CN215433371U - Processing system for material parts - Google Patents

Processing system for material parts Download PDF

Info

Publication number
CN215433371U
CN215433371U CN202121826896.0U CN202121826896U CN215433371U CN 215433371 U CN215433371 U CN 215433371U CN 202121826896 U CN202121826896 U CN 202121826896U CN 215433371 U CN215433371 U CN 215433371U
Authority
CN
China
Prior art keywords
auxiliary unit
hanging
frame body
hanger body
material part
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121826896.0U
Other languages
Chinese (zh)
Inventor
安健
陈汉杰
于振
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Prysler Technology Co ltd
Original Assignee
Suzhou Pressler Advanced Forming Technologies Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Pressler Advanced Forming Technologies Co ltd filed Critical Suzhou Pressler Advanced Forming Technologies Co ltd
Priority to CN202121826896.0U priority Critical patent/CN215433371U/en
Application granted granted Critical
Publication of CN215433371U publication Critical patent/CN215433371U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Chain Conveyers (AREA)

Abstract

The utility model discloses a processing system for material parts, which comprises a hanger body, a first auxiliary unit, a second auxiliary unit, a containing pool and a power supply unit, wherein the hanger body comprises a frame body, a first hanging part and a second hanging part, and the first hanging part and the second hanging part are distributed along a first direction and are arranged in a staggered manner; the first auxiliary unit is capable of acting on the piece in a first treatment process; the first auxiliary unit and the second auxiliary unit can act on the material piece in a second treatment process; the first auxiliary unit, the second auxiliary unit and the material part can be inserted into the containing pool along with the hanger body; the power supply unit is electrically connected with the material part; the containing pool is provided with a plurality of containing cavities which can work independently. The utility model at least comprises the following advantages: on the basis of effectively fixing the material, the material does not need to be disassembled and assembled in the switching process of different processes, the continuity of the processes is ensured, and the processing period is further effectively shortened.

Description

Processing system for material parts
Technical Field
The utility model relates to the technical field of processing systems, in particular to a processing system for a material part.
Background
The statements in this section merely provide background information related to the present disclosure and may not constitute prior art.
At present, in the stamping industry, particularly in the hot stamping process, uncoated materials are generally adopted for hot pressing, and after hot pressing, the material part needs to be put into various containers to carry out various treatments on the surface of the material part so as to obtain the material part with required performance.
In the prior art, a material part is usually fixed in a clamping mode, so that the material part is inconvenient to disassemble. In addition, in the batch production process, the prior art is used to arrange a plurality of identical wells together, which means that the distance between two wells of different processes is relatively large. Therefore, in the process of not using process switching, the material part needs to be disassembled and then assembled, and the time waste is serious.
It should be noted that the above background description is only for the sake of clarity and complete description of the technical solutions of the present invention and for the understanding of those skilled in the art. Such solutions are not considered to be known to the person skilled in the art merely because they have been set forth in the background section of the utility model.
SUMMERY OF THE UTILITY MODEL
In order to overcome the defects in the prior art, embodiments of the present invention provide a processing system for a material, which does not need to disassemble and assemble the material during the switching process of different processes on the basis of effectively fixing the material, so as to ensure the continuity of the processes, and further effectively shorten the processing period.
The embodiment of the application discloses: a processing system for material parts comprises a hanger body, a first auxiliary unit, a second auxiliary unit, a containing pool and a power supply unit,
the hanger body comprises a frame body, and a plurality of first hanging parts and a plurality of second hanging parts which are arranged on the frame body, wherein the first hanging parts and the second hanging parts are distributed along a first direction and are arranged in a staggered manner, and one first hanging part and one second hanging part are correspondingly arranged for fixing a material part;
the first auxiliary unit and the second auxiliary unit are detachably arranged on the frame body;
the first auxiliary unit is capable of acting on the piece in a first treatment process;
the first auxiliary unit and the second auxiliary unit can act on the material piece in a second treatment process;
the first auxiliary unit, the second auxiliary unit and the material part can be inserted into the containing pool along with the hanger body;
the power supply unit can be electrically connected with the material part;
the containing pool is provided with a plurality of containing cavities capable of working independently, and the containing cavities are arranged adjacently along the processing direction of the material part.
Furthermore, the hanger body is made of a conductive metal material, a conductive part located outside the containing pool is formed on the hanger body, and the power supply unit can be electrically connected with the material part through the conductive part.
The frame body is provided with a first hanging part and a second hanging part, the first hanging part is arranged on the frame body, the second hanging part is arranged on the frame body, and the first hanging part and the second hanging part are arranged on the frame body at intervals so as to be capable of being fixed with the outside.
Further, the third hanging portion and the frame body are formed by adopting an integral forming process.
Further, first hanging part and second hanging part all include and violently establish crossbeam on the framework, set up and be in a plurality of outwardly extending's the suspension rod on the crossbeam, two corresponding suspension rods can carry out the joint respectively to the material spare on first hanging part and the second hanging part and fix.
Further, the first auxiliary unit and the second auxiliary unit are matched with the shape of the material piece.
Furthermore, each of the cavities stores a corresponding solution, one of the cavities is arranged corresponding to the first auxiliary unit in a first treatment process, and the other cavity is arranged corresponding to the first auxiliary unit and the second auxiliary unit in a second treatment process.
By means of the technical scheme, the utility model has the following beneficial effects: the first hanging part and the second hanging part are arranged, so that the material part can be quickly and effectively fixed, and the first auxiliary unit, the second auxiliary unit and the frame body can adapt to different processing technological requirements in a detachable mode; in addition, the adjacent arrangement of the different cavities is adopted in the mode, and in the process of switching among different processes, the material part does not need to be disassembled, so that the processing period is effectively shortened, and the advantages are more prominent particularly in the middle and small-batch production processes.
In order to make the aforementioned and other objects, features and advantages of the utility model comprehensible, preferred embodiments accompanied with figures are described in detail below.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to the drawings without creative efforts.
FIG. 1 is a schematic view of the overall apparatus structure in an embodiment of the present invention;
FIG. 2 is a schematic structural diagram of a hanger body according to an embodiment of the present invention;
FIG. 3 is a schematic view of a combination of a hanger body and a first auxiliary unit according to an embodiment of the present invention;
fig. 4 is a schematic structural diagram of a second auxiliary unit in the embodiment of the present invention.
Reference numerals of the above figures: 1. a hanger body; 2. a first auxiliary unit; 3. a second auxiliary unit; 4. material parts; 5. a third hanging part; 11. a frame body; 12. a cross beam; 13. a suspension rod.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
It should be noted that, in the description of the present invention, the terms "first", "second", and the like are used for descriptive purposes only and for distinguishing similar objects, and no precedence between the two is considered as indicating or implying relative importance. In addition, in the description of the present invention, "a plurality" means two or more unless otherwise specified.
Referring to fig. 1 to 4, the present embodiment discloses a processing system for material parts, which includes a hanger body 1, a first auxiliary unit 2, a second auxiliary unit 3, a tank and a power supply unit,
the hanger body 1 comprises a frame body 11, and a plurality of first hanging parts and a plurality of second hanging parts which are arranged on the frame body 11, wherein the first hanging parts and the second hanging parts are distributed along a first direction and are arranged in a staggered manner, and one first hanging part and one second hanging part are correspondingly arranged to fix the material part 4;
the first auxiliary unit 2 and the second auxiliary unit 3 are detachably provided on the frame body 11;
the first auxiliary unit 2 is able to act on the piece 4 in a first treatment process;
the first auxiliary unit 2 and the second auxiliary unit 3 are both capable of acting on the piece 4 in a second treatment process;
the first auxiliary unit 2, the second auxiliary unit 3 and the material part 4 can be inserted into the containing pool along with the hanger body 1;
the power supply unit can be electrically connected with the material piece 4;
the containing pool is provided with a plurality of containing cavities capable of working independently, and the containing cavities are arranged adjacently along the processing direction of the material part 4.
In the above manner, through the arrangement of the first hanging portion and the second hanging portion, the material part 4 can be quickly and effectively fixed, and the first auxiliary unit 2 and the second auxiliary unit 3 and the frame body 11 can adapt to different processing requirements in a detachable manner. In addition, the adjacent arrangement of the different cavities is adopted in the mode, and the material part 4 does not need to be disassembled in the process of switching among different processes, so that the processing period is effectively shortened, and the advantages are more prominent particularly in the middle and small-batch production processes.
In the present embodiment, the frame 11 is located in a vertical plane, and preferably, the frame 11 has a rectangular shape. The first suspension part and the second suspension part each include a cross beam 12 transversely provided on the frame body 11, and a plurality of outwardly extending suspension rods 13 provided on the cross beam 12. Specifically, the cross members 12 extend in the left-right direction, one of the cross members 12 is located at an upper position of the frame 11, and the other cross member 12 is located at a lower position of the frame 11. Taking one of the beams 12 as an example, one part of the suspension rods 13 on the beam 12 extends forwards, and the other part extends backwards, and it should be noted that the suspension rods 13 extending forwards and the suspension rods 13 extending backwards are sequentially arranged at intervals.
In the above arrangement, a group of corresponding suspension rods 13 can be used for effectively clamping and fixing the material 4 at the upper and lower positions, and the suspension fixing mode can be adopted, so that the material 4 can be conveniently mounted and dismounted; in addition, a plurality of suspension rods 13 are arranged, so that a plurality of materials 4 can be processed in one process step, and the processing efficiency is effectively improved.
In this embodiment, the hanger body 1 is made of a conductive metal material, and specifically, the frame body 11, the first hanging portion and the second hanging portion are made of a metal material. The upper end of the frame 11 is formed with a conductive part which is electrically connected to the power supply unit so that energy applied from the power supply unit can be transferred to the material 4. It is noted that during operation, the conductive portion is always located outside the well.
In the present embodiment, the system further includes two third hanging portions 5, and the two third hanging portions 5 are provided on the frame 11 at an interval so as to be fixed to the outside. Specifically, the third hanging portion 5 may be a hook, and two hooks are spaced apart from each other at the upper end of the frame 11 to effectively fix the hanger body 1 stably. Preferably, the third hanging portion 5 and the frame 11 are formed by an integral molding process.
In the present embodiment, the first auxiliary unit 2 and the second auxiliary unit 3 are both adapted to the shape of the material 4. Specifically, the first auxiliary unit 2 and the second auxiliary unit 3 are also rectangular, and each include an auxiliary body, and a plurality of auxiliary bars provided on the auxiliary body at intervals in the left-right direction, and each of the auxiliary bars extends in the up-down direction. The first auxiliary unit 2 is positioned on the front side of the hanger body 1 and is arranged in an insulating manner relative to the hanger body 1; the second auxiliary unit 3 is located at the rear side of the hanger body 1 and is arranged opposite to the hanger body 1 in an insulating mode.
Each containing cavity is stored with a corresponding solution, one containing cavity is arranged corresponding to the first auxiliary unit 2 in a first treatment process, and the other containing cavity is arranged corresponding to the first auxiliary unit 2 and the second auxiliary unit 3 in a second treatment process. It is noted that, in the first treatment process, the first auxiliary unit 2 can be connected with the power supply unit to improve the treatment efficiency of the first treatment process on the material 4; in the second process, the first auxiliary unit 2 and the second auxiliary unit 3 can be connected with the power supply unit so as to improve the treatment efficiency of the second treatment process on the material piece 4. It should be noted that in the second process, the first auxiliary unit 2 and the second auxiliary unit 3 are respectively connected to different power supply units.
The principle and the implementation mode of the utility model are explained by applying specific embodiments in the utility model, and the description of the embodiments is only used for helping to understand the method and the core idea of the utility model; meanwhile, for a person skilled in the art, according to the idea of the present invention, there may be variations in the specific embodiments and the application scope, and in summary, the content of the present specification should not be construed as a limitation to the present invention.

Claims (7)

1. A processing system for material parts is characterized by comprising a hanger body, a first auxiliary unit, a second auxiliary unit, a containing pool and a power supply unit,
the hanger body comprises a frame body, and a plurality of first hanging parts and a plurality of second hanging parts which are arranged on the frame body, wherein the first hanging parts and the second hanging parts are distributed along a first direction and are arranged in a staggered manner, and one first hanging part and one second hanging part are correspondingly arranged for fixing a material part;
the first auxiliary unit and the second auxiliary unit are detachably arranged on the frame body;
the first auxiliary unit is capable of acting on the piece in a first treatment process;
the first auxiliary unit and the second auxiliary unit can act on the material piece in a second treatment process;
the first auxiliary unit, the second auxiliary unit and the material part can be inserted into the containing pool along with the hanger body;
the power supply unit can be electrically connected with the material part;
the containing pool is provided with a plurality of containing cavities capable of working independently, and the containing cavities are arranged adjacently along the processing direction of the material part.
2. The processing system for the material part according to claim 1, wherein the hanger body is made of a conductive metal material, a conductive portion is formed on the hanger body and located outside the tank, and the power supply unit is electrically connected to the material part through the conductive portion.
3. The processing system for the material piece according to claim 1, further comprising three hanging portions, wherein the number of the third hanging portions is two, and the two third hanging portions are arranged on the frame body at intervals so as to be capable of being fixed with the outside.
4. The handling system for material pieces according to claim 3, wherein the third hanging portion is formed with the frame body by an integral molding process.
5. The handling system for the material part according to claim 1, wherein the first hanging portion and the second hanging portion each comprise a cross beam transversely disposed on the frame body, and a plurality of outwardly extending hanging rods disposed on the cross beam, and two corresponding hanging rods on the first hanging portion and the second hanging portion can be respectively used for clamping and fixing the material part.
6. The handling system for a piece of material according to claim 1, characterized in that said first and second auxiliary units are each adapted to the shape of the piece of material.
7. The treatment system for a material member as claimed in claim 1, wherein each of the chambers stores a corresponding solution therein, one of the chambers being disposed corresponding to the first auxiliary unit in a first treatment process, and the other of the chambers being disposed corresponding to the first auxiliary unit and the second auxiliary unit in a second treatment process.
CN202121826896.0U 2021-08-06 2021-08-06 Processing system for material parts Active CN215433371U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121826896.0U CN215433371U (en) 2021-08-06 2021-08-06 Processing system for material parts

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121826896.0U CN215433371U (en) 2021-08-06 2021-08-06 Processing system for material parts

Publications (1)

Publication Number Publication Date
CN215433371U true CN215433371U (en) 2022-01-07

Family

ID=79691905

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121826896.0U Active CN215433371U (en) 2021-08-06 2021-08-06 Processing system for material parts

Country Status (1)

Country Link
CN (1) CN215433371U (en)

Similar Documents

Publication Publication Date Title
CA2643543C (en) Set of parts for positioning electrodes in cells for the electrodepositing of metal
CN215433371U (en) Processing system for material parts
CN206186089U (en) Case roof beam reinforcement bed -jig
CN210945833U (en) Dumbbell rod electroplating support
CN221740500U (en) Electroplating hanging rod and electroplating hanging device
CN210944511U (en) Turning tool for turning flexible reinforcing mesh
CN210847772U (en) Steel bending equipment for steel processing
CN216234489U (en) Anode plate hanger
CN221720988U (en) Hanging rod for electroplating and hanging tool for electroplating
CN220243373U (en) Universal welding-free skateboard chassis
CN218623045U (en) Prefabricated reinforced concrete reinforced assistant steel wire mesh heat-insulation decorative composite board
CN216397908U (en) Axle housing sand core die
CN218838140U (en) Material loading frock of component stopping
CN218586193U (en) Assembled energy storage battery rack
CN217230978U (en) Electrophoresis tool
CN221720989U (en) Hanger capable of reducing electroplating discharge and electroplating hanging device
CN210342449U (en) Triangular internal support bracket for reinforcement cage
CN210030923U (en) Tool for processing aluminum plate
CN214768037U (en) Bridging round steel manufacturing tool
CN217428907U (en) Oval arch bar connecting piece of canopy and connection structure breed
CN219930276U (en) Aluminum electrolysis cell cradle frame reinforcing structure
CN220079238U (en) Nickel plating hanger for relay
CN210088442U (en) Section bar structure
CN215155022U (en) Hoisting cabinet under vehicle
CN216452744U (en) High-strength oxygenation impeller

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: No. 299 Dujia East Road, Zhoushi Town, Kunshan City, Jiangsu Province, China 215313

Patentee after: Suzhou Prysler Technology Co.,Ltd.

Country or region after: China

Address before: 215300 No.519 hengchangjing Road, Zhoushi Town, Kunshan City, Suzhou City, Jiangsu Province

Patentee before: SUZHOU PRESSLER ADVANCED FORMING TECHNOLOGIES Co.,Ltd.

Country or region before: China