CN215442379U - House construction spandrel girder structure - Google Patents

House construction spandrel girder structure Download PDF

Info

Publication number
CN215442379U
CN215442379U CN202122084269.0U CN202122084269U CN215442379U CN 215442379 U CN215442379 U CN 215442379U CN 202122084269 U CN202122084269 U CN 202122084269U CN 215442379 U CN215442379 U CN 215442379U
Authority
CN
China
Prior art keywords
beam body
supporting
supporting plate
groove
sides
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202122084269.0U
Other languages
Chinese (zh)
Inventor
余江明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Shixin Engineering Building Co ltd
Original Assignee
Fujian Shixin Engineering Building Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Shixin Engineering Building Co ltd filed Critical Fujian Shixin Engineering Building Co ltd
Priority to CN202122084269.0U priority Critical patent/CN215442379U/en
Application granted granted Critical
Publication of CN215442379U publication Critical patent/CN215442379U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The application discloses a bearing beam structure for building, which relates to the technical field of building construction and solves the problem that a beam is inconvenient to install and fix, and comprises a first beam body and a second beam body, wherein the first beam body is a length direction supporting beam, the second beam body is a width direction supporting beam, the first beam body and the second beam body are respectively provided with two supporting components, two ends of the first beam body and two ends of the second beam body are fixedly connected with supporting components, each supporting component comprises a fixing seat in a rectangular block structure, four side surfaces of each fixing seat are provided with caulking grooves, two sides of each fixing seat, which are positioned in the caulking grooves, are provided with first positioning screw holes, the upper end and the lower end of each fixing seat are provided with inserting grooves, and the outer sides of the fixing seats, which are positioned in the inserting grooves, are provided with fixing holes; first roof beam body and second roof beam body all include backup pad and bottom suspension fagging, go up the vertical board of both ends fixedly connected with of backup pad and bottom suspension fagging, and the outside of vertical board is provided with the bulge, and the bulge is pegged graft in the caulking groove, and easy to assemble is fixed to do not produce the waste material moreover, energy-concerving and environment-protective.

Description

House construction spandrel girder structure
Technical Field
The application relates to the technical field of spandrel girders, in particular to a spandrel girder structure for building.
Background
The spandrel girder is exactly the roof beam that is used for the bearing inside the house, and utility model that the publication number is CN213741898U discloses a spandrel girder structure is built in room, including support post and spandrel girder body, the quantity of support post has all seted up the mounting groove for two and the top of relative one side, the both ends of spandrel girder body are established in two mounting grooves, the support post is kept away from spandrel girder body one side and is corresponded the position of spandrel girder body and seted up first connecting groove, be equipped with first screw in the first connecting groove, the one end that first screw is close to the spandrel girder body runs through first connecting groove and spandrel girder body in proper order and extends to inside the spandrel girder body, the bottom symmetry of spandrel girder body is equipped with strengthening support mechanism. This spandrel girder structure is built in room, reasonable in design can effectively support spandrel girder central part, adopts the triangular structure to improve and supports intensity, has effectively prevented that the roof beam middle part from producing the condition of sunken deformation, has reduced the potential safety hazard, can satisfy diversified demand.
In view of the above related technologies, the inventor believes that when the load-bearing beam is installed and assembled, there is no excessive connection structure between the beams, which is inconvenient for installation and fixation.
SUMMERY OF THE UTILITY MODEL
In order to improve the inconvenient fixed problem of installation of roof beam, this application provides a spandrel girder structure is built in room.
The application provides a spandrel girder structure is built in room adopts following technical scheme:
a bearing beam structure for a house building comprises a first beam body and a second beam body, wherein the first beam body is a length direction supporting beam, the second beam body is a width direction supporting beam, the first beam body and the second beam body are respectively provided with two beams, two ends of the first beam body and two ends of the second beam body are fixedly connected with supporting assemblies, each supporting assembly comprises a fixing seat in a rectangular block structure, four side surfaces of each fixing seat are provided with embedded grooves, two sides of each embedded groove are provided with positioning grooves communicated with the embedded grooves, the fixing seats are provided with first positioning screw holes on two sides of the embedded grooves, the upper end and the lower end of each fixing seat are provided with inserting grooves, and the fixing seats are provided with fixing holes on the outer sides of the inserting grooves;
the first beam body and the second beam body respectively comprise an upper supporting plate and a lower supporting plate, the upper supporting plate and the lower supporting plate are fixedly connected through two groups of supporting columns, a plurality of groups of supporting inclined rods are fixedly connected between the upper supporting plate and the lower supporting plate and are arranged in a staggered mode, inclined supporting seats are arranged on the upper surface of the upper supporting plate and the lower surface of the lower supporting plate respectively and are positioned on the upper side and the lower side of each supporting column, vertical plates are fixedly connected to two ends of the upper supporting plate and the lower supporting plate, bulges are arranged on the outer sides of the vertical plates and are inserted into adjacent embedding grooves, and positioning mechanisms are arranged on two sides of each bulge;
the positioning mechanism comprises spring grooves formed in two sides of the protruding portion, springs are installed in the spring grooves, positioning pins are fixedly connected to one sides of the springs, slope faces are arranged on the outer end faces of the positioning pins, and the positioning pins and the positioning grooves are connected in a matched and clamped mode.
Through adopting above-mentioned technical scheme, the first roof beam body and the second roof beam body constitute the rectangular frame structure, have good structural strength, and backup pad and bottom suspension fagging connection fixed promotion structural strength will be gone up to the support column and the multiunit support down tube that set up, and the vertical board of setting is used for fixed bulge, makes things convenient for the equipment of the first roof beam body and the second roof beam body.
Optionally, the vertical plate is provided with second positioning screw holes matched with the first positioning screw holes on two sides of the protruding portion, and the second positioning screw holes and the first positioning screw holes are fastened through bolts.
Through adopting above-mentioned technical scheme, peg graft the bulge in the caulking groove, align second location screw and first location screw, then use the bolt to fasten second location screw and first location screw to the installation of accomplishing first roof beam body and second roof beam body is fixed.
Optionally, a bearing column is connected below the fixing seat, the upper end and the lower end of the bearing column are provided with insertion columns, the insertion columns are inserted into the insertion grooves in an inserting mode, each insertion groove comprises a pointed conical groove and a rectangular groove which are communicated with each other, the pointed conical grooves are located inside the insertion grooves, the rectangular grooves are located outside the insertion grooves, and limiting edges are arranged on the rectangular grooves.
Through adopting above-mentioned technical scheme, the spacing arris of setting has spacing effect, inserts the post and inserts the slot back in, and the shape of inserting the post matches the joint with the shape of slot, and the slot can carry on spacingly to inserting the post, and the spacing arris of setting still has the effect of location.
Optionally, reinforcing ribs are arranged on the side faces of the upper supporting plate and the lower supporting plate and on the outer surface of the fixing seat.
Through adopting above-mentioned technical scheme, the strengthening rib of setting can strengthen the structural strength of backup pad and bottom suspension fagging.
Optionally, the two sides of the bearing column are provided with diagonal bracing columns, and the upper ends of the diagonal bracing columns are fixedly connected with the diagonal bracing supporting seats through bolts.
Through adopting above-mentioned technical scheme, the bracing post that sets up is fixed at the bracing supporting seat, can improve the structural strength after bearing post and first roof beam body and the second roof beam body coupling greatly.
In summary, the present application includes at least one of the following benefits:
1. the convex parts on the first beam body and the second beam body are inserted into the caulking grooves of the supporting assembly, the second positioning screw hole is aligned with the first positioning screw hole, and the second positioning screw hole is fastened with the first positioning screw hole by using a bolt, so that the first beam body and the second beam body are installed and fixed, the installation operation is convenient, the installation efficiency is improved, and the cost is saved;
2. the upper and lower both ends of carrier post all are provided with inserts the post, insert the post and peg graft in the slot, after inserting the post and insert the slot, the shape of inserting the post matches with the shape of slot, the slot can carry on spacingly to inserting the post, and the spacing arris that sets up still has the effect of location, make and insert the post and insert the slot back fixed orifices and can align, make things convenient for first roof beam body and second roof beam body to install, the both sides of carrier post are provided with the bracing post, pass through bolt fixed connection between the upper end of bracing post and the bracing supporting seat, the bracing post of setting is fixed at the bracing supporting seat, can improve the structural strength after carrier post and first roof beam body and second roof beam body are connected greatly, first roof beam body, second roof beam body and supporting component adopt the mode shaping of presetting, the installation assembly, can not produce the waste material, energy-saving and environmental protection.
Drawings
FIG. 1 is a schematic view of the overall structure of the present embodiment;
FIG. 2 is a schematic diagram of an axial structure of the present embodiment;
FIG. 3 is a schematic structural view of a first beam and a second beam of the present embodiment;
FIG. 4 is a schematic view of a socket structure according to the present embodiment;
FIG. 5 is a schematic sectional view of the projection of the present embodiment;
fig. 6 is a schematic view of a slot structure according to the present embodiment.
Description of reference numerals: 1. a first beam body; 2. a second beam body; 3. a support assembly; 31. a fixed seat; 311. caulking grooves; 312. a first positioning screw hole; 313. a slot; 3131. a tapered slot; 3132. a rectangular groove; 3133. a limiting edge; 314. a fixing hole; 4. an upper support plate; 5. a lower support plate; 6. a support pillar; 7. supporting the diagonal rods; 8. a bracing support seat; 9. a vertical plate; 10. a projection; 11. a second positioning screw hole; 12. a load bearing column; 13. inserting a column; 14. a diagonal bracing column; 15. positioning a groove; 16. a positioning mechanism; 161. a spring slot; 162. a spring; 163. positioning pins; 164. a slope surface.
Detailed Description
The present application is described in further detail below with reference to figures 1-6.
Example (b):
the embodiment of the application discloses spandrel girder structure is built in room. Referring to fig. 1-2, the bearing beam structure for building comprises a first beam body 1 and a second beam body 2, wherein the first beam body 1 and the second beam body 2 both adopt a preset steel beam structure, the first beam body 1 is a length direction supporting beam, the second beam body 2 is a width direction supporting beam, the first beam body 1 and the second beam body 2 are respectively provided with two reinforcing ribs, the first beam body 1 and the second beam body 2 form a rectangular frame structure with good structural strength, the first beam body 1 and the second beam body 2 both comprise an upper supporting plate 4 and a lower supporting plate 5, the side surfaces of the upper supporting plate 4 and the lower supporting plate 5 are integrally formed with reinforcing ribs, the arranged reinforcing ribs can enhance the structural strength of the upper supporting plate 4 and the lower supporting plate 5, the upper supporting plate 4 and the lower supporting plate 5 are fixedly connected through two groups of supporting columns 6, the supporting columns 6 are fixed with the upper supporting plate 4 and the lower supporting plate 5 in a welding manner, and still weld the multiunit between last backup pad 4 and bottom suspension fagging 5 and support down tube 7, and the multiunit supports the crisscross setting of down tube 7, the support column 6 and the multiunit that set up support down tube 7 will go up backup pad 4 and bottom suspension fagging 5 and be connected fixed promotion structural strength, all be provided with bracing supporting seat 8 on the upper surface of going up backup pad 4 and the lower surface of bottom suspension fagging 5, bracing supporting seat 8 is located the upper and lower side of support column 6, the both ends fixedly connected with vertical board 9 of going up backup pad 4 and bottom suspension fagging 5, the outside of vertical board 9 is provided with bulge 10, the vertical board 9 of setting is used for fixed bulge 10, make things convenient for the equipment of first roof beam body 1 and second roof beam body 2.
Referring to fig. 1, 2 and 5, the two ends of the first beam body 1 and the second beam body 2 are fixedly connected with the supporting component 3, the supporting component 3 is arranged to connect the first beam body 1 and the second beam body 2, the supporting component 3 includes a fixing base 31 in a rectangular block structure, the fixing base 31 is made of preset steel, a reinforcing rib is integrally formed on the outer surface of the fixing base 31, the reinforcing rib can improve the structural strength of the fixing base 31, four side surfaces of the fixing base 31 are provided with a caulking groove 311, two sides of the caulking groove 311 are provided with positioning grooves 15 communicated with the caulking groove 311, two sides of the fixing base 31 located at the caulking groove 311 are provided with first positioning screw holes 312, the protruding portion 10 is inserted into the adjacent caulking groove 311, two sides of the protruding portion 10 are provided with positioning mechanisms 16, the positioning mechanisms 16 include spring grooves 161 arranged at two sides of the protruding portion 10, the spring grooves 161 are provided with springs 162, and one side of the springs 162 is fixedly connected with positioning pins 163, be provided with slope 164 on the outer terminal surface of locating pin 163, mutually match the joint between locating pin 163 and the constant head tank 15, when bulge 10 inserted in caulking groove 311, locating pin 163 because spring 162's effect inwards removes, when locating pin 163 removed constant head tank 15 position, spring 162 thrust effect can make locating pin 163 fix a position in constant head tank 15, realize the location, prevent to drop, vertical board 9 is located bulge 10's both sides and has seted up second location screw 11 with first location screw 312 assorted, second location screw 11 and first location screw 312 pass through the bolt-up, peg graft bulge 10 in caulking groove 311 during the use, align second location screw 11 and first location screw 312, then use the bolt to fasten second location screw 11 and first location screw 312, thereby accomplish the installation of first roof beam body 1 and second roof beam body 2 and fix.
Referring to fig. 2, 4 and 6, the upper and lower ends of the fixing base 31 are provided with insertion slots 313, the fixing base 31 is provided with fixing holes 314 at the outer sides of the insertion slots 313, the insertion slots 313 include tapered slots 3131 and rectangular slots 3132 which are communicated with each other, the tapered slots 3131 are located inside the insertion slots 313, the rectangular slots 3132 are located outside the insertion slots 313, the rectangular slots 3132 are provided with limiting ribs 3133, the insertion slots 313 are formed by the tapered slots 3131 and the rectangular slots 3132 which are communicated with each other, the limiting ribs 3133 are provided to have a limiting function, a bearing post 12 is connected to the lower side of the fixing base 31, the upper and lower ends of the bearing post 12 are provided with insertion posts 13, the insertion posts 13 are inserted into the insertion slots 313, after the insertion posts 13 are inserted into the insertion slots 313, the shape of the insertion posts 13 is matched with the shape of the insertion slots 313, the insertion slots 313 can limit the insertion posts 13, and the limiting ribs 3133 are provided to have a positioning function, so that the fixing holes 314 can be aligned after the insertion posts 13 are inserted into the insertion slots 313, make things convenient for first roof beam body 1 and second roof beam body 2 to install, the both sides of bearer post 12 are provided with bracing column 14, through bolt fixed connection between the upper end of bracing column 14 and bracing supporting seat 8, and the bracing column 14 of setting is fixed at bracing supporting seat 8, can improve the structural strength after bearer post 12 is connected with first roof beam body 1 and second roof beam body 2 greatly.
The implementation principle of a spandrel girder structure is built in room of this application embodiment is:
when in use, the convex parts 10 on the first beam body 1 and the second beam body 2 are inserted into the embedding grooves 311 of the supporting component 3, the second positioning screw holes 11 are aligned with the first positioning screw holes 312, then the second positioning screw hole 11 and the first positioning screw hole 312 are fastened by using bolts, thereby completing the installation and fixation of the first beam body 1 and the second beam body 2, the upper end and the lower end of the bearing column 12 are both provided with the inserting columns 13, the inserting columns 13 are inserted in the inserting grooves 313, after inserting post 13 and inserting in slot 313, the shape of inserting post 13 matches with the shape of slot 313, slot 313 can carry on spacingly to inserting post 13, make and insert post 13 and insert slot 313 back fixed orifices 314 and can align, make things convenient for first roof beam body 1 and second roof beam body 2 to install, the both sides of bearing post 12 are provided with bracing post 14, pass through bolt fixed connection between the upper end of bracing post 14 and the bracing supporting seat 8, the bracing post 14 of setting is fixed at bracing supporting seat 8.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (6)

1. The utility model provides a spandrel girder structure is built in room, includes first roof beam body (1) and the second roof beam body (2), first roof beam body (1) is a length direction supporting beam, the second roof beam body (2) is a width direction supporting beam, its characterized in that: the two first beam bodies (1) and the two second beam bodies (2) are respectively arranged, two supporting components (3) are fixedly connected to two ends of the first beam bodies (1) and the two second beam bodies (2), each supporting component (3) comprises a fixing seat (31) in a rectangular block structure, each of four side faces of each fixing seat (31) is provided with an embedded groove (311), two sides of each embedded groove (311) are provided with positioning grooves (15) communicated with the corresponding embedded groove (311), the two sides, located on the embedded grooves (311), of each fixing seat (31) are provided with first positioning screw holes (312), the upper end and the lower end of each fixing seat (31) are provided with an inserting groove (313), and the outer sides, located on the inserting grooves (313), of the fixing seats (31) are provided with fixing holes (314);
the first beam body (1) and the second beam body (2) both comprise an upper supporting plate (4) and a lower supporting plate (5), the upper supporting plate (4) and the lower supporting plate (5) are fixedly connected through two groups of supporting columns (6), a plurality of groups of supporting diagonal rods (7) are fixedly connected between the upper supporting plate (4) and the lower supporting plate (5), the groups of supporting diagonal rods (7) are arranged in a staggered manner, inclined supporting seats (8) are respectively arranged on the upper surface of the upper supporting plate (4) and the lower surface of the lower supporting plate (5), the inclined supporting seats (8) are positioned on the upper side and the lower side of the supporting columns (6), vertical plates (9) are fixedly connected to the two ends of the upper supporting plate (4) and the lower supporting plate (5), bulges (10) are arranged on the outer sides of the vertical plates (9), and the bulges (10) are inserted into adjacent caulking grooves (311), positioning mechanisms (16) are arranged on two sides of the protruding part (10);
positioning mechanism (16) are including offering spring groove (161) in bulge (10) both sides, install spring (162) in spring groove (161), and at one side fixedly connected with locating pin (163) of spring (162), be provided with slope face (164) on the outer terminal surface of locating pin (163), match the joint each other between locating pin (163) and constant head tank (15).
2. The bearing beam structure is built in room of claim 1, characterized in that: and the two sides of the vertical plate (9) positioned on the protruding part (10) are provided with second positioning screw holes (11) matched with the first positioning screw holes (312), and the second positioning screw holes (11) and the first positioning screw holes (312) are fastened through bolts.
3. The bearing beam structure is built in room of claim 1, characterized in that: the insertion groove (313) comprises a tapered groove (3131) and a rectangular groove (3132) which are communicated with each other, the tapered groove (3131) is located inside the insertion groove (313), the rectangular groove (3132) is located outside the insertion groove (313), and a limiting edge (3133) is arranged on the rectangular groove (3132).
4. The bearing beam structure is built in room of claim 1, characterized in that: reinforcing ribs are arranged on the side surfaces of the upper supporting plate (4) and the lower supporting plate (5) and on the outer surface of the fixing seat (31).
5. The bearing beam structure of building construction according to claim 3, characterized in that: the lower part of the fixed seat (31) is connected with a bearing column (12), the upper end and the lower end of the bearing column (12) are provided with inserting columns (13), and the inserting columns (13) are inserted in the slots (313).
6. The bearing beam structure of building construction according to claim 5, characterized in that: and inclined struts (14) are arranged on two sides of the bearing column (12), and the upper ends of the inclined struts (14) are fixedly connected with the inclined strut supporting seats (8) through bolts.
CN202122084269.0U 2021-08-31 2021-08-31 House construction spandrel girder structure Expired - Fee Related CN215442379U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122084269.0U CN215442379U (en) 2021-08-31 2021-08-31 House construction spandrel girder structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122084269.0U CN215442379U (en) 2021-08-31 2021-08-31 House construction spandrel girder structure

Publications (1)

Publication Number Publication Date
CN215442379U true CN215442379U (en) 2022-01-07

Family

ID=79697738

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122084269.0U Expired - Fee Related CN215442379U (en) 2021-08-31 2021-08-31 House construction spandrel girder structure

Country Status (1)

Country Link
CN (1) CN215442379U (en)

Similar Documents

Publication Publication Date Title
CN210421404U (en) Hidden bracket, connecting seat and dry method connecting node
CN113356365B (en) Box type house structure connected through full bolts and construction method
CN215442379U (en) House construction spandrel girder structure
CN214329322U (en) Beam column node unit of multi-story and high-rise assembled steel structure system
CN211172435U (en) Assembly type node structure of PEC beam and H-shaped steel column in sleeve type connection
CN215166620U (en) High-strength steel structure node
CN213654384U (en) Support based on photovoltaic bicycle shed
CN212406104U (en) Floor support plate bottom plate and floor support plate formed by floor support plate bottom plate
CN110173058B (en) Assembled composite two-stage energy dissipation damper
CN213682846U (en) Crossbeam structure of steel construction factory building
CN216075921U (en) Spandrel girder structure is built in room
CN217758397U (en) Reinforcing apparatus is used in road and bridge construction
CN211472881U (en) Building structure reinforcing beam column node
CN219219342U (en) Assembled concrete beam column bidirectional insertion beam column connector
CN217079124U (en) Steel construction assembled house
CN219431451U (en) Building outer wall steel construction that shocks resistance
CN214143236U (en) Through-type bailey bridge
CN212771894U (en) Bridge supporting mechanism
CN216840223U (en) Light steel bearing column structure
CN218622576U (en) Beam column connection structure of low cost assembled
CN215706318U (en) Light-weight seat framework for subway carriage
CN218148874U (en) Assembly type building connection structure
CN217630836U (en) O-shaped chamfered-edge multi-azimuth truss convenient to install
CN111255067A (en) Vertical connecting node for assembly type building edge module and using method thereof
CN217079114U (en) Multi-beam connecting assembly for house main beam and steel column

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220107