4, and 3 cooperations of backup pad are installed on fossil fragments horizontal support frame 5, and for the ease of the installation of connecting rod and nut, the one end that nut 1 was kept away from to connecting rod 2 is equipped with interior hexagonal groove.
Embedding embedded hanging plate nuts at corresponding positions of the plates in the production process of the plates, and waiting for the plates to be molded; connecting one end of the connecting rod without the inner hexagon with a plate nut, and screwing the connecting rod with an inner hexagon wrench; firstly screwing a nut to position the support plate; installing a supporting plate, and screwing a nut to fix the position of the supporting plate; and (5) installing the plate on the keel transverse support frame 5 to finish installation.
This artificial stone panel's link plate component passes through prefabricated bolt location mounted position, and nut adjusting plate around the position and panel can be controlled on fossil fragments and adjust, have saved installation time greatly, improve the installation effectiveness, also improved mounted position's accuracy when easy to assemble, the panel interface gap is big when having avoided artificial stone panel installation, aligns the difficulty, adjusts the shortcoming of difficulty.
The horizontal support frame 5 of fossil fragments has the open mounting groove in top, 3 spacing supports in the mounting groove of backup pad, for example accomplish the back with 3 position control in backup pad, an iron plate of welding between backup pad both sides and support frame, make the two rigidity together, this device backup pad 3 can control the regulation in the mounting groove, adjust to spacing each other between the backup pad or the adjacent panel through the dog after accomplishing, the mounting groove of the horizontal support frame 5 of fossil fragments is fairly simple, the backup pad installation is also fairly convenient.
For the steadiness of improvement nut and panel, refer to figure 2, the one end integrated into one piece that connecting rod 2 was kept away from to nut 1 has the outer fringe portion 7 along the radial outside extension of nut 1, pre-buried in the rostone panel 6 has the metal mesh, outer fringe portion 7 has the notch that is in the same place with the metal mesh gomphosis, and preferred metal mesh is the metal mesh of # -shaped, and the notch is cruciform structure, and the notch card of outer fringe portion 7 improves the joint strength of nut and rostone panel on the metal mesh to avoid the nut not hard up in rostone panel.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any technical solutions, concepts and designs obtained by equivalent substitutions or changes of the technical solutions and the utility model concepts of the present invention by those skilled in the art within the technical scope of the present invention shall be covered by the scope of the present invention.

Claims (6)

1. The utility model provides an artificial stone board link plate subassembly, includes artificial stone board (6), fixes fossil fragments horizontal support frame (5) on the wall body, a serial communication port, pre-buried nut (1) having in artificial stone board (6), nut (1) opening side is located artificial stone board (6) back, the link plate subassembly still includes connecting rod (2), the outer circumference of connecting rod (2) is equipped with the screw thread, connecting rod (2) one end and nut (1) threaded connection, connecting rod (2) other end runs through and is inserted backup pad (3) that are equipped with the jack, connecting rod (2) are located backup pad (3) both sides equal threaded connection and have nut (4), install on fossil fragments horizontal support frame (5) backup pad (3) cooperation.
2. An artificial stone slab suspending board assembly according to claim 1, wherein the keel lateral support frame (5) has an open-topped mounting groove, and the support plate (3) is supported in the mounting groove in a limited manner.
3. An artificial stone slab suspending board assembly according to claim 1, wherein the end of the nut (1) remote from the connecting rod (2) is integrally formed with an outer rim portion (7) extending radially outwardly of the nut (1).
4. An artificial stone slab suspending board assembly according to claim 1, wherein one end of the connecting rod (2) far away from the nut (1) is provided with an inner hexagonal groove.
5. An artificial stone slab suspending board assembly according to claim 3, wherein the artificial stone slab (6) is embedded with a metal net, and the outer edge part (7) is provided with a notch embedded with the metal net.
6. A manmade stone slab suspending board assembly according to claim 1, wherein the inserting hole is arranged off-center of the supporting plate (3).
CN202122105535.3U 2021-09-02 2021-09-02 Artificial stone slab hanging plate assembly Active CN215564092U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122105535.3U CN215564092U (en) 2021-09-02 2021-09-02 Artificial stone slab hanging plate assembly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122105535.3U CN215564092U (en) 2021-09-02 2021-09-02 Artificial stone slab hanging plate assembly

Publications (1)

Publication Number Publication Date
CN215564092U true CN215564092U (en) 2022-01-18

Family

ID=79846086

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122105535.3U Active CN215564092U (en) 2021-09-02 2021-09-02 Artificial stone slab hanging plate assembly

Country Status (1)

Country Link
CN (1) CN215564092U (en)

Similar Documents

Publication Publication Date Title
CN105064646A (en) Facing integrated board dry hanging installation structure with adjustable and dismountable facade
CN110656762A (en) Three-section type pull rod overhanging outer scaffold and construction method thereof
CN215564092U (en) Artificial stone slab hanging plate assembly
CN204940779U (en) Facade is adjustable removable facing circuit board cladding mounting structure
CN110093856A (en) A kind of breast board connection structure in rail traffic bridge
CN109352241A (en) Control the method and fixture of igniter welding deformation
CN204906085U (en) [electric] motor coach driving motor suspension system
CN208430517U (en) Bracing members hanging plate for subway foundation pit construction
CN108859932A (en) A kind of rear combination lamp installation fixed structure
CN215519913U (en) Detachable shaping plate for civil engineering construction
CN214785430U (en) Eave structure of prefabricated building
CN112900695B (en) Wall frame device for building and building implementation method thereof
CN208571982U (en) A kind of solar panels supporting structure of novel maintenance easy to install
CN201326223Y (en) Auxiliary beam device connected by clamping mechanism of clamp plate
CN210857665U (en) Curtain mounting structure for civil engineering
CN219546457U (en) Section bar battery box hoisting structure
CN212836382U (en) Assembled indoor wall decoration's combination vertical aggregate
CN216636671U (en) A screwed pipe is from location mounting structure for car
CN109449336B (en) Motorcycle battery mounting box
CN219640056U (en) LED lamp positioning structure
CN219389603U (en) Illumination angle adjusting device of illumination lamp
CN210164262U (en) Prefabricated outer wall banding flitch fixed fixture of assembled structure
CN219509191U (en) Single-side inclined support bracket structure
CN219158405U (en) T-shaped beam steel template capable of being quickly installed and detached
CN211948852U (en) Novel prefabricated air conditioner board support frame of encorbelmenting

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant