CN215562745U - Double-spliced steel foundation - Google Patents
Double-spliced steel foundation Download PDFInfo
- Publication number
- CN215562745U CN215562745U CN202121974636.8U CN202121974636U CN215562745U CN 215562745 U CN215562745 U CN 215562745U CN 202121974636 U CN202121974636 U CN 202121974636U CN 215562745 U CN215562745 U CN 215562745U
- Authority
- CN
- China
- Prior art keywords
- foundation
- double
- steel
- bottom plate
- spliced
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 43
- 239000010959 steel Substances 0.000 title claims abstract description 43
- 239000004567 concrete Substances 0.000 claims abstract description 12
- 238000010276 construction Methods 0.000 claims description 21
- 239000011083 cement mortar Substances 0.000 claims description 11
- 238000007789 sealing Methods 0.000 claims description 7
- 239000000463 material Substances 0.000 claims description 6
- 239000010410 layer Substances 0.000 claims description 5
- 239000011241 protective layer Substances 0.000 claims description 5
- 238000005267 amalgamation Methods 0.000 claims 2
- 238000003466 welding Methods 0.000 claims 1
- 238000004078 waterproofing Methods 0.000 description 5
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 4
- 238000009412 basement excavation Methods 0.000 description 3
- 238000009435 building construction Methods 0.000 description 3
- 239000012528 membrane Substances 0.000 description 3
- 239000002689 soil Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000011449 brick Substances 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 230000002940 repellent Effects 0.000 description 1
- 239000005871 repellent Substances 0.000 description 1
Images
Landscapes
- Working Measures On Existing Buildindgs (AREA)
Abstract
The utility model discloses a double-spliced steel foundation which comprises a plurality of foundation units arranged between two constructional beams, wherein each foundation unit comprises at least one piece of section steel, each section steel is fixedly connected to a bottom plate, the bottom plate is mechanically connected with the constructional beams, a concrete reverse ridge is arranged on the periphery of the double-spliced steel foundation, a masonry structure is arranged on the reverse ridge, and waterproof structures are arranged at the joint of the concrete reverse ridge and the constructional beams and on the surfaces of the constructional beams. The elevator support body is installed on the roof, and the elevator support body passes through the roof and directly transmits the load for shaped steel, and shaped steel passes to the structure roof again. The problem that the elevator foundation cannot be arranged on the floor under the condition that the strength of the floor is not enough is solved.
Description
Technical Field
The utility model relates to the technical field of building construction, in particular to a double-spliced steel foundation.
Background
In building construction, how to carry out vertical transportation is always a serious and difficult problem which troubles high-rise and super high-rise construction, and at present, a construction elevator is one of main tools for vertical transportation. In the high-rise building at present, the external construction elevator foundation usually adopts reinforced concrete foundation as the stress foundation, and the concrete foundation falls on the structure floor, but the bearing capacity of structure floor is often not enough. In order to meet the vertical transportation requirement in the super high-rise construction, the super high overweight construction elevator is widely applied to the super high-rise building construction, the foundation of the overweight construction elevator is generally arranged on a raft to meet the bearing capacity requirement, and the roof reinforcement or the back-jacking steel pipe is difficult to meet the bearing capacity requirement. Therefore, the elevator foundation can not be arranged on the raft and the foundation bearing layer under the special working condition, or the construction is complicated and the cost is too high due to the conventional scheme under the special working condition.
Therefore, it is necessary to develop a double-spliced steel foundation to solve the above problems.
SUMMERY OF THE UTILITY MODEL
In order to solve the problems, the utility model provides a double-spliced steel foundation which comprises a plurality of foundation units arranged between two structural beams, wherein each foundation unit comprises at least one piece of section steel, each section steel is fixedly connected to a bottom plate, the bottom plate is mechanically connected with the structural beams, a concrete reverse ridge is arranged on the periphery of the double-spliced steel foundation, a masonry structure is arranged on the reverse ridge, and waterproof structures are arranged at the joint of the concrete reverse ridge and the structural beams and on the surfaces of the structural beams.
Furthermore, the waterproof structure is sequentially provided with a cement mortar leveling layer, an extruded sheet, an SBS waterproof coiled material and a cement mortar protective layer from bottom to top.
Furthermore, the plurality of base units are connected above through the top plate.
Furthermore, the surface of the masonry structure is also covered with SBS waterproof coiled materials.
Furthermore, a sealing rubber strip is arranged at the joint of the SBS waterproof coiled material and the section steel for sealing.
Further, the bottom plate is welded to the construction beam.
The utility model has the beneficial effects that: the elevator support body is installed on the roof, and the elevator support body passes through the roof and directly transmits the load for shaped steel, and shaped steel passes to the structure roof again. The problem that the elevator foundation cannot be arranged on the floor under the condition that the strength of the floor is not enough is solved.
Drawings
In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings needed to be used in the description of the embodiments are briefly introduced below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and other drawings can be obtained by those skilled in the art without inventive efforts, wherein:
FIG. 1 is a schematic cross-sectional view of the present invention;
FIG. 2 is a schematic view of the placement of the foundation trench of the present invention;
FIG. 3 is a top view of the present invention;
FIG. 4 is an enlarged partial view of a top view of the present invention;
FIG. 5 is an enlarged schematic view of the waterproof structure of FIG. 1;
fig. 6 is a schematic diagram of a second embodiment of the present invention.
Detailed Description
The technical solution of the present invention is further described with reference to the accompanying drawings and examples. It should be noted that the embodiments and features of the embodiments may be combined with each other without conflict. For convenience of description, the words "upper", "lower", "left" and "right" in the following description are used only to indicate the correspondence between the upper, lower, left and right directions of the drawings themselves, and do not limit the structure.
Example one
As shown in fig. 1-5, the present invention provides a double-spliced steel foundation, which includes a plurality of foundation units disposed between two structural beams (shown as a first structural beam 1 and a second structural beam 2), wherein each foundation unit includes at least one steel section 32, each steel section 32 is fixedly connected to a bottom plate 34, the bottom plate 34 is mechanically connected to the structural beams, a concrete reversed sill 9 is disposed around the double-spliced steel foundation, a masonry structure 6 is disposed on the reversed sill 9, and waterproof structures 9 are disposed at the joints of the concrete reversed sill 9 and the structural beams and on the surfaces of the structural beams.
The plurality of base units in this embodiment are connected to each other by a top plate 31.
The masonry structure 6 surface in this embodiment is also covered with SBS waterproofing membrane 92.
The joint of the SBS waterproof roll 92 and the section steel 32 in the embodiment is provided with a sealing rubber strip for sealing.
The bottom plate 34 in this embodiment is welded to the construction beam.
Example two
As shown in fig. 6, when the double-spliced steel foundation passes through the boundary of the cantilever plate, the waterproofing treatment as shown in fig. 6 is required. Set up waterproof construction 9 in basic and board junction of encorbelmenting, waterproof construction 9 is from supreme cement mortar screed-coat 94, extruded sheet 93, SBS waterproofing membrane 92 and cement mortar protective layer 91 of having set gradually down. A floor drain 95 is provided on the cantilever plate at the junction for drainage. A water draining groove 73 is hung and installed on the inner side, close to the foundation, of the joint of the foundation and the cantilever plate through a hanging rod 71, one side of the water draining groove 73 is hung and installed above the foundation through the hanging rod 71, the other side of the water draining groove 73 is connected to the cantilever plate through a mechanical structure (including but not limited to rivets and screws), and a rubber pad is arranged at the joint of the foundation and the cantilever plate and used for sealing and waterproofing. A floor drain is arranged at the bottom of the drainage groove 73.
The utility model is used as the foundation of the construction elevator.
The construction steps of the utility model are as follows: the periphery of the double-spliced steel foundation is excavated to the structural surface manually, an excavation line is determined before excavation, the excavation line is positioned, and the foundation trench 5 is excavated to the structural surface of the layer. And then removing the backfill soil around the construction beam, and arranging concrete reversed ridges around the construction beam after the backfill soil is removed.
Before carrying out the construction of two-piece profiled bar basis, need to clean up structure floor surface, unevenness department need polish levelly and smoothly, ensures that two-piece profiled bar basis and structure floor are closely laminated together.
The base plate 34 is connected to the structural beam by high strength bolts 35 of appropriate diameter, which are embedded at least 200mm deep into the structural beam. Next, the shape steel 32 is welded to the upper portion of the bottom plate 34, and the top plate 31 is welded to the plurality of shape steels 32.
Carry out water repellent around the double-pin shaped steel basis, for guaranteeing that roofing construction elevator basis periphery does not have ponding, set up the anti-bank of concrete in double-pin shaped steel basis week upwards, build by laying bricks or stones on the anti-bank, adopt cement mortar to carry out 2% to seeking sloping by double-pin shaped steel basis to floor drain all around. And arranging waterproof structures on the surface of the structure and at the connecting gap. The waterproof structure 9 is sequentially provided with a cement mortar leveling layer 94, an extruded sheet 93, an SBS waterproof roll 92 and a cement mortar protective layer 91 from bottom to top.
Then the elevator frame body 4 is installed on the top plate 31, the elevator frame body 4 directly transmits the load to the section steel 32 through the top plate 31, and the section steel 32 is transmitted to the structural beam.
The utility model realizes that the foundation is arranged on the structural beam through the section steel 32 under the condition that the concrete strength of the original floor slab design is insufficient or the embedded bar strength is insufficient, and the load borne by the foundation is dispersed on the structural beam and further dispersed on the integral frame structure of the building. The problem that the construction elevator foundation cannot be set under a specific situation is solved.
The above description is only an embodiment of the present invention, and not intended to limit the scope of the present invention, and all modifications of equivalent structures and equivalent processes, which are made by using the contents of the present specification and the accompanying drawings, or directly or indirectly applied to other related technical fields, are included in the scope of the present invention.
Claims (6)
1. The utility model provides a two amalgamation shaped steel basis, its characterized in that, is including placing a plurality of basic unit between two structure roof beams, basic unit includes an at least shaped steel, and every shaped steel fixed connection is on the bottom plate, bottom plate and structure roof beam mechanical connection, two amalgamation shaped steel basis are provided with the anti-bank of concrete all around, be provided with masonry structure on the anti-bank, the anti-bank of concrete all is provided with waterproof construction with structure roof beam junction and structure roof beam surface.
2. The double-spliced steel foundation of claim 1, wherein: the waterproof structure is provided with a cement mortar leveling layer, an extruded sheet, an SBS waterproof coiled material and a cement mortar protective layer from bottom to top in sequence.
3. A double-spliced steel foundation as claimed in claim 2, wherein: the upper parts of the plurality of basic units are connected through a top plate.
4. A double-spliced steel foundation as claimed in claim 3, wherein: the surface of the masonry structure is also covered with SBS waterproof coiled material.
5. A double pin type steel foundation according to claim 4, characterized in that: and a sealing rubber strip is arranged at the joint of the SBS waterproof coiled material and the section steel for sealing.
6. A double pin type steel foundation according to claim 5, characterized in that: the bottom plate is connected with the construction beam in a welding mode.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121974636.8U CN215562745U (en) | 2021-08-20 | 2021-08-20 | Double-spliced steel foundation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121974636.8U CN215562745U (en) | 2021-08-20 | 2021-08-20 | Double-spliced steel foundation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN215562745U true CN215562745U (en) | 2022-01-18 |
Family
ID=79840188
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202121974636.8U Expired - Fee Related CN215562745U (en) | 2021-08-20 | 2021-08-20 | Double-spliced steel foundation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN215562745U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117127787A (en) * | 2023-08-28 | 2023-11-28 | 广州一建建设集团有限公司 | Construction foundation structure for hollow floor slab and construction method thereof |
-
2021
- 2021-08-20 CN CN202121974636.8U patent/CN215562745U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117127787A (en) * | 2023-08-28 | 2023-11-28 | 广州一建建设集团有限公司 | Construction foundation structure for hollow floor slab and construction method thereof |
CN117127787B (en) * | 2023-08-28 | 2024-03-22 | 广州一建建设集团有限公司 | Construction foundation structure for hollow floor slab and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108612110A (en) | A kind of Deep Foundation Pit of Metro Stations combined type construction method for supporting | |
CN215562745U (en) | Double-spliced steel foundation | |
CN210342375U (en) | Concrete laminated slab | |
KR100313720B1 (en) | Composite Underground Structure Construction Method | |
CN115324366A (en) | Hoisting method for overlong and overweight truss of framed bent structure system | |
CN210127485U (en) | Concrete suction type caisson foundation and thin-wall pier stud connecting structure | |
CN212153472U (en) | Underground continuous wall water stop structure | |
CN211143116U (en) | Be applicable to floor division hole basement retaining wall structure | |
CN106400814A (en) | Foundation pit supporting method | |
CN217870407U (en) | Wall is led to concatenation formula | |
CN110821021A (en) | Floor slab capable of being installed rapidly | |
CN212452765U (en) | Two-in-one underground pipe gallery structure | |
CN206693469U (en) | A kind of precast floor slab connecting node | |
CN113585336B (en) | Quick construction method of sinking type concrete mixing station in soft foundation environment | |
CN211737147U (en) | Prefabricated piecing and assembling connecting device for tunnel with super-large section | |
CN215053220U (en) | Structure system for zero-distance crossing stub subway station | |
CN212641881U (en) | Bidirectional laminated slab concrete structure | |
CN114635503A (en) | Fair-faced concrete wall flexibly connected with concrete frame column and construction method | |
CN211621667U (en) | Tubular pile cushion cap girder steel rail mounted tower machine walking foundation structure | |
CN211200755U (en) | Basement roof movement joint waterproof construction structure | |
CN114319411A (en) | Flexible connection node for reducing secondary stress caused by foundation settlement and construction method thereof | |
CN1045805C (en) | Seepage-proof plate for river dam | |
CN112411590A (en) | Underground diaphragm wall structure and construction method | |
CN219710669U (en) | Shear wall construction structure at high-low span of bottom plate | |
CN217758906U (en) | Assembled anti-settlement beam slab foundation structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20220118 |
|
CF01 | Termination of patent right due to non-payment of annual fee |