CN215442275U - Municipal works sewage pipe network construction equipment - Google Patents
Municipal works sewage pipe network construction equipment Download PDFInfo
- Publication number
- CN215442275U CN215442275U CN202121899258.1U CN202121899258U CN215442275U CN 215442275 U CN215442275 U CN 215442275U CN 202121899258 U CN202121899258 U CN 202121899258U CN 215442275 U CN215442275 U CN 215442275U
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- clamping piece
- plate
- network construction
- push
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Sewage (AREA)
Abstract
The utility model discloses a municipal engineering sewage pipe network construction device which comprises an installation base, wherein an installation block is fixedly connected to the left side of the top of the installation base, a first clamping piece is fixedly connected to the top of the installation block, a push-pull mechanism is arranged on the top of the installation base and positioned on the right side of the installation block, a second clamping piece is arranged on the top of the push-pull mechanism, the push-pull mechanism comprises two first sliding rails, the tops of the two first sliding rails are both connected with first sliding blocks in a sliding mode, and the tops of the two first sliding blocks are both fixedly connected with a fixing plate. This municipal works sewer pipe network construction equipment adjusts push-and-pull institution and drives the sewer pipe motion of one side through the second holder, makes the connection terminal surface of waiting two sewer pipes connected paste tightly, conveniently couples together the terminal surface of two sewer pipes, prevents that the gap from appearing in the sewer pipe junction, has improved the construction quality of sewer pipe network greatly.
Description
Technical Field
The utility model relates to the technical field of pipeline construction, in particular to a municipal engineering sewage pipe network construction device.
Background
In the process of modern city construction, a rainwater pipeline and a sewage pipeline are important components and important marks for measuring the level of a modern city. Wherein, the rainwater pipeline is a pipeline for collecting natural rainwater on the ground and conveying the natural rainwater to a natural water body; the sewage pipeline is used for collecting sewage used by people, and generally, the sewage is conveyed to a sewage treatment plant to be treated and discharged into a water body or recycled after reaching a discharge standard by the sewage pipeline.
In order to establish a huge sewage pipe network, a plurality of pipelines with the same pipe diameter are generally required to be connected, for sewage pipes with larger pipe diameters, time and labor are wasted if manual connection is adopted, and connection dislocation phenomenon between the sewage pipes occurs at a certain probability during connection, so that gaps occur at the joints of the sewage pipes, and the whole sewage pipe network construction process is easily influenced.
SUMMERY OF THE UTILITY MODEL
Aiming at the defects of the prior art, the utility model provides a municipal engineering sewage pipe network construction device, which solves the problems that the connection dislocation phenomenon between sewage pipes occurs at a certain probability during the connection of the sewage pipes, so that the joints of the sewage pipes are in gaps, and the whole sewage pipe network construction process is easily influenced.
In order to achieve the purpose, the utility model is realized by the following technical scheme: a municipal works sewage pipe network construction device comprises an installation base, wherein the left side of the top of the installation base is fixedly connected with an installation block, the top of the installation block is fixedly connected with a first clamping piece, the top of the installation base and the right side of the installation block are provided with a push-pull mechanism, the top of the push-pull mechanism is provided with a second clamping piece, the push-pull mechanism comprises two first slide rails, the tops of the two first slide rails are both connected with a first slide block in a sliding manner, the tops of the two first slide blocks are both fixedly connected with a fixed plate, the tops of the two fixed plates are fixedly connected through an installation plate, the left side of the installation block is rotatably connected with a rotating lead screw through a rotating shaft, the surface of the rotating lead screw is in threaded connection with a threaded sleeve, the surface of the threaded sleeve is fixedly connected with the bottom of the installation plate through a connecting block, and the left end of the surface of the rotating lead screw is fixedly connected with a first bevel gear, the left end of the mounting block is fixedly connected with the supporting plate, the back of the supporting plate is rotatably connected with an adjusting rod, and one end, far away from the supporting plate, of the adjusting rod is fixedly connected with a second bevel gear matched with the first bevel gear.
Preferably, one end of the adjusting rod penetrates through the supporting plate and extends to the other side of the supporting plate, and one end, located on the front face of the supporting plate, of the adjusting rod is fixedly connected with an adjusting hand wheel.
Preferably, the first clamping piece comprises two second slide rails, two ends of the surfaces of the two second slide rails are connected with second slide blocks in a sliding mode, a connecting plate is fixedly connected between the two corresponding second slide blocks, and a semicircular limiting ring is fixedly connected to one side, close to the two connecting plates, of the two connecting plates.
Preferably, a bidirectional threaded rod is connected between the connecting plates in a threaded manner, and two ends of the bidirectional threaded rod penetrate through the connecting plates and extend to two sides of the connecting plates.
Preferably, the right side fixedly connected with reinforcing plate at installation base top, the left end of rotating the lead screw is connected with the left side rotation of reinforcing plate through the pivot.
Preferably, the first clamping piece and the second clamping piece are identical in structure, and the first clamping piece and the second clamping piece are coaxially mounted.
Advantageous effects
The utility model provides a municipal engineering sewage pipe network construction device. Compared with the prior art, the method has the following beneficial effects:
(1) the municipal engineering sewage pipe network construction device is characterized in that an installation block is fixedly connected to the left side of the top of an installation base, a first clamping piece is fixedly connected to the top of the installation block, a push-pull mechanism is arranged on the top of the installation base and positioned on the right side of the installation block, a second clamping piece is arranged on the top of the push-pull mechanism, the push-pull mechanism comprises two first slide rails, first slide blocks are respectively and slidably connected to the tops of the two first slide rails, fixed plates are respectively and fixedly connected to the tops of the two first slide blocks, the tops of the two fixed plates are fixedly connected through an installation plate, the left side of the installation block is rotatably connected with a rotating lead screw through a rotating shaft, a threaded sleeve is in threaded connection with the surface of the rotating lead screw, the surface of the threaded sleeve is fixedly connected with the bottom of the installation plate through a connecting block, a first bevel gear is fixedly connected to the left end of the surface of the rotating lead screw, and a support plate are fixedly connected to the left end of the installation block, the back of backup pad rotates and is connected with the regulation pole, the regulation pole is kept away from the one end fixedly connected with of backup pad and the second bevel gear of first bevel gear looks adaptation, two sewer pipe centre grippings that first holder cooperation second holder will treat to connect are adjusted push-and-pull mechanism and are passed through the sewer pipe motion that the second holder drove one side, make the connection terminal surface of treating two sewer pipes of connecting paste tightly, conveniently couple together two sewer pipes, prevent that the gap from appearing in the sewer pipe junction, sewage pipe network's construction quality has been improved greatly.
(2) This municipal works sewer pipe network construction equipment, include two second slide rails through first holder, the equal sliding connection in both ends on two second slide rail surfaces has the second slider, fixedly connected with connecting plate between two corresponding second sliders, the semicircular spacing ring of one side fixedly connected with that two connecting plates are close to mutually, threaded connection has two-way threaded rod between two connecting plates, the both ends of two-way threaded rod all run through the connecting plate and extend to the both sides of connecting plate, two sewage pipes that first holder cooperation second holder will treat to connect are held, make the junction of two sewage pipes of treating to connect be in on same axis, make things convenient for the connection of two sewage pipes.
Drawings
FIG. 1 is a perspective view of the structure of the present invention;
FIG. 2 is a top view of the structure of the present invention;
FIG. 3 is a partial front cross-sectional view of the structure of the present invention;
fig. 4 is a perspective view of the first clamping member of the present invention.
In the figure: the device comprises a mounting base 1, a mounting block 2, a first clamping piece 3, a second sliding rail 31, a second sliding block 32, a connecting plate 33, a semicircular 34 limiting ring, a bidirectional threaded rod 35, a push-pull mechanism 4, a first sliding rail 41, a first sliding block 42, a fixed plate 43, a mounting plate 44, a rotating 45 screw rod, a threaded 46 sleeve 47, a first bevel gear 48, a supporting plate 48, an adjusting rod 49, a second bevel gear 410, an adjusting hand wheel 411, a second clamping piece 5 and a reinforcing plate 6.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: a municipal works sewage pipe network construction device comprises an installation base 1, the left side of the top of the installation base 1 is fixedly connected with an installation block 2, the top of the installation block 2 is fixedly connected with a first clamping piece 3, the first clamping piece 3 comprises two second slide rails 31, both ends of each second slide rail 31 are fixedly connected with limiting blocks, both ends of the surface of each second slide rail 31 are respectively connected with a second slide block 32 in a sliding way, a connecting plate 33 is fixedly connected between the corresponding two second slide blocks 32, one side, close to each other, of each connecting plate 33 is fixedly connected with a semicircular limiting ring 34, the inner wall of each semicircular limiting ring 34 is provided with anti-skid grains, a bidirectional threaded rod 35 is in threaded connection between the two connecting plates 33, one end of each bidirectional threaded rod 35 is fixedly connected with an adjusting handle, both ends of each bidirectional threaded rod 35 penetrate through the connecting plates 33 and extend to both sides of the connecting plates 33, a push-pull mechanism 4 is arranged at the top of the installation base 1 and positioned on the right side of the installation block 2, the top of the push-pull mechanism 4 is provided with a second clamping part 5, the first clamping part 3 and the second clamping part 5 have the same structure, the first clamping part 3 and the second clamping part 5 are coaxially installed, the push-pull mechanism 4 comprises two first slide rails 41, the tops of the two first slide rails 41 are both slidably connected with first slide blocks 42, the tops of the two first slide blocks 42 are both fixedly connected with fixed plates 43, the tops of the two fixed plates 43 are fixedly connected through an installation plate 44, the left side of the installation block 2 is rotatably connected with a rotating lead screw 45 through a rotating shaft, the right side of the top of the installation base 1 is fixedly connected with a reinforcing plate 6, the left end of the rotating lead screw 45 is rotatably connected with the left side of the reinforcing plate 6 through a rotating shaft, the surface of the rotating lead screw 45 is in threaded connection with a threaded sleeve 46, the surface of the threaded sleeve 46 is fixedly connected with the bottom of the installation plate 44 through a connection block, the left end of the surface of the rotating lead screw 45 is fixedly connected with a first bevel gear 47, the left end of the mounting block 2 is fixedly connected with a support plate 48, the back of the support plate 48 is rotatably connected with an adjusting rod 49, one end of the adjusting rod 49, far away from the support plate 48, is fixedly connected with a second bevel gear 410 matched with the first bevel gear 47, one end of the adjusting rod 49 penetrates through the support plate 48 and extends to the other side of the support plate 48, and one end of the adjusting rod 49, located on the front face of the support plate 48, is fixedly connected with an adjusting hand wheel 411.
When the device is used, two sewage pipes to be connected are respectively fixed through the first clamping piece 3 and the second clamping piece 6, when the sewage pipes are fixed, the two-way threaded rod 35 is rotated, the two-way threaded rod 35 rotates to drive the two connecting plates 33 to approach each other, and further drives the two semicircular limiting rings 34 to approach each other to clamp and fix the sewage pipes to be connected, the second slide block 32 is driven to slide along the surface of the second slide rail 31 in the moving process of the connecting plates 33, after the two sewage pipes are fixed, the joint of the two sewage pipes is positioned on the same axis, the adjusting hand wheel 411 is rotated to drive the adjusting rod 49 and the second bevel gear 410 to rotate together, the second bevel gear 410 rotates to drive the first bevel gear 47 and the rotating screw rod 45 to rotate together through the meshing action, the rotating screw rod 45 rotates to drive the second clamping piece 5 and the sewage pipes to move together through the threaded sleeve 46, so that the end surfaces of the two sewage pipes to be connected are tightly attached, the two sewage pipes are conveniently connected.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. The utility model provides a municipal works sewer pipe network construction equipment, includes installation base (1), the left side fixedly connected with installation piece (2) at installation base (1) top, its characterized in that: the top of the mounting block (2) is fixedly connected with a first clamping piece (3), the top of the mounting base (1) and the right side of the mounting block (2) are provided with a push-pull mechanism (4), and the top of the push-pull mechanism (4) is provided with a second clamping piece (5);
the push-pull mechanism (4) comprises two first slide rails (41), the tops of the two first slide rails (41) are respectively connected with a first sliding block (42) in a sliding manner, the tops of the two first sliding blocks (42) are respectively fixedly connected with a fixed plate (43), the tops of the two fixed plates (43) are fixedly connected through a mounting plate (44), the left side of the mounting block (2) is rotatably connected with a rotating lead screw (45) through a rotating shaft, the surface of the rotating lead screw (45) is in threaded connection with a threaded sleeve (46), the surface of the threaded sleeve (46) is fixedly connected with the bottom of the mounting plate (44) through a connecting block, the left end of the surface of the rotating lead screw (45) is fixedly connected with a first bevel gear (47), the left end of the mounting block (2) is fixedly connected with a support plate (48), and the back of the support plate (48) is rotatably connected with an adjusting rod (49), one end of the adjusting rod (49) far away from the supporting plate (48) is fixedly connected with a second bevel gear (410) matched with the first bevel gear (47).
2. The municipal engineering sewer network construction device of claim 1, wherein: one end of the adjusting rod (49) penetrates through the supporting plate (48) and extends to the other side of the supporting plate (48), and one end, located on the front face of the supporting plate (48), of the adjusting rod (49) is fixedly connected with an adjusting hand wheel (411).
3. The municipal engineering sewer network construction device of claim 1, wherein: the first clamping piece (3) comprises two second sliding rails (31), two second sliding blocks (32) are connected to two ends of the surface of each second sliding rail (31) in a sliding mode, corresponding connecting plates (33) are fixedly connected between the two second sliding blocks (32), and a semicircular limiting ring (34) is fixedly connected to one side, close to each other, of each connecting plate (33).
4. The municipal engineering sewer network construction device of claim 3, wherein: two threaded connection has two-way threaded rod (35) between connecting plate (33), the both ends of two-way threaded rod (35) all run through connecting plate (33) and extend to the both sides of connecting plate (33).
5. The municipal engineering sewer network construction device of claim 1, wherein: the right side fixedly connected with reinforcing plate (6) at installation base (1) top, the left end of rotating lead screw (45) is connected with the left side rotation of reinforcing plate (6) through the pivot.
6. The municipal engineering sewer network construction device of claim 1, wherein: the first clamping piece (3) and the second clamping piece (5) are identical in structure, and the first clamping piece (3) and the second clamping piece (5) are coaxially mounted.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121899258.1U CN215442275U (en) | 2021-08-14 | 2021-08-14 | Municipal works sewage pipe network construction equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121899258.1U CN215442275U (en) | 2021-08-14 | 2021-08-14 | Municipal works sewage pipe network construction equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN215442275U true CN215442275U (en) | 2022-01-07 |
Family
ID=79694039
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202121899258.1U Active CN215442275U (en) | 2021-08-14 | 2021-08-14 | Municipal works sewage pipe network construction equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN215442275U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114922270A (en) * | 2022-06-21 | 2022-08-19 | 中冶建工集团有限公司 | Foundation treatment rapid drainage pipe network fixing device and construction method |
CN117364899A (en) * | 2023-12-05 | 2024-01-09 | 山西一建集团有限公司 | Drainage pipeline civil engineering structure |
-
2021
- 2021-08-14 CN CN202121899258.1U patent/CN215442275U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114922270A (en) * | 2022-06-21 | 2022-08-19 | 中冶建工集团有限公司 | Foundation treatment rapid drainage pipe network fixing device and construction method |
CN117364899A (en) * | 2023-12-05 | 2024-01-09 | 山西一建集团有限公司 | Drainage pipeline civil engineering structure |
CN117364899B (en) * | 2023-12-05 | 2024-03-12 | 山西一建集团有限公司 | Drainage pipeline civil engineering structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN215442275U (en) | Municipal works sewage pipe network construction equipment | |
CN111203589A (en) | Novel stainless steel seamless steel pipe and processing equipment thereof | |
CN214160978U (en) | High-efficient swan neck system of stainless steel pipe | |
CN210614565U (en) | Sewage treatment pipeline cleaning device | |
CN220200330U (en) | Transmission device for processing anti-corrosion pipeline | |
CN213080777U (en) | Positioning fixture for flange machining | |
CN219692474U (en) | Pipeline fixing frame | |
CN211388401U (en) | Connecting device for pipeline installation | |
CN208880567U (en) | Insulating tube produces adjustable steel pipe clamp | |
CN208145535U (en) | A kind of sewage treatment mud scraper | |
CN215488298U (en) | Connecting device for water pollution plastic pipe | |
CN211779663U (en) | Centering device assembling structure | |
CN212443992U (en) | T-shaped equal-diameter steel pipe tee joint welding positioning device | |
CN221399287U (en) | Municipal administration water supply and drainage energy-saving mounting structure | |
CN217683581U (en) | Fixing device for laying rain sewage pipeline | |
CN219312062U (en) | Welding device for PE pipeline connection | |
CN214489470U (en) | Pipeline connection fixing clamp for municipal water supply and drainage | |
CN219571108U (en) | Butt joint device of drainage pipeline | |
CN219838201U (en) | Continuous uninterrupted plastic pipeline hot-melt welding equipment | |
CN218254867U (en) | Pipeline butt joint device | |
CN116971461A (en) | Municipal works pipe network construction equipment | |
CN218194851U (en) | Quick interfacing apparatus of water supply and drainage pipe for construction | |
CN216692468U (en) | Drainage pipe for building drainage convenient to angle regulation | |
CN215948406U (en) | Sewage pipes convenient for cleaning filter screen for building water supply and drainage | |
CN216504863U (en) | A supplementary pipeline connection structure for anaerobic reactor installation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |