CN215443059U - Pendant for unloading steel wire rope - Google Patents

Pendant for unloading steel wire rope Download PDF

Info

Publication number
CN215443059U
CN215443059U CN202120695996.8U CN202120695996U CN215443059U CN 215443059 U CN215443059 U CN 215443059U CN 202120695996 U CN202120695996 U CN 202120695996U CN 215443059 U CN215443059 U CN 215443059U
Authority
CN
China
Prior art keywords
wire rope
steel wire
unloading
pendant
scaffold
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120695996.8U
Other languages
Chinese (zh)
Inventor
王会军
马超
乔海春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Yanhua Tianzheng Building Engineering Co ltd
Original Assignee
Beijing Yanhua Tianzheng Building Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Yanhua Tianzheng Building Engineering Co ltd filed Critical Beijing Yanhua Tianzheng Building Engineering Co ltd
Priority to CN202120695996.8U priority Critical patent/CN215443059U/en
Application granted granted Critical
Publication of CN215443059U publication Critical patent/CN215443059U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a pendant for unloading a steel wire rope, which is applied to a diagonal scaffold and comprises a saddle piece; the saddle member includes: the first bent part is used for being in contact with the upper part of a first cross beam of the scaffold, and the bent inner side of the first bent part is a first contact surface used for being in contact with the upper part of the first cross beam; the two second bending parts are used for being arranged on two sides of a vertical beam of the scaffold respectively, the bending inner sides of the second bending parts are second contact surfaces used for being in contact with the lower portion of a second cross beam of the scaffold, one end of each second bending part is provided with a steel wire rope connecting end used for being connected with a steel wire rope, and two ends of each first bending part are connected with the other end of each second bending part respectively. The hanging piece for unloading the steel wire rope is used for improving the uniform stress degree.

Description

Pendant for unloading steel wire rope
Technical Field
The utility model relates to the technical field of scaffold unloading equipment, in particular to a hanging piece for unloading a steel wire rope.
Background
Exceeding 50m scaffold and can receiving the outside thrust of the perpendicular decurrent pressure and level of upper scaffold at the steel pipe and the fastener junction of lapped in-process lower floor's scaffold for the steel pipe and the fastener junction of lower floor's scaffold can take place to incline to the outside and warp, influence the stability of scaffold. Therefore, the standards require that a steel cable unloading measure should be adopted for building a scaffold with a height of more than 50m, namely, the steel cable is used for pulling the scaffold to prevent the scaffold from inclining outwards.
The traditional steel wire rope unloading is that the steel wire rope directly bypasses a main node of a scaffold body on the outer side of the scaffold and then is directly tied. The scaffold is provided with a main node which is composed of a first cross beam, a second cross beam and a vertical beam which are perpendicular to each other, and the main node is provided with a fastener. However, the steel wire is wound on the fastener with an irregular shape, so that the tension of the steel wire on the fastener is not uniform, and the steel wire can be obliquely pulled, so that the main node is not uniformly stressed, and the pressure and the thrust on the lower-layer scaffold can not be well balanced.
Therefore, how to improve the uniform degree of stress is a problem to be solved urgently by those skilled in the art.
SUMMERY OF THE UTILITY MODEL
In view of this, the utility model provides a hanger for unloading a steel wire rope, so as to improve the uniform stress degree.
In order to achieve the purpose, the utility model provides the following technical scheme:
a hanging piece for unloading a steel wire rope is applied to a diagonal scaffold and comprises a saddle piece;
the saddle member includes:
the first bent part is used for being in contact with the upper part of a first cross beam of the scaffold, and the bent inner side of the first bent part is a first contact surface used for being in contact with the upper part of the first cross beam;
the two second bending parts are used for being arranged on two sides of a vertical beam of the scaffold respectively, the bending inner sides of the second bending parts are second contact surfaces used for being in contact with the lower portion of a second cross beam of the scaffold, one end of each second bending part is provided with a steel wire rope connecting end used for being connected with a steel wire rope, and two ends of each first bending part are connected with the other end of each second bending part respectively.
Optionally, in the pendant for unloading a steel wire rope, the first bent portion is an arc-shaped bent portion;
and/or the second bent part is an arc-shaped bent part.
Optionally, the hanging piece for unloading the steel wire rope further comprises a hanging ring which is used for being sleeved at the annular end part of the steel wire rope;
the hanging ring is detachably connected with the steel wire rope connecting end.
Optionally, in the pendant for unloading a steel wire rope, the hanging ring is hinged to the connecting end of the steel wire rope.
Optionally, in the pendant for unloading the steel wire rope, the hanging ring is an open hanging ring, and the open hanging ring can be sleeved on the annular end part of the steel wire rope through the opening of the open hanging ring;
mounting rings are respectively arranged at two open ends of the open hanging ring, and the steel wire rope connecting end is provided with a mounting hole; the two mounting rings and the mounting holes of the two steel wire rope connecting ends are connected through a hinged shaft in a penetrating mode.
Optionally, in the pendant for unloading a steel wire rope, the hinge shaft is a bolt.
Optionally, in the pendant for unloading a steel wire rope, at least one of the inner ring of the mounting ring and the mounting hole is a threaded hole, and the threaded hole is matched with the bolt.
Optionally, in the pendant for unloading a steel wire rope, the open hanging ring is a V-shaped hanging ring, and the bent portion of the V-shaped hanging ring is a positioning portion for positioning and matching with the annular end portion of the steel wire rope.
Optionally, in the pendant for unloading a steel wire rope, a first contact surface of the first bent portion has a gasket for contacting with an upper portion of the first cross beam;
and/or the second contact surface of the second bent part is provided with a gasket for contacting with the lower part of the second cross beam.
Optionally, in the pendant for unloading a steel wire rope, the first bending portion, the second bending portion, and the steel wire rope connecting end are of an integrated structure.
According to the technical scheme, the intersection positions of the first cross beam, the second cross beam and the vertical beam are main nodes. The first contact surface through first kink contacts with the top of first crossbeam, the second contact surface of second kink contacts with the below of second crossbeam, make saddle spare and the three position of main node periphery (the position of first contact surface and first crossbeam top contact and the position of the second contact surface of two second kinks and the contact of second crossbeam below) contact, and, two second kinks set up respectively in the perpendicular roof beam both sides of scaffold frame, make saddle spare and the three position symmetry of main node periphery set up outside the main node, when the wire rope link is connected with wire rope, can transmit wire rope's pulling force to the periphery of main node uniformly, the even degree of atress of main node has been improved.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to the drawings without creative efforts.
Fig. 1 is a schematic front view structural diagram of a hanger for unloading a steel wire rope, which is provided by an embodiment of the present invention, installed opposite to a scaffold;
fig. 2 is a schematic side view of a side view structure of the hanger for unloading a steel wire rope provided by the embodiment of the utility model, which is installed opposite to a scaffold;
FIG. 3 is an enlarged partial schematic view of FIG. 2;
fig. 4 is a schematic perspective view of a three-dimensional structure of the hanger for unloading a steel wire rope, provided by the embodiment of the utility model, installed opposite to a scaffold;
fig. 5 is a schematic view of a combined structure of a hanger for unloading a steel wire rope and a steel wire rope according to an embodiment of the present invention.
Detailed Description
The utility model discloses a hanging piece for unloading a steel wire rope, which is used for improving the uniform stress degree.
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
As shown in fig. 1 to 5, an embodiment of the present invention provides a hanger for unloading a steel wire rope, which is applied to a diagonal scaffold, and includes a saddle 1; the saddle 1 comprises: the first bent part 11 is used for contacting with the upper part of the first cross beam 6 of the scaffold, and the bent inner side of the first bent part 11 is a first contact surface for contacting with the upper part of the first cross beam 6; the two second bending parts 12 are used for being arranged on two sides of the vertical beam 7 of the scaffold respectively, the bending inner sides of the second bending parts 12 are second contact surfaces used for being in contact with the lower portion of the second cross beam 5 of the scaffold, one end of each second bending part 12 is provided with a steel wire rope connecting end 13 used for being connected with a steel wire rope 4, and two ends of each first bending part 11 are connected with the other ends of the two second bending parts 12 respectively.
According to the pendant for unloading the steel wire rope provided by the embodiment of the utility model, the crossed positions of the first cross beam 6, the second cross beam 5 and the vertical beam 7 are main nodes. The first contact surface through first kink 11 contacts with the top of first crossbeam 6, the second contact surface of second kink 12 contacts with the below of second crossbeam 5, make saddle 1 contact with the three position of main node periphery (the position of first contact surface and first crossbeam 6 top contact and the position of the second contact surface of two second kinks 12 and the contact of second crossbeam 5 below), and, two second kinks 12 set up respectively in the perpendicular roof beam 7 both sides of scaffold frame, make saddle 1 and the three position symmetry of main node periphery set up outside the main node, when wire rope connection end 13 is connected with wire rope 4, can transmit wire rope 4's pulling force to the periphery of main node uniformly, the even degree of atress of main node has been improved.
Through the arrangement, the pressure and the thrust which are received by the lower-layer scaffold can be well balanced, and the stability of the scaffold is effectively improved. And, can the anti-skidding performance of two fasteners of full play main node department, reduce scaffold frame extroversion deformation for the main node atress is more even.
In order to avoid damage to the scaffold, the first bent portion 11 is an arc-shaped bent portion, and the second bent portion 12 is an arc-shaped bent portion. It is also possible to provide only the first bent portion 11 as an arc-shaped bent portion, and the second bent portion 12 as a "V" shaped or other type bent portion; alternatively, only the second bent portion 12 is provided as an arc-shaped bent portion, and the first bent portion 11 is provided as a "V" shaped or other type of bent portion. Of course, the first bent portion 11 and the second bent portion 12 may be both provided as a "V" shaped or other types of bent portions.
In order to facilitate the saddle member 1 to be arranged on the periphery of the main node, the embodiment of the utility model also comprises a lifting ring 3 which is sleeved on the annular end part of the steel wire rope 4; the hoisting ring 3 is detachably connected with the steel wire rope connecting end 13. The saddle member 1 can be independently installed on the periphery of the main node through the relative disassembly of the lifting ring 3 and the steel wire rope connecting end 13, and the connection between the saddle member 1 and the steel wire rope 4 is completed through the relative installation of the lifting ring 3 and the steel wire rope connecting end 13, so that the steel wire rope can be conveniently unloaded by using the hanging member repeatedly.
The lifting ring 3 is hinged with the steel wire rope connecting end 13. Through the arrangement, the steel wire rope 4 is prevented from being subjected to shearing force, and the steel wire rope 4 is prevented from being damaged.
In order to further improve the uniformity effect, the hanging ring 3 is an open hanging ring, and the open hanging ring can be sleeved on the annular end part of the steel wire rope 4 through the opening of the open hanging ring; mounting rings 31 are respectively arranged at two open ends of the open hanging ring, and a mounting hole is formed in the steel wire rope connecting end 13; the two mounting rings 31 and the mounting holes of the two steel wire rope connecting ends 13 are connected through the hinge shaft 2.
In this embodiment, the hinge shaft 2 is a bolt.
In order to reduce the number of parts, at least one of the inner ring and the mounting hole of the mounting ring 31 is a threaded hole, and the threaded hole is matched with the bolt. A nut may be added to be screwed with the bolt after the bolt passes through the inner ring of the mounting ring 31 and the mounting hole.
The opening rings are V-shaped rings, and the bent parts of the V-shaped rings are positioning parts used for being matched with the annular end parts of the steel wire ropes 4 in a positioning mode. Through the arrangement, the positioning effect of the annular end part of the steel wire rope 4 on the opening hanging ring is ensured, the annular end part of the steel wire rope 4 is prevented from sliding on the opening hanging ring, and the steel wire rope 4 is further prevented from being damaged.
Further, the first contact surface of the first bent portion 11 has a pad for contacting with the upper side of the first beam 6; the second contact surface of the second bent portion 12 has a pad for contacting the lower side of the second cross member 5. Through setting up the gasket, on the basis of improving contact stability, further avoided scaffold frame and wire rope uninstallation to use the pendant impaired, effectively improved life.
For the convenience of processing and ensuring the tensile stability, the first bent portion 11, the second bent portion 12 and the steel wire rope connecting end 13 are of an integrated structure.
In this embodiment, the saddle member 1 and the hanging ring 3 are both formed by processing round steel with the diameter of 20 mm. The bolt has a diameter of 20mm and a length of 200 mm.
The embodiments in the present description are described in a progressive manner, each embodiment focuses on differences from other embodiments, and the same and similar parts among the embodiments are referred to each other.
The previous description of the disclosed embodiments is provided to enable any person skilled in the art to make or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the generic principles defined herein may be applied to other embodiments without departing from the spirit or scope of the utility model. Thus, the present invention is not intended to be limited to the embodiments shown herein but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.

Claims (10)

1. A steel wire rope unloading hanger is applied to a diagonal scaffold and is characterized by comprising a saddle (1);
said saddle (1) comprising:
the first bent part (11) is used for being in contact with the upper part of the first cross beam (6) of the scaffold, and the bent inner side of the first bent part (11) is a first contact surface used for being in contact with the upper part of the first cross beam (6);
the two second bending parts (12) are used for being arranged on two sides of a vertical beam (7) of the scaffold respectively, the bending inner sides of the second bending parts (12) are second contact surfaces used for being in contact with the lower portion of a second cross beam (5) of the scaffold, one end of each second bending part (12) is provided with a steel wire rope connecting end (13) used for being connected with a steel wire rope (4), and two ends of each first bending part (11) are connected with the other end of each second bending part (12) respectively.
2. The pendant for unloading a steel wire rope according to claim 1, wherein the first bent portion (11) is an arc-shaped bent portion;
and/or the second bend (12) is an arc bend.
3. A pendant for unloading a steel wire rope according to claim 1, further comprising a suspension ring (3) for being inserted and sleeved on the annular end of the steel wire rope (4);
the hanging ring (3) is detachably connected with the steel wire rope connecting end (13).
4. A pendant for unloading a steel wire rope according to claim 3, wherein said suspension ring (3) is hinged to said steel wire rope connection end (13).
5. A pendant according to claim 4, characterized in that the eye (3) is an open eye, through the opening of which the eye can be threaded over the looped end of the wire rope (4);
mounting rings (31) are respectively arranged at two open ends of the open hanging ring, and a mounting hole is formed in the steel wire rope connecting end (13); the two mounting rings (31) and the mounting holes of the two steel wire rope connecting ends (13) are connected through a hinge shaft (2).
6. A pendant for unloading a steel cord according to claim 5, wherein said articulated shaft (2) is a bolt.
7. A hanger for unloading a steel wire rope according to claim 6, wherein at least one of the inner ring of the mounting ring (31) and the mounting hole is a threaded hole, and the threaded hole is matched with the bolt.
8. The pendant for unloading a steel wire rope according to claim 5, wherein the open hanging ring is a V-shaped hanging ring, and the bent part of the V-shaped hanging ring is a positioning part for positioning and matching with the annular end part of the steel wire rope (4).
9. The pendant for unloading a steel wire rope according to claim 1, wherein the first contact surface of the first bent portion (11) has a pad for contacting with the upper part of the first beam (6);
and/or the second contact surface of the second bending part (12) is provided with a gasket for contacting the lower part of the second cross beam (5).
10. The pendant for unloading a steel wire rope according to any one of claims 1 to 9, wherein the first bent portion (11), the second bent portion (12) and the steel wire rope connection end (13) are of an integral structure.
CN202120695996.8U 2021-04-06 2021-04-06 Pendant for unloading steel wire rope Active CN215443059U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120695996.8U CN215443059U (en) 2021-04-06 2021-04-06 Pendant for unloading steel wire rope

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120695996.8U CN215443059U (en) 2021-04-06 2021-04-06 Pendant for unloading steel wire rope

Publications (1)

Publication Number Publication Date
CN215443059U true CN215443059U (en) 2022-01-07

Family

ID=79703878

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120695996.8U Active CN215443059U (en) 2021-04-06 2021-04-06 Pendant for unloading steel wire rope

Country Status (1)

Country Link
CN (1) CN215443059U (en)

Similar Documents

Publication Publication Date Title
US4845814A (en) Wedge socket
CN215443059U (en) Pendant for unloading steel wire rope
JP5348845B2 (en) Overhead ladder
CN214255445U (en) Cable lifting sling and lifting equipment
JPS58501684A (en) Extended main link
CN111181113A (en) Cable bearing and hanging device
JPS6030286Y2 (en) Coupling devices, especially for suspended loads
CN108358037B (en) Lifting appliance
CN109457807B (en) Construction method of air film building and tension adjusting structure and air film building foundation for construction method
CN220735980U (en) Anti-falling safety rope
CN210531514U (en) Connecting device for steel wire rope
CN215326389U (en) Transition section and upper portion jacket hoisting structure
CN212276042U (en) Micro-cluster optical cable reinforcing tool
CN218145396U (en) Vertical pipeline rigid hanger
CN214573403U (en) Suspension bridge main push-towing rope strand hoist device
CN215666786U (en) Rope blocking device for double-arm crane and double-arm crane
CN218754518U (en) Steel wire rope rigging convenient to replace
CN215626154U (en) Tensile metal lifting rope for crane
CN213738209U (en) Lifting hook with self-locking function
CN210528239U (en) Lifting hook for unloading coiled anchor cable
CN211579534U (en) Cable bearing and hanging device
CN210342634U (en) Outer frame protection device
CN214989773U (en) Crane rope guider
US20170036896A1 (en) Winch puller
CN216997267U (en) Large-scale girder steel lifts by crane and uses device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant