CN215524253U - Be used for as cast cooling water tower - Google Patents
Be used for as cast cooling water tower Download PDFInfo
- Publication number
- CN215524253U CN215524253U CN202120344311.5U CN202120344311U CN215524253U CN 215524253 U CN215524253 U CN 215524253U CN 202120344311 U CN202120344311 U CN 202120344311U CN 215524253 U CN215524253 U CN 215524253U
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- pipeline
- water
- water tower
- power generation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Other Liquid Machine Or Engine Such As Wave Power Use (AREA)
Abstract
The utility model discloses a cooling water tower for casting, which comprises a water tower main body, a water storage tank and power generation equipment, wherein the bottom end inside the water tower main body is fixedly connected with the water storage tank, one side of the bottom end of the water storage tank is fixedly connected with a water suction pump, the top end of the water suction pump is fixedly connected with a first pipeline, the top end of the first pipeline is fixedly connected with a second pipeline, the top end of the second pipeline is fixedly connected with a spray head, the top end inside the water tower main body is fixedly connected with a guide plate, the front surface of the second pipeline is fixedly connected with the power generation equipment, the power generation equipment can generate power, the ventilation plate improves the air permeability of the cooling water tower, an observation window can enable related workers to directly observe the internal condition of the cooling water tower, the convenience of the cooling water tower is improved, the pressure of the cooling water tower on a base can be well relieved by a cushion block, meanwhile, the cooling water tower is more stable, and the stability of the cooling water tower is improved, the method is suitable for the use of the cooling water tower and has wide development prospect in the future.
Description
Technical Field
The utility model relates to a cooling tower technical field specifically is a be used for as cast cooling tower.
Background
The cooling tower is a device for cooling water, in which the water exchanges heat and mass with the air flowing through the cooling tower to reduce the temperature of the water, and is widely applied to an air-conditioning circulating water system and an industrial circulating water system, and under a certain water treatment condition, the cooling effect is one of important performances of the cooling tower.
The lower the water temperature of the existing cooling water for casting, the faster the casting is cooled, the higher the working efficiency is, the water in the cooling pool is continuously added into the cast high-temperature casting, the water temperature in the pool is higher and higher, the working efficiency is relatively reduced, meanwhile, if the existing cooling water tower only relies on natural cooling when water drops fall in the air, a certain cooling effect can be achieved, but the time of the water in the air cannot be long after all.
Therefore, how to design a cooling water tower for casting becomes a problem to be solved currently.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a cooling water tower for casting, which aims to solve the problems of low working efficiency and poor cooling effect in the background technology.
In order to achieve the purpose, the utility model provides the following technical scheme: a cooling water tower for casting comprises a water tower main body, a water storage tank and power generation equipment, wherein the water storage tank is fixedly connected with the bottom end inside the water tower main body, one side of the bottom end of the water storage tank is fixedly connected with a water suction pump, the top end of the water suction pump is fixedly connected with a first pipeline, the top end of the first pipeline is fixedly connected with a second pipeline, the top end of the second pipeline is fixedly connected with a spray head, the top end inside the water tower main body is fixedly connected with a guide plate, the front of the second pipeline is fixedly connected with a power generation device, the back of the generating equipment is movably connected with a rotating shaft, the surface of the rotating shaft is fixedly connected with generating fan blades, the middle part of the power generation equipment is fixedly connected with a sealing ring, the front of the power generation equipment is fixedly connected with a power transmission pipe, the front of the power transmission pipe is fixedly connected with a fan, and the top of the guide plate is fixedly connected with a fixing plate.
Preferably, the top of the water tower main body is fixedly connected with a ventilation plate.
Preferably, the middle part of the water tower main body is fixedly connected with an observation window.
Preferably, the bottom end of the water tower main body is fixedly connected with a cushion block.
Preferably, the reservoir of the inside bottom of water tower main part, the suction pump of reservoir bottom one side, the first pipeline on suction pump top, the second pipeline on first pipeline top, the shower nozzle on second pipeline top, the baffle on the inside top of water tower main part constitutes cooling body jointly.
Preferably, the power generation equipment in front of the second pipeline, the rotating shaft behind the power generation equipment, the power generation fan blades on the surface of the rotating shaft, the sealing ring in the middle of the power generation equipment, the power transmission pipe in front of the power generation equipment and the fan in front of the power transmission pipe jointly form an auxiliary cooling mechanism.
Compared with the prior art, the utility model has the beneficial effects that:
1. this kind of a be used for cast cooling tower, through setting up cooling body, the suction pump can extract the water at the water reservoir or external water source, then send water into the second pipeline through first pipeline, water in the second pipeline can pass through the shower nozzle blowout, the direction of shower nozzle up, so the shower nozzle upwards spouts water, spun water can be hit and beat on the baffle, the baffle can fall into the water column two halves, then the place ahead and the rear from the baffle respectively, cooling tower's practicality has been improved.
2. This kind of a be used for cast cooling tower, through setting up auxiliary cooling mechanism, during rivers flow in the second pipeline, can drive the electricity generation flabellum and rotate, the electricity generation flabellum drives the pivot and rotates, and power generation facility just can turn into the electric energy with mechanical energy this moment, then gives the fan with the electricity transmission through the transmission of electricity pipe, and the fan has got the electricity and begins rotatory production wind-force, blows on the drop of water that falls downwards in the water tower, and the wind speed can increase thermal exchange, has improved cooling tower's practicality.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic overall sectional structure of the present invention;
FIG. 3 is a schematic view of the internal structure of a second pipe according to the present invention;
fig. 4 is an enlarged schematic view of the structure at the position a of the present invention.
In the figure: 1. a water tower main body; 2. a water storage tank; 3. a water pump; 4. a first conduit; 5. a second conduit; 6. a spray head; 7. a guide plate; 8. a power generation device; 9. a rotating shaft; 10. a power generation fan blade; 11. a seal ring; 12. a power transmission pipe; 13. a fan; 14. a fixing plate; 15. a ventilation board; 16. an observation window; 17. and a cushion block.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all embodiments, and all other embodiments obtained by a person of ordinary skill in the art without creative efforts based on the embodiments of the present invention belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides the following technical solutions: a cooling water tower for casting comprises a water tower body 1, reservoir 2 and power generation facility 8, the inside bottom fixedly connected with reservoir 2 of water tower main part 1, bottom one side fixedly connected with suction pump 3 of reservoir 2, the first pipeline 4 of top fixedly connected with of suction pump 3, the top fixedly connected with second pipeline 5 of first pipeline 4, the top fixedly connected with shower nozzle 6 of second pipeline 5, the inside top fixedly connected with baffle 7 of water tower main part 1, the preceding fixedly connected with power generation facility 8 of second pipeline 5, power generation facility 8's swing joint has pivot 9 at the back, the fixed surface of pivot 9 is connected with electricity generation flabellum 10, power generation facility 8's middle part fixedly connected with sealing washer 11, power generation facility 8's preceding fixedly connected with transmission pipe 12, the preceding fixedly connected with fan 13 of transmission pipe 12, the top fixedly connected with fixed plate 14 of baffle 7.
Preferably, the top fixedly connected with ventilating board 15 of water tower main part 1, current cooling tower needs good air permeability for water in the tower can carry out the heat exchange better, through setting up ventilating board 15, be provided with ventilating board 15 at the top of water tower main part 1, outside dry air can get into inside the cooling tower through ventilating board 15, dry air can make the water in the tower exchange better, improves the cooling effect, ventilating board 15 has improved cooling tower's gas permeability.
Preferably, the middle part fixedly connected with observation window 16 of water tower main part 1, current cooling tower is at the during operation, the behavior in the water tower needs regularly to be observed to relevant staff, the inspection has or not unusually, through setting up observation window 16, be provided with observation window 16 at water tower main part 1 middle part, observation window 16 is made by transparent glass material, the condition in water tower main part 1 is directly seen to relevant staff's accessible observation window 16, make the inspection can expand better, cooling tower's convenience has been improved.
Preferably, the bottom fixedly connected with cushion 17 of water tower main part 1, current cooling tower is bulky, many parts are made by metal material, it is comparatively heavy, pressure to the water tower base is great, through setting up cushion 17, bottom at water tower main part 1 is provided with cushion 17, cushion 17 has the rubber material to make, there is certain compliance, can alleviate the pressure that cooling tower caused to self base well, cushion 17 soft nature can laminate with ground better simultaneously, make cooling tower can be more firm, cushion 17 has improved the steadiness of cooling tower.
Preferably, the water storage tank 2 at the bottom end inside the water tower main body 1, the water suction pump 3 at one side of the bottom end of the water storage tank 2, the first pipeline 4 at the top end of the water suction pump 3, the second pipeline 5 at the top end of the first pipeline 4, the spray head 6 at the top end of the second pipeline 5, and the guide plate 7 at the top end inside the water tower main body 1 jointly form a cooling mechanism, the existing cooling water for casting has the advantages that the water temperature is lower, the casting is cooled faster, the working efficiency is higher, the water in the cooling tank is continuously added into the cast high-temperature casting, the water temperature in the tank is higher and higher, the working efficiency is relatively reduced, by arranging the cooling mechanism, the water suction pump 3 can extract the water at the water storage tank 2 or an external water source, then the water is sent into the second pipeline 5 through the first pipeline 4, the water in the second pipeline 5 can be sprayed out through the spray head 6, the direction of the spray head 6 is upward, so the water is sprayed out by the spray head 6, spun water can hit and hit on baffle 7, and baffle 7 can be divided into the water column two halves, then falls respectively with the rear from the place ahead of baffle, relies on water in aerial nature in-process of falling, reaches refrigerated effect with the heat exchange of air, has improved cooling tower's practicality.
Preferably, the power generation device 8 in front of the second pipeline 5, the rotating shaft 9 behind the power generation device 8, the power generation fan blades 10 on the surface of the rotating shaft 9, the sealing ring 11 in the middle of the power generation device 8, the power transmission pipe 12 in front of the power generation device 8, and the fan 13 in front of the power transmission pipe 12 jointly form an auxiliary cooling mechanism, if the existing cooling water tower only relies on natural cooling when water drops fall in the air, although a certain cooling effect can be achieved, the time of water in the air cannot be long after all, by arranging the auxiliary cooling mechanism, when the water in the second pipeline 5 flows, the power generation fan blades 10 are driven to rotate, the power generation fan blades 10 drive the rotating shaft 9 to rotate, at the moment, the power generation device 8 can convert mechanical energy into electric energy, then the electric energy is transmitted to the fan 13 through the power transmission pipe 12, the wind power fan 13 starts to rotate to generate wind power, and blows on downward water drops in the water tower, the wind speed can increase the heat exchange, the larger the wind speed is, the faster the peripheral air flows, the rarer the air is, and the lower the temperature is, thereby achieving the cooling purpose and improving the practicability of the cooling tower.
The working principle is as follows: firstly, by arranging the ventilating plate 15, the ventilating plate 15 is arranged at the top of the water tower main body 1, external dry air can enter the cooling tower through the ventilating plate 15, the dry air can better exchange water in the tower, the cooling effect is improved, and the ventilation property of the cooling tower is improved by the ventilating plate 15;
then, by arranging the observation window 16, the observation window 16 is arranged in the middle of the water tower main body 1, the observation window 16 is made of transparent glass, and related workers can directly see the condition in the water tower main body 1 through the observation window 16, so that the inspection can be better developed, and the convenience of the cooling water tower is improved;
then, by arranging the cushion block 17, the cushion block 17 is arranged at the bottom end of the water tower main body 1, the cushion block 17 is made of rubber materials and has certain softness, so that the pressure of the cooling water tower on a base of the cooling water tower can be well relieved, meanwhile, the softness of the cushion block 17 can be better attached to the ground, the cooling water tower is more stable, and the cushion block 17 improves the stability of the cooling water tower;
next, by arranging the cooling mechanism, the water pump 3 can pump water in the water storage tank 2 or at an external water source, then the water is sent into the second pipeline 5 through the first pipeline 4, the water in the second pipeline 5 can be sprayed out through the spray head 6, the direction of the spray head 6 is upward, so the spray head 6 sprays out the water upwards, the sprayed water can be hit on the guide plate 7, the guide plate 7 can divide the water column into two parts and then fall from the front and the rear of the guide plate respectively, and the cooling effect is achieved by heat exchange with air in the natural falling process of the water in the air, so that the practicability of the cooling water tower is improved;
finally, through setting up auxiliary cooling mechanism, during the rivers in the second pipeline 5 flow, can drive electricity generation flabellum 10 and rotate, electricity generation flabellum 10 drives pivot 9 and rotates, power generation facility 8 just can turn into the electric energy with mechanical energy this moment, then give fan 13 with the electricity transmission through transmission pipe 12, fan 13 gets the electricity and begins rotatory production wind-force, blow on the drop of water that falls downwards in the water tower, the wind speed can increase thermal exchange, the wind speed is big more, outlying air flow is fast more, the air is rarefied more, the temperature is low more, with this purpose of reaching the cooling, cooling tower's practicality has been improved, this kind is exactly this kind of theory of a work for casted cooling tower.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.
Claims (7)
1. A cooling water tower for casting, includes water tower main part (1), tank (2) and power generation facility (8), its characterized in that: the water tower comprises a water tower main body (1), a water storage tank (2) is fixedly connected to the inner bottom of the water tower main body (1), a water suction pump (3) is fixedly connected to one side of the bottom of the water storage tank (2), a first pipeline (4) is fixedly connected to the top end of the water suction pump (3), a second pipeline (5) is fixedly connected to the top end of the first pipeline (4), a spray head (6) is fixedly connected to the top end of the second pipeline (5), a guide plate (7) is fixedly connected to the inner top end of the water tower main body (1), a power generation device (8) is fixedly connected to the front side of the second pipeline (5), a rotating shaft (9) is movably connected to the back side of the power generation device (8), power generation fan blades (10) are fixedly connected to the surface of the rotating shaft (9), a sealing ring (11) is fixedly connected to the middle portion of the power generation device (8), and a power transmission pipe (12) is fixedly connected to the front side of the power generation device (8), and a fan (13) is fixedly connected in front of the power transmission pipe (12).
2. A cooling tower for casting according to claim 1, wherein: the top of the guide plate (7) is fixedly connected with a fixing plate (14).
3. A cooling tower for casting according to claim 1, wherein: the top of the water tower main body (1) is fixedly connected with a ventilating plate (15).
4. A cooling tower for casting according to claim 1, wherein: the middle part of the water tower main body (1) is fixedly connected with an observation window (16).
5. A cooling tower for casting according to claim 1, wherein: the bottom end of the water tower main body (1) is fixedly connected with a cushion block (17).
6. A cooling tower for casting according to claim 1, wherein: reservoir (2) of the inside bottom of water tower main part (1), suction pump (3) of reservoir (2) bottom one side, first pipeline (4) on suction pump (3) top, second pipeline (5) on first pipeline (4) top, shower nozzle (6) on second pipeline (5) top, baffle (7) on the inside top of water tower main part (1) constitute cooling body jointly.
7. A cooling tower for casting according to claim 1, wherein: the auxiliary cooling mechanism comprises power generation equipment (8) in front of the second pipeline (5), a rotating shaft (9) behind the power generation equipment (8), power generation fan blades (10) on the surface of the rotating shaft (9), a sealing ring (11) in the middle of the power generation equipment (8), a power transmission pipe (12) in front of the power generation equipment (8), and a fan (13) in front of the power transmission pipe (12).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120344311.5U CN215524253U (en) | 2021-02-07 | 2021-02-07 | Be used for as cast cooling water tower |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120344311.5U CN215524253U (en) | 2021-02-07 | 2021-02-07 | Be used for as cast cooling water tower |
Publications (1)
Publication Number | Publication Date |
---|---|
CN215524253U true CN215524253U (en) | 2022-01-14 |
Family
ID=79799387
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202120344311.5U Active CN215524253U (en) | 2021-02-07 | 2021-02-07 | Be used for as cast cooling water tower |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN215524253U (en) |
-
2021
- 2021-02-07 CN CN202120344311.5U patent/CN215524253U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP2004528509A (en) | Collecting wind power generation method and its equipment | |
CN210927351U (en) | Large-scale driving motor with high-efficiency heat dissipation | |
CN215524253U (en) | Be used for as cast cooling water tower | |
CN210384912U (en) | Chemical waste gas cooling liquefaction absorbing device | |
CN100447904C (en) | Nuclear energy-wind energy natural-circulation cogeneration system | |
CN104018984B (en) | Frame-type revolving support wind-driven generator | |
CN215490085U (en) | Heatstroke prevention spraying device for building roof construction | |
CN211777834U (en) | Temperature adjusting device for wind generating set overhaul room | |
CN208486982U (en) | Wind turbine generator with heat exchanger | |
CN211549905U (en) | External active and passive integrated cooling system of wind driven generator cabin | |
CN111322202A (en) | Wind power generation device with supercharging and compressing functions | |
CN104147876A (en) | Construction scheme of giant wind energy generation dust removal tower | |
CN203614330U (en) | Pressurizing wind power generation device | |
CN207686904U (en) | A kind of wind-driven generator with water conservancy diversion empennage | |
CN111237138A (en) | Temperature adjusting device for wind generating set overhaul room | |
CN214998046U (en) | Cooling device of wind generating set | |
CN211082161U (en) | Cooling device for wind driven generator | |
CN215003025U (en) | Hydraulic turbine cross flow tower | |
CN216599301U (en) | Distributed wind power acquisition device | |
CN215830765U (en) | Energy-saving ventilating fan suitable for public water use places | |
CN212618933U (en) | Thermal power's operational environment cooling device | |
CN217682115U (en) | Cooling device for wind power generation | |
CN210919317U (en) | Quick cooling protection device of water turbine for hydropower station | |
CN219081762U (en) | Guide bearing cooling device of hydroelectric generating set | |
CN220909885U (en) | Power generation equipment for building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |