CN215485206U - Civil engineering construction is with enclosing fender convenient to installation - Google Patents

Civil engineering construction is with enclosing fender convenient to installation Download PDF

Info

Publication number
CN215485206U
CN215485206U CN202122084577.3U CN202122084577U CN215485206U CN 215485206 U CN215485206 U CN 215485206U CN 202122084577 U CN202122084577 U CN 202122084577U CN 215485206 U CN215485206 U CN 215485206U
Authority
CN
China
Prior art keywords
baffle
column
convenient
spring
pulling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122084577.3U
Other languages
Chinese (zh)
Inventor
尹凯凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yin Kaikai
Original Assignee
Yin Kaikai
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yin Kaikai filed Critical Yin Kaikai
Priority to CN202122084577.3U priority Critical patent/CN215485206U/en
Application granted granted Critical
Publication of CN215485206U publication Critical patent/CN215485206U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses an enclosure convenient to install for civil construction, which comprises a first supporting column and a second supporting column, wherein a first baffle plate is arranged on one side of the first supporting column, a second baffle plate is sleeved inside the other side of the first baffle plate, the other side of the second baffle plate is arranged on one side of the second supporting column, an adjusting device is arranged at the top end of the first baffle plate and on one side far away from the first supporting column, the bottom of the adjusting device penetrates through the first baffle plate and is arranged at the top of the second baffle plate in a matched mode, mounting holes are formed in two ends of the first supporting column, a clamping device is arranged on the inner wall of each mounting hole, circular cavities are formed in two ends of one side, far away from the second baffle plate, of the second supporting column, jacks are formed in one side of each circular cavity, and the other side of each jack is located on the other side of the second supporting column. The enclosure is convenient to detach and mount, the dismounting efficiency is improved, the occupied area is small, the area of the enclosure can be adjusted, and the construction and the mounting are convenient.

Description

Civil engineering construction is with enclosing fender convenient to installation
Technical Field
The utility model relates to the technical field of constructional engineering, in particular to a fence convenient to install and used for civil construction.
Background
In civil engineering projects, fenders are generally arranged around construction sites. The enclosure is a safety protection device for building construction and has the function of beautifying the internal and external environments of construction. At present, before building construction, a fence needs to be built on the periphery of a construction area for isolating the inside and the outside of the construction area, so that a construction site becomes a relatively closed space.
For example, patent number is CN 210768144U discloses a civil engineering encloses and keeps off connecting device, and it includes various steel sheet, seat frame and is located pile found on the seat frame, the pile found installation section and overlap joint section including integrative setting, various steel sheet overlap joint runs through on two adjacent overlap joint sections the installation section is seted up the edge pile length direction's mounting hole, in installation section relative both sides seted up with at least a set of spacing hole of mounting hole intercommunication, each spacing downthehole limiting plate that can follow spacing hole and slide that is provided with can promote the limiting plate is followed the push rod that supports that spacing hole slided. Enclose through the civil engineering of design and keep off connecting device, be convenient for carry out the pile and be connected with various steel sheet, easy operation, simple to operate has improved the civil engineering and has enclosed the efficiency of construction that the fender was built, but, owing to enclose the connecting device complex operation of fender to influence installation and dismantlement efficiency, and then reduce the work progress, owing to enclose the fender area fixed unchangeably, thereby area occupied is big, be not convenient for transport and place to and can not adjust according to construction distance.
An effective solution to the problems in the related art has not been proposed yet.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Aiming at the defects of the prior art, the utility model provides the enclosing barrier for civil construction convenient to install, which has the advantages of convenience in disassembly and assembly, improvement on disassembly and assembly efficiency, small occupied area, capability of adjusting the area of the enclosing barrier and convenience in construction and installation, and further has the problem of complicated operation, thus the assembly and disassembly efficiency is influenced, the working progress is reduced, and the area of the enclosing barrier is fixed.
(II) technical scheme
In order to realize the advantages of convenient disassembly and assembly, improved disassembly and assembly efficiency, small occupied area and convenient construction and installation by adjusting the area of the enclosure, the utility model adopts the following specific technical scheme:
the utility model provides a civil engineering construction is with enclosing fender convenient to installation, one side of the first support column of first support column and second support column is provided with first baffle, the inside cover of opposite side of first baffle is equipped with the second baffle, the opposite side setting of second baffle is in one side of second support column, the top of first baffle and the one side of keeping away from first support column are provided with adjusting device, and adjusting device's bottom runs through the top that first baffle cooperation set up at the second baffle, the both ends of first support column are all seted up and are provided with the mounting hole, be provided with latch device on the inner wall of mounting hole, round cavity has all been seted up at one side both ends that the second baffle was kept away from to the second support column, the jack has been seted up to one side in round cavity, and the opposite side of jack is located the opposite side of second support column.
Furthermore, in order to effectively change the area of the enclosure and realize that the second baffle can effectively and stably move in the first baffle, so that the stability between the first baffle and the second baffle is improved, a fixing hole is formed in one side of the top end of the first baffle, a plurality of adjusting grooves are formed in the top end of the second baffle, and an I-shaped groove matched with the second baffle is formed in one side, away from the first supporting column, of the first baffle.
Further, in order to adjust the fender area of enclosing of first baffle and second baffle, thereby can make to enclose fender area of occupation diminish, and then be convenient for transport and place, and can adjust according to construction distance, the staff's of being convenient for construction, adjusting device is including setting up the outer sleeve on first baffle top, the middle part cover of outer sleeve is equipped with the pulling post, the top of pulling post is provided with the pull ring, the bottom of pulling post is run through first baffle cooperation and is set up the top at the second baffle, the inside top of outer sleeve is provided with first spring, the other end of first spring is provided with the pulling plate, the other end setting of pulling plate is in the inside bottom of outer sleeve, and the pulling plate sets up on the outer wall of pulling post.
Further, in order to quickly and conveniently carry out installation and disassembly between the enclosing blocks so as to improve disassembly and assembly efficiency and further save time and improve construction efficiency, the clamping device comprises an outer ring arranged on the inner wall of the installation hole, one end of the outer ring is sleeved with a pressing mechanism in a matching manner, the pressing mechanism is sleeved with a rotating rod inside, the other end of the rotating rod is provided with a clamping head, a second spring is arranged between one end of the pressing mechanism and the rotating rod, the pressing mechanism comprises a pressing column sleeved at one end of the outer ring in a matching manner, the outer wall of the pressing column is provided with a spring groove, a third spring is arranged inside the spring groove, the other end of the third spring is provided with a moving column, the moving column and the outer ring are arranged in a matching manner, two first track grooves are symmetrically arranged on the outer ring, a second track groove is connected between the two first track grooves, the second track groove is of a symmetrical X-shaped structure, and the tops of the two first track grooves are obliquely arranged, the bottom of the second track groove is obliquely arranged.
(III) advantageous effects
Compared with the prior art, the utility model provides the enclosing barrier for civil construction, which is convenient to install and has the following beneficial effects:
1. through setting up adjusting device and latch device to the civil engineering construction of being convenient for to install is with enclosing the fender, possesses convenient to detach and encloses the fender with the installation, improves dismouting efficiency, and area occupied is little, can adjust to enclose the fender area and be convenient for the construction installation.
2. Through setting up adjusting device to can adjust the fender area that encloses of first baffle and second baffle, thereby can make to enclose and keep off area of occupation and diminish, and then be convenient for transport and place, and can adjust the staff construction of being convenient for according to construction distance.
3. Through setting up latch device to can be fast convenient enclose installation and dismantlement between the fender, thereby improve dismouting efficiency, and then save time, improve the efficiency of construction.
4. Through setting up first baffle and second baffle to can effectual change enclose the area of keeping off, and realize that the second baffle carries out effective stable removal in the inside of first baffle, and then improve the stability between first baffle and the second baffle.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings needed in the embodiments will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art to obtain other drawings without creative efforts.
Fig. 1 is a perspective view of a civil engineering fence according to an embodiment of the present invention, which is convenient to install;
fig. 2 is a schematic view of a first support column and a first baffle fixing structure of a civil engineering fence convenient to install according to an embodiment of the utility model;
fig. 3 is a schematic view of a second supporting column and a second baffle fixing structure of the civil engineering fence convenient to install according to the embodiment of the utility model;
fig. 4 is a fixed sectional view of a second supporting column and a second barrier of the civil engineering fence facilitating installation according to the embodiment of the present invention;
FIG. 5 is a schematic structural view of an adjusting device of the civil engineering fence convenient to install according to the embodiment of the utility model;
FIG. 6 is an exploded view of an adjustment device of a civil engineering fence that facilitates installation according to an embodiment of the present invention;
FIG. 7 is one of the exploded views of a latch of a civil engineering fence according to an embodiment of the present invention for ease of installation;
FIG. 8 is one of the exploded views of a latch of the civil engineering fence according to an embodiment of the present invention for ease of installation;
FIG. 9 is a schematic structural view of an outer ring of a civil engineering fence that facilitates installation according to an embodiment of the present invention;
fig. 10 is a schematic view of an outer ring development structure of a civil engineering fence convenient to install according to an embodiment of the present invention.
In the figure:
1. a first support column; 2. a second support column; 3. a first baffle plate; 301. a fixing hole; 302. a I-shaped groove; 4. a second baffle; 401. an adjustment groove; 5. an adjustment device; 501. an outer sleeve; 502. pulling the column; 503. a pull ring; 504. a first spring; 505. pulling the movable plate; 6. mounting holes; 7. a clamping device; 701. an outer ring; 70101. a first track groove; 70102. a second track groove; 702. a pressing mechanism; 70201. pressing the column; 70202. a spring slot; 70203. a third spring; 70204. moving the column; 703. rotating the rod; 704. clamping a head; 705. a second spring; 8. a circular lumen; 9. and (4) inserting the jack.
Detailed Description
For further explanation of the various embodiments, the drawings which form a part of the disclosure and which are incorporated in and constitute a part of this specification, illustrate embodiments and, together with the description, serve to explain the principles of operation of the embodiments, and to enable others of ordinary skill in the art to understand the various embodiments and advantages of the utility model, and, by reference to these figures, reference is made to the accompanying drawings, which are not to scale and wherein like reference numerals generally refer to like elements.
According to the embodiment of the utility model, the fence for civil engineering construction is convenient to install.
The utility model will be further described with reference to the accompanying drawings and specific embodiments, as shown in fig. 1-10, the fender for civil engineering construction convenient to install according to the embodiment of the utility model comprises a first supporting column 1 and a second supporting column 2, a first baffle 3 is arranged on one side of the first supporting column 1, a second baffle 4 is sleeved inside the other side of the first baffle 3, the other side of the second baffle 4 is arranged on one side of the second supporting column 2, an adjusting device 5 is arranged on the top end of the first baffle 3 and on the side far away from the first supporting column 1, the bottom of the adjusting device 5 penetrates through the first baffle 3 and is arranged on the top of the second baffle 4 in a matching manner, mounting holes 6 are respectively arranged at two ends of the first supporting column 1, a clamping device 7 is arranged on the inner wall of the mounting holes 6, circular cavities 8 are respectively arranged at two ends of the second supporting column 2 far away from the second baffle 4, jacks 9 are respectively arranged at one side of the circular cavities 8, and the other side of the receptacle 9 is located on the other side of the second support column 2.
By means of the technical scheme, the adjusting device 5 is arranged, so that the enclosure area of the first baffle plate 3 and the second baffle plate 4 can be adjusted, the occupied area of the enclosure can be reduced, the transportation and the placement are convenient, the adjustment can be carried out according to the construction distance, and the construction of workers is convenient; through setting up latch device 7 to can be fast convenient enclose installation and dismantlement between the fender, thereby improve dismouting efficiency, and then save time, improve the efficiency of construction.
In an embodiment, for the first baffle 3 and the second baffle 4, a fixing hole 301 is opened on one side of the top end of the first baffle 3, a plurality of adjusting grooves 401 are opened on the top end of the second baffle 4, and an i-shaped groove 302 matched with the second baffle 4 is opened on one side of the first baffle 3 away from the first supporting column 1, so that the area of the baffle can be effectively changed, and the second baffle 4 can effectively and stably move inside the first baffle 3, thereby improving the stability between the first baffle 3 and the second baffle 4.
In one embodiment, for the above adjusting device 5, the adjusting device 5 includes an outer sleeve 501 disposed at the top end of the first baffle 3, a pulling column 502 is sleeved in the middle of the outer sleeve 501, a pulling ring 503 is disposed at the top end of the pulling column 502, the bottom of the pulling column 502 is disposed at the top end of the second baffle 4 through the first baffle 3 in a matching manner, a first spring 504 is disposed at the top end of the outer sleeve 501, a pulling plate 505 is disposed at the other end of the first spring 504, the other end of the pulling plate 505 is disposed at the bottom end of the outer sleeve 501, and the pulling plate 505 is disposed on the outer wall of the pulling column 502, so that the enclosure area of the first baffle 3 and the second baffle 4 can be adjusted, thereby the enclosure occupied area can be reduced, and further transportation and placement are facilitated, and adjustment can be performed according to the construction distance, thereby facilitating construction of workers.
The operating principle of the adjusting device 5 is as follows: when the area of enclosing the fender needs to be adjusted, constructor pulls the pull ring 503 upwards to pull, thereby drive pulling post 502 upward movement, at this moment, pull board 505 compresses first spring 504 upward movement, thereby make the bottom of pulling post 502 break away from adjustment tank 401, at this moment, the area of enclosing the fender is adjusted to the pulling or promotion second baffle 4, after modulating suitable position, when making fixed orifices 301 and adjustment tank 401 coincide, loosen pull ring 503, under the spring action of first spring 504, make pull board 505 downstream, thereby drive pulling post 502 downstream, thereby make the bottom of pulling post 502 block adjustment tank 401, thereby fixed first baffle 3 and second baffle 4, accomplish the regulation of enclosing the fender area.
In one embodiment, for the above-mentioned latch device 7, the latch device 7 includes an outer ring 701 disposed on an inner wall of the mounting hole 6, one end of the outer ring 701 is fittingly sleeved with a pressing mechanism 702, the pressing mechanism 702 is fittingly sleeved with a rotating rod 703, the other end of the rotating rod 703 is provided with a chuck 704, a second spring 705 is disposed between one end of the pressing mechanism 702 and the rotating rod 703, the pressing mechanism 702 includes a pressing column 70201 fittingly sleeved on one end of the outer ring 701, the outer wall of the pressing column 70201 is provided with a spring groove 70202, the inside of the spring groove 70202 is provided with a third spring 70203, the other end of the third spring 70203 is provided with a moving column 70204, the moving column 70204 is fittingly disposed with the outer ring 701, the outer ring 701 is symmetrically provided with two first rail grooves 70101, a second rail groove 70102 is connected between the two first rail grooves 70101, the second rail groove 70102 is of a symmetrical X-shaped structure, and tops of the two first rail grooves 70101 are disposed obliquely, the bottom of second track groove 70102 slopes to setting up to can be fast convenient enclose installation and the dismantlement between the fender, thereby improve dismouting efficiency, and then save time, improve the efficiency of construction.
The operating principle of the latch 7 is as follows: when the installation between the enclosing barriers needs to be carried out, firstly, the clamping heads 704 of the two clamping devices 7 are respectively inserted into the two insertion holes 9, and the clamping heads 704 enter the circular cavity 8, at the moment, a constructor presses the pressing column 70201 to the left, so that the second spring 705 is pressed to the left to be compressed, meanwhile, the moving column 70204 moves from the right to the left along the first rail groove 70101, as the top of the first rail groove 70101 is obliquely arranged, the moving column 70204 compresses the third spring 70203 to move, and then the moving column 70204 moves obliquely along the second rail groove 70102, so that the rotating rod 703 rotates 180 degrees, so that the clamping heads 704 clamp the second supporting column 2 in the circular cavity 8, and the installation is finished;
when the enclosure is required to be disassembled, a constructor presses the pressing column 70201 to the left again, so that the second spring 705 is pressed to the left to be compressed, meanwhile, the moving column 70204 moves from the right to the left along the first rail groove 70101, because the top of the first rail groove 70101 is obliquely arranged, the moving column 70204 compresses the third spring 70203 to move, the moving column 70204 moves obliquely along the second rail groove 70102, so that the rotating rod 703 rotates 180 degrees, at the moment, the two enclosures are pulled open, the chuck 704 is separated from the jack 9 to separate the two enclosures, and then the disassembly is completed;
for the convenience of understanding the technical solutions of the present invention, the following detailed description will be made on the working principle or the operation mode of the present invention in the practical process.
In practical application, when the installation between the enclosing barriers is needed, firstly, the chucks 704 of the two clamping devices 7 are respectively inserted into the two insertion holes 9, and the chucks 704 enter the circular cavity 8, at this time, a constructor presses the pressing column 70201 to the left, so as to press the second spring 705 to the left for compression, meanwhile, the moving column 70204 moves from the right to the left along the first rail groove 70101, because the top of the first rail groove 70101 is obliquely arranged, the moving column 70204 compresses the third spring 70203 for movement, and then the moving column 70204 moves obliquely along the second rail groove 70102, so that the rotating rod 703 rotates 180 degrees, so that the chucks 704 clamp the second supporting column 2 in the circular cavity 8, and the installation is completed;
when the enclosure is required to be disassembled, a constructor presses the pressing column 70201 to the left again, so that the second spring 705 is pressed to the left to be compressed, meanwhile, the moving column 70204 moves from the right to the left along the first rail groove 70101, because the top of the first rail groove 70101 is obliquely arranged, the moving column 70204 compresses the third spring 70203 to move, the moving column 70204 moves obliquely along the second rail groove 70102, so that the rotating rod 703 rotates 180 degrees, at the moment, the two enclosures are pulled open, the chuck 704 is separated from the jack 9 to separate the two enclosures, and then the disassembly is completed;
when the area of enclosing the fender needs to be adjusted, constructor pulls the pull ring 503 upwards to pull, thereby drive pulling post 502 upward movement, at this moment, pull board 505 compresses first spring 504 upward movement, thereby make the bottom of pulling post 502 break away from adjustment tank 401, at this moment, the area of enclosing the fender is adjusted to the pulling or promotion second baffle 4, after modulating suitable position, when making fixed orifices 301 and adjustment tank 401 coincide, loosen pull ring 503, under the spring action of first spring 504, make pull board 505 downstream, thereby drive pulling post 502 downstream, thereby make the bottom of pulling post 502 block adjustment tank 401, thereby fixed first baffle 3 and second baffle 4, accomplish the regulation of enclosing the fender area.
In conclusion, by means of the technical scheme, the adjusting device 5 and the clamping device 7 are arranged, so that the fence for civil construction is convenient to install, the fence is convenient to detach and install, the dismounting efficiency is improved, the occupied area is small, the fence area can be adjusted, and the construction and installation are convenient; by arranging the adjusting device 5, the enclosure area of the first baffle 3 and the second baffle 4 can be adjusted, so that the enclosure occupied area can be reduced, the transportation and the placement are convenient, the adjustment can be carried out according to the construction distance, and the construction of workers is convenient; by arranging the clamping device 7, the enclosure can be quickly and conveniently mounted and dismounted, so that the dismounting efficiency is improved, the time is saved, and the construction efficiency is improved; through setting up first baffle 3 and second baffle 4 to can the effectual area that encloses the fender of change, and realize that second baffle 4 carries out effective stable removal in the inside of first baffle 3, and then improve the stability between first baffle 3 and the second baffle 4.
In the present invention, unless otherwise expressly specified or limited, the terms "mounted," "disposed," "connected," "secured," "screwed" and the like are to be construed broadly, e.g., as meaning fixedly connected, detachably connected, or integrally formed; can be mechanically or electrically connected; the terms may be directly connected or indirectly connected through an intermediate, and may be communication between two elements or interaction relationship between two elements, unless otherwise specifically limited, and the specific meaning of the terms in the present invention will be understood by those skilled in the art according to specific situations.
The above description is only for the purpose of illustrating the preferred embodiments of the present invention and is not to be construed as limiting the utility model, and any modifications, equivalents, improvements and the like that fall within the spirit and principle of the present invention are intended to be included therein.

Claims (7)

1. The utility model provides a civil engineering is with enclosing fender convenient to installation, includes first support column (1) and second support column (2), its characterized in that:
a first baffle (3) is arranged on one side of the first supporting column (1), a second baffle (4) is sleeved inside the other side of the first baffle (3), the other side of the second baffle (4) is arranged on one side of the second supporting column (2), an adjusting device (5) is arranged on the top end of the first baffle (3) and on one side far away from the first supporting column (1), and the bottom of the adjusting device (5) penetrates through the first baffle (3) and is arranged on the top of the second baffle (4) in a matching manner;
the utility model discloses a fixing device for supporting a car, including first support column (1), mounting hole (6) are all seted up at the both ends of first support column (1), be provided with latch device (7) on the inner wall of mounting hole (6), second support column (2) are kept away from circular chamber (8) have all been seted up at one side both ends of second baffle (4), jack (9) have been seted up to one side of circular chamber (8), just the opposite side of jack (9) is located the opposite side of second support column (2).
2. The civil construction fence convenient to install of claim 1, wherein one side of the top end of the first baffle plate (3) is provided with a fixing hole (301), and the top end of the second baffle plate (4) is provided with a plurality of adjusting grooves (401).
3. The civil construction fence convenient to install according to claim 1 or 2, characterized in that one side of the first baffle (3) far away from the first support column (1) is provided with an I-shaped groove (302) matched with the second baffle (4).
4. The civil construction fence convenient to install according to claim 1, wherein the adjusting device (5) comprises an outer sleeve (501) arranged at the top end of the first baffle (3), a pulling column (502) is sleeved in the middle of the outer sleeve (501), a pull ring (503) is arranged at the top of the pulling column (502), and the bottom of the pulling column (502) penetrates through the first baffle (3) and is arranged at the top of the second baffle (4) in a matching manner;
the inner top end of the outer sleeve (501) is provided with a first spring (504), the other end of the first spring (504) is provided with a pulling plate (505), the other end of the pulling plate (505) is arranged at the inner bottom end of the outer sleeve (501), and the pulling plate (505) is arranged on the outer wall of the pulling column (502).
5. The civil engineering construction is with enclosing fender convenient to installation of claim 1, characterized in that latch device (7) is including setting up outer lane (701) on mounting hole (6) inner wall, the one end cooperation cover of outer lane (701) is equipped with pressing means (702), the inside cover of pressing means (702) is equipped with dwang (703), the other end of dwang (703) is provided with dop (704), pressing means (702) one end with be provided with second spring (705) between dwang (703).
6. The civil engineering construction fence convenient to install of claim 5, wherein the pressing mechanism (702) comprises a pressing column (70201) which is sleeved at one end of the outer ring (701) in a matching manner, a spring groove (70202) is formed in the outer wall of the pressing column (70201), a third spring (70203) is arranged inside the spring groove (70202), a moving column (70204) is arranged at the other end of the third spring (70203), and the moving column (70204) is matched with the outer ring (701).
7. The civil engineering construction fence convenient to install according to claim 5 or 6, wherein two first track grooves (70101) are symmetrically formed in the outer ring (701), a second track groove (70102) is connected between the two first track grooves (70101), the second track groove (70102) is of a symmetrical X-shaped structure, tops of the two first track grooves (70101) are arranged in an inclined manner, and bottoms of the second track grooves (70102) are arranged in an inclined manner.
CN202122084577.3U 2021-08-30 2021-08-30 Civil engineering construction is with enclosing fender convenient to installation Active CN215485206U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122084577.3U CN215485206U (en) 2021-08-30 2021-08-30 Civil engineering construction is with enclosing fender convenient to installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122084577.3U CN215485206U (en) 2021-08-30 2021-08-30 Civil engineering construction is with enclosing fender convenient to installation

Publications (1)

Publication Number Publication Date
CN215485206U true CN215485206U (en) 2022-01-11

Family

ID=79766497

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122084577.3U Active CN215485206U (en) 2021-08-30 2021-08-30 Civil engineering construction is with enclosing fender convenient to installation

Country Status (1)

Country Link
CN (1) CN215485206U (en)

Similar Documents

Publication Publication Date Title
CN215485206U (en) Civil engineering construction is with enclosing fender convenient to installation
CN215377584U (en) Pull-plug type battery box capable of improving turnover efficiency
CN114572748A (en) Efficient is production of fire-retardant whole area core with piling up device in colliery
CN215732883U (en) Electrical installation board assembly
CN215646395U (en) Stator punching sheet for wind driven generator
CN218293117U (en) Highway construction rail guard
CN215056033U (en) Combined type edge-facing protection device
CN220106250U (en) Split type iron core winding die
CN218616938U (en) Assembled tunnelling all-in-one track baffle convenient to dismouting
CN211763226U (en) Keyboard cover production facility convenient to processing
CN217099735U (en) Railway power supply contact net is with supporting arrangement
CN215561708U (en) Highway construction gutter slipform machine
CN214089987U (en) Concrete ground well is with anti damage device
CN210771035U (en) Manual fuel filling pump moving device
CN221002010U (en) Construction reinforcing bar location structure
CN220928990U (en) Assembled fence capable of being quickly installed and removed
CN220620583U (en) Energy-saving wall body of green building
CN220588972U (en) Combined multi-tower-section rectifying tower
CN216937999U (en) Novel stamping die
CN216663897U (en) Safety warning device is used in public road bridge roof beam construction
CN110725615A (en) Fender is enclosed in construction
CN218373188U (en) Highway engineering concrete placement is with strutting arrangement
CN219248280U (en) Movable touch screen instruction box
CN218366658U (en) Large-scale quality piece production facility
CN214641174U (en) Tunnel straight section steel bow member installation auxiliary stand