CN215563664U - Bamboo curtain wall - Google Patents

Bamboo curtain wall Download PDF

Info

Publication number
CN215563664U
CN215563664U CN202122011486.7U CN202122011486U CN215563664U CN 215563664 U CN215563664 U CN 215563664U CN 202122011486 U CN202122011486 U CN 202122011486U CN 215563664 U CN215563664 U CN 215563664U
Authority
CN
China
Prior art keywords
bamboo
connecting plate
mounting
groove
curtain wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122011486.7U
Other languages
Chinese (zh)
Inventor
于大海
巫汉立
何韵雍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Aimaiou Shanghai Architectural Design Consulting Co ltd
Original Assignee
Aimaiou Shanghai Architectural Design Consulting Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Aimaiou Shanghai Architectural Design Consulting Co ltd filed Critical Aimaiou Shanghai Architectural Design Consulting Co ltd
Priority to CN202122011486.7U priority Critical patent/CN215563664U/en
Application granted granted Critical
Publication of CN215563664U publication Critical patent/CN215563664U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

The application relates to the technical field of building curtain wall structures, in particular to a bamboo curtain wall which comprises a wall body of the curtain wall, a plurality of connecting pieces and a plurality of bamboo boards, the connecting piece is positioned between two adjacent bamboo boards in the horizontal direction and comprises a first connecting plate and a second connecting plate which are parallel to each other, the first connecting plate is attached to the surface of the wall body, a vertically arranged mounting plate is arranged between the first connecting plate and the second connecting plate, at least one mounting screw used for being mounted on a wall body is connected to the first connecting plate in a threaded manner, two vertical side walls of the bamboo board which are deviated from each other are respectively provided with a mounting groove for the second connecting plate and the mounting plate to slidably penetrate, when two are adjacent on the horizontal direction the lateral wall of bamboo plank is when laminating each other, two the mounting groove intercommunication is in order to form the installation cavity that supplies second connecting plate and mounting panel slip to inlay to establish. This application can improve the stability of bamboo plank.

Description

Bamboo curtain wall
Technical Field
The application relates to the technical field of building curtain wall structures, in particular to a bamboo curtain wall.
Background
The curtain wall is an outer wall enclosure of a building, does not bear load, and is a wall structure with a decorative effect commonly used in modern buildings. People generally choose to arrange a panel on the curtain wall for aesthetic property, and the material of the panel can be divided into glass, stone, bamboo and wood and the like.
In the related art of bamboo curtain wall, bamboo curtain wall includes the wall body of curtain wall, and the workman aims at the wall body with the bamboo plank in one side of wall body to bind the bamboo plank on basic unit fossil fragments with the gas nail, thereby accomplish the installation of bamboo curtain wall.
However, according to the installation of the bamboo curtain wall that the above-mentioned action was accomplished, make the gas nail expose on the surface of bamboo curtain wall easily, make the gas nail receive the corruption easily and produce not hard up, lead to the stability of bamboo plank to reduce, cause the condition that bamboo plank drops easily to take place.
SUMMERY OF THE UTILITY MODEL
In order to improve the stability of bamboo plank, this application provides a bamboo wood curtain wall.
The application provides a bamboo curtain wall adopts following technical scheme: the utility model provides a bamboo curtain wall, includes wall body, a plurality of connecting piece and a plurality of bamboo plank of curtain, the connecting piece is located between two adjacent bamboo planks on the horizontal direction, the connecting piece includes first connecting plate and the second connecting plate that is parallel to each other, first connecting plate is laminated in the wall body surface, be equipped with the mounting panel that is vertical setting between first connecting plate and the second connecting plate, threaded connection has at least one mounting screw that is used for installing on the wall body on the first connecting plate, all seted up on two vertical lateral walls that deviate from mutually of bamboo plank and supply second connecting plate and mounting panel to slide and wear to establish the mounting groove, two adjacent on the horizontal direction when the lateral wall of bamboo plank pastes each other, two the mounting groove intercommunication inlays the installation cavity of establishing in order to form to supply second connecting plate and mounting panel to slide.
Through adopting above-mentioned technical scheme, when the workman need install the bamboo plank, the workman laminates first connecting plate in the wall surface, then with mounting screw thread threaded connection in proper order in first connecting plate and wall body, then, the workman aims at second connecting plate and mounting panel with the mounting groove of two bamboo planks, with the bamboo plank from last to the grafting that slides down for first connecting plate and mounting panel are contradicted in the cell wall of mounting groove, and the lateral wall of two bamboo planks is laminated each other this moment.
The workman repeats above-mentioned action, installs connecting piece and bamboo plank one by one for the mounting screw is located between bamboo plank and the wall body, and the mounting screw is difficult for exposing on bamboo plank surface, realizes protecting the mounting screw, and then has improved the stability of bamboo plank.
Simultaneously, the installation cavity that forms between two bamboo planks accomodates the second connecting plate, has improved bamboo wood curtain's whole aesthetic property.
Optionally, the first connecting plate is provided with a first sinking groove for the threaded connection of the mounting screw.
Through adopting above-mentioned technical scheme, when mounting screw with first connecting plate threaded connection in the wall body, one side that the wall body was kept away from to the mounting screw sinks into first heavy inslot for one side laminating in the wall body is kept away from to the first connecting plate towards the bamboo plank, makes it be difficult for contradicting in the mounting screw, has improved the stability of bamboo plank.
Optionally, a sealing element for shielding the mounting screw is inserted in the first sinking groove in a sliding manner.
Through adopting above-mentioned technical scheme, when the mounting screw was kept away from the first heavy inslot of one end dust of wall body, the workman slided the grafting with the sealing member in the notch department of first heavy groove, and the sealing member shields the notch of first heavy groove, has improved the protection effect to the mounting screw.
Optionally, the first connecting plate is provided with a force application groove communicated with the first sinking groove.
Through adopting above-mentioned technical scheme, when the workman need take off the sealing member, the workman extrudees the lateral wall of sealing member through the application of force groove, and then conveniently takes out the sealing member from first heavy inslot.
Optionally, a plurality of second sinking grooves for the first connecting plates to be inserted are formed in the wall body.
Through adopting above-mentioned technical scheme, when first connecting plate was installed on the wall body, first connecting plate was pegged graft in the heavy inslot of second, and one side and wall body surface parallel and level that the wall body was kept away from to first connecting plate this moment for bamboo plank was laminated each other towards one side and wall body and first connecting plate of wall body when the installation of bamboo plank, makes more to hug closely between bamboo plank and the wall body, has improved the stability of bamboo plank.
Optionally, an elastic cushion layer is arranged on one side, facing the first connecting plate, of the second connecting plate.
Through adopting above-mentioned technical scheme, when mounting panel and second connecting plate slip grafting when the mounting groove, the elastic cushion layer is contradicted in one side cell wall that the mounting groove deviates from the wall body, and the elastic cushion layer takes place deformation and supports all the time tightly in the cell wall of mounting groove, supports tightly bamboo plank towards wall body department, has further improved bamboo plank's stability.
Optionally, a working groove for installing a screw to penetrate is formed in the second connecting plate.
Through adopting above-mentioned technical scheme, when the workman with first connecting plate laminating in the wall body, the workman wears to locate the working groove with mounting screw for mounting screw is corresponding with first connecting plate, has made things convenient for the workman to install mounting screw on first connecting plate.
Optionally, all the side walls of the second connecting plate are provided with a protection fillet.
Through adopting above-mentioned technical scheme, when the workman pegged graft the installation to the bamboo plank, the lateral wall of second connecting plate is difficult to cause the damage of colliding with to the bamboo plank, simultaneously, has reduced the second connecting plate and has caused the condition emergence that touches the accidental injury to the workman.
To sum up, the application comprises the following beneficial technical effects:
1. through the arrangement of the wall body, the bamboo board, the connecting piece, the mounting screws, the mounting groove and the mounting cavity, the mounting screws are not easily exposed on the surface of the bamboo board, the mounting screws are protected, and the stability of the bamboo board is improved;
2. through the arrangement of the first sinking groove, the bamboo board is not easy to touch the mounting screws, and the bamboo board is attached to the first connecting plate, so that the stability of the bamboo board is further improved;
3. the protection effect on the mounting screw is further improved by the arrangement of the sealing element;
4. through the arrangement of the force application groove, a worker can conveniently take out the sealing element;
5. through the arrangement of the second sinking groove, the bamboo board is attached to the wall body and the first connecting board, and the stability of the bamboo board is further improved;
6. the elastic cushion layer is arranged, so that the bamboo board is tightly attached to the surface of the wall body, and the stability of the bamboo board is further improved;
7. through the arrangement of the working groove, workers can conveniently use the mounting screw;
8. through the arrangement of the protection fillet, the second connecting plate is not easy to collide with and damage the bamboo board, and the use of workers is facilitated.
Drawings
FIG. 1 is a schematic diagram of the overall structure in the embodiment of the present application;
FIG. 2 is a schematic structural diagram of a hidden part of a bamboo board used for showing a connecting piece, a mounting groove and a second sinking groove in the embodiment of the application;
fig. 3 is a schematic diagram of an exploded structure for showing a connector, a mounting screw, and a sealing member in an embodiment of the present application.
Reference numerals: 1. a wall body; 2. bamboo and wood boards; 3. mounting grooves; 31. a first groove; 32. a second groove; 4. a mounting cavity; 5. a connecting member; 51. a first connecting plate; 52. mounting a plate; 53. a second connecting plate; 6. mounting screws; 7. a first sink tank; 71. installing a threaded hole; 72. a seal member; 73. a force application groove; 8. a second sink tank; 9. a working groove; 91. protecting a round angle; 92. an elastic cushion layer.
Detailed Description
The present application is described in further detail below with reference to figures 1-3.
The embodiment of the application discloses bamboo wood curtain wall. As shown in figures 1 and 2, the bamboo curtain wall comprises a wall body 1 of the curtain wall, a plurality of connecting pieces 5 and a plurality of bamboo boards 2, wherein the wall body 1 is vertically arranged. All the connecting pieces 5 are uniformly divided into a plurality of groups, each group of connecting pieces 5 are sequentially arranged on the wall body 1 along the horizontal direction, and all the connecting pieces 5 in the same group are sequentially arranged along the vertical direction.
As shown in fig. 2 and 3, the bamboo wood board 2 is vertically arranged. All set up the mounting groove 3 that supplies connecting piece 5 to slide to wear to establish on two adjacent vertical lateral walls of bamboo plank 2 and wall body 1, after two adjacent bamboo plank 2 lateral walls contradict each other in the horizontal direction, two mounting grooves 3 between two bamboo planks 2 communicate each other and form installation cavity 4 jointly, equal threaded connection has at least one mounting screw 6 that is used for connecting on wall body 1 on every connecting piece 5.
As shown in fig. 2 and 3, the connecting member 5 includes a mounting plate 52, a first connecting plate 51 and a second connecting plate 53, the first connecting plate 51 and the second connecting plate 53 are both parallel to the wall 1, the mounting plate 52 is vertically disposed and perpendicular to the first connecting plate 51 and the second connecting plate 53, one end of the mounting plate 52 is fixedly connected to the first connecting plate 51, and the other end of the mounting plate 52 is fixedly connected to the second connecting plate 53.
When the workman need install bamboo plank 2, the workman will first connecting plate 51 laminate in the position that wall body 1 predetermined was good, reuse a plurality of mounting screws 6 with all first connecting plate 51 threaded connection one by one on wall body 1, then, the workman pegs graft bamboo plank 2 one by one in the both sides of connecting piece 5, make mounting groove 3 contradict in second connecting plate 53 and mounting panel 52, the lateral wall of adjacent bamboo plank 2 contradicts each other this moment, mounting cavity 4 that two mounting grooves 3 formed jointly is accomodate mounting panel 52 and second connecting plate 53 parcel.
According to the action, after the bamboo board 2 is installed, the connecting piece 5 and the mounting screws 6 are not easily exposed outside the bamboo board 2, the overall attractiveness of the bamboo curtain wall is improved, the shielding effect is achieved on the mounting screws 6, the mounting screws 6 are protected, the mounting screws 6 are not prone to corrosion, looseness is generated, and the stability of the bamboo board 2 is improved.
As shown in fig. 1 and 2, the mounting groove 3 includes a first groove 31 and a second groove 32, the first groove 31 penetrates through the bamboo board 2 toward one side of the curtain wall, the second groove 32 is opened on a groove wall of the first groove 31, in this embodiment, a cross section formed by the first groove 31 and the second groove 32 is "L" shaped, and a mounting cavity 4 formed by the two mutually-communicated mounting grooves 3 is "T" shaped, when the second connecting plate 53 and the mounting plate 52 are inserted into the mounting groove 3, the mounting plate 52 is located in the first groove 31, the second connecting plate 53 is located in the second groove 32, and at this time, the second connecting plate 53 and the second groove 32 cooperate together to limit the bamboo board 2, so that the bamboo board 2 is not easily separated from the wall 1.
As shown in fig. 2 and 3, the first connecting plate 51 is provided with two first sunken grooves 7, and the groove walls of the first sunken grooves 7 are provided with mounting threaded holes 71 penetrating through the first connecting plate 51.
When the workman was laminated first connecting plate 51 in wall body 1, the workman worn to locate first heavy groove 7 with mounting screw 6 and mounting screw hole 71 threaded connection, until mounting screw hole 71 and wall body 1 threaded connection back, the one end that mounting screw 6 kept away from wall body 1 sinks in first heavy groove 7, the workman is with two mounting screw 6 threaded connection on two mounting screw holes 71 of first connecting plate 51 for first connecting plate 51's stability is carried into, and then promotes bamboo plank 2's stability.
When the bamboo boards 2 are inserted into the two sides of the connecting member 5, the side of the bamboo boards 2 facing the wall 1 abuts against the first connecting plate 51 to shield the first sink 7. And then improved the protection effect to mounting screw 6, simultaneously, bamboo plank 2 is difficult for contradicting takes place to rock in mounting screw 6, has improved bamboo plank 2's stability.
As shown in fig. 2 and 3, a sealing member 72 is slidably inserted into the first sinking groove 7, in this embodiment, the material of the sealing member 72 is preferably rubber, and the sealing member 72 is circular. When the workman need use mounting screw 6, workman pulling sealing member 72 makes its and the separation of first heavy groove 7, sink into first heavy groove 7 back until one side that mounting screw 6 kept away from wall body 1, the workman promotes sealing member 72, make the grafting in first heavy groove 7, sealing member 72 sinks into first heavy groove 7 this moment, sealing member 72 shields first heavy groove 7, and then improved the protection effect to mounting screw 6, make liquid be difficult for corroding mounting screw 6 in the infiltration of bamboo plank 2 to first heavy groove 7, the protection effect to mounting screw 6 has been improved.
As shown in fig. 3, two force applying grooves 73 penetrating through the wall of the first sinking groove 7 are formed in one side of the first connecting plate 51 away from the wall 1, the force applying grooves 73 correspond to the first sinking grooves 7 one to one, when a worker needs to take out the sealing element 72, the worker penetrates the force applying grooves 73 to abut against the side wall of the sealing element 72, and then takes out the sealing element 72 from the first sinking groove 7, so that the worker can take off the sealing element 72 conveniently. Meanwhile, when the sealing member 72 is inserted into the first sinking groove 7, the sealing member 72 isolates the force applying groove 73 from the first sinking groove 7, and the liquid is not easy to enter the first sinking groove 7 through the force applying groove 73.
As shown in fig. 2 and 3, a plurality of second sinking grooves 8 are formed in the wall 1 at positions corresponding to the first connecting plates 51, and the second sinking grooves 8 correspond to the first connecting plates 51 one by one. When the workman need place first connecting plate 51, the workman pegs graft first connecting plate 51 in second heavy groove 8, makes things convenient for the workman to carry out quick installation to first connecting plate 51. Meanwhile, when the first connecting plate 51 is inserted into the second sinking groove 8, one side of the first connecting plate 51, which is far away from the wall body 1, is flush with the wall body 1, so that the bamboo board 2 is attached to the wall body 1 and the first connecting plate 51 towards one side of the wall body 1, the second connecting plate 53 supports the bamboo board 2 tightly against the wall body 1, the gap between the bamboo board 2 and the wall body 1 is reduced, and the stability of the bamboo board 2 is improved.
As shown in fig. 2 and 3, two working grooves 9 penetrating through the second connecting plate 53 are formed in one side, away from the wall 1, of the second connecting plate 53, the working grooves 9 correspond to the first sinking grooves 7 one to one, and a worker penetrates the mounting screws 6 through the working grooves 9, so that the mounting screws 6 correspond to the first sinking grooves 7, and the worker can take out or install the mounting screws 6 conveniently.
As shown in fig. 2 and 3, the upper end surface of the second connecting plate 53 is provided with a protection fillet 91, so that when wood boards are inserted, a worker can align the second groove 32 with the second connecting plate 53 conveniently, damage of the second connecting plate 53 to the wood boards is reduced, and the worker is not easy to touch and scratch.
As shown in fig. 2 and 3, the second connecting plate 53 is fixedly connected with an elastic cushion 92 towards one side of the first connecting plate 51, when the second connecting plate 53 is inserted into the second groove 32, the elastic cushion 92 abuts against the groove wall of the second groove 32 and deforms, and the elastic cushion 92 urges the groove wall of the second groove 32 to abut against the second connecting plate 53 and the elastic cushion 92, so that the bamboo board 2 abuts against the wall 1, the bamboo board 2 is not prone to shake after being inserted, and the stability of the bamboo board 2 is further improved.
The implementation principle of the bamboo curtain wall of the embodiment of the application is as follows: when a worker needs to install the bamboo curtain wall, the worker firstly completes the installation of the wall body 1, inserts the first connecting plate 51 into the second sinking groove 8, and takes the sealing element 72 out of the first sinking groove 7 through the force application groove 73.
Then, the worker drives the mounting screw 6 to penetrate through the working groove 9, so that the mounting screw 6 penetrates through the first sunk groove 7 and is in threaded connection with the mounting threaded hole 71, and the mounting screw 6 is in threaded connection with the mounting threaded hole 71 and then is in threaded connection with the groove wall of the second sunk groove 8. The worker repeats the above-described operation to mount another mounting screw 6 on the first connection plate 51 so that the first connection plate 51 is inserted into the second sinking groove 8. The worker pushes the sealing member 72 again so that the sealing member 72 is inserted into the first sinking groove 7 to shield it, and the worker repeats the above-described actions to install all the connection members 5 in the corresponding second sinking grooves 8.
Then, the worker aligns two sides of the bamboo board 2 with two adjacent connecting pieces 5 in the horizontal direction, so that the first groove 31 corresponds to the mounting plate 52, the second groove 32 corresponds to the second connecting plate 53, the worker inserts the bamboo board 2 between the two connecting pieces 5, and inserts all the bamboo boards 2 one by one, at this time, the bamboo board 2 abuts against the wall body 1 towards one side of the wall body 1, the elastic cushion 92 deforms and abuts against the groove wall of the second groove 32, so that the bamboo board 2 always abuts against the wall body 1, a mounting cavity 4 is formed between the two adjacent bamboo boards 2 in the horizontal direction, and the second connecting plate 53 and the mounting plate 52 are wrapped.
According to the actions, the worker can shield the connecting piece 5 and the mounting screw 6 from the bamboo board 2 after the bamboo board 2 is mounted, the overall attractiveness of the bamboo curtain wall is improved, meanwhile, the mounting screw 6 is protected, the mounting screw 6 is not prone to corrosion and damage, and the stability of the bamboo board 2 is improved.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. The utility model provides a bamboo curtain wall which characterized in that: the curtain wall comprises a wall body (1) of a curtain wall, a plurality of connecting pieces (5) and a plurality of bamboo boards (2), wherein the connecting pieces (5) are positioned between two adjacent bamboo boards (2) in the horizontal direction, each connecting piece (5) comprises a first connecting plate (51) and a second connecting plate (53) which are parallel to each other, the first connecting plates (51) are attached to the surface of the wall body (1), a mounting plate (52) which is vertically arranged is arranged between the first connecting plates (51) and the second connecting plates (53), at least one mounting screw (6) used for being mounted on the wall body (1) is in threaded connection with the first connecting plates (51), two vertical side walls which are away from each other of the bamboo boards (2) are respectively provided with a mounting groove (3) for the second connecting plates (53) and the mounting plate (52) to slide through, when the side walls of the two adjacent bamboo boards (2) are attached to each other in the horizontal direction, the two mounting grooves (3) are communicated to form a mounting cavity (4) for the sliding embedding of the second connecting plate (53) and the mounting plate (52).
2. The bamboo-wood curtain wall of claim 1, characterized in that: and a first sinking groove (7) for the threaded connection of the mounting screw (6) is formed in the first connecting plate (51).
3. The bamboo-wood curtain wall of claim 2, characterized in that: and a sealing element (72) for shielding the mounting screw (6) is inserted at the first sinking groove (7) in a sliding manner.
4. The bamboo-wood curtain wall of claim 3, characterized in that: the first connecting plate (51) is provided with a force application groove (73) communicated with the first sinking groove (7).
5. The bamboo-wood curtain wall of claim 2, characterized in that: and the wall body (1) is provided with a plurality of second sinking grooves (8) for the first connecting plates (51) to be spliced.
6. The bamboo-wood curtain wall of claim 5, characterized in that: an elastic cushion layer (92) is arranged on one side, facing the first connecting plate (51), of the second connecting plate (53).
7. The bamboo-wood curtain wall of claim 1, characterized in that: and the second connecting plate (53) is provided with a working groove (9) for the installation screw (6) to penetrate through.
8. The bamboo-wood curtain wall of claim 1, characterized in that: all side walls of the second connecting plate (53) are provided with protection fillets (91).
CN202122011486.7U 2021-08-25 2021-08-25 Bamboo curtain wall Active CN215563664U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122011486.7U CN215563664U (en) 2021-08-25 2021-08-25 Bamboo curtain wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122011486.7U CN215563664U (en) 2021-08-25 2021-08-25 Bamboo curtain wall

Publications (1)

Publication Number Publication Date
CN215563664U true CN215563664U (en) 2022-01-18

Family

ID=79841794

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122011486.7U Active CN215563664U (en) 2021-08-25 2021-08-25 Bamboo curtain wall

Country Status (1)

Country Link
CN (1) CN215563664U (en)

Similar Documents

Publication Publication Date Title
DK1601843T3 (en) Cover plate
GB2483525A (en) Panel connection system for connecting floor panels
CN209855115U (en) Decorative wallboard easy to assemble
CN215563664U (en) Bamboo curtain wall
CN110847534A (en) Stone toilet wall assembly and mounting method thereof
CN211037679U (en) Splicing structure for wood floor
JP2015031090A (en) Staircase structure and staircase construction method
CN110616836A (en) Sound insulation floor slab mounting structure and construction method thereof
CN102003053A (en) Stone composite board
CN210622231U (en) Novel stainless steel skirting line
CN210369741U (en) Assembled fireproof wood floor
CN210459852U (en) Connecting structure of indoor wood veneer
CN108842984A (en) A kind of full Real-wood wall-protection plate and its installation method
CN217680155U (en) Assembled hard package veneer module convenient to maintenance is changed
CN212866421U (en) Dust-proof and sound-proof equipment suitable for various decoration environments
CN217439420U (en) External corner fixing piece and external corner structure
CN214658447U (en) Wallboard flying piece
CN215166937U (en) Gapless steel structure curtain wall
CN217461303U (en) External corner fixing piece and external corner structure
CN215167500U (en) Composite wall board
CN220666515U (en) Connecting piece of bamboo-wood fiber panel
CN212405804U (en) Stone toilet wall assembly
CN215484321U (en) Protection architecture of building wall
CN215442874U (en) Structure convenient to accurate quick installation of wall decorative board
CN213449248U (en) Fast-assembling wallboard mounting structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant