CN215443501U - Building construction enclosure - Google Patents

Building construction enclosure Download PDF

Info

Publication number
CN215443501U
CN215443501U CN202122099376.0U CN202122099376U CN215443501U CN 215443501 U CN215443501 U CN 215443501U CN 202122099376 U CN202122099376 U CN 202122099376U CN 215443501 U CN215443501 U CN 215443501U
Authority
CN
China
Prior art keywords
base
slider
water
building construction
integrated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122099376.0U
Other languages
Chinese (zh)
Inventor
黄克波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Shixin Engineering Building Co ltd
Original Assignee
Fujian Shixin Engineering Building Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Shixin Engineering Building Co ltd filed Critical Fujian Shixin Engineering Building Co ltd
Priority to CN202122099376.0U priority Critical patent/CN215443501U/en
Application granted granted Critical
Publication of CN215443501U publication Critical patent/CN215443501U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

The application discloses building construction envelope, the technical field who relates to, which comprises a base, open the both sides of base has the hole of permeating water, and integrated into one piece is provided with the water receiving board on the base, integrated into one piece is provided with the round and keeps off the platform in the base, the base inner wall is provided with a pair of second slider, a pair of second slider offsets with keeping off the platform, the round keeps off sliding connection between platform and the base open end and has the inserted block, install hollow post through the ring flange on the inserted block, the lower extreme of hollow post runs through in wearing out inserted block to basin region, and the water pump is installed to the one end that hollow post runs through out, high pressure nozzle is installed to the other end of hollow post. The utility model provides a base is followed integrated into one piece and is installed first slider and first spout on width direction's both sides, and first slider and first spout set up relatively, because the base is solitary individuality, conveniently carries the transportation, through first slider sliding connection at first spout internal fixation between adjacent base and the base, become the whole that can be according to construction length independent assortment.

Description

Building construction enclosure
Technical Field
The application relates to the technical field of building construction, in particular to a building construction envelope structure.
Background
During construction, guard rails are usually built on the outer edge of a construction site for protecting and protecting personal safety and equipment facilities.
However, the existing construction enclosure device is usually built by bricks for workers, which not only consumes manpower but also causes resource waste, and is troublesome in dismantling, and has large dust and environmental pollution.
SUMMERY OF THE UTILITY MODEL
In order to solve among the prior art envelope difficult transport, the inconvenient problem of reutilization, this application provides a building construction envelope.
The application provides a building construction envelope, adopts following technical scheme:
the utility model provides a building construction envelope, includes the base, the base is opened along length direction's both sides has the hole of permeating water, and the both sides integrated into one piece of base is provided with the water collector, the water collector is located the below in the hole of permeating water, integrated into one piece is provided with the round and keeps off the platform in the base, the base inner wall is provided with a pair of second slider, and is a pair of the second slider offsets with keeping off the platform, the round sliding connection has the inserted block between fender platform and the base open end, install hollow post through the ring flange on the inserted block, the lower extreme of hollow post runs through out inserted block to the base in, and hollow post runs through the one end of wearing out and installs the water pump, high pressure nozzle is installed to the other end of hollow post.
Through adopting above-mentioned technical scheme, when building site construction dust is great, the rainwater of storing in the water pump passes through high pressure nozzle blowout with the basin region, reaches the dust fall purpose, plays the guard action to the environment.
Optionally, the base is provided with a first sliding block and a first sliding groove along two sides of the width direction in an integrated forming manner, the first sliding block and the first sliding groove are arranged oppositely, and the base are adjacent to each other and fixed in the first sliding groove through the sliding connection of the first sliding block.
Through adopting above-mentioned technical scheme, because the base is solitary individual, conveniently carry the transportation, it is adjacent through first slider sliding connection at first spout internal fixation between base and the base, become the whole that can be according to construction length independent assortment.
Optionally, the base is further provided with support legs in an integrated manner, and ground inserting nails are arranged in the support legs.
Through adopting above-mentioned technical scheme, through inserting the ground nail with the firm fixing in the ground of base.
Optionally, threaded holes are formed in the hollow columns at equal intervals, a cross beam is connected between the adjacent hollow columns through the threaded holes, and a sealing ring made of rubber is arranged between the cross beam and the threaded holes.
Through adopting above-mentioned technical scheme, be provided with the sealing washer of rubber material between roof beam and the screw hole, prevent that the water pump was taken out from oozing outward.
Optionally, a water inlet has been seted up on the base, water inlet department rotates through the round pin axle and is connected with the waterproof board of looks adaptation, integrated into one piece is provided with the removal round pin on the waterproof board, install the arc orbit board through the bolt on the base, removal round pin sliding connection is in the arc orbit board.
Through adopting above-mentioned technical scheme, when needing to add water to the base inside, drive opening and shutting of waterproof board through the displacement of sliding movement round pin on the arc orbit board.
Optionally, branch pipes are communicated with the water inlet, and a main pipe is communicated among the multiple groups of branch pipes.
Through adopting above-mentioned technical scheme, carry to a plurality of branch pipes through being responsible for external water source, conveniently add water, raise the efficiency to the multiunit base simultaneously.
In summary, the present application includes at least one of the following benefits:
1. the two sides of the base along the width direction are integrally provided with a first sliding block and a first sliding groove, the first sliding block and the first sliding groove are arranged oppositely, the base is an independent individual body and is convenient to carry and transport, and the adjacent base and the base are connected in the first sliding groove in a sliding mode through the first sliding block and are fixed, so that the base becomes an integral body which can be freely combined according to the construction length;
2. the base is internally provided with the water tank area, the base is provided with the water inlet, when raining, rainwater is collected through the water receiving plate and flows to the water tank area in the base through the water permeable holes to be stored, and when construction dust on a construction site is large, the rainwater stored in the water tank area is sprayed out through the high-pressure spray head by the water pump, so that the dust falling purpose is achieved; during high temperature, carry to a plurality of branch pipes through being responsible for external water source, conveniently add water simultaneously to the multiunit base, the water pump passes through high pressure nozzle blowout with the external water of storing in the basin region, reaches cooling dust fall purpose.
Drawings
FIG. 1 is a schematic view of the overall structure of the present embodiment;
FIG. 2 is a schematic view of the internal structure of the base of the present embodiment;
FIG. 3 is a schematic cross-sectional view of the base of the present embodiment;
FIG. 4 is a schematic view of the structure of the connecting portion between the hollow column and the beam according to the present embodiment;
fig. 5 is a schematic structural view of the waterproof board of the present embodiment.
Description of reference numerals: 1. a base; 101. a water inlet; 2. water permeable holes; 3. a water receiving plate; 4. blocking the platform; 5. inserting a block; 6. a hollow column; 601. a threaded hole; 7. a water pump; 8. a high pressure spray head; 9. a first slider; 10. a first chute; 11. a support leg; 12. inserting a ground nail; 13. a cross beam; 14. a seal ring; 15. a waterproof sheet; 16. a moving pin; 17. an arc track plate; 18. a branch pipe; 19. a main pipe; 20. and a second slider.
Detailed Description
The present application is described in further detail below with reference to figures 1-5.
Example (b):
the embodiment of the application discloses a building construction enclosure structure, please refer to fig. 1-3, which comprises a base 1, wherein both sides of the base 1 along the length direction are provided with water permeable holes 2, and both sides of the base 1 are integrally formed with water receiving plates 3, the water receiving plates 3 incline to the sides of the water permeable holes 2, rainwater is collected through the water receiving plates 3 and flows into the base 1 through the water permeable holes 2 when raining, the water receiving plates 3 are positioned below the water permeable holes 2, a circle of baffle table 4 is integrally formed in the base 1, the baffle table 4 is positioned above the water permeable holes 2, the inner wall of the base 1 is provided with a pair of second sliding blocks 20, the pair of second sliding blocks 20 are abutted against the baffle table 4, an inserting block 5 is slidably connected between the circle of baffle table 4 and the opening end of the base 1, so that the base 1 and the inserting block 5 are quickly installed together, the installation efficiency is improved, both sides of the inserting block 5 are recessed and matched with the pair of second sliding blocks 20, and are used for improving the smoothness of the sliding connection with the base 1, install hollow post 6 through the ring flange on the inserted block 5, the lower extreme of hollow post 6 runs through out in inserted block 5 to the basin region, and hollow post 6 runs through the one end of wearing out and installs water pump 7, high pressure nozzle 8 is installed to the other end of hollow post 6, equidistant threaded hole 601 of opening on hollow post 6, be connected with crossbeam 13 through threaded hole 601 between the adjacent hollow post 6, connect into an entity that has the enclosure effect with independent individuality originally, and be provided with rubber material's sealing washer 14 between crossbeam 13 and the threaded hole 601, prevent the water exosmosis that water pump 7 took out, when building site construction dust is great, water pump 7 passes through high pressure nozzle 8 blowout with the rainwater of storing in the basin region, reach the dust fall purpose, play the guard action to the environment.
Referring to fig. 1, a first sliding block 9 and a first sliding groove 10 are integrally formed on two sides of a base 1 in the width direction, the first sliding block 9 and the first sliding groove 10 are arranged oppositely, and the base 1 is an independent individual body and is convenient to carry and transport, and adjacent bases 1 and the base 1 are connected in the first sliding groove 10 through the first sliding block 9 in a sliding mode and are fixed into a whole body which can be freely combined according to the construction length.
Referring to fig. 1-2, the base 1 is further integrally formed with a support leg 11, a ground inserting nail 12 is disposed in the support leg 11, and the base 1 is firmly fixed in the ground by the ground inserting nail 12.
Please refer to fig. 1 and 5, a water inlet 101 has been opened on the base 1, a time for dry weather without precipitation, the water inlet 101 is connected with the waterproof board 15 of looks adaptation through the round pin axle rotation, the waterproof board 15 of installation plugs up the water inlet 101 and can prevent the interior rivers play of base 1 originally, integrated into one piece is provided with the removal round pin 16 on the waterproof board 15, install arc orbit board 17 through the bolt on the base 1, 16 sliding connection of removal round pin is in arc orbit board 17, when needing to add water to base 1 inside, the displacement through the slip removal round pin 16 on arc orbit board 17 drives the waterproof board 15 and uses the round pin axle to rotate as the fulcrum, thereby control the opening size between waterproof board 15 and the water inlet 101.
Referring to fig. 1, branch pipes 18 are connected to the water inlet 101, a main pipe 19 is connected between the plurality of groups of branch pipes 18 through a water pump, and the main pipe 19 is connected to the plurality of branch pipes 18 through an external water source, so that water can be conveniently added to the plurality of groups of bases 1 at the same time, and the efficiency is improved.
The implementation principle of the building construction envelope of the embodiment of the application is as follows:
when raining, rainwater is collected through the water receiving plate 3 and flows to the water tank area in the base 1 through the water permeable holes 2 to be stored, and when dust is large in construction of a construction site, the rainwater stored in the water tank area is sprayed out through the high-pressure spray head 8 by the water pump 7, so that the dust falling purpose is achieved;
during high temperature, carry to a plurality of branch pipes 18 through being responsible for 19 external water sources, conveniently add water simultaneously to multiunit base 1, water pump 7 passes through high pressure nozzle 8 blowout with the external water of storing in the basin region, reaches the cooling dust fall purpose.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (6)

1. The utility model provides a building construction envelope, includes base (1), its characterized in that: both sides of the base (1) along the length direction are provided with water permeable holes (2), and both sides of the base (1) are integrally formed with water receiving plates (3), the water receiving plate (3) is positioned below the water permeable hole (2), a circle of baffle table (4) is integrally formed in the base (1), a pair of second sliding blocks (20) is arranged on the inner wall of the base (1), the pair of second sliding blocks (20) is abutted against the blocking platform (4), an inserting block (5) is connected between the ring of the blocking platform (4) and the open end of the base (1) in a sliding way, the insert block (5) is provided with a hollow column (6) through a flange plate, the lower end of the hollow column (6) penetrates through the insert block (5) to the inside of the base (1), and the water pump (7) is installed to the one end that hollow post (6) are located base (1), high pressure nozzle (8) are installed to the other end of hollow post (6).
2. The building construction envelope of claim 1, wherein: base (1) is followed integrated into one piece and is installed first slider (9) and spout (10) on width direction's both sides, first slider (9) and spout (10) set up relatively, and are adjacent through first slider (9) sliding connection at spout (10) internal fixation between base (1) and base (1).
3. The building construction envelope of claim 1, wherein: the base (1) is further provided with support legs (11) in an integrated forming mode, and ground inserting nails (12) are arranged in the support legs (11).
4. The building construction envelope of claim 1, wherein: threaded holes (601) are formed in the hollow columns (6) at equal intervals, a cross beam (13) is connected between the adjacent hollow columns (6) through the threaded holes (601), and a sealing ring (14) made of rubber is arranged between the cross beam (13) and the threaded holes (601).
5. The building construction envelope of claim 1, wherein: the water inlet (101) has been seted up on base (1), water inlet (101) department rotates waterproof board (15) that is connected with the looks adaptation through the round pin axle, integrated into one piece is provided with removal round pin (16) on waterproof board (15), install arc orbit board (17) through the bolt on base (1), removal round pin (16) sliding connection is in arc orbit board (17).
6. The building construction envelope of claim 5, wherein: branch pipes (18) are communicated in the water inlet (101), and main pipes (19) are communicated among the groups of branch pipes (18).
CN202122099376.0U 2021-09-01 2021-09-01 Building construction enclosure Active CN215443501U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122099376.0U CN215443501U (en) 2021-09-01 2021-09-01 Building construction enclosure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122099376.0U CN215443501U (en) 2021-09-01 2021-09-01 Building construction enclosure

Publications (1)

Publication Number Publication Date
CN215443501U true CN215443501U (en) 2022-01-07

Family

ID=79698200

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122099376.0U Active CN215443501U (en) 2021-09-01 2021-09-01 Building construction enclosure

Country Status (1)

Country Link
CN (1) CN215443501U (en)

Similar Documents

Publication Publication Date Title
CN113414047B (en) Road and bridge construction surface spraying device and application method thereof
CN215443501U (en) Building construction enclosure
CN106320370A (en) Underground comprehensive pipe rack system
CN209891041U (en) A waterproof construction for overhead view water course junction
CN218902393U (en) Silicon carbide desulfurization nozzle
CN210188944U (en) Combined pipeline aligning device for improving welding quality of pressure pipeline
CN207092671U (en) A kind of mounting structure of garden pavilion pillar
CN211859330U (en) Bury formula power box for municipal administration
CN109826118B (en) Safety protective cover for ensuring smooth and unobstructed highway
CN220916067U (en) Forest park spraying equipment with safeguard function
CN216843406U (en) Pipeline moving foundation pier
KR970006874Y1 (en) A movable drinking water supply apparatus
CN213654478U (en) Building engineering guard plate convenient to carry
CN216339950U (en) Breathable observation tube for waterproof and drainage integrated device
CN219305238U (en) High-density energy storage framework
CN216778318U (en) Environmental protection dust collecting equipment of building engineering construction
CN216921319U (en) Foldable socket joint type disc buckle horizontal rod
CN204299048U (en) Sheet material connects and waterproof construction
CN202530113U (en) Access door
CN214194873U (en) Sewage pipeline and rail transit junction antiseep pipeline structure
CN214973023U (en) Extractable desulfurization spraying layer
CN217961828U (en) Energy-conserving dust fall equipment is used in municipal construction
CN214740430U (en) Rail guard that has perpendicular afforestation effect that municipal construction protection was used
CN219399465U (en) Environment-friendly dust removal device for building decoration
KR200367731Y1 (en) A circular arc cover for the tank of generating gas

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant