CN215561876U - Bracket device for mounting pier steel bars - Google Patents
Bracket device for mounting pier steel bars Download PDFInfo
- Publication number
- CN215561876U CN215561876U CN202121869464.8U CN202121869464U CN215561876U CN 215561876 U CN215561876 U CN 215561876U CN 202121869464 U CN202121869464 U CN 202121869464U CN 215561876 U CN215561876 U CN 215561876U
- Authority
- CN
- China
- Prior art keywords
- bracket
- utility
- model
- penetrating hole
- bracket device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model discloses a bracket device for mounting pier reinforcing steel bars, and relates to the technical field of pier reinforcing steel bar mounting brackets. The utility model comprises a bracket, wherein both ends of the bracket are fixedly connected with fixing plates, the lower end of the bracket is provided with a rib penetrating hole, the bracket is made of equal-angle steel, the fixing plates are also made of equal-angle steel, the rib penetrating hole is round, and the rib penetrating hole is long-strip-shaped. According to the utility model, through the mutual matching of the bracket, the fixing plate and the reinforcement penetrating hole, the cost of labor input can be effectively reduced, the safety is ensured, and the construction efficiency is improved.
Description
Technical Field
The utility model belongs to the technical field of bridge pier steel bar installation brackets, and particularly relates to a bracket device for bridge pier steel bar installation.
Background
The pier is the building that the supporting bridge strides the structure and passes to the ground with dead load and vehicle live load, the abutment is established in the bridge both sides, when the construction of bridge pier shaft, need use reinforcing bar cage to carry out pouring of pier, general vertical main muscle is more in quantity, generally adopt artifical single butt joint and with straight thread muffjoint completely in the installation, consequently, need use the bracket device during installation, current bracket device, make artifical input cost higher, the security is relatively poor, influence the efficiency of construction, based on this, we have provided a bracket device for pier steel bar installation
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a bracket device for mounting pier reinforcing steel bars, which aims to solve the existing problems: the existing bracket device has the advantages of high labor input cost, poor safety and influence on the construction efficiency.
In order to solve the technical problems, the utility model is realized by the following technical scheme:
the utility model relates to a bracket device for mounting pier steel bars, which comprises a bracket, wherein both ends of the bracket are fixedly connected with fixing plates, and the lower end of the bracket is provided with a steel bar penetrating hole.
Furthermore, the bracket is made of equal-angle steel, and the fixing plate is made of equal-angle steel.
Further, the shape of the rib penetrating hole is circular.
Furthermore, the shape of the rib penetrating hole is a long strip.
The utility model has the following beneficial effects:
according to the utility model, through the mutual matching of the bracket, the fixing plate and the reinforcement penetrating hole, the cost of labor input can be effectively reduced, the safety is ensured, and the construction efficiency is improved.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings used in the description of the embodiments will be briefly introduced below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art that other drawings can be obtained according to the drawings without creative efforts.
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is an exploded view of the present invention;
fig. 3 is a partial view of the present invention.
In the drawings, the components represented by the respective reference numerals are listed below:
1. a support; 2. a fixing plate; 3. and (5) perforating the rib holes.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-3, the present invention relates to a bracket device for mounting reinforcing steel bars of a pier, which includes a bracket 1, wherein both ends of the bracket 1 are fixedly connected with fixing plates 2, and the lower end of the bracket 1 is provided with a bar penetrating hole 3;
the bracket 1 is made of equal-angle steel, and the fixing plate 2 is made of equal-angle steel, so that the structural strength of the bracket device is improved;
the shape of the bar penetrating hole 3 is circular, the bar penetrating hole 3 can also be in the shape of a long strip, and the bar penetrating hole 3 can be conveniently suitable for reinforcing steel bars with different diameters and different intervals.
One specific application of this embodiment is: when in use, according to the use requirement, 100 x 100mm equal angle steel is used for manufacturing the bracket 1, the length of the bracket 1 is made to be 1500mm, the angle steel with the same type as the bracket 1 is used for manufacturing two fixing plates 2, the length of the fixing plates 2 is 50mm, the two fixing plates 2 are welded and fixed at the two ends of the bracket 1 to form a square section, the hanging ring can pass through the square section, a plurality of reinforcement penetrating holes 3 are arranged at the lower end of the bracket 1, the distance between every two adjacent reinforcement penetrating holes 3 is 120mm, the reinforcement penetrating hole 3 is processed into a round hole or a strip-shaped hole according to the steel bars with different types, so that the steel bars with different diameters and different distances can be conveniently used, and (3) manually penetrating the reinforcing steel bars through the reserved reinforcing steel bar penetrating holes 3 on the ground, then installing the straight threaded sleeves, fixing the hanging rings, lifting the bracket to the working surface by the tower crane, and simultaneously vertically reaching the working surface by a plurality of reinforcing steel bars for pier reinforcing steel bar connection installation.
In the description herein, references to the description of "one embodiment," "an example," "a specific example" or the like are intended to mean that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the utility model. In this specification, the schematic representations of the terms used above do not necessarily refer to the same embodiment or example. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.
The preferred embodiments of the utility model disclosed above are intended to be illustrative only. The preferred embodiments are not intended to be exhaustive or to limit the utility model to the precise embodiments disclosed. Obviously, many modifications and variations are possible in light of the above teaching. The embodiments were chosen and described in order to best explain the principles of the utility model and the practical application, to thereby enable others skilled in the art to best utilize the utility model. The utility model is limited only by the claims and their full scope and equivalents.
Claims (4)
1. The utility model provides a bracket device for installation of pier reinforcing bar, its characterized in that, includes support (1), the equal fixedly connected with fixed plate (2) in both ends of support (1), muscle hole (3) have been seted up to the lower extreme of support (1).
2. A bracket device for pier reinforcement installation according to claim 1, wherein the bracket (1) is made of equilateral angle steel, and the fixing plate (2) is made of equilateral angle steel.
3. A bracket device for pier reinforcement installation according to claim 1, wherein the shape of the tendon passing hole (3) is circular.
4. A bracket assembly for pier reinforcement installation according to claim 1, wherein the bar penetration hole (3) is formed in a long bar shape.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121869464.8U CN215561876U (en) | 2021-08-11 | 2021-08-11 | Bracket device for mounting pier steel bars |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121869464.8U CN215561876U (en) | 2021-08-11 | 2021-08-11 | Bracket device for mounting pier steel bars |
Publications (1)
Publication Number | Publication Date |
---|---|
CN215561876U true CN215561876U (en) | 2022-01-18 |
Family
ID=79834492
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202121869464.8U Expired - Fee Related CN215561876U (en) | 2021-08-11 | 2021-08-11 | Bracket device for mounting pier steel bars |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN215561876U (en) |
-
2021
- 2021-08-11 CN CN202121869464.8U patent/CN215561876U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101736893A (en) | Overhanging type scaffold supporting system | |
CN211143305U (en) | Steel structure building | |
CN205476761U (en) | Communication tower | |
CN215561876U (en) | Bracket device for mounting pier steel bars | |
CN202072386U (en) | Lifting appliance for lifting raft foundation reinforcement cage of containment vessel of nuclear power station | |
CN105735308A (en) | Prestressed pipe pile | |
CN213062094U (en) | Ground storehouse roof reservation entrance to a cave retaining wall convenient to demolish | |
AU2018298511A1 (en) | Assembled building wall body and building house with combination of steel structure and concrete structure | |
CN213062632U (en) | Assembled steel truss structure | |
CN211421160U (en) | Assembled transmission line shaft tower basis | |
CN211228884U (en) | Big sloping node is used in timber structure building decoration | |
CN211846839U (en) | Prefabricated post hoist device | |
CN212024610U (en) | Full PC tower crane of outer wall attaches wall | |
CN210482567U (en) | Structure for improving fatigue resistance of steel pipe concrete intersecting joint | |
CN210104546U (en) | Prefabricated pier with lightning protection function | |
CN220285636U (en) | Steel pipe cat ladder structure and steel pipe support | |
CN216380270U (en) | Prefabricated conical head piece | |
CN214698653U (en) | Connecting inner flange | |
CN219931705U (en) | Steel plate protective net for outer scaffold | |
CN111170179A (en) | Tower crane jib loading boom reinforcing frame | |
CN220732206U (en) | Spliced suspension bracket structure for pipeline suspension construction | |
CN212294304U (en) | Ultra-high performance concrete truss girder | |
CN213017138U (en) | Connecting structure of self-supporting rod piece reinforcing member | |
CN210529515U (en) | Upper hanging type electricity-proof small truss | |
CN217759602U (en) | Pile foundation engineering reinforcement cage for installing mechanical equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20220118 |
|
CF01 | Termination of patent right due to non-payment of annual fee |