CN215556215U - Solid waste handles conveying equipment stabilising arrangement - Google Patents

Solid waste handles conveying equipment stabilising arrangement Download PDF

Info

Publication number
CN215556215U
CN215556215U CN202122020364.4U CN202122020364U CN215556215U CN 215556215 U CN215556215 U CN 215556215U CN 202122020364 U CN202122020364 U CN 202122020364U CN 215556215 U CN215556215 U CN 215556215U
Authority
CN
China
Prior art keywords
main body
connection
mounting
stabilizing
installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122020364.4U
Other languages
Chinese (zh)
Inventor
刘庆云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Suzhong Renewable Resources Technology Co ltd
Original Assignee
Jiangsu Suzhong Renewable Resources Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Suzhong Renewable Resources Technology Co ltd filed Critical Jiangsu Suzhong Renewable Resources Technology Co ltd
Priority to CN202122020364.4U priority Critical patent/CN215556215U/en
Application granted granted Critical
Publication of CN215556215U publication Critical patent/CN215556215U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Processing Of Solid Wastes (AREA)

Abstract

The utility model relates to the technical field of solid waste treatment equipment, in particular to a stabilizing device of solid waste treatment conveying equipment. The technical scheme adopted by the utility model is as follows: the mounting and connecting device comprises a circular arc-shaped main body mounting and connecting stabilizing frame, wherein a circular arc-shaped mounting and supporting safe combination groove with an opening arranged at the lower end of the main body mounting and connecting stabilizing frame is arranged at the lower end of the main body mounting and connecting stabilizing frame, a mounting and supporting matching connecting plate is arranged at the lower end of the left side of the main body mounting and connecting stabilizing frame, a cylindrical main body mounting and locking fixing hole is formed in the front of the mounting and supporting matching connecting plate, and a circular arc-shaped matching and connecting locking stabilizing groove is formed in the connecting position of the left side of the main body mounting and connecting stabilizing frame and the mounting and supporting matching connecting plate. The utility model has the advantages that: have more reliable stability during the assembly, can cooperate the mounting structure of movable part to carry out more firm built-up connection, the right side position is through setting up locking location cooperation structure, and the security that can ensure when using is higher, and conveying equipment's maintenance cycle is longer.

Description

Solid waste handles conveying equipment stabilising arrangement
Technical Field
The utility model relates to the technical field of solid waste treatment equipment, in particular to a stabilizing device of solid waste treatment conveying equipment.
Background
The conveying equipment in the solid waste treatment equipment is relatively common and important treatment equipment, the movable assembly of the conveying equipment is easy to loosen in use and has limited strength, the durability in use is relatively poor, regular maintenance is required in the use process, and the maintenance cost is relatively high.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a stabilizing device for solid waste treatment conveying equipment, which can be matched with a plurality of positions of the solid waste conveying equipment for combined connection, can be movably adjusted according to the requirement, has more reliable stability during assembly, can be matched with a mounting structure of a movable assembly for more firm combined connection, and can ensure higher safety during use by arranging an anti-loosening positioning matching structure at the right side position, so that the maintenance period of the conveying equipment can be longer, the integral durability during use is more reliable, and the use cost is lower.
The technical scheme of the utility model is as follows:
the utility model provides a solid waste handles conveying equipment stabilising arrangement which characterized in that: the assembly and locking device comprises a circular arc-shaped main body installation and connection stabilizing frame, wherein a circular arc-shaped assembly and support safety combination groove with an opening towards the right lower part is arranged at the lower end position of the main body installation and connection stabilizing frame, an integrally formed installation and support matching connecting plate is arranged at the lower end position of the left side of the main body installation and connection stabilizing frame, a cylindrical main body assembly and locking fixing hole is arranged on the front side of the installation and support matching connecting plate, a circular arc-shaped matching and connection anti-loosening stabilizing groove is arranged at the connecting position of the left side of the main body installation and connection stabilizing frame and the installation and support matching connecting plate, a positioning and combination connecting support plate with an integral direction towards the right side is arranged on the right side of the main body installation and connection stabilizing frame, a combination fastening and stabilizing connecting groove with an inclined lower end surface is arranged at the upper end position of the positioning and combination connecting support plate, and a combination guiding and reinforcing anti-loosening column with an integral form is arranged on the right side of the combination fastening and stabilizing connecting groove, the upper end of the matched guide reinforcing anti-loosening column is provided with a U-shaped combined stable installation matching groove with an opening facing the right side.
Furthermore, the mounting support matching connecting plate is positioned at the central position of the main body in the front-back direction of the mounting and connecting stabilizing frame.
Furthermore, the upper ends of the left side and the right side of the matched guide reinforcing anti-loosening column are respectively provided with a matched connection guide arc structure.
Furthermore, the width of the positioning combination connection supporting plate in the front-back direction is the same as the thickness of the main body installation connection stabilizing frame in the front-back direction.
Furthermore, the width of the combination stable installation matching groove in the front-back direction is half of the width of the positioning combination connection supporting plate in the front-back direction.
The utility model has the beneficial effects that:
the utility model can be matched with a plurality of positions of the solid waste conveying equipment for combined connection, can movably adjust the mounting position according to requirements, has more reliable stability during assembly, can be matched with the mounting structure of the movable assembly for more firm combined connection, and can ensure higher safety during use by arranging the anti-loosening positioning matching structure at the right side position, thereby ensuring longer maintenance period of the conveying equipment, more reliable integral durability during use and lower use cost.
Drawings
FIG. 1 is a schematic perspective view of the present invention;
FIG. 2 is a schematic front view of the present invention;
FIG. 3 is a left side schematic view of the present invention;
FIG. 4 is a right side schematic view of the present invention;
FIG. 5 is a schematic top view of the present invention;
FIG. 6 is a schematic bottom view of the present invention;
FIG. 7 is a perspective view of the present invention in a second direction;
in the figure: 1. the main part erection joint stabilizer, 2, assembly support safe combination groove, 3, installation support cooperation connecting plate, 4, main part assembly locking fixed orifices, 5, the locking stabilizer bar is connected in the cooperation, 6, location built-up joint backup pad, 7, the stable spread groove of combination fastening, 8, the locking post of cooperation direction reinforcement, 9, the stable installation cooperation groove of combination.
Detailed Description
As shown in fig. 1 to 7, a solid waste treatment conveying equipment stabilizing device can be matched with a plurality of positions of solid waste conveying equipment for combination connection, can be movably adjusted in installation position according to requirements, has more reliable stability during assembly, can be matched with an installation structure of a movable assembly for more firm combination connection, and can ensure higher safety during use by arranging a locking positioning matching structure at a right side position, so that the maintenance period of the conveying equipment is longer, the whole durability during use is more reliable, and the use cost is lower. It includes convex main part erection joint stabilizer 1, the lower extreme position of main part erection joint stabilizer 1 is equipped with the convex assembly of opening below right and supports safe combination groove 2, and the cooperation that can ensure the lower extreme position is connected stability more reliably. The left lower end position of main part erection joint stabilizer 1 is equipped with integrated into one piece's erection bracing cooperation connecting plate 3, the front of erection bracing cooperation connecting plate 3 is equipped with cylindrical main part assembly locking fixed orifices 4, carries out holistic installation locking through it. The left side of main part erection joint stabilizer 1 with the erection bracing cooperation connecting plate 3 hookup location is equipped with convex cooperation and connects locking stable trough 5, can make to have the locking effect of combination after the integrated into one piece, and stability during the assembly is more reliable. The right side of main part erection joint stabilizer 1 is equipped with location built-up connection backup pad 6 on integrative direction orientation right side, the upper end position of location built-up connection backup pad 6 is equipped with down the terminal surface and stabilizes spread groove 7 for the combination fastening on inclined plane, can play better cooperation location to the installation of right side position. The right side of the combined fastening stable connecting groove 7 is provided with an integrally formed matched guiding reinforcing anti-loosening column 8, and the assembly positioning connecting position is guaranteed to have a more reliable combined anti-loosening effect. The upper end of cooperation direction reinforcement locking post 8 is equipped with the opening and stabilizes installation cooperation groove 9 to the U-shaped combination on right side, can carry out more stable combination with the cooperation subassembly on right side together, and the cooperation fastness is more stable.
Preferably, the mounting support matching connecting plate 3 is located at the central position of the main body mounting and connecting stabilizing frame 1 in the front-back direction, so that the structural combination strength is higher during mounting and assembling, and the safety is better during use.
Preferably, the upper ends of the left side and the right side of the matched guide reinforcing anti-loosening column 8 are respectively provided with a matched connection guide arc structure, so that the matched connection smoothness of the positions is better, and the efficiency in installation and disassembly is higher.
Preferably, the width of the positioning, combining and connecting support plate 6 in the front-back direction is the same as the thickness of the main body mounting and connecting stabilizer 1 in the front-back direction, so that the whole structure is more smooth, and the combination strength during mounting is more reliable.
Preferably, the width of the combination stable mounting engagement groove 9 in the front-rear direction is half of the width of the positioning combination connection support plate 6 in the front-rear direction, so that the connection stability at this position during engagement is better, and the mounting combination fastening property at the right position is further ensured.
The foregoing is a preferred embodiment of the present invention, and it should be noted that, for those skilled in the art, various modifications or substitutions can be made without departing from the principle of the present invention, and these modifications or substitutions should also be considered as the protection scope of the present invention.

Claims (5)

1. The utility model provides a solid waste handles conveying equipment stabilising arrangement which characterized in that: the safety assembly and support device comprises a circular arc-shaped main body installation and connection stabilizing frame (1), wherein a circular arc-shaped assembly and support safety combination groove (2) with an opening arranged at the lower end of the main body installation and connection stabilizing frame (1) and arranged at the right lower side, an integrally formed installation and support matching connecting plate (3) is arranged at the lower end of the left side of the main body installation and connection stabilizing frame (1), a cylindrical main body assembly locking fixing hole (4) is formed in the front of the installation and support matching connecting plate (3), a circular arc-shaped matching connection anti-loosening stabilizing groove (5) is formed at the connecting position of the left side of the main body installation and connection stabilizing frame (1) and the installation and support matching connecting plate (3), a positioning combination and connection supporting plate (6) with an integral direction towards the right side is arranged at the right side of the main body installation and connection stabilizing frame (1), and a combination fastening and stabilizing connection groove (7) with an inclined lower end surface is arranged at the upper end of the positioning combination and connection supporting plate (6), the right side of the combined fastening stable connection groove (7) is provided with an integrally formed matched guide reinforcing anti-loosening column (8), and the upper end of the matched guide reinforcing anti-loosening column (8) is provided with a U-shaped combined stable installation matching groove (9) with an opening on the right side.
2. The solid waste treatment conveying apparatus stabilizing device according to claim 1, wherein: the mounting support matching connecting plate (3) is positioned at the central position of the main body in the front-back direction of the mounting and connecting stabilizing frame (1).
3. The solid waste treatment conveying apparatus stabilizing device according to claim 1, wherein: and the upper ends of the left side and the right side of the matched guide reinforcing anti-loosening column (8) are respectively provided with a matched connection guide arc structure.
4. The solid waste treatment conveying apparatus stabilizing device according to claim 1, wherein: the width of the positioning combination connection supporting plate (6) in the front-back direction is the same as the thickness of the main body installation connection stabilizing frame (1) in the front-back direction.
5. The solid waste treatment conveying apparatus stabilizing device according to claim 1, wherein: the width of the combined stable installation matching groove (9) in the front-back direction is half of the width of the positioning combined connection supporting plate (6) in the front-back direction.
CN202122020364.4U 2021-08-25 2021-08-25 Solid waste handles conveying equipment stabilising arrangement Active CN215556215U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122020364.4U CN215556215U (en) 2021-08-25 2021-08-25 Solid waste handles conveying equipment stabilising arrangement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122020364.4U CN215556215U (en) 2021-08-25 2021-08-25 Solid waste handles conveying equipment stabilising arrangement

Publications (1)

Publication Number Publication Date
CN215556215U true CN215556215U (en) 2022-01-18

Family

ID=79842200

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122020364.4U Active CN215556215U (en) 2021-08-25 2021-08-25 Solid waste handles conveying equipment stabilising arrangement

Country Status (1)

Country Link
CN (1) CN215556215U (en)

Similar Documents

Publication Publication Date Title
CN215556215U (en) Solid waste handles conveying equipment stabilising arrangement
CN214424823U (en) Accurate location structure of software debugging equipment
CN216111570U (en) End position casting of box body structure of textile machine tool
CN215719973U (en) Stable cooperation pad of electrolytic sludge conveying equipment
CN214945465U (en) Anti-loosening assembly for adjusting guardrail
CN213509922U (en) Firm type metal guardrail combination fixed part
CN218706192U (en) Plate type chain matching positioning plate
CN216305546U (en) Communication tower convenient to make up dismouting
CN218759154U (en) Three proofings tarpaulin easy to assemble
CN216104567U (en) Flexible stainless steel bar supporting assembly
CN219060490U (en) Step combined curtain wall plate
CN218321816U (en) Auxiliary nozzle mounting and positioning frame
CN214124443U (en) Intelligent power distribution cabinet safety isolation part
CN218321819U (en) Loom nozzle installation positioning component
CN211259227U (en) Spliced rigging assembly
CN214533849U (en) High-strength combined positioning aluminum profile
CN215928015U (en) Auxiliary mounting structure of multifunctional sterilization equipment
CN215928010U (en) Disposable vacuum test tube processing equipment location safety frame
CN210438896U (en) Novel mechanical assembly for textile equipment
CN214534220U (en) Rib knit cuff production and processing shock-resistant structure
CN214534372U (en) High-strength gear matching frame
CN220522175U (en) Flexible connection structure for power transmission tower
CN214120780U (en) Convenient reinforced structure of two stove roller installations
CN218594491U (en) Motorcycle frame fast assembly accessory
CN209709513U (en) A kind of power distribution cabinet installation and adjustment standard apparatus

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant