CN215560817U - Large-size BRIG crystal growth laboratory process water pipeline - Google Patents

Large-size BRIG crystal growth laboratory process water pipeline Download PDF

Info

Publication number
CN215560817U
CN215560817U CN202122346476.9U CN202122346476U CN215560817U CN 215560817 U CN215560817 U CN 215560817U CN 202122346476 U CN202122346476 U CN 202122346476U CN 215560817 U CN215560817 U CN 215560817U
Authority
CN
China
Prior art keywords
positioning
water pipeline
crystal growth
pipeline
brig
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122346476.9U
Other languages
Chinese (zh)
Inventor
余智强
余智胜
张瑛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Kaitong Environmental Protection Technology Co ltd
Original Assignee
Wuhan Kaitong Environmental Protection Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Kaitong Environmental Protection Technology Co ltd filed Critical Wuhan Kaitong Environmental Protection Technology Co ltd
Priority to CN202122346476.9U priority Critical patent/CN215560817U/en
Application granted granted Critical
Publication of CN215560817U publication Critical patent/CN215560817U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a large-size BRIG crystal growth laboratory process water pipeline, which belongs to the technical field of crystal growth and comprises a fixed chassis and a water pipeline, wherein an inner layer cover is arranged on the surface of the fixed chassis, an outer layer cover is arranged on the outer side of the inner layer cover, and the outer layer cover is arranged on the fixed chassis through a positioning mechanism; according to the utility model, one end of the water pipeline is arranged in the pipeline interface through the positioning nut, the positioning retainer ring is connected with the limiting fixture block, the sealing ring is used for sealing, the connecting rod is adjusted through the movable adjusting cap, so that the adjusting fixture block arranged at the other end of the connecting rod can limit the position of the water pipeline, the disassembly and the installation are convenient, the positioning retainer ring is used for installing and limiting the outer cover through the annular fixture block, the outer cover is installed, the positioning block is limited through the limiting block at the bottom of the arc-shaped plate, the outer cover and the inner cover can be conveniently disassembled and assembled, and the middle water passing layer is cleaned.

Description

Large-size BRIG crystal growth laboratory process water pipeline
Technical Field
The utility model relates to the technical field of crystal growth, in particular to a large-size BRIG crystal growth laboratory process water pipeline.
Background
The crystal has a series of characteristics of hard strength, high temperature resistance, abrasion resistance, strong corrosion resistance, excellent light transmittance, excellent electrical insulation performance and the like, so that the sapphire is widely applied to a series of high-tech technical fields of national defense, military, scientific research and the like as an important technical crystal material, and simultaneously has a large amount of application in the civil industry, and the crystal growth method and equipment have important influence on the quality of the prepared crystal. The temperature control in the furnace body is required to be within a certain range in the use process of the optical crystal growth furnace, the heating device is arranged in the furnace body, but the temperature is overhigh sometimes to cause the damage of the furnace body, so that the cooling structure is required to be cooled when the temperature of the furnace body is overhigh, the existing crystal growth furnace is generally formed by double-layer welding, and the middle of the crystal growth furnace is cooled by water through a pipeline.
But crystal growth stove is in the installation, and the pipeline is not convenient for dismantle the change, and the pipeline needs the bolt to screw up when changing, wastes time and energy to temperature is higher in the stove during the use, and middle water layer can produce a large amount of incrustations, causes the jam easily, can't clear up, therefore we need provide a jumbo size BRIG crystal growth laboratory process water pipeline.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a large-size BRIG crystal growth laboratory process water pipeline, which can be conveniently replaced, improves the efficiency, can be conveniently used for cleaning a middle cold water layer and is conveniently replaced when an inner layer cover or an outer layer cover is damaged, so as to solve the problems in the background technology.
To achieve the above object, the present invention provides: the utility model provides a jumbo size BRIG crystal growth laboratory process water pipeline, includes fixed chassis and water pipeling, the surface mounting on fixed chassis has the inlayer cover, the inlayer covers the outside and is provided with outer cover, outer cover passes through positioning mechanism and installs on fixed chassis, the fixed surface of outer cover installs the pipeline interface, the spacing cardboard of pipeline interface inner wall fixedly connected with, be provided with adjustment mechanism on the pipeline interface, one side of adjustment mechanism is provided with the regulation cap, adjustment mechanism passes through the surface of adjusting the fixture block and connecting water pipeling, positioning nut is passed through to the one end of water pipeling and installs in the pipeline interface.
Preferably, adjustment mechanism is including backup pad, connecting rod, compression spring, installation pole and regulation fixture block, the connecting rod rotates through the round pin axle and installs on the backup pad surface, the one end of connecting rod is connected with compression spring, the other end of connecting rod passes through the articulated elements and connects the one end of installation pole, the one end fixedly connected with regulation fixture block of installation pole.
Preferably, the surface of the pipeline interface is provided with a positioning groove, the other end of the compression spring is installed inside the positioning groove, and the adjusting clamping block is installed in the pipeline interface through the installation rod.
Preferably, the outside of connecting rod is provided with the protecting crust, protecting crust fixed connection is on the surface of pipeline interface, the surface of pipeline interface is provided with the screw thread, adjust the cap and pass through screw thread installation pipeline interface surface.
Preferably, the surface of the water pipeline is fixedly connected with a limiting ring, a positioning retaining ring and a limiting baffle ring, the limiting ring is connected with a limiting clamping plate through the water pipeline, and a bonding sealing ring is fixed on one side of the limiting clamping plate.
Preferably, the water pipeline is connected with a positioning nut through a limiting baffle ring, and the positioning retainer ring is connected with the adjusting fixture block through the water pipeline.
Preferably, positioning mechanism is including location rand, locating piece, spacing ring and positioning channel section, the fixed surface of location rand installs the locating piece, positioning channel section has been seted up on the surface of spacing ring, the locating piece passes through the location rand and installs in positioning channel section.
Preferably, the surface of the outer cover is provided with an annular fixture block, the positioning clamping ring is clamped on the surface of the annular fixture block, and the outer cover is arranged on the surface of the fixed chassis through the positioning clamping ring.
Preferably, the outer cover outside is provided with the arc, the bottom fixed mounting of arc has the stopper, the arc is installed inside positioning channel groove through the stopper grafting.
Preferably, the surface of the inner layer cover is fixedly connected with a positioning ring, and the positioning ring is fixedly arranged on the surface of the fixed chassis through a screw.
Compared with the prior art, the utility model has the beneficial effects that:
1. according to the utility model, through the arrangement of components such as the pipeline interface, the adjusting cap and the adjusting mechanism, one end of the water pipeline is installed in the pipeline interface through the positioning nut, the positioning retainer ring is connected with the limiting fixture block, the sealing ring is used for sealing, the adjusting cap is moved to adjust the connecting rod, so that the adjusting fixture block installed at the other end of the connecting rod can limit the position of the water pipeline through the positioning retainer ring, and the disassembly and the installation are convenient;
2. according to the utility model, through the arrangement of the annular fixture block, the arc-shaped plate, the positioning mechanism and other components, the inner layer cover is arranged on the fixing chassis through the positioning ring, the positioning clamping ring is used for installing and limiting the outer layer cover through the annular fixture block and is arranged in the positioning clamping groove through the positioning block to install the outer layer cover, the positioning block is limited through the limiting block at the bottom of the arc-shaped plate, the outer layer cover and the inner layer cover can be conveniently disassembled and assembled, the middle water passing layer is cleaned, and the inner layer cover or the outer layer cover is convenient to replace when damaged, so that the service life is prolonged.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of a pipe joint structure according to the present invention;
FIG. 3 is a schematic view of the positioning collar of the present invention;
FIG. 4 is a schematic view of a stop collar according to the present invention.
In the figure: 1. fixing the chassis; 2. an outer layer cover; 3. an inner layer cover; 4. a pipe interface; 5. a water conduit; 6. a positioning ring; 7. an annular fixture block; 8. a positioning collar; 9. positioning blocks; 10. a limiting ring; 11. positioning the clamping groove; 12. an arc-shaped plate; 13. a limiting block; 14. a limiting clamping plate; 15. a seal ring; 16. a support plate; 17. a connecting rod; 18. a compression spring; 19. mounting a rod; 20. adjusting the clamping block; 21. a protective shell; 22. an adjusting cap; 23. a limiting ring; 24. positioning a retainer ring; 25. a limit stop ring; 26. and (5) positioning a nut.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
The present invention provides: a large-size BRIG crystal growth laboratory process water pipeline is shown in figure 1 and comprises a fixed chassis 1 and a water pipeline 5, wherein an inner layer cover 3 is mounted on the surface of the fixed chassis 1, an outer layer cover 2 is arranged on the outer side of the inner layer cover 3, the outer layer cover 2 is mounted on the fixed chassis 1 through a positioning mechanism, a pipeline interface 4 is fixedly mounted on the surface of the outer layer cover 2, a limiting clamping plate 14 is fixedly connected to the inner wall of the pipeline interface 4, an adjusting mechanism is arranged on the pipeline interface 4, an adjusting cap 22 is arranged on one side of the adjusting mechanism, the adjusting mechanism is connected with the surface of the water pipeline 5 through an adjusting clamping block 20, and one end of the water pipeline 5 is mounted in the pipeline interface 4 through a positioning nut 26; fixed chassis 1 is the subassembly that is used for installing inlayer cover 3 and outer cover 2, can conveniently change the raise the efficiency when water pipeling 5 is installed and is dismantled through adjustment mechanism, through positioning mechanism can conveniently clear up middle cold water layer to and convenient the change when damage appears in inlayer cover 3 or outer cover 2.
As shown in fig. 2, the adjusting mechanism includes a supporting plate 16, a connecting rod 17, a compression spring 18, an installation rod 19 and an adjusting fixture block 20, the connecting rod 17 is rotatably installed on the surface of the supporting plate 16 through a pin, one end of the connecting rod 17 is connected with the compression spring 18, the other end of the connecting rod 17 is connected with one end of the installation rod 19 through an articulated element, and one end of the installation rod 19 is fixedly connected with the adjusting fixture block 20; the surface of the pipeline interface 4 is provided with a positioning groove, the other end of the compression spring 18 is arranged in the positioning groove, and the adjusting fixture block 20 is arranged in the pipeline interface 4 through the mounting rod 19; the water pipeline 5 can be conveniently disassembled and replaced by arranging the adjusting mechanism, the supporting plate 16 is a supporting component for installing the connecting rod 17, the connecting rod 17 can adjust the position of the adjusting fixture block 20 at one end of the installing rod 19 through the supporting plate 16, the limiting stability of the water pipeline 5 is ensured, the compression spring 18 can act on the connecting rod 17, and the adjusting fixture block 20 is prevented from loosening to influence the connection stability;
a protective shell 21 is arranged on the outer side of the connecting rod 17, the protective shell 21 is fixedly connected to the surface of the pipeline interface 4, threads are arranged on the surface of the pipeline interface 4, and an adjusting cap 22 is installed on the surface of the pipeline interface 4 through the threads; the surface of the water pipeline 5 is fixedly connected with a limiting ring 23, a positioning retainer ring 24 and a limiting retainer ring 25, the limiting ring 23 is connected with a limiting clamping plate 14 through the water pipeline 5, and one side of the limiting clamping plate 14 is fixedly bonded with a sealing ring 15; the water pipe 5 is connected with a positioning nut 26 through a limiting stop ring 25, and a positioning stop ring 24 is connected with the adjusting fixture block 20 through the water pipe 5; can protect the subassembly such as backup pad 16, connecting rod 17, compression spring 18, installation pole 19 and regulation fixture block 20 through protecting sheathing 21, adjust cap 22 through removing for adjust cap 22 can push down the regulation to connecting rod 17, conveniently dismantle the installation to water pipeling 5, and can also play the guard action of certain degree.
As shown in fig. 3 and 4, the positioning mechanism includes a positioning collar 8, a positioning block 9, a limiting ring 10 and a positioning slot 11, the positioning block 9 is fixedly mounted on the surface of the positioning collar 8, the positioning slot 11 is formed on the surface of the limiting ring 10, and the positioning block 9 is mounted in the positioning slot 11 through the positioning collar 8; an annular fixture block 7 is arranged on the surface of the outer layer cover 2, a positioning clamping ring 8 is clamped on the surface of the annular fixture block 7, and the outer layer cover 2 is arranged on the surface of the fixed chassis 1 through the positioning clamping ring 8; through the arrangement of the positioning mechanism, the outer cover 2 can be disassembled and assembled to clean the middle water passing layer, the positioning clamping ring 8 can limit the position of the outer cover 2 through the annular clamping block 7, the outer cover 2 is convenient to assemble, the positioning block 9 is a component for positioning the positioning clamping ring 8, the limiting ring 10 is a component for installing and positioning the position of the positioning block 9, and the outer cover 2 is convenient to install on the fixed chassis 1;
an arc-shaped plate 12 is arranged on the outer side of the outer layer cover 2, a limiting block 13 is fixedly arranged at the bottom of the arc-shaped plate 12, and the arc-shaped plate 12 is inserted into the positioning clamping groove 11 through the limiting block 13; the surface of the inner layer cover 3 is fixedly connected with a positioning ring 6, and the positioning ring 6 is fixedly arranged on the surface of the fixed chassis 1 through a screw; the arc 12 is used for preventing that location rand 8 from appearing rocking, guarantees the stability of installation through stopper 13, and inlayer cover 3 can be convenient for carry out the dismouting through holding ring 6 to when damage appears in inlayer cover 3 or outer cover 2, conveniently change, improve life.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (10)

1. The utility model provides a big size BRIG crystal growth laboratory process water pipeline, includes fixed chassis (1) and water pipeling (5), its characterized in that: the surface mounting of fixed chassis (1) has inlayer cover (3), inlayer cover (3) outside is provided with outer cover (2), outer cover (2) are installed on fixed chassis (1) through positioning mechanism, the fixed surface of outer cover (2) installs pipeline interface (4), the spacing cardboard of pipeline interface (4) inner wall fixedly connected with (14), be provided with adjustment mechanism on pipeline interface (4), one side of adjustment mechanism is provided with adjusts cap (22), adjustment mechanism passes through the surface of adjusting fixture block (20) connecting water pipeline (5), the one end of water pipeline (5) is passed through positioning nut (26) and is installed in pipeline interface (4).
2. The large-size BRIG crystal growth laboratory process water pipeline of claim 1, wherein: adjustment mechanism is including backup pad (16), connecting rod (17), compression spring (18), installation pole (19) and regulation fixture block (20), connecting rod (17) are installed in backup pad (16) surface through the round pin axle rotation, the one end of connecting rod (17) is connected with compression spring (18), the one end of installation pole (19) is connected through the articulated elements to the other end of connecting rod (17), the one end fixedly connected with regulation fixture block (20) of installation pole (19).
3. The large-size BRIG crystal growth laboratory process water pipeline of claim 2, wherein: the surface of the pipeline interface (4) is provided with a positioning groove, the other end of the compression spring (18) is installed inside the positioning groove, and the adjusting clamping block (20) is installed in the pipeline interface (4) through the installation rod (19).
4. The large-size BRIG crystal growth laboratory process water pipeline of claim 3, wherein: the outside of connecting rod (17) is provided with protecting crust (21), protecting crust (21) fixed connection is on the surface of pipeline interface (4), the surface of pipeline interface (4) is provided with the screw thread, adjust cap (22) and pass through screw thread installation pipeline interface (4) surface.
5. The large-size BRIG crystal growth laboratory process water pipeline of claim 1, wherein: the surface of the water pipeline (5) is fixedly connected with a limiting ring (23), a positioning retainer ring (24) and a limiting retainer ring (25), the limiting ring (23) is connected with a limiting clamp plate (14) through the water pipeline (5), and a sealing ring (15) is fixedly bonded on one side of the limiting clamp plate (14).
6. The large-size BRIG crystal growth laboratory process water pipeline of claim 5, wherein: the water pipeline (5) is connected with a positioning nut (26) through a limiting baffle ring (25), and the positioning baffle ring (24) is connected with the adjusting fixture block (20) through the water pipeline (5).
7. The large-size BRIG crystal growth laboratory process water pipeline of claim 1, wherein: positioning mechanism is including location rand (8), locating piece (9), spacing ring (10) and positioning channel groove (11), the fixed surface of location rand (8) installs locating piece (9), positioning channel groove (11) have been seted up on the surface of spacing ring (10), locating piece (9) are installed in positioning channel groove (11) through location rand (8).
8. The large-size BRIG crystal growth laboratory process water pipeline of claim 7, wherein: outer cover (2) surface is provided with annular fixture block (7), location rand (8) joint is on annular fixture block (7) surface, outer cover (2) are installed on fixed chassis (1) surface through location rand (8).
9. The large-size BRIG crystal growth laboratory process water pipeline of claim 8, wherein: the outer cover (2) outside is provided with arc (12), the bottom fixed mounting of arc (12) has stopper (13), arc (12) are pegged graft through stopper (13) and are installed inside positioning groove (11).
10. The large-size BRIG crystal growth laboratory process water pipeline of claim 1, wherein: the surface of the inner layer cover (3) is fixedly connected with a positioning ring (6), and the positioning ring (6) is fixedly arranged on the surface of the fixed chassis (1) through a screw.
CN202122346476.9U 2021-09-27 2021-09-27 Large-size BRIG crystal growth laboratory process water pipeline Active CN215560817U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122346476.9U CN215560817U (en) 2021-09-27 2021-09-27 Large-size BRIG crystal growth laboratory process water pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122346476.9U CN215560817U (en) 2021-09-27 2021-09-27 Large-size BRIG crystal growth laboratory process water pipeline

Publications (1)

Publication Number Publication Date
CN215560817U true CN215560817U (en) 2022-01-18

Family

ID=79852410

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122346476.9U Active CN215560817U (en) 2021-09-27 2021-09-27 Large-size BRIG crystal growth laboratory process water pipeline

Country Status (1)

Country Link
CN (1) CN215560817U (en)

Similar Documents

Publication Publication Date Title
CN215560817U (en) Large-size BRIG crystal growth laboratory process water pipeline
CN207200839U (en) A kind of monitoring camera protective cover
CN210320677U (en) Water heater business turn over water pipe end cap
CN207395216U (en) A kind of anti-device that quivers of solar water heater movement
CN210860181U (en) Natural gas pressure regulating metering device
CN210241932U (en) Central air conditioning tuber pipe installation device
CN215977498U (en) Emptying device for indoor fire-fighting water supply pipeline
CN208887442U (en) A kind of heat exchange tube of condenser with super-hydrophobic coat
CN215446906U (en) Wall-mounted furnace with quick-release filtering device
CN218972046U (en) Galvanized pipe capable of filtering rust scale
CN216924633U (en) Double-coil type fresh air preheating anti-freezing device
CN216878094U (en) Filter convenient to renew cartridge more
CN210197618U (en) Cold air system for steel pouring position
CN219263560U (en) Heating pipeline convenient to change filter screen
CN220194336U (en) Detachable high temperature resistant filter
CN216743177U (en) Support that heating and ventilation equipment used
CN217559270U (en) Coupling assembling is used in pipeline butt joint for municipal works
CN204677899U (en) A kind of support for the protection of front-back wall boiler oil gun
CN209800906U (en) Idle call cooling pipe joint subassembly
CN211319646U (en) Outdoor LCD display screen protection device
CN220958856U (en) Air conditioner drain pan mounting structure with quick assembly disassembly structure
CN215007802U (en) Transformer shell based on improved structure
CN217875497U (en) Plant growth lamp
CN220228187U (en) Water distributor convenient to dismouting
CN216011318U (en) Solar water heater exhaust pipe capable of effectively reducing heat loss

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant